CN-370000-HW559-DC004C.pdf
PDF 1 MB Posted
- Contract number
- HW559
- Issued by
- Florida
About this file
Document Summary
This document is a Task Assignment Notification Form (HW559-DC004C) issued by the Florida Department of Environmental Protection (FDEP) to AMEC Foster Wheeler for work at the Elite Cleaners site (FAC ID 559500841) located at 830-1 A1A North, Ponte Vedra, St. Johns County, Florida. The task assignment is conducted under the state and local contract indefinite delivery vehicle HW559, with Brandie Stringer serving as the FDEP Contract Manager and Ronald D. White as the Contractor Representative.
The scope of work encompasses the abandonment of all monitor wells installed at the Elite Cleaners facility, including six 1-inch by 15-foot micro-wells and one 1-inch by 70-foot micro-well, with well abandonment activities to be completed by Probe Domain of Middleburg, Florida. The deliverables include preparation of a Well Abandonment Report due April 14, 2017, with project completion by May 31, 2017. The task assignment is structured as a fixed-price contract with a total value of $4,173.03, with invoice submission contingent upon FDEP approval of the Well Abandonment Report covering three subtasks: Project Management (12.5% of direct labor), Well Abandonment Activities, and the Well Abandonment Report. No retainage or fee schedule provisions apply to this assignment. Supporting cost estimate documentation details labor, subcontractor costs (Probe Domain drilling services at $2,150.00), field expenses, vehicles, per diem allowances, and supplies totaling the fixed price amount.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name: ___Amec Foster Wheeler____________________________________________
Site Name & Location: ___Elite Cleaners, Ponte Vedra, FL_____ Date: __2/10/17__ FAC ID#: _____
PROPOSED SCOPE OF WORK:
Abandon (6) 1" x 15' MWs & (1) 1"x70' MW Remove six pads and replace three pads with concrete and three with new sod Remove and patch one 4" manhole inside of building
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger _____ Mud Rotary_____ Other_____________________________
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)
<50 foot boring depth per foot $10.79 $0.00 50 foot to 100 foot boring depth per foot $14.03 $0.00 >100 foot boring depth (Multiple quotes required) per foot NA
Borehole Grouting
4 - inch borehole diameter per foot $6.56 $0.00 6 - inch borehole diameter per foot $9.57 $0.00 8 - inch borehole diameter per foot $12.51 $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $25.37 $0.00 50 foot to 100 foot boring depth per foot $27.46 $0.00 >100 foot boring depth (Multiple quotes required) per foot NA
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $33.34 $0.00 50 foot to 100 foot boring depth per foot $35.67 $0.00 >100 foot boring depth (Multiple quotes required) per foot NA
Recovery Well Diameter: 4" - 6" per foot $61.84 $0.00 Double Cased Wells
6" Surface Casing per foot $40.10 $0.00 8" Surface Casing per foot $53.81 $0.00 per well $188.22 $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $5.00 160 $800.00 3"- 4" Well Abandonment (includes grouting) per foot $8.94 $0.00 5"- 6" Well Abandonment (includes grouting) per foot $11.64 $0.00 2' x 2' Well Pad Removal and Patch each $100.00 6 $600.00
Mobilization roundtrip $500.00 1 $500.00 Per Diem per person / per night $128.71 $0.00 DOT Approved 55-gal Drum each $52.71 $0.00 Permits (Drilling or abandonment only) (only actual costs are accepted) each (actual) $50.00 1 $50.00 Sod each $50.00 1 $50.00 Dirt each $50.00 1 $50.00 Other - Remove 4' manhole for inside MW and patch floor to close as original each $100.00 1 $100.00 Additional Development Time (Requires prior approval) per hour $138.84 $0.00 Additional Decontamination Time (Requires prior approval) per hour $134.69 $0.00 Standby/Delay/Difficult Access Time (Requires prior approval) per hour $198.94 $0.00
TOTAL PRICE $2,150.00
Days to Complete Scope of Work: ___1_____ Project No.: ________________________
Subcontract Company Name: _________Probe Domain, Inc._____________________________________________________________________________________
Subcontract Mailing Address: ___3020 Thunder Rd., Middleburg, FL 32068 ___________________________________
Signature and Title of Person Submitting Quote: _____James R. Laymon / James Laymon / President_______________________________________Date: _____2/10/17_________
DRILLING
Well Completion (includes 30 minute development, bolt down MH w/ cover, concrete pad, locking well cap, MISCELLANEOUS