CN-370000-GC904-223CCO1.pdf

PDF 472 KB Posted

Attached to
Master Agreement FL|GC904|c560f091e904e082a29e787f42919918
Contract number
GC904
Issued by
Florida

About this file

This is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to amend an existing task assignment with Geosyntec Consultants, a contractor providing environmental consulting services. The change order is identified as TACO Number 1 under Contract Number GC904 and Task Assignment GC904-223C. The FDEP Project Manager is Melissa Brock (850-245-8922), and the contractor's Project Manager is Joe Applegate (850-556-8419). The change order was executed on October 29, 2024, and is effective on that date.

The change order extends deliverable due dates and the Period of Service (POS) end date due to delays in receiving an updated site access agreement. Specifically, Task 2's deliverable due date was extended from October 31, 2024, to January 3, 2025; Tasks 3 and 4's deliverable due dates were extended from December 30, 2024, to March 7, 2025; and the POS end date was extended from February 28, 2025, to April 29, 2025, representing a 60-day extension. The total authorized cost remains $39,257.17 with fixed unit rate compensation. Deliverables include an Updated Health and Safety Plan (HASP), an Interim Report, tabulated spreadsheet and meeting summary, and a certified Remedial Action Plan (RAP) with scope and cost for source removal. The contract is funded entirely by FDEP (100% cost share) under Appropriation Category 087889, with invoicing scheduled upon completion of each deliverable.

View the file

Other files

File Type Posted
CN-370000-GC904-222ACO1.pdf PDF
CN-370000-GC904-CMC3.pdf PDF
CN-370000-GC904-222A.pdf PDF
CN-370000-GC904-223ACO2.pdf PDF
CN-370000-GC904-223BCO4.pdf PDF
CN-370000-GC904-A1.pdf PDF
CN-370000-GC904-A3.pdf PDF
CN-370000-GC904-CMC1.pdf PDF
PC-370000-GC904.pdf PDF
CN-370000-GC904-223ACO1.pdf PDF
CN-370000-GC904-223B.pdf PDF
CN-370000-GC904-223BCO3.pdf PDF
CN-370000-GC904-223BCO5.pdf PDF
CN-370000-GC904-223C.pdf PDF
CN-370000-GC904-A2R1.pdf PDF
CN-370000-GC904-CMC2.pdf PDF
CN-370000-GC904-222ACO2.pdf PDF
CN-370000-GC904-223A.pdf PDF
CN-370000-GC904-223BCO1.pdf PDF
CN-370000-GC904-223BCO2.pdf PDF
CN-370000-GC904-223CCO2.pdf PDF
CN-370000-GC904-A4.pdf PDF
CN-370000-GC904.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

GC904-223C 1 GC904

Geosyntec is submitting this RFC to extend the Tasks 2, 3, and 4 deliverable due dates and POS due to delay in receiving the updated site access agreement. Task 2 field work is scheduled for mid November.

Melissa Brock 850-245-8922 Contractor Geosyntec Consultants Contractor

Contractor Joe Applegate Contractor 850-556-8419

✔ $ 39,257.17

$ 0.00 $ 39,257.17 Completion

Completion 02/28/2025 04/29/2025 60

1 1

TACO1 changes Task 2 deliverable due date from 10/31/2024 to 1/3/2025, Tasks 3&4 deliverable due dates from 12/30/2024 to 3/7/2025, and POS end date from 2/28/2025 to 4/29/2025.

Geosyntec Consultants Contractor Joe Applegate

Project Manager

Joseph Applegate Digitally signed by Joseph Applegate Date: 2024.10.29 10:24:21 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.10.29 10:56:04 -04'00'

450202000 JG 139900 37450300 087889 NA NA 24 $ 39,257.17

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

GC904

GC904-223C

$ 39,257.14

Updated HASP

Interim Report

Tabulated spreadsheet and meeting summary cetified RAP with scope/cost for source removal

Updated HASP

Tabulated spreadsheet and meeting summary cetified RAP with scope/cost for source removal

Interim Report

08/02/2024

01/03/2025

03/07/2025

03/07/2025

$ 10,327.74

$ 0.00

$ 4,353.80

$ 24,575.60

Fl or id a

De pa rt m en t o f E nv iro nm en ta l P ro te ct io n-

Di vi sio n of W as te

M an ag em en t-P et ro le um

R es to ra tio n

Pr og ra m

Re qu es t f or C ha ng e

- A ut ho riz at io n fo r C ha ng e in

S co pe o f W or k

Co nt ra ct

GC

PO

GC

4-

3C

Pe tro leu m

Pr od uc ts

Co rp

Co nt ra ct or

CO

Br itta ny

.A nd ing Co nt ra ct or

P ho ne

CO

T yp e:

Da te

Ex ten sio n O nly (8

)2

-8

FD

EP

C os t S ha re

:1

.00

Re f #

Br itta ny

.A nd ing flo rid ad ep

.go v

TA

SK

PA

Y

IT

EM

UN

IT

O F

ME

AS

UR

E

P

AY

IT

EM

P

RI

CE

UN

IT

S E

XT

EN

DE

D

PR

IC

E

Ta sk

Ch an ge O rd er

S ub to ta ls

Pe rio d of

S er vic e:

$ To ta l A ut ho riz ed

C os t (F

DE

P

Sh ar e:

0%

Co nt ra ct or R ep re se nt at ive

J.

Br oo ks B al dw in

/2 5/

(P rin t N am

e) (D ate

FD

EP

T as k M an ag er

Br itt an y An di ng

(P rin t N am

e) (D ate

Ad m in ist ra tiv e R ev iew er

(P rin t N am e)

(D ate

9- Di gi t F ac ilit y I D

Fa cil ity

N am e:

Ta sk

M an ag er

P ho ne

Ta sk

M an ag er

E m ail

Th is is an au tho riz ati on fo r t he co sts as so cia ted w ith th e c ha ng e i n q ua nti tie s o f s er vic es be ing pr ov ide d a nd /or de liv er ab le du e d ate s.

In or de r f or th es e c os ts to be pa id, th es e c ha ng es m us t b e p ro ce ss ed th ro ug h a ch an ge de r t o t he pu rch as e r eq uis itio n a nd a re vis ed P ur ch as e O rd er is su ed by

M

FM

P pr ior to in itia tin g w or k.

DE

SC

RI

PT

IO

N

De sc rip tio n of

C ha ng e an d

Ju sti fic at ion : I nc lud e co m ple te d es cr ipt ion o f w ho , w ha t, wh er e, w he n, h ow a nd w hy

G eo sy nt ec is s ub m itt in g th is R

FC

to e xt en d th e

Ta sk s 2, , a nd d el iv er ab le d ue d at es d ue to d el ay in re ce iv in g th e up da te d si te a cc es s ag re m en t.

Ta sk fi el d w or k is s ch ed ul ed fo r m id N ov em be r.

Ge os yn tec

C on su lta nts

0.5

.18

Ta sk

M an ag er

N am e:

(S ign atu re

1/ 3/

3/ 7/

3/ 7/

De liv er ab le Na m e

In te rim R ep or t Ta bu la te d sp re ad sh ee t a nd m ee tin g su m m ar y ce tif ie d

R

AP

w ith s co pe /c os t f or s ou rc e re m ov al

*F or re im bu rsa ble pa y i tem s t he co st lis te d i s a

"n ot to ex ce ed

" a mo un

t. F ee s w ill be re im bu rse d f or th e p ay ite m ba se d o n t he ac tua l in vo ice . P lea se no te, th e u nit of m ea su re fo r t he se ite ms w ill be di sp lay ed as do lla rs for in vo ici ng pu rp os es

. P lea se re fer to th e S co pe of W or k f or ad dit ion al de sc rip tio n o f th es e i tem s.

(S ign atu re

2/

/2

4/

/2

Pr ev io us

E nd

D at e Ne w En d Da te

(S ign atu re

Pr ev io us

D ue

D at e Ne w Du e D at e

/3

1/

/3 0/

/3

0/

Pa ge o f 2 F&

TS

S ch ed ul e of P ay It em s 1

0-

-2

(S ign atu re

(S ign atu re

/2 5/

PO

S is al so e xt en de d.

Fl id a

De pa rt m en t o f E nv iro nm en ta l P ro te ct io n-

Di vi sio n of W as te

M an ag em en t-P et ro le um

R es to ra tio n

Pr og ra m

Re qu es t f or C ha ng e

- A ut ho riz at io n fo r C ha ng e in

S co pe o f W or k

Co nt ra ct

GC

PO

GC

4-

3C

Pe tro leu m

Pr od uc ts

Co rp

Co nt ra ct or

CO

9-

Di gi t F ac ilit y I

D

Fa cil ity N am e:

Ge os yn tec

C on su lta nts

Re vie we r ( op tio na l):

Te ch ni ca l A pp ro va l ( op tio na l):

Co st

C en te r A pp ro va l ( op tio na l):

Pa ge o f 2 F&

TS

S ch ed ul e of P ay It em s 1

0-

-2

File details come from the government source that posted it. Updated .