CR 15 Trail Bid Schedule.pdf
PDF 542 KB Posted
- Attached to
- CR 15 Trail
- Solicitation number
- TOW-PRC-2025-52
- Issued by
- Colorado
About this file
This document is a Bid Schedule for a transportation infrastructure project, detailing a comprehensive list of 44 contract line items across various construction and site preparation categories. The project involves clearing and grubbing, tree and asphalt removal, excavation, erosion control, concrete and pipe installation, bikeway and sidewalk construction, and various ancillary services. Key quantities include 1,709 cubic yards of unclassified excavation, 7,483 square yards of 6-inch concrete bikeway, 7,258 linear feet of 12-inch erosion logs, and 2,567 tons of aggregate base course. The work appears to encompass site preparation, utility infrastructure, and transportation pathway improvements.
The bid schedule lists unit prices for each line item, though the total bid amount is not completed on the document. Items are measured in various units including lump sum (LS), each (EACH), linear feet (LF), cubic yards (CY), square yards (SY), tons (TON), acres (ACRE), and force account (FA) allocations. The project includes provisions for fuel cost adjustments, minor contract revisions, erosion control, and work on Harmony, suggesting potential flexibility in contract execution. Several items relate to environmental management, such as native seeding, soil conditioning, mulching, and erosion control measures, indicating a comprehensive approach to site restoration and environmental sensitivity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CR 15 Trail Bid Schedule.xlsx | XLSX spreadsheet | |
| CR 15 Trail Specs.pdf | ||
| Project Manual - CR15.pdf | ||
| CR 15 Plan Set 09032025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 201-00000 Clearing & Grubbing LS 1
2 202-00010 Removal of Tree EACH 2
3 202-00203 Removal of Curb and Gutter LF 202
4 202-00220 Removal of Asphalt Mat SY 16
5 203-00010 Unclassified Excavation (Complete In Place) CY 1,709
6 203-00050 Unsuitable Material CY 50
7 203-00510 Rock Fill (Special) CY 50
8 203-01500 Blading HR 10
9 203-01597 Potholing HR 20
10 203-02330 Laborer HR 40
11 207-00210 Stockpile Topsoil CY 1,360
12 208-00023 Erosion Log Type 3 (12 Inch) LF 7,258
13 208-00046 Pre-fabricated Concrete Washout Structure EACH 2
14 208-00075 Pre-fabricated Vehicle Tracking Pad EACH 2
15 208-00106 Sweeping (Sediment Removal) HR 15
16 208-00207 Erosion Control Management DAY 25
17 210-01011 Reset Gate EACH 2
18 212-00006 Seeding (Native) ACRE 1.37
19 212-00032 Soil Conditioning ACRE 1.37
20 213-00002 Mulching (Weed Free Hay) ACRE 1.37
21 213-00061 Mulch Tackifier LB 270
22 304-06000 Aggregate Base Course (Class 6) TON 2,567
23 306-01000 Reconditioning SY 8,327
24 403-00721 Hot Mix Asphalt (Patching)(Asphalt) SY 24
25 403-33752 Hot Mix Asphalt (Grading S)(75)(PG 64-28) SY 265
26 504-00000 Concrete Class D (Wall) Reinforced CY 13
27 603-01185 18 Inch Reinforced Concrete Pipe (Complete in Place) LF 24
28 603-50018 18 Inch Plastic Pipe LF 20
29 603-05018 18 Inch Reinforced Concrete End Section EACH 2
30 603-71004 10x4 Foot Concrete Box Culvert (Precast) LF 88
31 608-00010 Concrete Curb Ramp SY 16
32 608-00026 Concrete Bikeway (6 Inch) SY 7,483
33 608-00028 Concrete Bikeway (8 Inch) SY 88
34 608-10000 Sidewalk Drain LF 60
35 514-00100 Handrail LF 262
36 609-21010 Curb and Gutter Type 2 (Section I-B) LF 480
37 620-00020 Sanitary Facility EACH 1
38 625-00000 Construction Surveying LS 1
39 626-00000 Mobilization LS 1
40 630-00012 Traffic Control Management LS 1
41 700-70010 F/A Minor Contract Revisions FA 1 42 700-70016 F/A Fuel Cost Adjustment FA 1 43 700-70380 F/A Erosion Control FA 1 44 700-70381 F/A Work on Harmony FA 1
BID TOTAL:
BID SCHEDULE
ITEM NO.
SECTION
NUMBER
CONTRACT ITEM UNIT UNIT COST QUANTITY COST