CR 15 Trail Bid Schedule.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
CR 15 Trail
Solicitation number
TOW-PRC-2025-52
Issued by
Colorado

About this file

The document is a bid schedule spreadsheet for the CR 15 Trail project issued by the Town of Windsor Parks, Recreation and Culture Department in Colorado, detailing a construction contract for approximately 1.3 miles of 10-foot wide concrete trail connecting Harmony Road to an existing trail and Windsor's new Middle School. The bid schedule comprehensively lists 44 line items covering various construction activities including clearing and grubbing, excavation, erosion control, concrete work, pipe installation, road base preparation, asphalt work, surveying, and traffic management. The project involves multiple construction elements such as concrete bikeway construction (spanning 7,571 square yards), aggregate base course installation (2,567 tons), erosion control measures, and infrastructure components like box culverts, curb ramps, and drainage systems.

The bid schedule indicates a lump sum contract approach with unit pricing for specific activities, allowing flexibility in project execution. The total project scope suggests a comprehensive trail construction project with detailed specifications for each construction phase. Quantities are precisely defined for each line item, enabling accurate cost estimation, with key items including unclassified excavation (1,709 cubic yards), topsoil stockpiling (1,360 cubic yards), and native seeding (1.37 acres). Additional elements like mobilization, construction surveying, traffic control management, and various force account adjustments are included, indicating a complex infrastructure development project with multiple technical and administrative components.

View the file

Other files

File Type Posted
CR 15 Trail Bid Schedule.pdf PDF
CR 15 Trail Specs.pdf PDF
Project Manual - CR15.pdf PDF
CR 15 Plan Set 09032025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST EST. (UPDATE HERE)

BID SCHEDULE

ITEM NO. SECTION NUMBER CONTRACT ITEM UNIT UNIT COST QUANTITY COST

1201-00000Clearing & GrubbingLS1
2202-00010Removal of TreeEACH2
3202-00203Removal of Curb and GutterLF202
4202-00220Removal of Asphalt MatSY16
5203-00010Unclassified Excavation (Complete In Place)CY1,709
6203-00050Unsuitable MaterialCY50
7203-00510Rock Fill (Special)CY50
8203-01500BladingHR10
9203-01597PotholingHR20
10203-02330LaborerHR40
11207-00210Stockpile TopsoilCY1,360
12208-00023Erosion Log Type 3 (12 Inch)LF7,258
13208-00046Pre-fabricated Concrete Washout StructureEACH2
14208-00075Pre-fabricated Vehicle Tracking PadEACH2
15208-00106Sweeping (Sediment Removal)HR15
16208-00207Erosion Control ManagementDAY25
17210-01011Reset GateEACH2
18212-00006Seeding (Native)ACRE1.37
19212-00032Soil ConditioningACRE1.37
20213-00002Mulching (Weed Free Hay)ACRE1.37
21213-00061Mulch TackifierLB270
22304-06000Aggregate Base Course (Class 6)TON2,567
23306-01000ReconditioningSY8,327
24403-00721Hot Mix Asphalt (Patching)(Asphalt)SY24
25403-33752Hot Mix Asphalt (Grading S)(75)(PG 64-28)SY265
26504-00000Concrete Class D (Wall) ReinforcedCY13
27603-0118518 Inch Reinforced Concrete Pipe (Complete in Place)LF24
28603-5001818 Inch Plastic PipeLF20
29603-0501818 Inch Reinforced Concrete End SectionEACH2
30603-7100410x4 Foot Concrete Box Culvert (Precast)LF88
31608-00010Concrete Curb RampSY16
32608-00026Concrete Bikeway (6 Inch)SY7,483
33608-00028Concrete Bikeway (8 Inch)SY88
34608-10000Sidewalk DrainLF60
35514-00100HandrailLF262
36609-21010Curb and Gutter Type 2 (Section I-B)LF480
37620-00020Sanitary FacilityEACH1
38625-00000Construction SurveyingLS1
39626-00000MobilizationLS1
40630-00012Traffic Control ManagementLS1
41700-70010F/A Minor Contract RevisionsFA1
42700-70016F/A Fuel Cost AdjustmentFA1
43700-70380F/A Erosion ControlFA1
44700-70381F/A Work on HarmonyFA1
BID TOTAL: