The document is a comprehensive set of bid plans for the CR 15 Trail project, prepared by J-U-B ENGINEERS, INC. for the Town of Windsor, Colorado. The project involves constructing approximately 1.33 miles (7,020.38 feet) of 10-foot wide concrete multi-use trail, extending from County Road 15 and connecting Harmony Road to an existing trail near Windsor's new Middle School. The trail will be located in the East Quarter of Section 6, Township 6 North, Range 67 West, and includes multiple culvert installations, grading, drainage work, and trail connection points. The bid plans are dated September 2025 and cover detailed engineering aspects including geometric design, plan and profile, grading, stormwater management, structures, and cross-sections.
The project includes several key construction elements such as installing reinforced concrete trail sections, aggregate base course, culverts (including an 88-foot 10x4 foot box culvert), erosion control measures, and associated infrastructure. The estimated quantities include 1,709 cubic yards of unclassified excavation, 2,050 cubic yards of embankment material, and 1,360 cubic yards of topsoil. The total project area is approximately 3.57 acres, with 3.13 acres of disturbance and 1.37 acres designated for seeding. The plans specify detailed technical requirements, including compliance with Colorado Department of Transportation standards, stormwater management protocols, and specific construction techniques for trail development and environmental preservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CR 15 Trail Bid Schedule.xlsx | XLSX spreadsheet | |
| CR 15 Trail Bid Schedule.pdf | ||
| CR 15 Trail Specs.pdf | ||
| Project Manual - CR15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LIMITS
W C
R
CR-15
W C
R 74 / H
AR
M
O N
Y R
O
AD
CR-15 TRAIL
BEGIN PROJECT
STA: 0+00.00
CR-15 TRAIL
END PROJECT
STA: 70+20.38
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
N
COUNTY ROAD 15 TRAIL
EAST QUARTER OF SECTION 6,
TOWNSHIP 6 NORTH, RANGE 67 WEST OF THE 6TH P.M.
WINDSOR, CO, 80550
PROJECT LOCATION MAP
FINAL PLANS
SEPTEMBER 2025
0 500 1,000
SCALE IN FEET
FEET MILES
TOTAL
SUMMARY OF PROJECT LENGTH
TRAIL (NET LENGTH)
MAJOR STRUCTURE
PROJECT GROSS LENGTH
FOR INFORMATION ONLY
TRAIL
FEET
MAJOR
STRUCTURE
STATION
CR-15 TRAIL
STA. 0+00.00
BEGIN PROJECT
STA. 70+28.58
STB. END PROJECT
TABULATION OF LENGTH & DESIGN DATA
INDEX OF SHEETS
SUBSET
SHEET
NUMBER(S)
DRAWING
NUMBER(S)
GENERAL 1-8 G-001 TO G-008
GEOMETRIC 9-12 GM-101 TO GM-104
PLAN & PROFILE 13-21 PP-201 TO PP-209
GRADING & DRAINAGE 22-27 GR-301 TO GR-306
SWMP 28-40 SW-401 TO SW-413
STRUCTURES 41-41 ST-501 TO ST-501
DETAILS 42-43 DT-601 TO DT-602
CROSS SECTIONS 44-53 XS-701 TO XS-710
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-001
SZURN
SFETZER
GENERAL
TBD
9/3/2025
AS NOTED
7,020.38
7,020.38
7,020.38
7,020.38
1.33
1.33 0 0
T. 6 NORTH
R. 67 WEST
SECTION 6
CITY OF GREELEY
REVIEWED BY: _____________________________________________
WATER/SEWER CHIEF ENGINEER DATE
REVIEW DOES NOT CONSTITUTE “APPROVAL” OF PLANS. PERMITTEE IS
RESPONSIBLE FOR ACCURACY AND COMPLETENESS OF PLANS.
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
TOWN STANDARDS. NO RESPONSIBILITY
IS ASSUMED FOR CORRECTNESS OF DESIGN.
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-002
SZURN
SFETZER
GENERAL
TBD
9/3/2025
AS NOTED
ABBREVIATIONS
ASSY ASSEMBLY
> ANGLE
@ AT (MEASUREMENTS)
BLDG BUILDING
BM BENCH MARK
BOW BACK OF WALK
BSC BITUMINOUS SURFACE COURSE
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW BOTH WAYS
C CHANNEL (STRUCTURAL)
C/L CENTER LINE
CIP COMPLETE IN PLACE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
CONT CONTINUOUS
CPLG COUPLING
CU FT CUBIC FEET
CU YD CUBIC YARD
DEG OR ° DEGREE
DET DETAIL
DIA OR Ø DIAMETER
DIP DUCTILE IRON PIPE
DIST DISTRIBUTION
DWG DRAWING
EA EACH
EG EDGE OF GRAVEL
ELB ELBOW
ELEV or EL ELEVATION
EVC END VERTICAL CURVE
EW EACH WAY
EXIST OR EX EXISTING
FG FINISH GRADE
FH FIRE HYDRANT
FLG FLANGE
FT OR ' FEET
GV GATE VALVE
HCL HORIZONTAL CONTROL LINE
HERPC HORIZONTAL ELLIPTICAL
REINFORCED CONCRETE PIPE
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HP HIGH POINT
ID INSIDE DIAMETER
IN OR " INCH
LB OR # POUND
LF LINEAL FEET
LN LINEAL
LVC LENGTH OF VERTICAL CURVE
MAX MAXIMUM
MIN MINIMUM
NO OR # NUMBER
PC POINT OF CURVE
PCR POUND PER CUBIC FOOT
PE POLYETHYLENE
PGL PROFILE GRADE LINE
PSI POUND PER SQUARE INCH
PL PLATE
PL PROPERTY LINE
PNT POINT
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENT
PVC POLYVINYL-CHLORIDE
PVI POINT OF VERTICAL INFLECTION
PVMT PAVEMENT
R RADIUS
RCP REINFORCED CONCRETE PIPE
RCEP REINFORCED CONCRETE
ELLIPTICAL PIPE
RP RADIUS POINT
R&R REMOVE & REPLACE
REM REMOVE
REQ'D REQUIRED
REV REVISION
R/W or ROW RIGHT-OF-WAY
S SLOPE
SPEC SPECIFICATION
STA STATION
STD STANDARD
STL STEEL
ST STL STAINLESS STEEL
TBC TOP BACK OF CURB
TYP TYPICAL
TFC TOP FACE OF CONCRETE
W/ WITH
W/O WITHOUT
W/REQ'D WHERE REQUIIRED
WL WATER LINE
YR YEAR
WATER (GENERAL)
WATER (SPECIFIED SIZE)
WATER SERVICE
W
X"W
WSWS
W
X"W
WSWS
DOMESTIC WATER
IRRIGATION IRRIRR
IRRIGATION
NATURAL GAS
NATURAL GAS SERVICE
G
GG
G
GG
NATURAL GAS
PROPERTY LINE
RIGHT OF WAY
TEMPORARY EASEMENT
PERMANENT EASEMENT
SECTION LINE
QUARTER SECTION LINE
BOUNDARY
RIGHT OF WAY, ABANDONED AB R/W
RIGHT OF WAY, RESERVED RES R/W
R/W R/W
FENCE (3-STRAND)
MAJOR CONTOUR
MINOR CONTOUR
CUT LIMITS
FILL LIMITS
DITCH
EDGE OF WATER
TOP OF SLOPE
TOE OF SLOPE
HIGH WATER
STORM SWALE
XX
TOP
TOE
WETLAND WET
SITE
TOP
TOE
WET
CUT
FILL
FENCE (DOWEL)
ROAD SHOULDER
ROAD CENTERLINE
ROAD ASPHALT
ROAD GRAVEL
TOP BACK OF CURB
LIP OF GUTTER
EP
EG
ROADWAY
OVERHEAD POWER
UNDERGROUND POWER
OVERHEAD TELEPHONE
UNDERGROUND TELEPHONE
FIBER OPTIC
CABLE TELEVISION
OHP
UP
OHT
UT
F/O
CTV
OHP
UP
OHT
UT
F/O
CTV
UNDERGROUND POWER, TEL,
CABLE TV
P,T,CTV
UNDERGROUND POWER, TEL,
CABLE TV, GAS
P,T,CTV,G
POWER / COMMUNICATIONS
P,T,CTV
P,T,CTV,G
X
DT-90X
DETAIL
NUMBER
SHEET
NUMBER
DETAIL CALLOUT
SURVEY
1/2" PIN
CONTROL PT
CAP
(ALUMINUM)
CTRL PT 12"
REBAR
CTRL PT 5 8"
REBAR
CTRL PT
PK NAIL
CTRL PT
60D NAIL
5/8" PIN
CONTROL PT
60D
PK
BENCHMARK
NAIL
WELL
TREE
(STUMP)
TREE
(SHRUB)
TREE
(CONIFEROUS)
TREE
(DECIDUOUS)
SIGN
BOX
ROCK
GATE
FLAGPOLE
BOLLARD
TEST
HOLE
SITE
BORE HOLE
SPOT
ELEVATION
POST
TELE.
MANHOLE
TELE.
POLE
TELE.
PEDESTAL
TV
PEDESTAL
COMMUNICATIONS
GUY
WIRE
MANHOLE
(GENERIC)
THRUST
BL0CK
UTILITIES
VAULT
VALVE
(GENERIC)
UTILITY
POLE
VERTICAL
PIPE
WATER
MANHOLE
WATER
METER
WATER
VALVE
FIRE
HYDRANT
DOMESTIC WATER
IRRIGATION
VALVE BOX
IRRIGATION
VALVE
IRRIGATION
SS
MANHOLE
SEWER
STUB
CLEANOUT
SANITARY SEWER
GAS
VALVE
GAS
METER
NATURAL GAS
SD
MANHOLE
CATCH
BASIN
FLARE END
STORM DRAIN
ARROW
LEFT
ARROW
RIGHT
ROAD MARKINGS
PIPE
END
OBJECT
BREAK LINE
TYPICAL DETAILS
WATER
SURFACE
POWER
POLE
POWER
STUB
ELEC.
MANHOLE
JUNCTION
BOX
STREET
LIGHT
ELEC.
METER
ELEC.
TRANS.
GUY WIRE
POWER
STREET LIGHT
W/ ARM
ELEC.
SERVICE
EXISTING
LINE
LINE
DESCRIPTION
PROPOSED
LINE
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
STORM DRAIN (GENERAL)
STORM DRAIN
SD
X"SD
SD
X"SD
STORM DRAIN
SANITARY SEWER SSSS
SANITARY SEWER
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-003
SZURN
SFETZER
GENERAL
TBD
9/3/2025
AS NOTED
GENERAL NOTES
1. ALL STREET, EMBANKMENT, STORM SEWER AND ROCK CONSTRUCTION SHALL MEET OR
EXCEED THE STANDARD SPECIFICATIONS SET FORTH IN THE COLORADO DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION AND
TOWN OF WINDSOR STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF
EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT AND
APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN
THESE PLANS AND SPECIFICATIONS OR ANY APPLICABLE STANDARDS, THE MOST
RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED & APPROVED BY
THE TOWN OF WINDSOR. ANY CONSTRUCTION OCCURRING THREE YEARS OR MORE AFTER
THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF
THE PLANS BY THE TOWN ENGINEER, WHO MAY REQUIRE THAT THEY BE MADE TO
CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME.
2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SOILS REPORT
PREPARED FOR THIS PROJECT AND APPROVED BY THE TOWN ENGINEER.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE UTILITY NOTIFICATION
CENTER OF COLORADO (CALL BEFORE YOU DIG), 811. CALL TWO BUSINESS DAYS PRIOR
(NOT INCLUDING THE DAY OF THE CALL) TO DIGGING, GRADING OR EXCAVATING FOR THE
MARKING OF UNDERGROUND MEMBER UTILITIES.
4. 48 HOURS PRIOR TO ANY EARTH DISTURBANCE, THE CONTRACTOR SHALL NOTIFY THE
TOWN ENGINEER (970-674-2400).
5. 48 HOURS PRIOR TO ANY EARTH DISTURBANCE, THE CONTRACTOR SHALL NOTIFY THE
STORMWATER PROGRAM COORDINATOR (970-674-2490) TO SET UP THE REQUIRED
INITIALGRADING, EROSION AND SEDIMENT CONTROL INSPECTION.
6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES PRIOR TO CONSTRUCTION AND SHALL MAINTAIN THE CONTROL MEASURES
DURING CONSTRUCTION, AS IDENTIFIED ON THE GRADING, EROSION AND SEDIMENT
CONTROL PLAN (GESCP). THE STORMWATER PROGRAM COORDINATOR SHALL APPROVE
ANY MODIFICATION OF A CONTROL MEASURE IDENTIFIED ON THE GESCP PRIOR TO
INSTALLATION. MAINTENANCE OF ONSITE DRAINAGE AND EROSION CONTROL FACILITIES
DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT
ALL UTILITIES TO COORDINATE SCHEDULES.
8. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF
ANY TYPE, THE CONTRACTOR SHALL CONTACT THE TOWN ENGINEER. PHONE (970)
674-2400.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL DURING
CONSTRUCTION:
a. ALL SIGNS, STRIPING AND TRAFFIC CONTROL DEVICE SHALL CONFORM TO, AND PLACEMENT
SHALL BE PERFORMED IN ACCORDANCE WITH, THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD), LATEST EDITION AND CDOT M&S STANDARDS, LATEST EDITION.
b. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND CLEANING OF TRAFFIC
CONTROL DEVICES.
c. THE CONTRACTOR SHALL MAINTAIN EXISTING PAVEMENT MARKINGS DURING CONSTRUCTION
OPERATIONS, IN CONFORMANCE WITH CONSTRUCTION DOCUMENTS.
d. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL BE ACCOMPLISHED BY A METHOD THAT
DOES NOT MATERIALLY DAMAGE THE SURFACE OR TEXTURE OF THE PAVEMENT OR EXISTING
SURFACING. THE PAVEMENT MARKINGS SHALL BE REMOVED TO THE EXTENT THAT THEY ARE
NOT VISIBLE UNDER DAY OR NIGHT CONDITIONS.
10. THE CONTRACTOR SHALL RESTORE ANY DISTURBED AREAS TO EQUAL OR BETTER
CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR
WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE
GRADES AND CROSS-SECTIONS THAT EXISTED BEFORE CONSTRUCTION, UNLESS
OTHERWISE SHOWN ON THE CONSTRUCTION DOCUMENTS.
11. PRIOR TO CLOSEOUT OF ANY TOWN ISSUED GRADING EROSION AND SEDIMENT CONTROL
PLAN, ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WILL HAVE A UNIFORM
VEGETATIVE COVER ESTABLISHED WITH AN INDIVIDUAL PLANT DENSITY OF AT LEAST 70
PERCENT OF PRE-DISTURBANCE LEVELS, OR EQUIVALENT PERMANENT, PHYSICAL EROSION
REDUCTION METHODS.
12. THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS,
REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS.
IN CASE OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED
UNDER THE DIRECTION OF A COLORADO LICENSED PROFESSIONAL LAND SURVEYOR.
13. THE CONTRACTOR SHALL IMMEDIATELY REMOVE ANY CONSTRUCTION DEBRIS AND MUD
TRACKED ONTO EXISTING ROADWAYS. THE CONTRACTOR SHALL REPAIR ANY EXCAVATION
OR PAVEMENT FAILURES CAUSED BY THE CONSTRUCTION.
14. ALL DAMAGED EXISTING CURB, GUTTER, AND RECREATIONAL TRAIL SHALL BE REPAIRED
PRIOR TO ACCEPTANCE OF COMPLETED IMPROVEMENTS.
15. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE CONSTRUCTION DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL
UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK PRIOR TO COMMENCING ANY
NEW CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE OF ANY UNKNOWN
UNDERGROUND UTILITIES.
16. THE CONTRACTOR SHALL NOTIFY THE TOWN OF WINDSOR PUBLIC WORKS DEPARTMENT AT
(970) 674-5400 AT LEAST 48 HOURS PRIOR TO INSTALLING A NEW SEWER SERVICE.
17. THE CONTRACTOR SHALL NOTIFY THE TOWN OF WINDSOR PUBLIC WORKS DEPARTMENT AT
(970) 674-5400 AT LEAST 48 HOURS PRIOR TO INSTALLING A NEW WATER SERVICE OR
ABANDONING AN EXISTING WATER SERVICE.
18. THE TOWN OF WINDSOR SHALL NOT BE RESPONSIBLE FOR OPERATION, MAINTENANCE OR
REPAIR OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE SERVICES OF A QUALIFIED
TESTING LABORATORY TO PERFORM ALL COMPACTION TESTING, ASPHALT TESTING,
CONCRETE TESTING AND ANY OTHER TESTING AS MAY BE REQUIRED TO COMPLETE THE
WORK. QUALITY CONTROL TEST RESULTS MUST BE SUBMITTED FOR ALL PHASES OF THIS
PROJECT PER THE TOWN’S REQUIREMENTS.
20. THE CONTRACTOR SHALL MAINTAIN ONE (1) SET OF “REDLINED” PRINTS OF THE
CONSTRUCTION PLANS. THE “REDLINED” PRINTS SHALL BE KEPT CURRENT TO
ACCURATELY REPRESENT THE DIMENSIONS AND LOCATIONS OF ALL WORK PERFORMED BY
THE CONTRACTOR. PRIOR TO FINAL PAYMENT, THE CONTRACTOR MUST PRESENT THE
“REDLINED” PRINTS TO THE OWNER’S ENGINEER FOR PREPARATION OF A SET OF
REPRODUCIBLE “RECORD DRAWINGS” WHICH SHALL BE SUBMITTED TO THE TOWN WITHIN
30 DAYS OF CONSTRUCTION ACCEPTANCE OF THE PROJECT BY THE TOWN.
21. THE OWNER/DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED LOT
STAKING AND CONSTRUCTION STAKING. THE CONTRACTOR SHALL COORDINATE THROUGH
THE OWNER’S DESIGNATED REPRESENTATIVE TO ASSURE THAT THE SURVEYOR IS GIVEN
ADEQUATE NOTICE AND INSTRUCTION IN ORDER TO COMPLETE THE SURVEY
REQUIREMENTS FOR THE VARIOUS PHASES OF WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COST OF RE-SURVEYING REQUIRED DUE TO THE CONTRACTOR’S,
OR SUBCONTRACTOR’S,ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COSTS ASSOCIATED WITH RESCHEDULING THE SURVEYOR TO ACCOMMODATE THE
CONTRACTOR’S REQUESTS FOR UNSCHEDULED STAKING.
22. THE CONTRACTOR SHALL PROVIDE AND IMPLEMENT A “TRAFFIC CONTROL PLAN” RELATED
TO ALL CONSTRUCTION ACTIVITIES FOR THIS PROJECT.
23. THE CONTRACTOR SHALL PERFORM ALL WORK ACCORDING TO ALL TOWN, COUNTY, STATE
AND FEDERAL SAFETY AND HEALTH REGULATIONS. IN PARTICULAR, THE TRENCHING AND
OPEN EXCAVATION OPERATIONS SHALL COMPLY WITH ALL CURRENT O.S.H.A. REGULATORY
REQUIREMENTS, IF NEEDED.
24. ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH THE STATE OF COLORADO PERMITTING
PROCESS FOR “STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY.”
FOR INFORMATION CONTACT THE COLORADO DEPARTMENT OF HEALTH, WATER QUALITY
CONTROL DIVISION, WQCD-P-B2, 4300 CHERRY CREEK DRIVE SOUTH, DENVER, COLORADO,
80246-1530. ATTENTION: PERMITS AND ENFORCEMENT SECTION. PHONE (303) 692-3500. A
COPY OF THE CONTRACTOR’S PERMIT CERTIFICATION MUST BE SUBMITTED TO THE
STORMWATER PROGRAM COORDINATOR.
25. WHEN DISCHARGING GROUNDWATER, ALL DEWATERING METHODS SHALL BE IN
CONFORMANCE WITH ALL LAWS AND REGULATIONS OF THE STATE – INCLUDING OBTAINING
A COLORADO DISCHARGE PERMIT SYSTEM PERMIT FOR CONSTRUCTION DEWATERING
WASTEWATER DISCHARGE, IF APPLICABLE. THE CONTRACTOR SHALL TAKE ALL NECESSARY
AND PROPER PRECAUTIONS TO PROTECT ADJACENT PROPERTIES FROM ANY AND ALL
DAMAGE THAT MAY OCCUR FROM STORMWATER RUNOFF AND /OR DEPOSITION OF DEBRIS
RESULTING FROM ANY AND ALL WORK.
26. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREON,
DOES HEREBY AFFIRM RESPONSIBILITY TO THE TOWN OF WINDSOR, AS A BENEFICIARY OF
SAID ENGINEER’S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS,
AND APPROVAL OF THESE PLANS SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED
THESE PLANS OF ANY SUCH RESPONSIBILITY.
27. THE CONTRACTOR SHALL HAVE A REGISTERED LAND SURVEYOR TIE OUT AND RESET ANY
PROPERTY CORNERS OR SECTION CORNERS PLANNED TO BE DISTURBED BY
CONSTRUCTION OF THIS PROJECT, AND SHALL HAVE A REGISTERED LAND SURVEYOR
REESTABLISH ANY PROPERTY CORNERS OR SECTION CORNERS INADVERTENTLY
DISTURBED DURING CONSTRUCTION OF THIS PROJECT.
GRADING, EROSION AND SEDIMENT CONTROL NOTES
1. ANY LAND DISTURBANCE WITHIN THE LIMITS OF DISTURBANCE NOTED ON THIS PLAN BY
ANY OWNER, DEVELOPER, BUILDER, CONTRACTOR, OR OTHER PERSON SHALL COMPLY
WITH THE BEST MANAGEMENT PRACTICES REQUIREMENTS AND PROHIBITIONS NOTED IN
THE USDCM: VOL. III STORMWATER QUALITY, CHAPTER 7. NOTE: THE USE OF STRAW BALE
BARRIERS (SBB), NOTED AS SC-03 IN THE URBAN STORM DRAINAGE CRITERIA MANUAL, IS
DISCOURAGED IN THE TOWN. SPECIFIC APPROVAL FROM THE TOWN’S STORM WATER
PROGRAM COORDINATOR IS REQUIRED FOR USE.
2. NON-COMPLIANCE AND ANY NOTICE OF VIOLATION IS THE RESPONSIBILITY OF THE OWNER
SIGNING THESE PLANS.
3. NO CLEARING, GRADING, EXCAVATION, FILLING, OR OTHER LAND DISTURBING ACTIVITIES
SHALL BE PERMITTED UNTIL SIGNOFF AND ACCEPTANCE OF THE GRADING, EROSION AND
SEDIMENT CONTROL PLAN IS RECEIVED FROM TOW ENGINEERING, AND AN INITIAL
INSPECTION HAS BEEN COMPLETED.
4. THE INSTALLATION OF THE FIRST LEVEL OF TEMPORARY SEDIMENT AND EROSION CONTROL
FACILITIES AND BMPS SHALL BE INSTALLED AND INSPECTED PRIOR TO ANY EARTH
DISTURBANCE OPERATIONS TAKING PLACE. CALL THE STORMWATER PROGRAM
COORDINATOR, 970-674-2490, 48 HOURS PRIOR TO CONSTRUCTION.
5. SEDIMENT (MUD AND DIRT) TRANSPORTED ONTO A PUBLIC ROAD, REGARDLESS OF THE
SIZE OF THE SITE, SHALL BE REMOVED AND PROPERLY DISPOSED OF IMMEDIATELY. POWER
WASHING OF PAVEMENT IS NOT ALLOWED.
6. CONCRETE WASH WATER SHALL NOT BE ALLOWED TO RUNOFF TO STATE WATERS,
INCLUDING GROUNDWATER AND ANY SURFACE OR SUBSURFACE STORM DRAINAGE
SYSTEM OR FACILITIES. CONCRETE WASH WATER, AND WASTE WATER USED IN RINSING
TOOLS USED FOR GROUT, MORTAR, SAW CUTTING, AND SIMILAR MATERIALS SHALL BE
COLLECTED IN AN APPROVED WASH OUT AREA, REMOVED REGULARLY, AND DISPOSED OF
APPROPRIATELY.
7. SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR ANY
DISTURBED LAND AREA SHALL BE COMPLETED WITHIN FOURTEEN (14) CALENDAR DAYS
AFTER FINAL GRADING OR FINAL EARTH DISTURBANCE HAS BEEN COMPLETED. DISTURBED
AREAS AND STOCKPILES WHICH ARE NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR
LONGER THAN THIRTY (30) DAYS SHALL ALSO BE MULCHED WITHIN FOURTEEN (14) DAYS
AFTER INTERIM GRADING. AN AREA THAT IS GOING TO REMAIN IN AN INTERIM DORMANT
STATE FOR MORE THAN SIXTY (60) DAYS SHALL BE SEEDED ANDMULCHED (CONDITIONS
PERMITTING), OR AN APPROPRIATE SOIL BINDER SHALL BE APPLIED IF CONDITIONS DO NOT
PERMIT SEED GERMINATION, WITHIN FOURTEEN (14) DAYS AFTER GRADING OPERATIONS
CEASE. ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND BMPS SHALL BE
MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED.
8. THE GRADING, EROSION AND SEDIMENT CONTROL PLAN WILL BE SUBJECT TO RE-REVIEW
AND RE-ACCEPTANCE BY THE TOWN OF WINDSOR ENGINEERING SHOULD ANY OF THE
FOLLOWING OCCUR: GRADING DOES NOT COMMENCE WITHIN TWELVE (12) MONTHS OF THE
TOWN ENGINEER’S ACCEPTANCE OF THE PLAN, A CHANGE IN PROPERTY OWNERSHIP,
PROPOSED DEVELOPMENT CHANGES, OR PROPOSED GRADING REVISIONS.
9. ACCEPTANCE OF THIS PLAN DOES NOT CONSTITUTE APPROVAL TO GRADE IN ANY UTILITY
EASEMENT OR RIGHT-OF-WAY. APPROVALS TO GRADE WITHIN UTILITY EASEMENTS MUST BE
OBTAINED FROM THE APPROPRIATE UTILITY COMPANY. IT IS NOT PERMISSIBLE FOR ANY
PERSON TO MODIFY THE GRADE OF THE EARTH ON ANY TOWN OF WINDSOR EASEMENT OR
UTILITY RIGHT-OF-WAY WITHOUT WRITTEN APPROVAL FROM THE ROW OWNER. THE PLAN
SHALL NOT INCREASE OR DIVERT WATER TOWARDS UTILITY FACILITIES. ANY CHANGES TO
EXISTING UTILITY FACILITIES TO ACCOMMODATE THE PLAN MUST BE APPROVED BY THE
AFFECTED UTILITY OWNER PRIOR TO IMPLEMENTING THE PLAN. THE COST TO RELOCATE
OR
PROTECT EXISTING UTILITIES OR TO PROVIDE INTERIM ACCESS IS THE
EXPENSE OF THE OWNER SIGNING THESE PLANS.
10. THIS PLAN CONTAINS EROSION AND SEDIMENT CONTROL METHODS AND BEST
MANAGEMENT PRACTICES (BMPS) TO BE USED DURING CONSTRUCTION; ADDITIONAL
MEASURES AND BMPS MAY BE REQUIRED AS CONDITIONS CHANGE. IT IS THE
CONTRACTOR’S RESPONSIBILITY TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND
TOWN OF WINDSOR REQUIREMENTS, AND THE STORMWATER PROGRAM COORDINATOR
MUST BE NOTIFIED OF ANY MAJOR CHANGES.
11. ALL BMPS ARE TO BE MAINTAINED PER THE SPECIFICATIONS NOTED IN THIS PLAN. IF ANY
SUBSTANTIAL DEVIATION FROM INSTALLATION/IMPLEMENTATION SPECIFICATIONS MAY
BETTER SUIT A PARTICULAR APPLICATION, CONTACT THE STORMWATER PROGRAM
COORDINATOR FOR APPROVAL BEFORE INSTALLATION, OR MAKING A CHANGE TO THE BMP
OR ITS LOCATION.
12. SOILS EXPOSED BY LAND DISTURBING ACTIVITIES ON SLOPES SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING/DISKING ALONG CONTOURS TO PREVENT EROSION.
TECHNIQUES SUCH AS SURFACE ROUGHENING AND/OR DUST SUPPRESSION WITH WATER
TRUCKS SHALL BE USED TO MINIMIZE WIND EROSION.
13. ALL TEMPORARY BMPS MUST BE REMOVED FROM THE CONSTRUCTIONS SITE AND
PROPERLY DISPOSED OF ONCE FINAL STABILIZATION IS ACHIEVED, EXCEPT BMPS WITH
SPECIFICATIONS THAT ALLOW THE BMP TO REMAIN IN PLACE (I.E. BIO-DEGRADABLE BMPS).
14. UPON THE REQUEST TO CLOSE OUT THE GRADING, EROSION AND SEDIMENT CONTROL
PERMIT, CONTRACTOR SHALL ENSURE THAT ALL AREAS DISTURBED BY CONSTRUCTION
ACTIVITIES, BOTH ON AND OFF SITE, WILL HAVE A UNIFORM VEGETATIVE COVER
ESTABLISHED, WITH ACCEPTABLE PLANTS, AND WITH AN INDIVIDUAL PLANT DENSITY OF AT
LEAST 70 PERCENT OF PRE-DISTURBANCE LEVELS, OR EQUIVALENT PERMANENT PHYSICAL
EROSION REDUCTION METHODS.
1. ALL EASEMENTS AND RIGHTS-OF-WAY CROSSING THE CITY OF GREELEY EASEMENT ARE SUBJECT TO THE
RIGHTS OF SAID CITY OF GREELEY EASEMENT.
2. THERE SHALL BE NO PERMANENT STRUCTURES, CONCRETE SLABS, DETENTION PONDS, FENCES, WALLS, TREES, OR OTHER LANDSCAPING OR BERMS GREATER THAN 3 FEET AT MATURE GROWTH, OR OTHER OBSTRUCTIONS WITHIN THE CITY OF GREELEY EASEMENT. NO COVER SHALL BE REMOVED AND/OR ADDED
WITHOUT WRITTEN PERMISSION FROM CITY OF GREELEY WATER ENGINEER.
3. THERE SHALL BE NO OTHER UTILITIES WITHIN THE CITY OF GREELEY EASEMENT EXCEPT AT RIGHT ANGLE
CROSSINGS AND UNLESS PREVIOUSLY APPROVED BY THE CITY OF GREELEY WATER & SEWER
DEPARTMENT. ALL PLANS SHALL BE SUBMITTED DURING THE DESIGN PHASE AT LEAST TWO WEEKS PRIOR TO CONSTRUCTION AND SHALL SHOW POTHOLED LOCATIONS AND ELEVATIONS IN PLAN AND PROFILE VIEW.
GREELEY WATER & SEWER WILL ISSUE APPROPRIATE CROSSING APPROVAL.
4. IN THE EVENT THAT EXCAVATION IS REQUIRED FOR THE CITY OF GREELEY WATER PIPELINES DUE TO WATER PIPELINE REPAIRS, REPLACEMENT OR OTHER OPERATIONS, THE EXCAVATION WILL BE BACKFILLED SAFELY BUT SURFACE RESTORATION WILL NOT BE DONE BY/ OR AT THE EXPENSE OF THE CITY OF
GREELEY.
5. GREELEY WATER PIPELINE LOCATIONS ARE APPROXIMATE, CONTACT THE TRANSMISSION LINE TECHNICIAN AT 970-371-3726, 72 HOURS IN ADVANCE OF ANY LOCATE REQUEST OR ANY CONSTRUCTION ACTIVITIES
WITHIN THE GREELEY WATER PIPELINE EASEMENT.
6. THERE SHALL BE NO VIBRATORY OR HEAVY SHEEPSFOOT COMPACTION WITHIN 20 FEET OF THE EXISTING
WATER TRANSMISSION PIPELINE. STATIC COMPACTION EQUIPMENT SHALL BE USED.
7. GREELEY PIPELINES MUST HAVE A MINIMUM OF SIX (6) FEET OF COVER AT ALL LOCATIONS TO BE USED AS
A LAND BRIDGE DURING ANY CONSTRUCTION ACTIVITIES.
8. NO CUTS IN GRADING ARE ALLOWED WITHIN THE TRANSMISSION WATERLINE EASEMENTS UNLESS
SUFFICIENT COVER EXISTS AND IS REVIEWED / APPROVED BY THE CITY OF GREELEY.
9. GREELEY WATER LINE SUPPORT AT CROSSINGS SHALL BE INCORPORATED INTO THE DESIGN IF PROPOSED
UTILITY CROSSING IS BELOW THE WATER LINE USING OPEN TRENCH CONSTRUCTION.
10. ANY IRRIGATION LINES AND/OR SPRINKLER SYSTEMS LOCATED WITHIN GREELEY EASEMENT REQUIRES CONTRACTOR TO PROVIDE GREELEY A FULL SET OF LANDSCAPING & IRRIGATION/SPRINKLER SYSTEM PLANS FOR REVIEW AND APPROVAL. PLANS TO BE PROVIDED A MINIMUM OF 2 WEEKS PRIOR TO
CONSTRUCTION. VALVE BOXES ARE NOT TO BE LOCATED WITHIN GREELEY'S EASEMENT.
11. ANY WORK TO BE DONE ON CITY OF GREELEY WATERLINE(S) SHALL CONFORM TO CURRENT CITY OF
GREELEY SPECIFICATIONS.
CITY OF GREELEY WATERLINE NOTES
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-004
SZURN
SFETZER
GENERAL
TBD
9/3/2025
AS NOTED
1 201-00000 Clearing & Grubbing LS 1
2 202-00010 Removal of Tree EACH 1
3 202-00203 Removal of Curb and Gutter LF 202
4 202-00220 Removal of Asphalt Mat SY 16
5 203-00010 Unclassified Excavation (Complete In Place) CY 1,709
6 203-00050 Unsuitable Material CY 50
7 203-00510 Rock Fill (Special) CY 50
8 203-01500 Blading HR 10
9 203-01597 Potholing HR 20
10 203-02330 Laborer HR 40
11 207-00210 Stockpile Topsoil CY 1,360
12 208-00023 Erosion Log Type 3 (12 Inch) LF 7,258
13 208-00046 Pre-fabricated Concrete Washout Structure EACH 2
14 208-00075 Pre-fabricated Vehicle Tracking Pad EACH 2
15 208-00106 Sweeping (Sediment Removal) HR 15
16 208-00207 Erosion Control Management DAY 25
17 210-01010 Reset Gate Post EACH 2
18 210-01011 Reset Gate EACH 1
19 212-00006 Seeding (Native) ACRE 1
20 212-00032 Soil Conditioning ACRE 1
21 213-00002 Mulching (Weed Free Hay) ACRE 1
22 213-00061 Mulch Tackifier LB 270
23 304-06000 Aggregate Base Course (Class 6) TON 2,567
24 306-01000 Reconditioning SY 8,327
25 403-00721 Hot Mix Asphalt (Patching)(Asphalt) SY 24
26 403-33752 Hot Mix Asphalt (Grading S)(75)(PG 64-28) SY 265
27 504-00000 Concrete Class D (Wall) Reinforced CY 13
28 603-01185 18 Inch Reinforced Concrete Pipe (Complete in Place) LF 24
29 603-50018 18 Inch Plastic Pipe LF 20
30 603-05018 18 Inch Reinforced Concrete End Section EACH 2
31 603-71004 10x4 Foot Concrete Box Culvert (Precast) LF 88
32 608-00010 Concrete Curb Ramp SY 16
33 608-00026 Concrete Bikeway (6 Inch) SY 7,483
34 608-00028 Concrete Bikeway (8 Inch) SY 88
35 608-10000 Sidewalk Drain LF 60
36 514-00100 Handrail LF 262
37 609-21010 Curb and Gutter Type 2 (Section I-B) LF 480
38 620-00020 Sanitary Facility EACH 1
39 625-00000 Construction Surveying LS 1
40 626-00000 Mobilization LS 1
41 630-00012 Traffic Control Management LS 1
42 700-70010 F/A Minor Contract Revisions FA 1 43 700-70016 F/A Fuel Cost Adjustment FA 1 44 700-70380 F/A Erosion Control FA 1 45 700-70381 F/A Work on Harmony FA 1
CONTRACT
ITEM NO.
CONTRACT
SECTION NO. CONTRACT ITEM UNIT
PROJECT TOTALS
PLAN AS
CONST.
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
TOWN STANDARDS. NO RESPONSIBILITY
IS ASSUMED FOR CORRECTNESS OF DESIGN.
CONTRACT
ITEM NO.
CONTRACT
SECTION NO. CONTRACT ITEM UNIT
PROJECT TOTALS
PLAN AS
CONST.
2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-005
SZURN
SFETZER
9/3/2025
GENERAL
DRAINAGE ITEMS
STATION / LOCATION
REINFORCED
CONCRETE PIPE
FLARED END
SECTION
CONCRETE BOX
CULVERT (PRECAST) SIDEWALK DRAIN PLASTIC PIPE
18 INCH 18 INCH 10 X 4 FOOT 18 INCH
LF EA LF LF LF
CR-15 TRAIL
CULVERT A 24 2
CULVERT B 20
CULVERT C 10
CULVERT D 88
CULVERT E 30
SIDEWALK CHASE 10
TOTALS 24 2 88 50 20
REMOVALS, ADJUSTMENTS, RELOCATES, AND RESET ITEMS
STATION/LOCATION
RESET GATE
(EA)
REMOVAL OF
TREE (EA)
REMOVAL OF
CURB &
GUTTER (LF)
NOTES:
CR-15 TRAIL
STA. 0+00 TO STA. 9+00 0 0 0
STA . 9+00 TO STA. 18+00 0 0 81
STA . 18+00 TO STA. 27+00 0 0 0
STA . 27+00 TO STA. 36+00 0 0 0
STA . 36+00 TO STA. 45+00 1 1 0
STA . 45+00 TO STA. 54+00 0 0 60
STA . 54+00 TO STA. 63+50 0 0 60
STA . 63+50 TO STA. 70+00 0 0 0
TOTALS 1 1 202
SURFACE ITEMS
STATION/LOCATION
AREA
(SF)
CONCRETE BIKEWAY
(6 INCH)
CONCRETE BIKEWAY
(8 INCH)
CONCRETE CURB
RAMP
HOT MIX ASPHALT
PATCH
(PATCHING)(ASPHALT)
HOT MIX
ASPHALT
((GRADING
S)(75)(PG 64-28))
GRAVEL
ROCK FILL
(SPECIAL)
AGGREGATE BASE
COURSE
(CLASS 6)
RECONDITIONING NOTES:
SY SY SY SY SY SY CY TON SY
CR-15 TRAIL
STA. 0+00 TO STA. 9+00 9132 1015 0 16 0 0 0 0 296 1015
STA . 9+00 TO STA. 18+00 9000 970 30 0 0 265 0 0 292 1000
STA . 18+00 TO STA. 27+00 9000 1000 0 0 0 0 0 0 292 1000
STA . 27+00 TO STA. 36+00 9000 1000 0 0 0 0 0 0 292 1000
STA . 36+00 TO STA. 45+00 9000 977 23 0 0 0 205 0 292 1000
STA . 45+00 TO STA. 54+00 9000 982 18 0 12 0 102 1 292 1000
STA . 54+00 TO STA. 63+50 9000 983 17 0 12 0 93 5 292 1000
STA . 63+50 TO STA. 68+00 5000 556 0 0 0 0 0 0 162 556
TOTALS 68133 7483 88 16 24 265 400 6 2208 8327
MISCELLANEOUS ITEMS
STATION/LOCATION
514-00100
Handrail (LF)
CR-15 TRAIL
STA. 0+00 TO STA. 9+00 0
STA . 9+00 TO STA. 18+00 0
STA . 18+00 TO STA. 27+00 0
STA . 27+00 TO STA. 36+00 0
STA . 36+00 TO STA. 45+00 164
STA . 45+00 TO STA. 54+00 0
STA . 54+00 TO STA. 63+50 98
STA . 63+50 TO STA. 68+00 0
TOTALS 262
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
W C
R
W C
R
CR-15
4:1
TYP.
10'
MULTI-USE
PATH
MIN. 22'
PARKWAY *
30'
TO CR-15 C/L
28'
TO CR-15 C/L
2%
* SEE ALIGNMENT FOR EXACT OFFSET
* NOT MET DUE TO PHYSICAL CONSTRAINTS FROM:
STA. 41+16.04 TO 43+40.12
STA. 66+94.28 TO 70+20.70
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
SCALE:B SOFT SPOT REPAIR DETAIL
NONE
18" -
6" AGGREGATE
BASE COURSE
GEO-GRID MIRAFI 580i, OR
APPROVED EQUIVALENT*
CONCRETE TRAIL PAVEMENT SECTION
(SEE DWG DT-601)
IF THE CONTRACTOR ENCOUNTERS SUBGRADE THAT IS DETERMINED BY THE
ENGINEER TO BE UNSTABLE, CONTRACTOR SHALL EXCAVATE 24" BELOW
PLANNED CONCRETE PAVEMENT. CONTRACTOR SHALL THEN INSTALL GEO-GRID
ON SUBGRADE, PLACE & COMPACT 6" MINUS AGGREGATE TO BOTTOM OF
AGGREGATE BASE COURSE LAYER AND INSTALL AN ADDITIONAL GEO-GRID
LAYER BEFORE PROCEEDING WITH PLACEMENT OF REMAINING PLANNED
PAVEMENT SECTION. WORK SHALL INCLUDE EXCAVATION, HAULING AND
DISPOSING OF UNSUITABLE MATERIAL, FURNISHING AND PLACING GEO-GRID
FABRIC, AND FURNISHING AND PLACING IMPORTED MATERIAL SHOWN IN SOFT
SPOT REPAIR DETAIL ‘A’ WILL BE ALL INCLUSIVE UNDER ITEM, 203-00050 -
UNSUITABLE MATERIAL (CY). ENGINEER SHALL DETERMINE LIMITS IN THE FIELD.
6" AGGREGATE
BASE COURSE
SCALE IN FEET
300 600
N
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-006
SZURN
SFETZER
GENERAL
TBD
9/3/2025
AS NOTED
EARTHWORK NOTES
1. EARTHWORK QUANTITIES ARE IN PLACE MEASUREMENT AND DO NOT
ACCOUNT FOR CLEARING AND GRUBBING ACTIVITIES. NO SHRINK OR SWELL
FACTORS WERE APPLIED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO INTERPRET THE SOIL CONDITION AND APPLY
COMPACTION SWELL FACTORS.
2. EARTHWORK QUANTITIES HAVE BEEN ADJUSTED TO ACCOUNT FOR 6
INCHES OF TOPSOIL PLACED ON ALL DISTURBED AREAS NOT SURFACED.
3. R-VALUE (MINIMUM REQUIREMENT): EMBANKMENT WITHIN PAVED TRAIL
PRISM = 5. IT IS ANTICIPATED THAT UNCLASSIFIED EXCAVATION WILL BE
ABLE TO BE USED FOR TRAIL EMBANKMENT. HOWEVER, THE CONTRACTOR
MAY NEED TO BE SELECTIVE WHEN DETERMINING WHAT UNCLASSIFIED
EXCAVATION IS TO BE USED AS TRAIL EMBANKMENT.
4. REFER TO GEOTECHNICAL INVESTIGATION FOR COMPLETE PAVEMENT,
BASE COURSE AND SUB-GRADE PREPARATION RECOMMENDATIONS.
SUMMARY OF EARTHWORK QUANTITIES
EMBANKMENT MATERIAL
EMBANKMENT MATERIAL (CIP) CUBIC YARDS
AREA 1 2,050
TOTAL EMBANKMENT (CIP) 2,050
TOPSOIL CUBIC YARDS
AREA 1 1,360
STOCKPILE TOPSOIL 1,360
TOPSOIL (OFFSITE) 0
TOTAL TOPSOIL 1,360
EXCAVATION MATERIAL
UNCLASSIFIED EXCAVATION (CIP) CUBIC YARDS
AREA 1 1,709
TOTAL EXCAVATION (CIP) 1,709
SCALE:A TYPICAL SECTION WITH FUTURE EDGE OF ROAD
NONE
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
20+00 21+00
22+00 23+00
OWNER: TOWN OF WINDSOR
CR-15 TRAIL
CONTROL LINE
42234341
554BEGIN CR-15
TRAIL ALIGNMENT
STA: 0+00.00
N: 1427326.59 E: 3160242.58
W C
R
CR-15
OWNER: TOWN OF WINDSOR
OWNER: TOWN OF WINDSOR
23+00 24+00
25+00 26+00 27+00 28+00 29+00
30+00
31+00 32+00 33+00 34+00 35+00 36+00 37+00
38+00
39+00 40+00
41+00 42+00 43+00 44+00 45+00 46+00 47+00
OWNER: TOWN OF WINDSOR
OWNER: SERFER VENTURES LLC
CR-15 TRAIL
CONTROL LINE
CR-15
OWNER: TOWN OF WINDSOR
SURVEY CONTROL
POINT #
NORTHING
1428980.96
1431591.94
1427353.70
1429024.95
1431424.58
1427359.51
1428996.36
EASTING
3160279.73
3160213.34
3160212.52
3160230.20
3160132.48
3160245.62
3160230.74
ELEVATION
4834.456
4866.319
4822.250
4834.154
4865.208
4821.887
4833.666
DESCRIPTION
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-007
SZURN
SFETZER
9/3/2025
AS NOTED
GENERAL
VERTICAL DATUM:
NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) & GEIOD18.
BENCHMARK IS IN THE TOWN OF WINDSOR BENCHMARK
DESIGNATION "KIMBERLY" ELEVATION=4829.4'.
HORIZONTAL DATUM:
PROJECT COORDINATES ARE COLORADO STATE PLANE
COORDINATES NAD 83(2011) THAT HAVE BEEN SCALED TO GROUND
BY 0.9997342606 (1.00026581) ABOUT THE ORIGIN (0,0).
NOTES:
1. THIS DRAWING IN PROJECT COORDINATES. SEE HORIZONTAL
DATUM NOTE
2. ALL PROPERTY PINS, INTERSECTION MONUMENTS, AND
SECTION CORNERS DISTURBED DURING CONSTRUCTION MUST
BE REFERENCED AND REPLACED UNDER THE SUPERVISION OF
A LICENSED SURVEYOR.
3. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND
UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE
DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK BEFORE
COMMENCING NEW CONSTRUCTION. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
4. ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A
COURTESY. IT IS THE RESPONSIBILITY OF THE RECIPIENT TO
VERIFY THE ACCURACY OF THE COORDINATES AND
ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY
PURPOSES.
N CR-15 TRAIL
W C
R -7
W C
R -7
M
AT
C H
LI
N
E
ST
A.
3+
SE
E
BE
LO
W
M
AT
C H
LI
N
E
ST
A.
3+
SE
E
AB
O
VE
M
AT
C H
LI
N
E
ST
A.
7+
SE
E
D R
AW
IN
G G
-0
N
SCALE IN FEET
100 200
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70
+0
+2
OWNER: SERFER VENTURES LLC
OWNER: LOT A
AFFIDAVIT OF CORRECTION
RECORDED EXEMPTION
OWNER: DANIEL H VARRA
CR-15 TRAIL
CONTROL LINE
END CR-15
TRAIL ALIGNMENT
STA: 70+20.36
N: 1434204.65 E: 3160075.27
W C
R
CR-15
FUTURE WORK
SEE DWG. GM-104
SURVEY CONTROL
POINT #
NORTHING
1432405.15
1433997.69
EASTING
3160118.23
3160102.69
ELEVATION
4871.758
4891.937
DESCRIPTION
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
G-008
SZURN
SFETZER
9/3/2025
GENERAL
VERTICAL DATUM:
NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) & GEIOD18.
BENCHMARK IS IN THE TOWN OF WINDSOR BENCHMARK
DESIGNATION "KIMBERLY" ELEVATION=4829.4'.
HORIZONTAL DATUM:
PROJECT COORDINATES ARE COLORADO STATE PLANE
COORDINATES NAD 83(2011) THAT HAVE BEEN SCALED TO GROUND
BY 0.9997342606 (1.00026581) ABOUT THE ORIGIN (0,0).
NOTES:
1. THIS DRAWING IN PROJECT COORDINATES. SEE HORIZONTAL
DATUM NOTE
2. ALL PROPERTY PINS, INTERSECTION MONUMENTS, AND
SECTION CORNERS DISTURBED DURING CONSTRUCTION MUST
BE REFERENCED AND REPLACED UNDER THE SUPERVISION OF
A LICENSED SURVEYOR.
3. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND
UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE
DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK BEFORE
COMMENCING NEW CONSTRUCTION. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
4. ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A
COURTESY. IT IS THE RESPONSIBILITY OF THE RECIPIENT TO
VERIFY THE ACCURACY OF THE COORDINATES AND
ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY
PURPOSES.
N CR-15 TRAIL
W C
R -7
W C
R -7
M
AT
C H
LI
N
E
ST
A.
7+
SE
E
D R
AW
IN
G G
-0
N
SCALE IN FEET
100 200
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
OWNER: TOWN OF WINDSOR
CR-15 TRAIL
CONTROL LINE
EXISTING 40'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
0+00 1+00
2+00 3+00
4+00 5+00 6+00 7+00 8+00 9+00
N01°16'40"W 18.81'
N07°44'15"W 20.02'
N03°12'41"W 349.19'
N02°32'35"E 339.11'
C3
C4 C1 C2
BP: 0+00.00
PC: 4+16.78
PC: 7+70.96
PC: 0+18.81
PC: 0+55.74
PT: 4+31.85
PT: 7+87.54
PT: 0+35.72
PT: 0+67.59
CR-15
PROPOSED
CULVERT A
18" RCP
OWNER: TOWN OF WINDSOR
CR-15 TRAIL
CONTROL LINE
PROPOSED 10'
CONCRETE TRAIL
9+00 10+00
11+00 12+00 13+00 14+00 15+00
16+00 17+00 18+00
N19°49'05"W 61.38'
N01°17'02"W 135.04' N01°05'17"E
142.79'
N03°47'30"W 337.52'
N03°04'04"E 345.35'
C6
C7 C5
C8
PC: 14+88.36
PC: 15+69.72
PC: 11+25.06
PC: 17+20.93
PT: 15+08.34
PT: 15+85.89
PT: 11+43.02
PT: 17+25.07
W C
R
PROPOSED CULVERT B
18" PVC WITH
CONCRETE TRANSITIONS
EXISTING GRAVEL ROAD
PROPOSED SIDEWALK
CULVERT C
EXISTING 40'
TRAIL EASEMENT
ALIGNMENT CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
C7
C8
LENGTH
16.91'
11.85'
15.06'
16.58'
17.96'
19.97'
16.17'
4.14'
RADIUS
150.00'
150.00'
150.00'
150.00'
150.00'
50.00'
50.00'
100.00'
TANGENT
8.46
5.93
7.54
8.30
8.99
10.12
8.16
2.07
DELTA
006°27'35"
004°31'34"
005°45'16"
006°20'05"
006°51'33"
022°53'09"
018°32'04"
002°22'19"
CHORD DIRECTION
N04°30'28"W
N05°28'28"W
N00°20'03"W
N00°37'27"W
N00°21'43"W
N08°22'31"W
N10°33'03"W
N00°05'52"W
CHORD LENGTH
16.90'
11.85'
15.06'
16.58'
17.95'
19.84'
16.10'
4.14'
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
GM-101
SZURN
SFETZER
9/3/2025
AS NOTED
GEOMETRICS
M
AT
C H
LI
N
E
ST
A.
+0
SE
E
BE
LO
W
M
AT
C H
LI
N
E
ST
A.
+0
SE
E
AB
O
VE
M
AT
C H
LI
N
E
ST
A.
8+
SE
E
D R
AW
IN
G G
M -1
N
SCALE IN FEET
40 80
NOTES
1. SEE DRAWING G-002 FOR ABBREVIATIONS.
2. SEE DRAWING G-007 TO G-008 FOR HORIZONTAL
CONTROL.
3. WORK TO BE COMPLETED AS FORCE ACCOUNT WORK
OR BY CHANGE ORDER IN WHICH THE CONTRACTOR
WILL BE REQUESTED TO PROVIDE UNIT COST FOR
ITEMS INCLUDED IN THIS AREA, TO BE DETERMINED
AFTER NOTICE TO PROCEED.
N CR-15 TRAIL
W C
R -7
W C
R -7
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
CONTROL LINE
EXISTING 40'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
18+00 19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
PC: 18+67.87
PC: 23+95.10
PC: 26+36.40
PT: 18+80.96
PT: 23+99.04
PT: 26+50.86
C9
C10
C11
N13°54'39"W 514.15'
N11°39'02"W 237.35'
CR-15
OWNER: TOWN OF WINDSOR
CR-15 TRAIL
CONTROL LINE
EXISTING 40'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
27+00 28+00
29+00
30+00
31+00 32+00
33+00 34+00
35+00 36+00
PC: 28+62.18
PC: 30+73.27
PT: 28+82.14
PT: 30+94.36
C12
C13
N26°34'09"W 191.13'
N03°38'51"E 509.36'
N07°30'33"W 211.33'
CR-15
ALIGNMENT CURVE TABLE
CURVE #
C9
C10
C11
C12
C13
LENGTH
13.09'
3.94'
14.46'
19.96'
21.10'
RADIUS
50.00'
100.00'
200.00'
60.00'
40.00'
TANGENT
6.58
1.97
7.23
10.07
10.80
DELTA
014°59'56"
002°15'37"
004°08'29"
019°03'36"
030°13'00"
CHORD DIRECTION
N06°24'41"W
N12°46'51"W
N09°34'48"W
N17°02'21"W
N11°27'39"W
CHORD LENGTH
13.05'
3.94'
14.45'
19.87'
20.85'
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
GM-102
SZURN
SFETZER
9/3/2025
AS NOTED
GEOMETRICS
M
AT
C H
LI
N
E
ST
A.
7+
SE
E
BE
LO
W
M
AT
C H
LI
N
E
ST
A.
7+
SE
E
AB
O
VE
M
AT
C H
LI
N
E
ST
A.
6+
SE
E
D R
AW
IN
G G
M -1
N
SCALE IN FEET
40 80
NOTES
1. SEE DRAWING G-002 FOR ABBREVIATIONS.
2. SEE DRAWING G-007 TO G-008 FOR HORIZONTAL
CONTROL.
3. WORK TO BE COMPLETED AS FORCE ACCOUNT WORK
OR BY CHANGE ORDER IN WHICH THE CONTRACTOR
WILL BE REQUESTED TO PROVIDE UNIT COST FOR
ITEMS INCLUDED IN THIS AREA, TO BE DETERMINED
AFTER NOTICE TO PROCEED.
N CR-15 TRAIL
W C
R -7
W C
R -7
M
AT
C H
LI
N
E
ST
A.
8+
SE
E
D R
AW
IN
G G
M -1
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
OWNER: SERFER VENTURES LLC
CONTROL LINE
EXISTING 40'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
36+00
37+00
38+00
39+00
40+00
41+00 42+00 43+00 44+00 45+00
PC: 36+03.72
PC: 3
8+
.14
PC
: 4
0+
.1
PC
: 3
7+
.4
PT: 36+24.72
PT
: 3
9+
.4
PT: 41+05.90
PT:
+9 8.0
C14
CR-15
EXISTING GRAVEL ROAD
PROPOSED BOX
CULVERT D
PROPOSED SAFETY
RAIL END
STA:41+89.40
OFF:7.00'L
PROPOSED SAFETY
RAIL START
STA:41+55.33
OFF:7.00'R
PROPOSED GRAVEL ROAD
C15
C16
C17
PROPOSED SAFETY
RAIL START
STA:41+22.31
OFF:7.00'L
PROPOSED SAFETY
RAIL END
STA:42+34.68
OFF:7.00'R
OWNER: DANIEL H VARRA
CR-15 TRAIL
CONTROL LINE
EXISTING 20'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
45+00 46+00 47+00 48+00 49+00 50+00
51+00 52+00 53+00
PC
: 4
9+
.7
PC
: 5
1+
.1
PT
: 5
0+
.0
PT
: 5
1+
.2
CR-15
EXISTING GRAVEL ROAD
N08°56'43"W 142.02'
PROPOSED GRAVEL ROAD
C18
C19
ALIGNMENT CURVE TABLE
CURVE #
C14
C15
C16
C17
C18
C19
LENGTH
20.99'
40.64'
34.31'
40.80'
21.31'
15.14'
RADIUS
100.00'
100.00'
100.00'
100.00'
150.00'
100.00'
TANGENT
10.54
20.61
17.32
20.69
10.67
7.59
DELTA
012°01'45"
023°17'14"
019°39'22"
023°22'37"
008°08'21"
008°40'33"
CHORD DIRECTION
N09°39'44"E
N30°35'00"E
N32°23'56"E
N10°52'57"E
N04°52'32"W
N04°36'26"W
CHORD LENGTH
20.96'
40.36'
34.14'
40.52'
21.29'
15.13'
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
GM-103
SZURN
SFETZER
9/3/2025
AS NOTED
GEOMETRICS
M
AT
C H
LI
N
E
ST
A.
5+
SE
E
BE
LO
W
M
AT
C H
LI
N
E
ST
A.
5+
SE
E
AB
O
VE
M
AT
C H
LI
N
E
ST
A.
4+
SE
E
D R
AW
IN
G G
M -1
N
SCALE IN FEET
40 80
NOTES
1. SEE DRAWING G-002 FOR ABBREVIATIONS.
2. SEE DRAWING G-007 TO G-008 FOR HORIZONTAL
CONTROL.
3. WORK TO BE COMPLETED AS FORCE ACCOUNT WORK
OR BY CHANGE ORDER IN WHICH THE CONTRACTOR
WILL BE REQUESTED TO PROVIDE UNIT COST FOR
ITEMS INCLUDED IN THIS AREA, TO BE DETERMINED
AFTER NOTICE TO PROCEED.
N CR-15 TRAIL
W C
R -7
W C
R -7
M
AT
C H
LI
N
E
ST
A.
6+
SE
E
D R
AW
IN
G G
M -1
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
EXISTING 20'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
CR-15 TRAIL
CONTROL LINE
54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00
CR-15
PROPOSED CULVERT E
EXISTING GRAVEL ROAD
PROPOSED SAFETY
RAIL START
STA:54+37.18
OFF:8.00'L
PROPOSED SAFETY
RAIL START
STA:54+37.22
OFF:8.00'R
PROPOSED SAFETY
RAIL END
STA:55+00.68
OFF:7.25'L
PROPOSED SAFETY
RAIL END
STA:55+03.22
OFF:8.00'R
PROPOSED GRAVEL ROAD
CR-15 TRAIL
CONTROL LINEEXISTING 20'
TRAIL EASEMENT
PROPOSED 10'
CONCRETE TRAIL
+2
64+00 65+00 66+00 67+00
68+00 69+00
+0
PI: 63+90.24
PC: 67+87.66
PC: 69+63.96
PC
: 6
6+
.5
PT: 67+95.06
PT: 70+05.71
PT
: 6
6+
.7
W C
R
FUTURE WORK
SEE NOTE # 3
C20
C21
C22
ALIGNMENT CURVE TABLE
CURVE #
C20
C21
C22
LENGTH
21.16'
7.41'
41.75'
RADIUS
100.00'
39.10'
27.17'
TANGENT
10.62
3.71
26.26
DELTA
012°07'17"
010°51'18"
088°02'37"
CHORD DIRECTION
N04°43'08"E
N05°01'52"E
N45°29'18"W
CHORD LENGTH
21.12'
7.40'
37.76'
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
GM-104
SZURN
SFETZER
9/3/2025
AS NOTED
GEOMETRICS
M
AT
C H
LI
N
E
ST
A.
3+
SE
E
BE
LO
W
M
AT
C H
LI
N
E
ST
A.
3+
SE
E
AB
O
VE
N
SCALE IN FEET
40 80
NOTES
1. SEE DRAWING G-002 FOR ABBREVIATIONS.
2. SEE DRAWING G-007 TO G-008 FOR HORIZONTAL
CONTROL.
3. WORK TO BE COMPLETED AS FORCE ACCOUNT WORK
OR BY CHANGE ORDER IN WHICH THE CONTRACTOR
WILL BE REQUESTED TO PROVIDE UNIT COST FOR
ITEMS INCLUDED IN THIS AREA, TO BE DETERMINED
AFTER NOTICE TO PROCEED.
N CR-15 TRAIL
W C
R -7
W C
R -7
M
AT
C H
LI
N
E
ST
A.
+0
SE
E
D R
AW
IN
G G
M -1
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
A
PROPOSED 10'
CONCRETE TRAIL
0+00 1+00
2+00 3+00
4+00 5+00 6+00 7+00 8+00 9+00
EXISTING 30'
RIGHT-OF-WAY
EXISTING 30'
RIGHT-OF-WAY
EXISTING 40'
RIGHT-OF-WAY
EXISTING 60'
RIGHT-OF-WAY
CR-15 TRAIL
CONTROL LINE
EXISTING 20'
TOWN OF WINDSOR
PIPELINE EASEMENT
OWNER: TOWN OF WINDSOR
-0+25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
0.76% 0.19%
-2.00% 0.38%
LP STA: 0+84.91
LP ELEV: 4822.72
PVI STA:0+60.18
PVI ELEV:4822.61
K:30.59
LVC:72.91
0.76% 0.19%
-2.00% 0.38%
PV
I:0
+0 0.
EL
EV
: 4
3.
PV
I:6
+0 1.
EL
EV
: 4
5.
PV
I:3
+2 9.
EL
EV
: 4
3.
BV
C
S:
+2 3.
BV
C E:
3.
EV
C
S:
+9 6.
EV
C E:
2.
PROPOSED GRADE
EXISTING GROUND
PROPOSED CULVERT A
A
0+00
0+45
0+
FES-A2
18" REINFORCED
CONCRETE END SECTION
STA: 0+24.04 =
STA: 0+08.19, 9.19' R
N: 1427334.98 E: 3160251.58
FES-A1
18" REINFORCED
CONCRETE END SECTION
STA: 0+00.00 =
STA: 0+02.92, 14.27' L
N: 1427329.18 E: 3160228.24
-0+25 0+00 0+50 0+75
24 LF 18" RCP @ 2.62%
INV:4821.14INV:
4820.19
PROPOSED GRADE
EXISTING GROUND
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
M
AT
C H
LI
N
E
ST
A.
+0
SE
E
D R
AW
IN
G P
P-
N
SCALE IN FEET
VERT
HORZ 40 80
5 10
KEYED NOTES
PROPOSED CONCRETE TRAIL, SEE TYPICAL
SECTION 1, DRAWING DT-601.
PROPOSED 6" THICK PERPENDICULAR CURB
RAMP. SEE CDOT DETAIL M-608-1. COST OF
DETECTABLE WARNING INCLUDED IN THE SY
COST OF THE RAMP. PAID AS ITEM: 608-00010
CONCRETE CURB RAMP.
2' WIDE REMOVAL OF ASPHALT TO ALLOW FOR
PLACEMENT OF CONCRETE FORMS FOR CURB
RAMP INSTALLATION. REMOVED ASPHALT SHALL
BE PATCHED TO MATCH EXISTING ASPHALT
DEPTH UTILIZING (GRADING S)(75)(PG 64-28)
PROPOSED PIPE
PROPOSED CURB & GUTTER TYPE 2 (SECTION II-M)
INSTALLATION. SEE CDOT DETAIL M-609-1
PROPOSED HANDRAIL/BICYCLE RUB RAIL, SEE
CDOT DETAIL B-607-1
PROPOSED SIDEWALK CULVERT. SEE CONCRETE
SIDEWALK CULVERT DETAIL C, DRAWING DT-601
PROPOSED DRIVEWAY SURFACING; 4" HOT MIX
ASPHALT (GRADING S)(75)(PG 64-28)OVER
COMPACTED SUBGRADE
PROPOSED RETAINING WALL
PROTECT TREE IN-PLACE.
REMOVAL OF GUARDRAIL TO ALLOW TRAIL
CONNECTION
ACCESS ROAD, 6" GRAVEL
REMOVAL OF TREE
NOTES
1. SEE DRAWING GM-101 TO GM-104 FOR GEOMETRIC &
HORIZONTAL CONTROL.
2. SEE DRAWING GR-301 TO GR-304 FOR GRADING.
3. EXPANSION JOINTS, WHERE REQUIRED, SHALL BE FILLED
WITH ONE-HALF (1
2") THICK, FULL DEPTH, PREFORMED
EXPANSION JOINT MATERIAL AS PER CDOT STANDARD
SPECIFICATIONS, SUBSECTION 705.01
PROPOSED LIMITS
OF FILL
PROPOSED
REINFORCED
CONCRETE TRAIL
PROPOSED LIMITS
OF CUT
LEGEND
PROTECT IN
PLACE
N CR-15 TRAIL
W C
R -7
W C
R -7
PROPOSED GRAVEL
ACCESS ROAD
PROPOSED ASPHALT
ACCESS ROAD
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
PP-201
SZURN
SFETZER
PLAN & PROFILE
TBD
9/3/2025
AS NOTED
CR-15
PP-201
PP-1
SCALE:PP-1 S. RAMP AND RCP
NONE
SC
H
O O
L
AC
C
ESS
PROPOSED
CULVERT A - SEE
PROFILE AT RIGHT
DETECTABLE
WARNING
SURFACE
P.I.P.
WATER
FACILITIES
CULVERT A PROFILE
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
CONTROL LINEPROPOSED 10'
CONCRETE TRAIL
9+00 10+00
11+00 12+00 13+00 14+00 15+00
16+00 17+00 18+00
EXISTING 60'
RIGHT-OF-WAY
EXISTING 40'
TRAIL EASEMENT
EXISTING 35'
CITY OF GREELEY
WATERLINE EASEMENT
EXISTING 20'
TOWN OF WINDSOR
PIPELINE EASEMENT
EXISTING 20'
TOWN OF WINDSOR
PIPELINE EASEMENT
CONTRACTOR TO CONFIRM
DEPTH OF GREELEY WATERLINE
9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00
0.19% 0.52%
1.10%-0.21%
0.09% 4.15%
0.65% 1.13%
PV
I:9
+1 2.
EL
EV
: 4
6.
PV
I:1
0+
.7
EL
EV
: 4
7.
PV
I:1
2+
.2
EL
EV
: 4
8.
PV
I:9
+1 2.
EL
EV
: 4
6.
PV
I:1
0+
.7
EL
EV
: 4
7.
PV
I:1
2+
.2
EL
EV
: 4
8.
LP STA: 17+12.63
LP ELEV: 4833.73
PVI STA:17+29.50
PVI ELEV:4833.68
K:38.20
LVC:50.00
LP STA: 15+25.93
LP ELEV: 4830.53
PVI STA:15+50.93
PVI ELEV:4830.55
K:12.33
LVC:50.00 BV
C S:
6+
.8
BV
C E:
2.
EV
C
S:
6+
.4
EV
C
E:
3.
BV
C
S:
4+
.9
BV
C
E:
0.
EV
C
S:
4+
.9
EV
C
E:
0.
HP STA: 16+55.78
HP ELEV: 4833.84
PVI STA:16+31.60
PVI ELEV:4833.89
K:12.29
LVC:53.60
HP STA: 14+51.96
HP ELEV: 4830.46
PVI STA:14+39.46
PVI ELEV:4830.45
K:23.95
LVC:25.00
0.19% 0.52%
1.10%-0.21%
0.09% 4.15%
0.65% 1.13%
BV
C
S:
7+
.5
BV
C
E:
3.
EV
C
S:
7+
.5
EV
C
E:
3.
BV
C
S:
5+
.9
BV
C
E:
0.
EV
C
S:
5+
.9
EV
C
E:
1.
PROPOSED GRADE
EXISTING GROUND
PROPOSED CULVERT B
20 LF 18" PVC SDR-35
WITH CONCRETE TRANSITIONS
PROPOSED SIDEWALK
CULVERT C
16+00 17+00
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
M
AT
C H
LI
N
E
ST
A.
8+
SE
E
D R
AW
IN
G P
P-
KEYED NOTES
PROPOSED CONCRETE TRAIL, SEE TYPICAL
SECTION 1, DRAWING DT-601.
PROPOSED 6" THICK PERPENDICULAR CURB
RAMP. SEE CDOT DETAIL M-608-1. COST OF
DETECTABLE WARNING INCLUDED IN THE SY
COST OF THE RAMP. PAID AS ITEM: 608-00010
CONCRETE CURB RAMP.
2' WIDE REMOVAL OF ASPHALT TO ALLOW FOR
PLACEMENT OF CONCRETE FORMS FOR CURB
RAMP INSTALLATION. REMOVED ASPHALT SHALL
BE PATCHED TO MATCH EXISTING ASPHALT
DEPTH UTILIZING (GRADING S)(75)(PG 64-28)
PROPOSED PIPE
PROPOSED CURB & GUTTER TYPE 2 (SECTION II-M)
INSTALLATION. SEE CDOT DETAIL M-609-1
PROPOSED HANDRAIL/BICYCLE RUB RAIL, SEE
CDOT DETAIL B-607-1
PROPOSED SIDEWALK CULVERT. SEE CONCRETE
SIDEWALK CULVERT DETAIL C, DRAWING DT-601
PROPOSED DRIVEWAY SURFACING; 4" HOT MIX
ASPHALT (GRADING S)(75)(PG 64-28)OVER
COMPACTED SUBGRADE
PROPOSED RETAINING WALL
PROTECT TREE IN-PLACE.
REMOVAL OF GUARDRAIL TO ALLOW TRAIL
CONNECTION
ACCESS ROAD, 6" GRAVEL
REMOVAL OF TREE
NOTES
1. SEE DRAWING GM-101 TO GM-104 FOR GEOMETRIC &
HORIZONTAL CONTROL.
2. SEE DRAWING GR-301 TO GR-304 FOR GRADING.
3. EXPANSION JOINTS, WHERE REQUIRED, SHALL BE FILLED
WITH ONE-HALF (1
2") THICK, FULL DEPTH, PREFORMED
EXPANSION JOINT MATERIAL AS PER CDOT STANDARD
SPECIFICATIONS, SUBSECTION 705.01
PROPOSED LIMITS
OF FILL
PROPOSED
REINFORCED
CONCRETE TRAIL
PROPOSED LIMITS
OF CUT
LEGEND
PROTECT IN
PLACE
N CR-15 TRAIL
W C
R -7
W C
R -7
PROPOSED GRAVEL
ACCESS ROAD
PROPOSED ASPHALT
ACCESS ROAD
M
AT
C H
LI
N
E
ST
A.
+0
SE
E
D R
AW
IN
G P
P-
N
SCALE IN FEET
VERT
HORZ 40 80
5 10
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
PP-202
SZURN
SFETZER
PLAN & PROFILE
TBD
9/3/2025
AS NOTED
CR-15
WCR 72
PP-202
PP-2
SCALE:PP-2 CULVERT B & C
NONE
PRIVATE
ACCESS
CITY OF GREELEY
REVIEWED BY: _____________________________________________
WATER/SEWER CHIEF ENGINEER DATE
REVIEW DOES NOT CONSTITUTE “APPROVAL” OF PLANS. PERMITTEE IS
RESPONSIBLE FOR ACCURACY AND COMPLETENESS OF PLANS.
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
PROPOSED 10'
CONCRETE TRAIL
18+00 19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
CR-15
EXISTING 40'
TRAIL EASEMENT
EXISTING 80'
RIGHT-OF-WAY
18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00
1.84%
0.77%
0.66%
1.10%
1.28%
PV
I:1
8+
.9
EL
EV
: 4
5.
PV
I:2
1+
.2
EL
EV
: 4
8.
1.84%
0.77%
0.66%
1.10%
1.28%
PV
I:1
8+
.9
EL
EV
: 4
5.
PV
I:2
1+
.2
EL
EV
: 4
8.
BV
C
S:
2+
.0
BV
C
E:
9.
EV
C
S:
3+
.5
EV
C
E:
0.
LP STA: 22+72.03
LP ELEV: 4839.61
PVI STA:23+01.77
PVI ELEV:4839.84
K:55.35
LVC:59.48
BV
C
S:
4+
.0
BV
C
E:
2.
EV
C
S:
5+
.3
EV
C
E:
3.
HP STA: 25+15.32
HP ELEV: 4843.41
PVI STA:24+85.20
PVI ELEV:4843.21
K:51.17
LVC:60.24
PROPOSED GRADE
EXISTING GROUND
J-U-B ENGINEERS, INC.
Fort Collins, CO 80528 2809 E. Harmony Rd., Suite 300
Phone: 970.377.3602
301 Walnut Street Windsor, CO 80550 Phone: (970) 674-2400 Fax: (970) 674-2456
M
AT
C H
LI
N
E
ST
A.
7+
SE
E
D R
AW
IN
G P
P-
KEYED NOTES
PROPOSED CONCRETE TRAIL, SEE TYPICAL
SECTION 1, DRAWING DT-601.
PROPOSED 6" THICK PERPENDICULAR CURB
RAMP. SEE CDOT DETAIL M-608-1. COST OF
DETECTABLE WARNING INCLUDED IN THE SY
COST OF THE RAMP. PAID AS ITEM: 608-00010
CONCRETE CURB RAMP.
2' WIDE REMOVAL OF ASPHALT TO ALLOW FOR
PLACEMENT OF CONCRETE FORMS FOR CURB
RAMP INSTALLATION. REMOVED ASPHALT SHALL
BE PATCHED TO MATCH EXISTING ASPHALT
DEPTH UTILIZING (GRADING S)(75)(PG 64-28)
PROPOSED PIPE
PROPOSED CURB & GUTTER TYPE 2 (SECTION II-M)
INSTALLATION. SEE CDOT DETAIL M-609-1
PROPOSED HANDRAIL/BICYCLE RUB RAIL, SEE
CDOT DETAIL B-607-1
PROPOSED SIDEWALK CULVERT. SEE CONCRETE
SIDEWALK CULVERT DETAIL C, DRAWING DT-601
PROPOSED DRIVEWAY SURFACING; 4" HOT MIX
ASPHALT (GRADING S)(75)(PG 64-28)OVER
COMPACTED SUBGRADE
PROPOSED RETAINING WALL
PROTECT TREE IN-PLACE.
REMOVAL OF GUARDRAIL TO ALLOW TRAIL
CONNECTION
ACCESS ROAD, 6" GRAVEL
REMOVAL OF TREE
NOTES
1. SEE DRAWING GM-101 TO GM-104 FOR GEOMETRIC &
HORIZONTAL CONTROL.
2. SEE DRAWING GR-301 TO GR-304 FOR GRADING.
3. EXPANSION JOINTS, WHERE REQUIRED, SHALL BE FILLED
WITH ONE-HALF (1
2") THICK, FULL DEPTH, PREFORMED
EXPANSION JOINT MATERIAL AS PER CDOT STANDARD
SPECIFICATIONS, SUBSECTION 705.01
PROPOSED LIMITS
OF FILL
PROPOSED
REINFORCED
CONCRETE TRAIL
PROPOSED LIMITS
OF CUT
LEGEND
PROTECT IN
PLACE
N CR-15 TRAIL
W C
R -7
W C
R -7
PROPOSED GRAVEL
ACCESS ROAD
PROPOSED ASPHALT
ACCESS ROAD
M
AT
C H
LI
N
E
ST
A.
8+
SE
E
D R
AW
IN
G P
P-
N
SCALE IN FEET
VERT
HORZ 40 80
5 10
Call before you dig.
Know what's below .
R
BI
D
P
LA
N S
PP-203
SZURN
SFETZER
PLAN & PROFILE
TBD
9/3/2025
AS NOTED
OMAR HERRERA, P.E. Date Town Engineer
APPROVAL BLOCK
TOWN OF WINDSOR
DRAWING REVIEW
REVIEW IS FOR GENERAL COMPLIANCE WITH
CONTROL LINE
PROPOSED 10'
CONCRETE TRAIL
27+00 28+00
29+00
30+0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .