About this file
This file contains bridging documents for the Cobb-Douglas Public Health Department facility expansion and renovation project located at 6770 Selman Drive, Douglasville, Georgia 30134. The project encompasses the design, permitting, site preparation, expansion, and remodel of an existing 12,049 square foot health department building with an additional 4,610 square foot addition, utilizing Type IIB construction. The bridging documents include architectural plans, demolition details, life safety plans, and code compliance information prepared by McMillan Pazdan Smith Architecture with supporting engineering disciplines including structural (Mark Nannis Structural Engineers), mechanical, electrical, plumbing, fire protection, and low voltage systems (all through TLC Consulting Engineers). The project is classified as a clinic outpatient business use with a primary occupancy classification and includes multiple exam rooms, waiting areas, administrative offices, restrooms, storage, and mechanical spaces distributed across the facility. The total gross building area following completion will be 16,659 square feet. The bridging documents are dated May 18, 2026, and represent the pre-construction phase with construction details addressing life safety requirements, ADA accessibility compliance, fire-rated assemblies, and specialized wall systems.
The project must comply with the 2024 International Building Code with Georgia amendments, 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2023 National Electrical Code, and applicable NFPA standards including NFPA 13 for sprinkler systems, NFPA 72 for fire alarm systems, and NFPA 101 Life Safety Code. The design includes provisions for emergency lighting, exit signage, fire alarm systems, smoke detection, and carbon monoxide detection throughout the facility. The project involves demolition of existing non-structural elements including the standing seam mansard roof, interior finishes, ceiling systems, and exterior carport structure while maintaining existing structural components and the parapet. The funding is sourced through Cobb & Douglas Public Health reserve funds and appropriations from the Douglas County Board of Commissioners General Fund. The Design-Builder holds responsibility for all permitting, approvals, licensing requirements, and compliance with Douglas County standards and all authorities having jurisdiction. Interior finishes are organized into six finish zones with varying quality levels, and the facility includes specialized spaces such as negative pressure isolation rooms, blood draw areas, hearing/vision screening rooms, and car seat installation areas reflecting the comprehensive public health services provided.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER
COBB-DOUGLAS PUBLIC HEALTH
6770 SELMAN DRIVE
DOUGLASVILLE, GA 30134
770.949.1970
DESTINY.DAVIDSON@DPH.GA.GOV
DESTINY DAVIDSON
CIVIL
FORESITE GROUP
3740 DAVINCI COURT, SUITE 100
PEACHTREE CORNERS, GA 30092
770.368.1399
JBULLARD@FG-INC.NET
JONATHAN BULLARD
STRUCTURAL
MARK NANNIS STRUCTURAL ENGINEERS
2060 BUFORD HIGHWAY NE, SUITE 106
BUFORD, GA 30518
770.310.8472
JAMIE@MARKNANNIS.COM
JAMIE DAVIS
ELECTRICAL
TLC CONSULTING ENGINEERS
4360 CHAMBLEE DUNWOODY ROAD, SUITE 210
ATLANTA, GA 30341
770.451.6757
TAWAN.MARTIN@TLC-ENG.COM
TAWAN MARTIN
PLUMBING
TLC CONSULTING ENGINEERS
4360 CHAMBLEE DUNWOODY ROAD, SUITE 210
ATLANTA, GA 30341
770.451.6757
TRIP.WALTERS@TLC-ENG.COM
TRIP WALTERS
FIRE PROTECTION
TLC CONSULTING ENGINEERS
4360 CHAMBLEE DUNWOODY ROAD, SUITE 210
ATLANTA, GA 30341
770.451.6757
TRIP.WALTERS@TLC-ENG.COM
TRIP WALTERS
ARCHITECT
McMILLAN PAZDAN SMITH ARCHITECTURE
1200 PEACHTREE ST NE SUITE 750
ATLANTA, GA 30309
678-251-4602
WBRYANT@MCMILLANPAZDANSMITH.COM
WILL BRYANT
MECHANICAL
TLC CONSULTING ENGINEERS
4360 CHAMBLEE DUNWOODY ROAD, SUITE 210
ATLANTA, GA 30341
770.451.6757
MATT.MASON@TLC-ENG.COM
MATT MASON
LOW VOLTAGE
TLC CONSULTING ENGINEERS
4360 CHAMBLEE DUNWOODY ROAD, SUITE 210
ATLANTA, GA 30341
770.451.6757
CHRIS.NUNAMAKER@TLC-ENG.COM
CHRIS NUNAMAKER
PROJECT AREA
PROJECT
NORTH
PROJECT AREA
PROJECT
NORTH
1. ALL WORK SHALL MEET THE MINIMUM REQUIREMENTS OF THE LATEST ADOPTED
EDITIONS OF THE APPLICABLE CODES, AS INDICTED ON THIS SHEET AND ALL OTHER
LOCAL, STATE OR FEDERAL CODES OR REGULATIONS HAVING JURISDICTION.
2. ALL WORK LISTED, SHOWN OR IMPLIED ON THE CONSTRUCTION DOCUMENTS SHALL BE
SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR EXCEPT WHERE
OTHERWISE NOTED.
3. ALL CONSTRUCTION SHALL BE ADA ACCESSIBLE AND COMPLY WITH BARRIER FREE
DESIGN AND OTHER APPLICABLE STANDARDS.
4. DO NOT SCALE DRAWINGS. CLARIFY ANY DIMENSIONAL DISCREPANCIES WITH THE
ARCHITECT PRIOR TO CONTINUING WITH THE WORK.
5. IN THE EVENT OF ANY DISCREPANCIES FOUND IN THE DRAWINGS OR CONFLICTS
BETWEEN THE ARCHITECTURAL DRAWINGS AND THOSE OF THE ENGINEERS, THE
CONTRACTOR SHALL BE REQUIRED TO NOTIFY THE ARCHITECT BEFORE PROCEEDING
WITH THE WORK.
6. DIMENSIONS SHOWN FOR EXTERIOR DOORS AND WINDOWS ARE TO EDGE OF FRAME
UNLESS OTHERWISE NOTED.
7. ALL INTERIOR DIMENSIONS GIVEN ARE FROM FACE OF STUD OR CENTERLINE OF
COLUMN, UNLESS OTHERWISE NOTED. EXTERIOR DIMENSIONS ARE FROM FACE/EDGE
OF MASONRY/CONCRETE OR COLUMN CENTERLINE, UNLESS OTHERWISE NOTED.
8. PROVIDE FIRE EXTINGUISHERS IN ACCORDANCE W/ NFPA 10. INSTALL WALL MOUNTED
FIRE EXTINGUISHER CABINET (FEC) AT 4'-0" AFF TO TOP OF CABINET. GENERAL
CONTRACTOR TO COORDINATE LOCATIONS WITH LOCAL FIRE MARSHALL.
9. HORIZONTALLY BRACE (STIFFEN) ALL METAL STUD SYSTEMS AS RECOMMENDED AND
BRACE TOPS OF ALL PARTITIONS TO STRUCTURE ABOVE.
10. THE GENERAL CONTRACTOR SHALL PROVIDE CONTROL JOINTS (CJ) IN ALL MASONRY
WALLS AS SHOWN IN THE DRAWINGS, BUT NOT TO EXCEED 30'-0" LINEAR BETWEEN
JOINTS. THE CONTROL JOINT SHALL CONTINUE UP FULL HEIGHT OF WALL. COLORS OF
SOFT JOINT SEALANT SHALL MATCH THAT OF THE WALL CONSTRUCTION MATERIAL.
THE GENERAL CONTRACTOR SHALL COORDINATE THE CONTROL JOINT QUANTITY,
SPACING AND LOCATIONS WITH THE ARCHITECT PRIOR TO CONSTRUCTION.
11. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION THE CONTRACTOR IS
RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT BEFORE
CONTINUING WITH THE WORK.
12. WHERE REQUIRED, BLOCKING TO BE FRT PER 2024 IBC 603.1. ALL WOOD IN CONTACT
WITH MORTAR, CONCRETE, OR MASONRY TO BE PRESSURE TREATED. PT BLOCKING AT
STOREFRONT. FRT AND PRESSURE TREATED BLOCKING AT ROOF AND PARAPETS.
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N E
D
O R
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :3
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
COVER SHEET
G001 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
MPS Project No:
Agency Review ID:
Issue Date/ Description:
HEALTH DEPARTMENT EXPANSION
6770 SELMAN DR, DOUGLASVILLE, GA 30134
DOUGLAS COUNTY PUBLIC HEALTH DEPARTMENT
025135.00
SITE MAP
VICINITY MAP
SHEET NO SHEET NAME
GENERAL
G001 COVER SHEET
G003 CODE SUMMARY / UL DETAILS
G110 LEVEL 1 LIFE SAFETY PLAN
ARCHITECTURAL
A001 ABBREVIATION, SYMBOLS AND LEGENDS
A003 EXTERIOR WALL ASSEMBLIES & PARTITION TYPES
A010 DEMOLITION SITE PLAN
A011 ARCHITECTURAL SITE PLAN
A031 LEVEL 1 DEMOLITION PLAN
A041 LEVEL 1 DEMOLITION RCP
A060 DEMOLITION ELEVATIONS
A110 LEVEL 1 OVERALL PLAN
A111A LEVEL 1 - ENLARGED PLAN A
A111B LEVEL 1 - ENLARGED PLAN B
A115 LEVEL 1 INTERIOR FINISH PLAN
A116 INTERIOR FINISH NARRATIVE SCHEDULE
A130 ROOF OVERALL PLAN
A210 LEVEL 1 OVERALL RCP
A211A LEVEL 1 - ENLARGED RCP A
A211B LEVEL 1 - ENLARGED RCP B
A300 OVERALL BUILDING ELEVATIONS
A920 PERSPECTIVE VIEWS - FOR REFERENCE ONLY
05.18.2026 BRIDGING DOCUMENTS
GENERAL NOTESDRAWING LIST
FOR REFERENCE ONLY
NO. DATE DESCRIPTION
05.18.2026 BRIDGING DOCUMENTS
Name of Project: COBB-DOUGLAS HEALTH DEPT - DOUGLASVILLE FACILITY
Address: 6770 SELMAN DR, DOUGLASVILLE, GA
Owner/Authorized Agent:
Owned By:
Code Enforcement Jurisdiction:
COBB-DOUGLAS HEALTH DEPT
City/County Private
Phone:
State
City: - County:
WILL BRYANT
Architectural McMILLAN PAZDAN SMITH WILL BRYANT - 678.251.4602
DISCIPLINE FIRM NAME LICENSE# TELEPHONE#
IBC 2018 BUILDING CODE: New Building
I-A II-A III-A IV V-AConstruction Type:
(Check All That Apply)
No PartialSprinklers:
Standpipes:
Fire District:
Special Inspections Required:
GROSS BUILDING AREA:
NFPA 13 NFPA 13R NFPA 13D
No Yes
No Yes
Class: I II III Wet Dry
FLOOR EXISTING (SQ FT) ADDITION (SQ FT)
Level 01
E-MAIL: DESTINY.DAVIDSON@DPH.GA.GOV
Addition Renovation
Yes
No YesFlood Hazard Area:
Zip Code:
State
Electrical
Plumbing
Mechanical
Fire Protection
Structural
Civil
I-B* II-B III-B V-B
PROJECT INFORMATION:
TYPE OF WORK BEING PERFORMED:
1st Time Interior Completion
Shell/Core - Contact the local inspection jurisdiction for possible additional procedures and requirements
Phased Construction - Shell/Core- Contact the local inspection jurisdiction for possible additional procedures and requirements
RISK CATEGORY (Table 1604.5) I IIIII IVProposed:
No Yes Contact the local inspection jurisdiction for additional procedures and requirements
CODE SUMMARY
Proposed Use CLINIC, OUTPATIENT - BUSINESS
Building Description:
BRIDGING DOCUMENTS FOR A RENOVATION OF AN EXISTING 12049 SF HEALTH DEPARTMENT BUILDING AND 4,610 SF
ADDITION THAT UTILIZES TYPE TYPE IIB CONSTRUCTION.
30134
770.949.1970
FORESITE GROUP JONATHAN BULLARD 770.368.1399-
PROJECT SUMMARY:
LEAD DESIGN PROFESSIONAL:
BASIC BUILDING INFORMATION
ALLOWABLE HEIGHT
Building Height in Feet (Table 504.3) 2
Building Height in Stories (Table 504.4) 3
ALLOWABLE SHOWN ON PLANS CODE REFERENCE
75'-0"
1 Provide code reference if the "Shown on Plans" quantity is not based on Table 504.3 or 504.4
2 The maximum height of air traffic control towers must comply with Table 412.3.1.
3 The maximum height of open parking garages must comply with Table 406.5.4.
FIRE PROTECTION REQUIREMENTS
LIFE SAFETY SYSTEM REQUIREMENTS*:
No YesEmergency Lighting:
No Yes
No Yes
No Yes
No Yes
Partial:
Exit Signs:
Fire Alarm:
Smoke Detection Systems:
Carbon Monoxide Detection
LIFE SAFETY PLAN REQUIREMENTS
Fire and/or smoke rated wall locations (Chapter 7)
Assumed and real property line locations (if not on site plan)
Exterior wall opening area with respect to distance to assumed property lines (705.8)
Occupancy use of each area as it relates to occupant load calculation (Table 1004.5)
Occupant loads for each area
Exit sign locations (1013)
Common path of travel distances (Table 1006.2.1 & Table 1006.3.2)
Dead end lengths (1020.4)
Clear exit widths for each exit door
Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3)
Actual occupant load for each exit door
A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation
Location of doors with panic hardware (1010.1.10)
Location of doors with delayed egress locks and the amount of delay (1010.1.9.8)
Location of doors with electromagnetic egress locks (1010.1.9.9)
Location of doors equipped with hold-open devices
Location of emergency escape windows (1030)
The square footage of each fire area (202)
The square footage of each smoke compartment for Occupancy Classification I-2 (407.5)
Note any code exceptions or table notes that may have been utilized regarding the items above
Exit access travel distances (1017)
Life Safety Plan Sheet # G110
Primary Occupancy Classification:
Assembly A-1 A-2 A-3 A-4 A-5
Business
Hazardous
Institutional
Mercantile
Storage
Utility and Miscellaneous
H-1 Detonate
I-1
Residential
S-1 Moderate
Factory
H-2 Deflagrate
Condition: 1
R-1
S-2 Low
H-3 Combust H-4 Health
F-1 Moderate F-2 Low
H-5 HPM
R-2 R-3 R-4
High-Piled
Parking Garage Open Enclosed Repair Garage
Mixed Occupancy: No Yes Separation: - Exception:
Non-Separated Use (508.3)
The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable occupancies to the entire building. The most restrictive type of construction, so determined, shall apply to the entire building.
Separated Use (508.4) - See below for area calculations
For each story, the area of the occupancy shall be such that the sum of the ratios of the actual floor area of each use divided by the allowable floor area for each use shall not exceed 1.
ALLOWABLE AREA:
Educational
I-2
I-3
I-4
Condition: 1 2
Condition: 1 2 3 4 5
Institutional
Select one
Accessory Occupancy Classification:
Assembly A-1 A-2 A-3 A-4 A-5
Business
Hazardous
Institutional
Mercantile
Storage
Utility and Miscellaneous
H-1 Detonate
I-1
Residential
Factory
H-2 Deflagrate
Condition: 1
R-1
S-2 Low
H-3 Combust H-4 Health
F-1 Moderate F-2 Low
H-5 HPM
R-2 R-3 R-4
High-Piled
Parking Garage Open Enclosed Repair Garage
Educational
I-2
I-3
I-4
Condition: 1 2
Condition: 1 2 3 4 5
Institutional
Incidental Uses (Check All That Apply)
Furnace room where any piece of equipment is over 400,000 Btu per hour input
Rooms with boilers where the largest piece of equipment is over 15 psi and 10 horsepower
Refrigerant machinery room
Hydrogen fuel gas rooms, not classified as Group H
Incinerator rooms
Paint shops, not classified as Group H, located in occupancies other than Group F
In Group E occupancies, laboratories and vocational shops not classified as Group H
In Group I-2 occupancies, laboratories not classified as Group H
Laundry rooms over 100 square feet
Group I-3 cells and Group I-2 patient rooms equipped with padded surfaces
In Group I-2, physical plant maintenance shops
In ambulatory care facilities or Group I-2 occupancies, waste and linen collection rooms with containers that have an aggregate volume of 10 cubic feet or greater
In other than ambulatory care facilities and Group I-2 occupancies, waste and linen collection rooms over 100 square feet
Stationary storage battery systems having an energy capacity great than the threshold quantity specified in Table 1206.2 of the international Fire Code.
In ambulatory care facilities, laboratories not classified as Group H
In Group I-2, laundry rooms over 100 square feet
In ambulatory care facilities or Group I-2 occupancies, storage rooms greater than 100 square feet
Special Uses: 403 404 405 406 407 408 409 410 411 412
413 414 415 416 417 418 419 420 421 422 423
424 425 426 427 428
Special Provisions: 510.2 510.3 510.4 510.5 510.6 510.7 510.8 510.9
APPLICABLE BUILDING CODES -
INTERNATIONAL BUILDING CODE, 2024 EDITION, WITH GEORGIA AMENDMENTS
INTERNATIONAL PLUMBING CODE, 2024 EDITION, WITH GEORGIA AMENDMENTS
INTERNATIONAL MECHANICAL CODE, 2024 EDITION, WITH GEORGIA AMENDMENTS
INTERNATIONAL FUEL GAS CODE, 2024 EDITION, WITH GEORGIA AMENDMENTS
NATIONAL ELECTRICAL CODE, 2023 EDITION, WITH GEORGIA AMENDMENTS
INTERNATIONAL FIRE CODE, 2024 EDITION WITH GEORGIA STATE FIRE COMMISSIONER
AMENDMENTS
INTERNATIONAL ENERGY CONSERVATION CODE, 2015 EDITION, WITH GEORGIA
SUPPLEMENTS AND AMENDMENTS
GEORGIA ACCESSIBILITY CODE CHAPTER 120-3-20(.01-.08) WITH GEORGIA STATE FIRE
COMMISSIONER AMENDMENTS 120-3-3-.08 THROUGH .11 - 2010 ADA STANDARDS FOR
ACCESSIBLE DESIGN
2024 NFPA 101 LIFE SAFETY CODE WITH 2025 GEORGIA STATE FIRE COMMISSIONER
AMENDMENTS 120-3-3-.04(72)
2022 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS WITH GEORGIA STATE FIRE
COMMISSIONER AMENDMENTS
2022 NFPA 13 FIRE SPRINKLER SYSTEMS WITH GEORGIA STATE FIRE COMMISSIONER
AMENDMENTS
2024 NFPA 14 STANDPIPE AND HOSE SYSTEMS WITH GEORGIA STATE FIRE COMMISSIONER
AMENDMENTS
2023 NFPA 25 INSPECTION, TESTING, MAINTENANCE OF WATER-BASED FIRE PROTECTION
SYSTEMS CODE WITH GEORGIA STATE FIRE COMMISSIONER AMENDMENTS
2022 NFPA 72 FIRE ALARM AND SIGNALING CODE WITH GEORGIA STATE FIRE COMMISSIONER
AMENDMENTS
2024 NFPA 96 VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING
OPERATIONS WITH GEORGIA STATE FIRE COMMISSIONER AMENDMENTS
SEISMIC CATEGORY: C
OCCUPANT LOAD AND EXIT WIDTH
(REFER TO LIFE SAFETY PLANS FOR MORE
INFORMATION)
Electrical installations and transformers
S-1 Moderate
FLOOR, ROOM OR
SPACE DESIGNATION
MIN. # OF EXITS
SHOWN ON
PLANS
LEVEL 1
NUMBER AND ARRANGEMENTS OF EXITS
(REFER TO LIFE SAFETY PLANS FOR MORE INFORMATION)
REQ'D
2 5
TRAVEL DISTANCE LIMIT (TABLE A7.6)
ACTUAL TRAVEL DISTANCE
SHOWN
ALLOWABLE TRAVEL
DISTANCE
ARRANGEMENT OF MEANS OF EGRESS (1017.2)
ACTUAL DISTANCE SHOWN
(BETWEEN CLOSEST EXITS)
REQ'D DISTANCE
BETWEEN EXIT DOORS
300' 120'-10" 75'-9" 82'-10"
COMMON PATH LIMIT (TABLE A7.6)
ACTUAL DISTANCE
SHOWN
ALLOWABLE COMMON
PATH LENGTH
100' - 0" 61'-6"
MINIMUM CORRIDOR WIDTH (12.2.3.8)
ACTUAL WIDTH SHOWNMINIMUM CORRIDOR
WIDTH
44" 57"
DEAD-END LIMIT (TABLE A7.6)
ACTUAL DISTANCE
SHOWN
ALLOWABLE DEAD-
END LENGTH
50' - 0" 16'-0"
PLUMBING FIXTURE REQUIREMENTS
(2024 IPC SECTION 403)
12049
TOTAL (SQ FT)
16,659
A. MANUAL FIRE ALARM BOXES.
B. VISIBLE ALARMS.
C. FIRE EXTINGUISHERS THAT MEET:
a. MAXIMUM AREA PER EXTINGUISHER 11,250 SF, PER IBC TABLE 906.3.
b. MAX TRAVEL DISTANCE TO EXTINGUISHER 75 FT, PER IBC TABLE 906.3
c. PROVIDE 10LB TYPE ABC EXTINGUISHER, PER NFPA 10.
d. FINAL EXTINGUISHER PLACEMENT TO BE COORDINATED WITH F.M.O.
18'-6"
Technology TLC Consulting Engineers TRIP WALTERS - 770.451.6757
TLC Consulting Engineers TRIP WALTERS 770.451.6757
TLC Consulting Engineers TRIP WALTERS 770.451.6757
TLC Consulting Engineers TRIP WALTERS 770.451.6757
TLC Consulting Engineers TRIP WALTERS 770.451.6757
MARK NANNIS STRUCTURAL ENGINEERS JAMIE DAVIS 770.310.8472
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :3
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
CODE SUMMARY / UL
DETAILS
G003 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
USE GROUP OR
SPACE DESCRIPTION
(a) (b)
GROSS/
NET
CALCULATED
OCCUPANT
LOAD (a/b)
(c)
EGRESS WIDTH
PER OCCUPANT
EXIT WIDTH (IN)
AREA
SF PER
OCCUPANT
STAIR DOOR
REQ'D WIDTH (a/b) X c
ACTUAL WIDTH
SHOWN ON PLANS
STAIR LEVEL STAIR DOOR
AMBULATORY 2,372 SF 150 24 0.2 0.0 4.80 34.0
ASSEMBLY 1,399 SF 15 95 0.2 0.0 19.00 70.0
BUSINESS 5,717 SF 150 49 0.2 0.0 9.80 34.0
STORAGE 1,517 SF 500 17 0.2 0.0 3.40 34.0
11,004 SF 185 0.0 37.00
NO. DATE DESCRIPTION
05.18.2026 BRIDGING DOCUMENTS
PROVIDED... 3 1 4 8 16 4 4 8 16 2 2
REQUIRED... 2 - 2 4 2 2 4 1
SUBTOTALS 1.514 0.82 1.869 1.03 1.03 0.937
S STORAGE 17 1/100 0.09 .5 0.05 1/100 0.09 1/100 0.14 0.14 1/1000 0.017
B BUSINESS 73
1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50
1.04 .5 0.52 1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50
1.04 1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80
0.65 0.65 1/100 0.73
A-3 ASSEMBLY 95 1/125 0.384 .67 0.26 1/65 0.739 1/200 0.24 0.24 1/500 0.19
USE TOTAL LOAD RATIO MALE
URINAL
SUBSTITUTION
ALLOWED
NUMBER
URINALS
RATIO FEMALE UNISEX TOTAL RATIO MALE FEMALE UNISEX TOTAL
SPACE WATER CLOSETS LAVATORIES
SHOWERS/
TUBS
DRINKING
FOUNTAINS
RATIO
DRINKING
FOUNTAINS
SERVICE
SINK
BUSINESS
STORAGE
STORAGE
STORAGE
BUSINESS
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
BUSINESS
BUSINESS
STORAGE
BUSINESS
BUSINESS
BUSINESS
STORAGE
AMBULATORY
AMBULATORY
ASSEMBLY
BUSINESS
STORAGE
BUSINESS
BUSINESS
STORAGE
BUSINESS
AMBULATORY
ASSEMBLY
STORAGE
AMBULATORY
BUSINESS
STORAGE
AMBULATORY
LONGEST DIAGONAL = 227'-5"
1/3 OF DIAGONAL =75'-9"
STORAGE
15 34 170
ASSEMBLY
BUSINESS
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
AMBULATORY
BUSINESS
BUSINESS
BUSINESS
AMBULATORY
AMBULATORY
STORAGE
AMBULATORY
BUSINESS
STORAGE
BUSINESS
BUSINESS
BUSINESS
BUSINESS
AMBULATORY
BUSINESS
BUSINESS
BUSINESS
BUSINESS
BUSINESS
BUSINESS
STORAGE
BUSINESS
STORAGE
BUSINESS
BUSINESS
BUSINESS
BUSINESS
BUSINESS
STORAGE
AMBULATORY
AMBULATORY
AMBULATORY
STORAGE
FE
FE
PATH OF TRAVEL : 91'-5"
PATH OF TRAVEL : 116'-3"
PATH OF TRAVEL : 120'-10"
PATH OF TRAVEL : 86'-9"
COMMON PATH : 61'-1"
COMMON PATH : 35'-5"
PATH OF TRAVEL : 71'-6"
BUSINESS
STORAGE
86 68 340
PH
27 34 170
40 34 170
17 34 72
EXISTING STORAGE SHED
FIRE RATING AND FIRE PROOFING NOTES :
1. FIRE CAULK PARTITION TIGHT TO FLOOR AND DECK. FILL VOID AT DECK WITH COMPRESSIBLE
FIRE SEAL.
2. MAINTAIN ALL FIRE RATED ASSEMBLIES. PENETRATIONS AND SEALING METHODS TO BE UL
RATED. REF MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR ADDITIONAL DETAILS.
3. MAX TRAVEL DISTANCE TO A FIRE EXTINGUISHER IS 75'. (MAINTAIN WALL RATING AT FEC).
4. PROVIDE NFPA APPROVED KNOX BOX (COORDINATE AN APPROVED LOCATION WITH THE FIRE
MARSHAL).
000 00 000
MAX. OCCUPANT CAPACITY OF EXIT
WIDTH OF EXIT
POTENTIALLY EXITING OCCUPANTS
DOOR EGRESS TAG EGRESS SIGNAGE
FEC
FIRE EXTINGUISHER CABINET - SEMI-RECESSED
TRAVEL DISTANCE
FIRE EXTINGUISHER ACCESS RADIUS
COMMON PATH OF TRAVEL
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :4
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
LEVEL 1 LIFE SAFETY
PLAN
G110 025135.00
AR, BW
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
1/8" = 1'-0"G110
A5 LIFE SAFETY PLAN
LIFE SAFETY LEGEND
LINE TYPES
BEYOND
CENTERLINE
DEMOLISHED
HIDDEN
OVERHEAD
ANNOTATIONS
'X' 'X'
CL
A
CENTERLINE DIMENSION
COLUMN GRID TAG - NEW
COLUMN GRID TAG - EXISTING
ALIGN FACE OF SURFACESALIGN
SPOT ELEVATION
Name Elevation
0'-0"
LEVEL / ELEVATION HEIGHT
REVISION TAG AND CLOUD1
ANNOTATIONS AND TAGS
NORTH
NORTH (PROJECT OR TRUE)
PROJECT NORTH
TRUE NORTH
WINDOW / CURTAIN WALL TAGA
LOUVER TAGL1
WALL TAGSA4.0
DEMOLITION KEYNOTE01
KEYNOTE01
ACCESSORY TAGTA-1
FURNITURE TAGF1
EQUIPMENT TAGE123456
SIGNAGE TAGS99
CEILING TAG
AFF
1t
10'-0" CEILING TYPE (IF / WHEN INDICATED)
CEILING HEIGHT
ROOM TAG(S):
ROOM TAG WITH AREA (NO ROOM #)ROOM NAME
150 SF
DEPARTMENT OR PHASE (IF SHOWN)
ROOM NAME
00999
DEPT/ PHASE
ROOM NAME
FLOOR # = 1 OR 2 DIGITS
ROOM # = 2 OR 3 DIGITS
AREA (IF SHOWN)
ROOM NAME
00999
150 SF
DOOR RATING (IF SHOWN)
FLOOR # = 1 OR 2 DIGITS
ROOM # = 2 OR 3 DIGITS
122A
DOOR SEQUENCE (ALPHABETIC)
VIEW REFERENCE
PHOTO REFERENCE TAG
1/ A
A1 VIEW NAME
1/8" = 1'-0"A101
PLAN VIEW TITLE REFERENCE
A1 VIEW NAME
1/8" = 1'-0"A101
CURRENT SHEET
CURRENT SHEET
VIEW SCALE
PLAN NUMBER
SIM
A103
PLAN / DETAIL CALLOUT
REFERENCED SHEET
A610
SIM
A610
SIM
BUILDING SECTION CALLOUT
REFERENCED SHEET
A5
A610
SIM
WALL SECTION CALLOUT
REFERENCED SHEET
A601
SIM
DETAIL SECTION CALLOUT
REFERENCED SHEET
A510
1 Ref
1 Ref 1 Ref
1 Ref
INTERIOR ELEVATION CALLOUT
A1011 EXTERIOR ELEVATION CALLOUT
A1 Ref
A1 Ref A1 Ref
A1 Ref
A1 Ref
DETAIL NUMBER
DETAIL VIEW TITLE REFERENCE
VIEW SCALE
AREA ONLY
150 SF
10036 24
DEPTH
TYPE (SEE CASEWORK DETAILS)
WIDTH
HEIGHT
CASEWORK (BASE)
10036 24
34 HEIGHT
CASEWORK (WALL)
DEPTH
TYPE (SEE CASEWORK DETAILS)
WIDTH
ANNOTATIONS AND TAGS
LIFE SAFETY ANNOTATIONS
2,203
ASSEMBLY OCCUPANCY TYPE
AREA SQ FT
SF PER OCCUPANT
OCCUPANCY LOAD
2,203
ASSEMBLY
200 36 240
PH 45 MIN
EXIT OCCUPANT LOAD
EGRESS CAPACITY
EXIT CLEAR WIDTH
FIRE RATING (IN MINUTES)
PANIC HARDWARE
DOOR EGRESS TAG
AREA OCCUPANCY TAG(S)
EGRESS PATH(S)
EXIT
POSTED OCCUPANCY
COMMON PATH : 86'-10"
TRAVEL PATH : 86'-10"
PANIC HARDWARE (IF SHOWN)
DOOR TAG:
FIRE EXTINGUISHERS
FEC FEC
FEC
EXIT SIGNS
WALL MOUNTED
FIRE EXTINGUISER
SURFACE MOUNTED FEC
SEMI-RECESSED FEC
RECESSED FEC
DIRECTION ARROWS (WHEN SHOWN)
CEILING MOUNTED
TRAVEL PATH
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AVG AVERAGE
BD BOARD
BD FT BOARD FEET (FOOT)
BLDG BUILDING
BOS BOTTOM OF STEEL
BOT BOTTOM
CAB CABINET
CCTV CLOSED CIRCUIT TELEVISION
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFMF COLD-FORMED METAL FRAMING
CG CORNER GUARD
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT\ CONTROL JOINT
C/L CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
COORD COORDINATE
CORR CORRIDOR
DBL DOUBLE
DEMO DEMOLITION/DEMOLISH
DEPT DEPARTMENT
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIST DISTANCE
DS DOWNSPOUT
DW DISHWASHER
EA EACH
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEM ELEMENTARY
ELEV ELEVATOR
EMER EMERGENCY
EOS EDGE OF SLAB
EP EPOXY PAINT
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ETR EXISTING TO REMAIN
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
ABBREVATION NOTES:
1. ABBREVIATIONS LISTED BELOW APPLY TO THE ARCHITECTURAL DRAWINGS ONLY, REFER TO
CONSTRUCTION DOCUMENTS PREPARED BY MPS CONSULTANTS FOR ABBREVIATIONS USED.
2. REFER TO FINISH SCHEDULE FOR FINISH MATERIAL ABBREVAITIONS NOT SHOWN.
FIXT FIXTURE
FOC FACE OF CONCRETE/ FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FURN FURNITURE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTER
GL GLASS/GLAZING
GMP GUARANTEED MAXIMUM PRICE
GYP BD GYPSUM WALL BOARD
HB HOSE BIBB
HC HOLLOW CORE
HDW HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
ID INSIDE DIAMETER/ INSIDE DIMENSION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
KD KNOCKED DOWN
LAM LAMINATE
LAV LAVATORY
LF LINEAR FEET (FOOT)
LOS LINE OF SIGHT
LWC LIGHTWEIGHT CONCRETE
MAINT MAINTENANCE
MAX MAXIMUM
MED MEDICAL
MEZZ MEZZANINE
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MOD BIT MODIFIED BITUMEN
MR MOISTURE RESISTANT
MTL METAL
MW MICROWAVE
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTP NOTICE TO PROCEED
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/OWNER INSTALLED
OPP OPPOSITE
P PAINT
PAT PATTERN
PERF PERFORATED
PERM PERMANENT
PERP PERPENDICULAR
PJ PANEL JOINT
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
POLYISO POLYISOCYANURATE
PORC PORCELAIN
PREFAB PREFABRICATE
PT PRESSURE TREATED
R RADIUS
RA RELIEF ANGLE
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING STEEL BARS
REF REFERENCE
REINF REINFORCE
REQD REQUIRED
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RTF RUBBER TILE FLOOR
RTU ROOF TOP UNIT
RV ROOF VENT
SCHED SCHEDULE
SD SMOKE DETECTOR
SHR SHOWER
SHRD SHOWER DRAIN
SIM SIMILAR
SP STANDPIPE
SPEC SPECIFICATION(S)
SPKLR SPRINKLER
SPKR SPEAKER
SQ FT SQUARE FOOT
SS SOLID SURFACE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STOR STORAGE
SUSP CLG SUSPENDED CEILING
SYM SYMMETRICAL
TA TOILET ACCESSORY
TBD TO BE DETERMINED
T&G TONGUE AND GROOVE
TEMP TEMPORARY
THRU THROUGH
TLT TOILET
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB\ TOP OF STEEL
TOW TOP OF WALL
TS TRANSITION STRIP
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WALL PROTECTION
WRB WATER RESISTANT BARRIER
WSCT WAINSCOT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
UNOBSTRUCTED FORWARD REACH
UNOBSTRUCTED SIDE REACHOBSTRUCTED HIGH SIDE REACH
OBSTRUCTED HIGH FORWARD REACH
M
A X
M
A X
MAX
10" >10" - 24" MAX
M
A X
M
A X
10" MAX
M
IN
M
A X
20" MAX
M
A X
>20" - 25" MAX
M
IN
M
A X
M
A X
PULL SIDE
FRONT APPROACHES
NOTE:
1. ALL DIMENSIONS SHOWN ARE MINIMUMS.
2. DIMENSIONS AND CLEARANCES SHOWN MUST BE PROVIDED AT ALL
DOORS. CONTRACTOR SHALL REVIEW FIELD LAYOUT AND CONFIRM
THAT ALL OF THE APPROPRIATE CLEARANCES ARE PROVIDED. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S
ATTENTION. ANY REMEDIAL WORK THAT SHOULD HAVE BEEN
AVOIDED BY BRINGING DISCREPANCIES TO THE ARCHITECT'S
ATTENTION SHALL BE AT THE CONTRACTORS EXPENSE.
M
IN
IM
U
M
0"
IF
x)
(y
M
IN
IM
U M
IF
x)
(y
M
IN
IM
U
M
M
IN
IM
U M
C L
O S
E R
A N
D L
A T
C H
IF
D O
O R
H A
S
PUSH SIDE PULL SIDE
HINGE SIDE APPROACHES
PUSH SIDE
PULL SIDE
LATCH SIDE APPROACHES
PUSH SIDE
DOORS IN A SERIES
FRONT APPROACH
DOORWAY W/O DOORS, SLIDING DOORS, AND FOLDING DOORS
SIDE APPROACH POCKET OR HINGE APPROACH STOP OR LATCH APPROACH
M
IN
IM
U M
MINIMUM
22"
MINIMUM
24"
M
IN
IM
U M
M
IN
IM
U
M
8"
M
IN
IM
U
M
2"
M
IN
IM
U M
IF
C
L O
S E
R I
S P
R O
V
ID
E D
M
IN
IM
U M
M
IN
IM
U M
IF
C
L O
S E
R P
R O
V
ID
E D
M
IN
IM
U M
(x) = 36"
(x) = 42"
MINIMUM
22"
MINIMUM
24"
(ALL DOORS)
32" CLEAR
48" 48"48"
MINIMUM
18"
M
IN
IM
U
M
8"
A CLOSER AND LATCH
12" IF DOOR HAS BOTH
MINIMUM
24"
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :4
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
ABBREVIATION,
SYMBOLS AND
LEGENDS
A001 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
STANDARD GRAPHICS AND SYMBOLSABBREVIATIONS LIST
REACH RANGESMANEUVERING CLEARANCES AT DOORS (ICC/ANSI-2009)
A. PLAN DIMENSIONS ARE FACE OF STUD, CMU OR FINISH FACE OF EXISTING WALL
CONSTRUCTION UNLESS SPECIFICALLY NOTED OTHERWISE
B. GYPSUM WALL BOARD LAYERS ON RATED WALLS SHALL BE CONTINUOUS THROUGH
ALL INTERSECTIONS WITH NON-RATED WALLS. REFER TO FIRE WALL PRIORITY
DIAGRAM.
C. REFERENCE ALL FLOOR PLANS AND LIFE SAFETY PLANS FOR RATED WALL
LOCATIONS AND RATINGS.
D. PROVIDE TYPE X, MOLD AND MOISTURE RESISTANT GYPSUM WALL BOARD IN ALL
TOILET AND JANITOR ROOMS.
E. PROVIDE IMPACT RESISTANT GYPSUM WALL BOARD UP TO 4'-0" IN ALL LOBBIES,
CORRIDORS, AND STAIRWELLS.
F. AT ALL JOINTS AT TOP OF ALL FIRE RATED PARTITIONS: PROVIDE COMPLETE UL
LISTED FIRE RESISTIVE JOINT SYSTEM TO MATCH FIRE RESISTANCE OF WALL
ASSEMBLY AND THAT IS ALSO COMPATIBLE WITH JOINT SUBSTRATES.
G. ANY PORTION OF GYPSUM WALL BOARD THAT BECOMES WET OR SHOWS SIGNS OF
MOISTURE DAMAGE, EITHER BEFORE OR AFTER INSTALLATION, IS TO BE REMOVED
IMMEDIATELY AND REPLACED WITH NEW DRY GYPSUM WALL BOARD.
H. INTERIOR PARTITIONS MAY HAVE ADDITIONAL FINISHES. REFERENCE FINISH
SCHEDULE AND DETAIL SHEETS FOR ADDITIONAL INFORMATION.
I. PROVIDE PROJECT SPECIFIC DELEGATED DESIGN DATA INCLUDING STUD SPACING,
STUD GAUGE, BRACING AND DEFLECTION.
J. SOUND ATTENUATION BLANKET IS REQUIRED AT ALL INTERIOR PARTITIONS AND
SHALL RUN FULL HEIGHT OF PARTITION UNLESS NOTED OTHERWISE. SOUND
ATTENUATION BATT SHALL BE AS FOLLOWS:
a. FIRE RESISTANT PARTITIONS: MINERAL WOOL SOUND ATTENUATION FIRE
BLANKET (SAFB) - FULL STUD DEPTH
b. NON-RATED PARTITIONS: UNFACED FIBERGLASS SOUND ATTENUATION BATTS
(SAB) - FULL STUD DEPTH
K. MINOR WALLS OR OTHER WALLS NOT TAGGED WILL BE OF THE SAME WALL TYPE AS
ADJACENT WALLS (UNLESS OTHERWISE NOTED).
L. COORDINATE AND PROVIDE ALL REQUIRED BLOCKING WITHIN THE WALLS. THIS
INCLUDES BUT IS NOT LIMITED TO, ALL MILLWORK, CASEWORK, GRAB BARS,
MONITORS, AND TOILET PARTITIONS.
M. INSTALL GYPSUM WALL BOARD ON INTERIOR PARTITIONS WITH A MINIMUM 1/4” GAP
BETWEEN THE GYPSUM WALL BOARD AND THE FINISHED FLOOR.
N. AT RATED PARTITIONS AND CEILINGS, INSTALL CONTROL JOINTS PER THE TESTED
ASSEMBLIES.
SA4.0
WALL TYPE
M - MASONRY
S - STEEL STUD
W - WOOD STUD
MEMBER THICKNESS
SEE BELOW
WALL VARIANT
ALPHABETICALLY
SEQUENTIAL
WALL FRAMING PRIORITY
A. PARTITIONS SHALL BE PRIORITIZED BASED ON FIRE AND SMOKE RATING.
B. PARTITIONS SHALL BE CONSTRUCTED SUCH THAT HIGHER PRIORITY IS
FRAMED BEFORE LOWER PRIORITY.
C. LOWER PRIORITY PARTITIONS SHALL BE FRAMED TIGHT TO, BUT NOT
INTERRUPT HIGHER PRIORITY CONSTRUCTION. (SEE THE EXAMPLE
BELOW)
2 HOUR FIRE RATED WITH SMOKE BARRIER PRIORITY 1 (HIGHEST)
2 HOUR FIRE RATED PRIORITY 2
1 HOUR FIRE RATED WITH SMOKE BARRIER PRIORITY 3
1 HOUR FIRE RATED PRIORITY 4
NONE RATED PRIORITY 5 (LOWEST)
FURRING STEEL STUD WOOD STUD SHAFT WALL MASONRY
L - LAMINATED 1 - 1 5/8" STUD 2 - 1 1/2" x 1 1/2" NAILER 2 - 2 1/2" SHAFT STUD 4 - 3 5/8" CMU 0 - 7/8" HAT 2 - 2 1/2" STUD 4 - 1 1/2" x 3 1/2" STUD 4 - 4" SHAFT STUD 6 - 5 5/8" CMU 1 - 1 1/2" HAT 3 - 3 5/8" STUD 6 - 1 1/2" x 5 1/2" STUD 6 - 6" SHAFT STUD 8 - 7 5/8" CMU
4 - 4" STUD 8 - 1 1/2" x 7 1/4" STUD 10 - 9 5/8" CMU 6 - 6" STUD 12 - 1 1/2" x 11 1/4" STUD 12 - 11 5/8" CMU
8 - 8" STUD
WALL TAG LEGEND
WALL RATING
(IN HOURS)
4 7/8"
SA3
SA
5 1/4"
SA4
7 1/4"
SA6
(1) LAYER 5/8" TYPE X GYPSUM WALL BOARD EACH
SIDE OF STUD
BATT INSULATION (FULL CAVITY WIDTH)
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
CONTINUOUS SEALANT PER UL AND OR STC
ASSEMBLY
3 5/8" 4 6
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
SLAB STRUCTURE OR DECKING ABOVE, FILL FLUTES
IF METAL DECK - REFERENCE STRUCTURAL
'X'
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
DEFLECTION TRACK PACKED WITH COMPRESSIBLE
4PCF MINERAL WOOL, 1/4" MAXIMUM JOINT
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
3 3/4"
SA2
2 1/2"
5 1/4"
SB4
7 1/4"
SB6
4" 6
DIAGONAL BRACING PER SPECIFICATION
M
IN4
'X'
(1) LAYER 5/8" TYPE X GYPSUM WALL BOARD EACH
SIDE OF STUD
BATT INSULATION (FULL CAVITY WIDTH)
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
SLAB STRUCTURE OR DECKING ABOVE
4 7/8"
SB3
3 5/8"
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
SB
3 3/4"
SB2
2 1/2"
4 5/8"
SC4
6 5/8"
SC6
4" 6
4 1/4"
SC3
3 5/8"
'X'
(1) LAYER 5/8" TYPE X GYPSUM WALL BOARD AT ONE
SIDE OF STUD - REFERENCE PLAN
ACOUSTICAL BATT INSULATION (FULL CAVITY WIDTH)
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
SLAB STRUCTURE OR DECKING ABOVE, FILL FLUTES
IF METAL DECK - REFERENCE STRUCTURAL
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
DEFLECTION TRACK PACKED WITH COMPRESSIBLE
4PCF MINERAL WOOL, 1/4" MAXIMUM JOINT
CONTINUOUS SEALANT PER UL AND OR STC
ASSEMBLY
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
SC
3 1/8"
SC2
2 1/2"
SD4 SD6
4 5/8" 6 5/8"
4" 6
4 1/4"
3 5/8"
SD3
M
IN4
'X'
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
SLAB STRUCTURE OR DECKING ABOVE
(1) LAYER 5/8" TYPE X GYPSUM WALL BOARD AT ONE
SIDE OF STUD - REFERENCE PLAN
DIAGONAL BRACING PER SPECIFICATION
BATT INSULATION (FULL CAVITY WIDTH)
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
SD
3 1/8"
2 1/2"
SD2
6 1/2"
SE4
8 1/2"
SE6
4" 6
'X'
(2) LAYERS 5/8" TYPE X GYPSUM WALL BOARD EACH
SIDE OF STUD
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
SLAB STRUCTURE OR DECKING ABOVE, FILL FLUTES
IF METAL DECK
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
DEFLECTION TRACK PACKED WITH COMPRESSIBLE
4PCF MINERAL WOOL, 1/4" MAXIMUM JOINT
BATT INSULATION (FULL CAVITY WIDTH)
CONTINUOUS SEALANT PER UL AND OR STC
ASSEMBLY
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
SE
6 1/8"
SE3
3 5/8"
5"
SE2
2 1/2"
5 7/8"
SF4
7 7/8"
SF6
4" 6
'X'
(2) LAYERS ON ONE SIDE - (1) LAYER ON OPPOSITE
SIDE 5/8" TYPE X GYPSUM WALL BOARD
FINISH FLOORING AND WALL BASE - REFERENCE
FINISH SCHEDULE
SUB FLOOR - REFERENCE STRUCTURAL
STEEL RUNNER, FASTENED TO SUB FLOOR
METAL STUD FRAMING - REFERENCE CHART BELOW
FOR STUD SIZE
SLAB STRUCTURE OR DECKING ABOVE, FILL FLUTES
IF METAL DECK - REFERENCE STRUCTURAL
REFERENCE REFLECTED CEILING PLAN AND/OR
ROOM FINISH PLAN FOR CEILING HEIGHT/ELEVATION
DEFLECTION TRACK PACKED WITH COMPRESSIBLE
4PCF MINERAL WOOL, 1/4" MAXIMUM JOINT
BATT INSULATION (FULL CAVITY WIDTH)
CONTINUOUS SEALANT PER UL AND OR STC
ASSEMBLY
ACTUAL DIMENSION 'X'
ACOUSTICAL RATING
STRUCTURE ABOVE
CEILING LINE
STUD SIZE
FLOOR LINE
PLAN
FIRE RESISTANCE AND DESIGN NUMBER
(SEE LIFE SAFETY FOR RATED ASSEMBLY LOCATIONS)
SF
4 3/8"
SF2
2 1/2"
5 1/2"
SF3
3 5/8"
GYPSUM WALL BOARD:
LOCATE CONTROL JOISTS AS FOLLOWS:
A. PROVIDE CONTROL JOINTS IN WIDTHS NO GREATER THAN 30’-0” OC, BUT NO LESS
THAN 16’-0”.
B. INSTALL CONTROL JOINTS ACCORDING TO ASTM C 840 AND IN SPECIFIC
LOCATIONS APPROVED BY ARCHITECT FOR VISUAL EFFECT.
C. SUBMIT CONTROL JOINT LOCATION PLAN TO ARCHITECT FOR REVIEW PRIOR TO
INSTALLATION.
D. PROVIDE CONTROL JOINTS ABOVE DOOR JAMBS WHENEVER POSSIBLE.
EW-01 BRICK
SECTION
PLAN
BRICK TIE
5/8" GYPSUM BOARD
2" AIR GAP
1 1/2" RIGID INSULATION, MIN R-7.5
5/8" FIBERGLASS-MAT FACED GYPSUM
SHEATHING
R-13 BATT INSULATION
2"
BRICK TIE
WEATHER BARRIER SYSTEM
COLD- FORMED METAL FRAMING
COLD- FORMED METAL FRAMING
WEATHER BARRIER SYSTEM
BRICK, REFERENCE EXTERIOR ELEVATION FOR FINISH
EW-02 CMU
SECTION
PLAN
5/8" GYPSUM BOARD
2" AIR GAP
1 1/2" RIGID INSULATION, MIN R-7.5
5/8" FIBERGLASS-MAT FACED GYPSUM
SHEATHING
R-13 BATT INSULATION
WEATHER BARRIER SYSTEM
COLD- FORMED METAL FRAMING
COLD- FORMED METAL FRAMING
SPLIT FACE CMU
WEATHER BARRIER SYSTEM
RF-01 ROOF
6" RIGID INSULATION, MIN R-30
STEEL DECKING, SEE STRUC
REFERENCE RCP FOR
CEILING TYPE
1/2" HIGH DENSITY POLYISO COVER BOARD
FULLY ADHERED PVC MEMBRANE
EW-03 METAL PANEL
SECTION
PLAN
5/8" GYPSUM BOARD
1 1/2" RIGID INSULATION, MIN R-7.5
5/8" FIBERGLASS-MAT FACED GYPSUM
SHEATHING
R-13 BATT INSULATION
COLD- FORMED METAL FRAMING
COLD- FORMED METAL FRAMING
WEATHER BARRIER SYSTEM
EXTERIOR MCM METAL PANEL CLADDING
EXTERIOR MCM METAL PANEL CLADDING
RF-02 ROOF
1/2" FRT PLYWD SHEATHING
STEEL DECKING, SEE STRUC
1/2" HIGH DENSITY POLYISO COVER BOARD
METAL PANEL SOFFIT
COLD FORM METAL FRAMING
FULLY ADHERED PVC MEMBRANE
WEATHER BARRIER SYSTEM
EW-04 METAL PANEL COLUMN WRAP
SECTION
PLAN
5/8" FIBERGLASS-MAT FACED GYPSUM
SHEATHING
WEATHER BARRIER SYSTEM
COLD- FORMED METAL FRAMING
COLD- FORMED METAL FRAMING
WEATHER BARRIER SYSTEM
VARY AS REQ TO ACCOMODATE STRUCTURE
EXTERIOR MCM METAL PANEL CLADDING
EXTERIOR MCM METAL PANEL CLADDING
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :4
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
EXTERIOR WALL
ASSEMBLIES &
PARTITION TYPES
A003 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
GENERAL PARTITION NOTES
CONTROL JOINT NOTES
HC
HC
HC
SELM
AN
D R
IV
E
PROJECT
NORTH
10' - 0"
30' - 0"
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :4
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
DEMOLITION SITE
PLAN
A010 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
1" = 20'-0"A010
A5 DEMOLITION SITE PLAN
DEMO KEYNOTES
KEY DESCRIPTION
1 PUBLIC HEALTH DEPARTMENT BUILDING SHOWN SHADED
2 EXISTING SELMAN LIBRARY - NOT WITHIN SCOPE
3 EXISTING STORAGE BUILDING TO REMAIN
4 EXISTING PARKING LOT AND DRIVEWAYS TO REMAIN
5 SITE SETBACKS
6 EXISTING UTILITY EASEMENT APPROX LOCATION
7 REMOVE EXISTING RAMPED CURB
DEMO EXISTING ASPHALT AND CURBS - PREP AREA TO RECEIVE NEW SLAB OR DRIVEWAY AS
INDICATED ON PROPOSED SITE PLAN
9 REMOVE EXISTING CURB AND GUTTER
10 EXISTING PAVING TO REMAIN
HC
DRIVE-THRU
SELM
AN
D R
IV
E
PROJECT
NORTH
10' - 0"
30' - 0"
PUBLIC HEALTH
DEPARTMENT ADDITION
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :4
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
ARCHITECTURAL SITE
PLAN
A011 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
1" = 20'-0"A011
A5 PROPOSED SITE PLAN
SHEET KEYNOTES
KEY DESCRIPTION
1 PUBLIC HEALTH DEPARTMENT BUILDING SHOWN SHADED, ADDITION SHOWN HATCHED
2 EXISTING SELMAN LIBRARY - NOT WITHIN SCOPE
3 REMILL AND RESTRIPE EXISTING PARKING LOT
3 REMILL AND RESTRIPE EXISTING PARKING LOT
4 NEW CURB AND GUTTER AND ASPHALT INFILL
5 NEW PAVERS ON SAND BASE ON TOP OF EXISTING ASPHALT
6 NEW DRIVE-THRU CAR INSTALLATION BAY WITH COVERED ACCESS
7 NEW SIDEWALK INFILL ON TOP OF EXISTING ASPHALT
8 NEW RAMPED SIDEWALK FOR ADA ACCESS
9 SITE FENCE WITH GATE
10 RUN MOTION SENSING FLOODLIGHT TO COMMUNITY GARDEN
A060
D4
A060 C5
A060C3
MECHANICAL
CONFERENCE ROOM
137A
WAITING AREA
WAITING AREA
LOBBY
STAFF AREA
STAFF AREA
104B
CHILDREN'S EXAM
STAFF
WOMEN'S PUBLIC
RESTROOM
MEN'S PUBLIC
RESTROOM
LAB
RECORDS
WAITING AREA
TOILET
TOILET
ELECTRICAL
TOILET
TOILET
TOILET
OFFICE
TEAM LEADER
CLIENT AREA
104A
VESTIBULE
JAN
STORAGE
TOILET
TOILET
BREAK ROOM
132A
OFFICE
132B
OFFICE
137B
OFFICE
OFFICE
140B
OFFICE
140A
OFFICE
142B
OFFICE
142A
OFFICE
OFFICE
OFFICE
STAFF AREA
CHILDREN'S EXAM
CHILDREN'S EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
OFFICE
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
EXAM
EXAM
EXAM
COMPUTER ROOM
UTILITY
STOR
145A
ROOM
STOR
STOR
STOR
143A
ROOM
/4
A060
B4
4 6 8 4 6 8 4 6 8
4 8
4 6 8
4 6 8
4 6 8
4 6
4 6 8 4 6 8 4 6 8 4 6 8 4 6 8 4 4
6 8
6 8
6 8
PROJECT
NORTH
WIC
SERVICES
RECEPTION
AND PAYMENT
6 8
6 8
A300 A5
6 6
13' - 1 1/8" 5' - 7 7/8"
16' - 3 1/2" 31' - 6 1/2"
15' - 1 3/8" 14' - 9 1/2" 4' - 3 3/8"
DEMO LEGEND
EXISTING TO REMAIN SHOWN SHADED
EXISTING TO BE DEMOLISHED
EXISTING DOOR TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H 'S
C O
M M
O N
L A
W C
O P
Y R
IG
H
T O
R O
T H
E R
R E
S E
R V
E D
R
IG
H T
S
C O
P Y
R
IG
H T
M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H
A
LL
R
IG
H T
S R
E S
E R
V E
D
CONSULTANT LOGO
B
C
D
SEALS
NOT F
OR C
ONSTRUCTIO
N
PHASE:
ISSUE DATE:
/1
/2
:1 :5
P
M m p s \s
\P ro je c ts
\A T
L \0
.0
C o b b D o u g la s P u b lic
H e a lt h
D o u g la s v ill
\D ra w in g s
C e n tr a l M o d e l\ A rc h C o b b -D o u g la s P u b lic
H e a lt h S e le c te d O p ti o n .r v t
LEVEL 1 DEMOLITION
PLAN
A031 025135.00
CC
H E
A L
T H
D E
P A
R T
M E
N T
E X
P A
N S
IO
N
S E
LM
A
N D
R
D O
U G
LA
S
V
IL
LE
G A
JA
WB
D O
U G
LA
S
C O
U N
T Y
P U
B L
IC
H
E A
LT
H
D E
P A
R T
M E
N T
05.18.2026
BRIDGING DOCUMENTS
1/8" = 1'-0"A031
A5 DEMOLITION FLOOR PLAN
DEMO KEYNOTES
# DESCRIPTION
1 REMOVE EXISTING WALLS SHOWN DASHED - STABILIZE STRUCTURE TO REMAIN IN LOCATIONS
WHERE NECESSARY.
2 DEMOLISH STANDING SEAM MANSARD ROOF AND SUPPORTING STRUCTURE. EXISTING PARAPET
BEHIND MANSARD ROOF TO REMAIN. EXISTING BRICK TO REMAIN IF PRESENT.
3 REMOVE PORTION OF EXISTING WALL - PREP AREA TO RECEIVE DOOR.
4 REMOVE EXISTING FURNITURE, FIXTURES, INTERIOR FINISHES, AND EQUIPMENT.
6 REMOVE EXISTING PLUMBING FIXTURES - SALVAGE DRINKING FOUNTAINS FOR REUSE.
7 REMOVE EXISTING STOREFRONT WINDOW AND TRIM.
8 REMOVE EXISTING MILLWORK SHOWN DASHED.
9 REMOVE EXISTING EXTERIOR CARPORT STRUCTURE. EXISTING SLAB TO REMAIN.
10 REMOVE DRYWALL AND WOOD FURRING AT WALL INDICATED - ASSESS EXTENT OF TERMITE DAMAGE
AND TAKE MEASURES TO ADDRESS AREAS OF CONCERN.
11 EXISTING GRID TO REMAIN.
12 REMOVE EXISTING CEILING TILES.
13 REMOVE EXISTING ACT GRID.
14 REMOVE EXISTING LIGHTING FIXTURES AND CEILING-MOUNTED SENSORS.
15 REMOVE EXISTING GYP BD CEILING.
16 ASSESS CRACKS IN STRUCTURAL CMU WALL AND DEMO AREAS AS NECESSARY - DETERMINE BEST
PROCESS OF MITIGATION DURING CONSTRUCTION.
12 12
13 14
11 12 14 11 12 14 11 12 14 11 12 14 11 12 14
11 12 14
12 13 14
MECHANICAL
CONFERENCE ROOM
137A
WAITING AREA
WAITING AREA
LOBBY
STAFF AREA
STAFF AREA
104B
WIC
SERVICES
CHILDREN'S EXAM
STAFF
WOMEN'S PUBLIC
RESTROOM
MEN'S PUBLIC
RESTROOM
RECEPTION
AND PAYMENT
LAB
RECORDS
WAITING AREA
115 TOILET
TOILET
ELECTRICAL
TOILET
TOILET
TOILET
OFFICE
TEAM LEADER
CLIENT AREA
104A
VESTIBULE
JAN
STORAGE
TOILET
TOILET
BREAK ROOM
132A
OFFICE
132B
OFFICE
137B
OFFICE
OFFICE
140B
OFFICE
140A
OFFICE
142B
OFFICE
142A
OFFICE
OFFICE
OFFICE
STAFF AREA
CHILDREN'S EXAM
CHILDREN'S EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
OFFICE
ADULTS' EXAM
ADULTS' EXAM
ADULTS' EXAM
EXAM
EXAM
EXAM
COMPUTER ROOM
UTILITY
STOR
145A
ROOM
STOR
STOR
STOR
143A
ROOM
PROJECT
NORTH
11 12 14
11 12 14
11 12 14
12 13 14
12 13 14
12 14 12 14
14 15
12 13 14
12 13 14
11 12 1411 12 1411 12 14
12 13 14
11 12 14
11 12 14
11 12 14
12 13 14
11 12 14
11 12 14
14 15
13 13
12 13 14
12 13 14
12 13 14
12 13 14
12 13 14
EXISTING STORAGE SHED
DEMO LEGEND
EXISTING TO REMAIN SHOWN SHADED
EXISTING TO BE DEMOLISHED
EXISTING DOOR TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
SHEET TITLE:
SHEET NO. PROJ. NO.
DRAWN BY:
PROJECT ARCHITECT:
PRINCIPAL IN CHARGE:
SHEET ISSUE:
A
5 4 3 2 1
5 4 3 2 1
A L
L D
R A
W
IN
G S
S
P E
C
IF
IC
A
T
IO
N S
A N
D C
O P
IE
S
T H
E R
E O
F F
U R
N
IS
H E
D B
Y M
C M
IL
LA
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
A R
E A
N D
S H
A
LL
R E
M A
IN
T
H E
P R
O P
E R
T Y
O F
M C
M
IL
LA
N
P A
Z D
A N
S M
IT
H
A R
C H
IT
E
C T
U R
E
T H
E S
E M
A T
E R
IA
LS
A R
E T
O B
E U
S E
D O
N
LY
W
IT
H R
E S
P E
C T
T O
T H
IS
P
R O
JE
C
T A
N D
N O
T T
O B
E U
S E
D W
IT
H
A N
Y O
T H
E R
P R
O
JE
C T
W
IT
H
T H
E E
X C
E P
T
IO
N O
F O
N E
C O
N T
R A
C T
S E
T F
O R
E A
C H
P A
R T
Y T
O T
H E
C O
N T
R A
C T
S
U C
H D
O C
U M
E N
T S
A R
E T
O B
E R
E T
U R
N
S U
IT
A
B
LY
A C
C O
U N
T E
D F
O R
T O
M C
M
IL
L A
N P
A Z
D A
N S
M
IT
H A
R C
H
IT
E C
T U
R E
U P
O N
C O
M P
L E
T
IO
N O
F T
H E
P R
O
JE
C T
S
U B
M
IS
S
IO
N O
R D
IS
T
R
IB
U T
IO
N
T O
M E
E T
O F
F
IC
IA
L
R E
G U
LA
T
O R
Y R
E Q
U
IR
E M
E N
T S
O R
F O
R O
T H
E R
P U
R P
O S
E S
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E P
R O
JE
C
T
IS
N O
T T
O B
E C
O N
S T
R U
E D
A S
P U
B
LI
C A
T
IO
N
IN
D E
R O
G A
T
IO
N O
F M
C M
IL
LA
N P
A Z
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .