This document is a Task Assignment (TA) issued under Contract GC904, an indefinite delivery vehicle for Environmental Forensics Site Investigation and Other Technical Support Services. The Task Assignment is between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants. The project is located at Petroleum Products Corp, a petroleum-contaminated facility in Pembroke Park, Broward County, Florida, with FDEP Facility ID 068732818. The assignment was executed on June 9, 2023, and expires on January 17, 2024.

This Task Assignment calls for a forensic site investigation at the Petroleum Products Corp facility under the Division of Waste Management's Petroleum Restoration Program. Work includes preparing a health and safety plan, conducting a soil investigation with 12 soil borings (8 via hand auger and 4 via direct push technology), analyzing soil and water samples per specified tables, and overseeing waste disposal. The total Task Assignment value is $49,781.73, compensated on a fixed unit rate basis with 10 percent retainage withheld until task completion. Costs are allocated through funding code 45020200 and include labor (Program Manager, Project Manager, Geologist, and Draftsperson), drilling operations, sample analysis, and reimbursable items such as laboratory testing, GPR surveying, and equipment disposal. Three deliverables are due by specified dates: an updated Health and Safety Plan (July 17, 2023), an Interim Remedial Report with spreadsheet (October 17, 2023), and waste manifests and documentation (November 17, 2023).

View the file

Other files

File Type Posted
CN-370000-GC904-222A.pdf PDF
CN-370000-GC904-223ACO2.pdf PDF
CN-370000-GC904-223BCO4.pdf PDF
CN-370000-GC904-223CCO1.pdf PDF
CN-370000-GC904-A1.pdf PDF
CN-370000-GC904-A3.pdf PDF
CN-370000-GC904-CMC1.pdf PDF
PC-370000-GC904.pdf PDF
CN-370000-GC904-222ACO2.pdf PDF
CN-370000-GC904-223A.pdf PDF
CN-370000-GC904-223BCO1.pdf PDF
CN-370000-GC904-223BCO2.pdf PDF
CN-370000-GC904-223CCO2.pdf PDF
CN-370000-GC904-A4.pdf PDF
CN-370000-GC904.pdf PDF
CN-370000-GC904-222ACO1.pdf PDF
CN-370000-GC904-CMC3.pdf PDF
CN-370000-GC904-223ACO1.pdf PDF
CN-370000-GC904-223BCO3.pdf PDF
CN-370000-GC904-223BCO5.pdf PDF
CN-370000-GC904-223C.pdf PDF
CN-370000-GC904-A2R1.pdf PDF
CN-370000-GC904-CMC2.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment A:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Program Administrator or Designee

(Authorized Signature) (Authorized Signature)

☐ Additional signatures attached on separate page.

GC904

GC904-223B Expiration January 17, 2024

Task Assignment description and deliverable information are specified in the Scope of Work (SOW), Attachment A, see Water Sampling Table, Soil sampling table, and SB installation table for details, with costs and invoice information attached as Scheduled Pay Items (SPI) Attachment B. Additionally, the figure to be utilized for locations is attached. The following attachments and or documents are hereby added to the contract.

Melissa Brock 850-245-8922 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec Consultants

Geosyntec Consultants

Joe Applegate 850-556-8419 068732818

3130 SW 19th Street, Pembrooke Park ,Broward Co. FL

Petroleum Products Corp

✔ $ 49,781.73

$ 49,781.73

Scope of Work

Tables, Quotes, Schedule of Pay Items Attachment B, Figure

Joe Applegate

Project Manager

Joseph Applegate Digitally signed by Joseph Applegate Date: 2023.06.09 10:03:03 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.06.12 11:39:25 -04'00'

450202000 JG 139900 37450300 087889 NA NA 23 $ 49,781.73

9-Digit Facility ID Number: 068732818 STCM Facility Name: Petroleum Product Corp

TSS/FORENSIC

Prepare and submit an updated Health and Safety Plan.

Updated Health and Safety Plan Monday, July 17, 2023 Mobilize to site and conduct GPR survery prior to soil borings to locate underground utilities. Complete a soil investigation according to the attached SB-Well Installation table.

Analyze samples according to the attached Soil-Air Sampling and Water sampling tables.

Utilize the attached figure. 12 soil borings will be conducted. SB-20-FR, SB-21-FR, SB-22-FR, and CS-1-FR will be conducted via DPT rig while the remaining 8 will be hand augered. This soil investigation shall define the limits of the upcoming excavation per the EPA ROD.

Prepare and submit an Interim Remedial Report (IRR) summarizing all the current findings with previous data and assessments/remedial actions and recommendations for the upcoming excavation. Please provide a tabulated spreadsheet for hours worked for each personnel for invoicing purposes as part of the deliverable.

Interim Remedial Report/Tabulated Spreadsheet Tuesday, October 17, 2023 Mobilize (if necessary) and oversee IDW/contact water disposal (include photo documentation and field notes if mobilization is required). Note: the container fullness of 75% capacity is not required in this instance. Submit waste manifest(s), and photo documentation (with field notes, if necessary). Contingent Funding in this task is only to be used to offset the cost for pay items associated with a Field Request for Change for any open task.

Waste Manifest(s)/Photos/Field Notes (if necessary) Friday, November 17, 2023

Attachment A Division of Waste Management

Scope of Work

Task 1 Description:

Task 2 Deliverable Due Date:

Task 2 Deliverable:

Task 2 Description:

Task 1 Deliverable Due Date:

Task 1 Deliverable:

Specifications All work must be performed in accordance with this Scope of Work (SOW) and any attachments, Chapters 62-160, 62-532, 62-777 and 62-780, F.A.C., all applicable FDEP and Water Management District guidance memoranda, standard industry procedures and as described in the Agency Term Contract (ATC).

Copies of all referenced guidelines are available at:

http://www.dep.state.fl.us/waste/categories/pcp/default.htm Reports must be submitted using the appropriate FDEP forms found at:

http://www.dep.state.fl.us/waste/categories/pcp/pages/pg_documents.htm All work must be conducted in accordance with PRP Standard Specification Details found at:

http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm

The following tables are included as attachments to this SOW and further represent the details of the scope of work.

Soil Boring (SB) and Well Installation Table

SubPhase(s):

Water Sampling Table

Soil and Air Sampling Table

Task 3 Description:

Task 3 Deliverable:

Task 3 Deliverable Due Date:

Attachment A (SOW Template) F&TS 4-21-17 http://www.dep.state.fl.us/waste/categories/pcp/default.htm http://www.dep.state.fl.us/waste/categories/pcp/default.htm http://www.dep.state.fl.us/waste/categories/pcp/default.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/pg_documents.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/pg_documents.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/pg_documents.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm http://www.dep.state.fl.us/waste/categories/pcp/default.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/pg_documents.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm

9-Digit Facility ID Number: 068732818 STCM Facility Name: Petroleum Product Corp

Attachment A Division of Waste Management

Scope of Work

Wednesday, January 17, 2024

Any change which results in an extension of the due dates, PO end date, or a change in quantities or costs, requires that a PO Change Order be formally issued prior to performance of the revised SOW.

The FDEP/LP Task Manager will review the work and/or deliverables within the timeframes established in FDEP guidance documents. The Contractor will respond to any comments to complete the work and/or deliverables within the timeframe established in the comment letter or email correspondence.

Failure to provide all deliverables, failure to provide deliverables which are satisfactory or failure to meet the specified deliverable timetables, shall result in non-payment, loss of retainage, or other financial consequences, and/or termination of the PO, as specified in the ATC. If the deliverable due day occurs on a weekend, state holiday, or federal holiday the deliverable will be due the following business day.

Retainage shall be withheld in the amount of 10%, unless otherwise noted in the SPI, from each payment by the FDEP/LP until completion and approval of all Tasks. The Contractor shall submit a Release of Claims and request for retainage payment with the final invoice. Payment of retainage will be reduced by the amount of any assessed financial consequences.

Notice of Field Activities The Contractor must provide written notification (emails are acceptable) of field activities at least seven (7) calendar days prior to the commencement of work to all applicable parties including the FDEP/LP task manager, Inspector (PRP_Inspector@dep.state.fl.us), site operator, site owner, RP and affected off-site property owners.

http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm

Schedule of Pay Items (SPI) All unit rates and extended prices for all line item costs associated with this project are provided in the SPI [Attachment B to this Purchase Order (PO)] and shall not exceed the rates established in the ATC.

Requests for Change (RFC) All requests for changes to the SOW must be submitted in writing and be approved in writing by the FDEP/LP using the RFC form in accordance with paragraphs 2.A and 26 of the ATC and can be found at:

Performance Measures The FDEP/LP Site Manager will review the submitted documentation to confirm that all work was performed in accordance with the Specifications referenced above. The FDEP/LP Task Manager will notify the Contractor of acceptance or any deficiencies in the work and/or deliverables. The Contractor will be given an opportunity to remedy deficiencies at no additional cost to the FDEP.

Invoicing, Payments and Financial Consequences The Contractor may submit an invoice for a Task upon written notification of acceptance of the work/deliverables by the FDEP/LP Task Manager. Upon receipt of FDEP/LP written approval of the required documentation for completed portions of each task, the Contractor must submit an invoice. Invoices for completed work may be submitted no more frequently than every thirty (30) days, or upon completion of the individual tasks as specified. Each invoice request must contain all documentation of performance as specified in the ATC, this Purchase Order (PO), and its attachments.

PO End Date:

Attachment A (SOW Template) F&TS 4-21-17 http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm http://www.dep.state.fl.us/waste/categories/pcp/pages/templates.htm

Florida Department of Environmental Protection - Division of Waste Management

FDEP Facility ID#: 068732818 STCM Facility Name:

Any blank fields are not applicable to the scope of work.

WATER SAMPLING TABLE

Task # Well #(s) or Water Sample Location

Frequency (if applicable)

Expedited Turnaround

(TA)

Water Level/FP Gauging

Only (8-7.)

# MWs Sampled (8-1./8-2.)

(9-36.)

TRPH

(FL-PRO)

(9-37.)

PCBs

(9-38.)

Arsenic, Total

(9-41.)

Lead, Total

2 QA/QC Equipment Blank 1 1 1 1

2 QA/QC Trip Blank 1 1 1 1 2 Task 2 Subtotal 0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0

0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0

Petroleum Product Corp

GRAND TOTALS

Attachment A (Water Sampling) F&TS 4-21-17

Any blank fields are not applicable to the scope of work.

SOIL and AIR SAMPLING TABLE

Task # Soil /Air Sample Locations

Frequency (if applicable)

Expedited Turnaround

(TA)

Depth Interval (if applicable)

(9-5.)

PAHs

(9-8.)

TRPH

(FL-PRO)

(9-8.a.)

TRPH

Fraction ation

(9-9.)

PCBs [or Aroclors]

(9-10.) 8

RCRA

Metals

(9-11.)

Arsenic

(9-14.)

Lead

(9-15.)

TCLP-

Extractio n Only

22-1.

Dioxins Analysis

(soil), EPA

Method

22-2.

EDB (1,2-

dibromo ethane) (soil), EPA

Method

2 SB-3-FR 12"-24" 1

2 SB-5-FR 0"-12" 1 1 1 1 1 1

2 SB-5-FR 12"-24" 1 1

2 SB-5-FR 24"-36" 1 1

2 SB-5-FR 36"-48" 1 1

2 SB-9-FR 0"-12" 1 1 1 1 1 1

2 SB-9-FR 12"-24" 1 1

2 SB-9-FR 24"-36" 1 1

2 SB-9-FR 36"-48" 1 1

2 SB-10-FR 0"-12" 1 1 1 1 1 1

2 SB-10-FR 12"-24" 1 1

2 SB-10-FR 24"-36" 1 1

2 SB-10-FR 36"-48" 1 1

2 SB-13-FR 0"-12" 1 1 1 1 1 1

2 SB-13-FR 12"-24" 1 1

2 SB-13-FR 24"-36" 1 1

2 SB-13-FR 36"-48" 1 1

2 SB-16-FR 0"-12" 1 1 1 1 1 1

2 SB-16-FR 12"-24" 1 1

2 SB-16-FR 24"-36" 1 1

2 SB-16-FR 36"-48" 1 1

2 SB-20-FR 0"-12" 1 1 1 1 1 1

2 SB-20-FR 12"-24" 1 1

2 SB-20-FR 24"-36" 1 1

2 SB-20-FR 36"-48" 1 1

2 SB-21-FR 0"-12" 1 1 1 1 1 1

2 SB-21-FR 12"-24" 1 1 1

2 SB-21-FR 24"-36" 1 1

2 SB-21-FR 36"-48" 1 1

2 SB-22-FR 0"-12" 1 1 1 1 1 1

2 SB-22-FR 12"-24" 1 1

2 SB-22-FR 24"-36" 1 1

2 SB-22-FR 36"-48" 1 1

2 CS-1-FR 0"-12" 1 1 1 1 1 1

2 CS-1-FR 12"-24" 1 1 1 1 1 1

2 CS-1-FR 24"-36" 1 1 1 1 1 1

2 CS-1-FR 36"-48" 1 1 1 1 1 1

2 CS-2-FR 0"-12" 1 1 1 1 1 1

2 CS-2-FR 12"-24" 1 1 1 1 1 1

2 CS-2-FR 24"-36" 1 1 1 1 1 1

2 CS-2-FR 36"-48" 1 1 1 1 1 1

2 CS-3-FR 0"-12" 1 1 1 1 1 1

2 CS-3-FR 12"-24" 1 1 1 1 1 1

2 CS-3-FR 24"-36" 1 1 1 1 1 1

2 CS-3-FR 36"-48" 1 1 1 1 1 1

Petroleum Product Corp

Attachment A (Soil-Air Sampling) F&TS 4-21-17

Any blank fields are not applicable to the scope of work.

SOIL and AIR SAMPLING TABLE

Task # Soil /Air Sample Locations

Frequency (if applicable)

Expedited Turnaround

(TA)

Depth Interval (if applicable)

(9-5.)

PAHs

(9-8.)

TRPH

(FL-PRO)

(9-8.a.)

TRPH

Fraction ation

(9-9.)

PCBs [or Aroclors]

(9-10.) 8

RCRA

Metals

(9-11.)

Arsenic

(9-14.)

Lead

(9-15.)

TCLP-

Extractio n Only

22-1.

Dioxins Analysis

(soil), EPA

Method

22-2.

EDB (1,2-

dibromo ethane) (soil), EPA

Method

Petroleum Product Corp

1 TBD subsurface from the above intervals

Subsurface 1 1

2 1 TBD surface from the above intervals Surface 1 1

2 IDW NA 1 1

2 2 QA/QC Duplicate NA 1 1

2 Task 2 Subtotal 23 20 20 21 1 44 44 1 2 2 0 0 0 0 0

23 20 20 21 1 44 44 1 2 2 0 0 0 0 0GRAND TOTALS

Attachment A (Soil-Air Sampling) F&TS 4-21-17

Any blank fields are not applicable to the scope of work.

SOIL BORING (SB) and WELL INSTALLATION TABLE

TASK # Installation Method Quantity Depth

(ft bls)

Total Boring

Footage (ft)

Screening Depth

Interval 1 & Spacing

Screening Depth

Interval 2 & Spacing

Screening Depth

Interval 3 & Spacing

Quantity Well Type Well

Diameter (in)

Depth (ft bls)

Screen Interval (ft bls)

Total Well

Footage (ft)

Surface Casing

Diameter (in)

Surface Casing Depth

(ft)

Total Casing

Footage (ft)

Well Completion

Type

2 Hand Auger 8 4 32 0-4 @ 1 0 0 2 HA Step Outs 8 4 32 0-4 @ 1 0 0

2 DPT 4 4 16 0-4 @ 1 0 0

2 DPT Step Outs 4 4 16 0-4 @ 1 0 0

96 0 0

Petroleum Product Corp

TOTALS

Screening/Split Spoon IntervalsSOIL BORING DETAILS WELL INSTALLATION DETAILS

Attachment A (SB-Well Installation) F&TS 4-21-17

Environmental Forensics Site Investigation and Other Technical Support Services

SCHEDULE OF PAY ITEMS WORKSHEET

Petroleum Product Corp Contract #:

8732818 CID #:

06 Contractor:

Brittany.Anding Contract Term: Year 2

(850) 245-8856 Brittany.Anding@floridadep.gov

PAY

ITEM

UNIT OF

MEASURE PAY ITEM PRICE TOTAL

QUANTITIES TASK 1

QUANT.

TASK 2

QUANT.

TASK 3

QUANT.

TASK 4

QUANT.

TASK 5

QUANT.

TASK 6

QUANT.

TASK 7

QUANT.

TASK 8

QUANT.

TASK 9

QUANT.

TASK 10

QUANT.

1-2.a. Per Site -$ 1 1 1-7. % Surcharge 0.06$ 3070 0 3070 0 0 0 0 0 0 0 0 3-1. Per Round Trip 687.48$ 3 2 1 3-7. Per Round Trip 788.08$ 1 1 5-2. Per Boring 211.48$ 16 16 8-6. Per Sample 36.33$ 51 51 9-5. Per Sample 109.61$ 23 23 9-8. Per Sample 78.67$ 20 20

9-8.a. Per Sample 328.37$ 20 20 9-9. Per Sample 73.51$ 21 21

9-10. Per Sample 113.49$ 1 1 9-11. Per Sample 15.47$ 44 44 9-14. Per Sample 15.47$ 44 44 9-15. Per Sample 52.88$ 1 1 9-36. Per Sample 78.67$ 2 2 9-37. Per Sample 73.51$ 2 2 9-38. Per Sample 14.19$ 2 2 9-41. Per Sample 14.19$ 2 2 12-6. Per Drum 225.68$ 2 2

12-13. Per Drum 225.68$ 1 1 20-1. Per Hour 238.82$ 6 6 20-2. Per Hour 214.93$ 8 8 20-4. Per Hour 179.11$ 71 71 20-9. Per Hour 82.75$ 8 8

20-10. Per Hour 68.95$ 2 2

22-1. Reimbursable* 1.00$ 700 700

22-2. Reimbursable* 1.00$ 70 70

Geosyntec Consultants

DESCRIPTION

Facility Name:

6% Handling Fee for Cost Reimbursable Items Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Hand Auger Boring ≤ 10 foot total depth Soil/Sediment Sample Collection Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Transport and Disposal of Petroleum Impacted Soil (includes drum)

7-Digit Facility ID #:

County:

Task Manager Name:

Task Manager Phone:

Task Manager Email:

Geologist/Geoscientist (Key)

Site Health & Safety Plan for Continued Work at no cost to FDEP

DPT Rig Mobilization - ≤ 100 miles each way

Transport and Disposal of Petroleum Contact Water (includes drum)

GC904

00360

Draftsperson Administrative

Program Manager (Key) Project Manager (Key)

Dioxins Analysis (soil), EPA Method 8290

EDB Analysis (soil), EPA Method 8260

Original Renewal

Page 1 of 2 6/9/2023F&TS Schedule of Pay Items 10-06-22

PAY

ITEM

UNIT OF

MEASURE PAY ITEM PRICE TOTAL

QUANTITIES TASK 1

QUANT.

TASK 2

QUANT.

TASK 3

QUANT.

TASK 4

QUANT.

TASK 5

QUANT.

TASK 6

QUANT.

TASK 7

QUANT.

TASK 8

QUANT.

TASK 9

QUANT.

TASK 10

QUANT.

DESCRIPTION

22-3. Reimbursable* 1.00$ 1300 1300

22-4. Reimbursable* 1.00$ 1000 1000

23-1. NOT BILLABLE 1.00$ 7000 7000

Version: 2.1 Contingent Funding - Allowance only to be used as offset for field change orders

*For reimbursable pay items the cost listed is a "not to exceed" amount. Fees will be reimbursed for the pay item based on the actual invoice. Please note, the unit of measure for these items will be displayed as dollars for invoicing purposes. Please refer to the Scope of Work for additional description of these items.

GPR Survey (per day)

1/2 day DPT

Page 2 of 2 6/9/2023F&TS Schedule of Pay Items 10-06-22

DETAIL INVOICE, Page 2 of 4

Petroleum Product Corp Contractor: Purchase Order:

8732818 CID #: 360 Retainage %: 10% Program Area: WM

County: 06 Contract #: GC904 FDEP Cost Share %: 100.00% Total Extended Cost: 49,781.73$ Brittany.Anding Contract Term: Renewal - Year 2 Without Handling Fee: 49,597.53$ 8502458856 Brittany.Anding@floridadep.gov

PAY

ITEM

UNIT OF

MEASURE UNITS PAY ITEM PRICE TOTAL EXTENDED

PRICE UNITS UNITS EXTENDED

PRICE UNITS

Task 1 1-2.a. Per Site 1 -$ -$ 0 0 -$ 1

RETAINAGE -$ -$ -$ -$

SUBTOTAL -$ -$ -$ -$

Task 2 1-7. % Surcharge 3070 0.06$ 184.20$ 0 0 -$ 3070 3-1. Per Round Trip 2 687.48$ 1,374.96$ 0 0 -$ 2 3-7. Per Round Trip 1 788.08$ 788.08$ 0 0 -$ 1 5-2. Per Boring 16 211.48$ 3,383.68$ 0 0 -$ 16 8-6. Per Sample 51 36.33$ 1,852.83$ 0 0 -$ 51 9-5. Per Sample 23 109.61$ 2,521.03$ 0 0 -$ 23 9-8. Per Sample 20 78.67$ 1,573.40$ 0 0 -$ 20

9-8.a. Per Sample 20 328.37$ 6,567.40$ 0 0 -$ 20 9-9. Per Sample 21 73.51$ 1,543.71$ 0 0 -$ 21

9-10. Per Sample 1 113.49$ 113.49$ 0 0 -$ 1 9-11. Per Sample 44 15.47$ 680.68$ 0 0 -$ 44 9-14. Per Sample 44 15.47$ 680.68$ 0 0 -$ 44 9-15. Per Sample 1 52.88$ 52.88$ 0 0 -$ 1 9-36. Per Sample 2 78.67$ 157.34$ 0 0 -$ 2 9-37. Per Sample 2 73.51$ 147.02$ 0 0 -$ 2 9-38. Per Sample 2 14.19$ 28.38$ 0 0 -$ 2 9-41. Per Sample 2 14.19$ 28.38$ 0 0 -$ 2 20-1. Per Hour 6 238.82$ 1,432.92$ 0 0 -$ 6 20-2. Per Hour 8 214.93$ 1,719.44$ 0 0 -$ 8

Program Manager (Key) Project Manager (Key)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil/Sediment Sample Collection

This Invoice Balance Previously Invoiced

DESCRIPTION

Site Health & Safety Plan for Continued Work at no cost to FDEP

Facility Name:

7-Digit Facility ID #:

Task Manager Name:

Task Manager Phone:

Task Manager Email:

PO Rate Sheet

Geosyntec Consultants

DPT Rig Mobilization - ≤ 100 miles each way Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

6% Handling Fee for Cost Reimbursable Items

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Hand Auger Boring ≤ 10 foot total depth

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

6/9/2023F&TS Schedule of Pay Items 10-06-22

DETAIL INVOICE, Page 3 of 4

PAY

ITEM

UNIT OF

MEASURE UNITS PAY ITEM PRICE TOTAL EXTENDED

PRICE UNITS UNITS EXTENDED

PRICE UNITS

This Invoice Balance Previously Invoiced

DESCRIPTION

PO Rate Sheet

20-4. Per Hour 71 179.11$ 12,716.81$ 0 0 -$ 71 20-9. Per Hour 8 82.75$ 662.00$ 0 0 -$ 8

20-10. Per Hour 2 68.95$ 137.90$ 0 0 -$ 2

22-1. Reimbursable* 700 1.00$ 700.00$ 0 0 -$ 700

22-2. Reimbursable* 70 1.00$ 70.00$ 0 0 -$ 70

22-3. Reimbursable* 1300 1.00$ 1,300.00$ 0 0 -$ 1300

22-4. Reimbursable* 1000 1.00$ 1,000.00$ 0 0 -$ 1000

RETAINAGE 4,141.72$ -$ -$ 4,141.72$

SUBTOTAL 41,417.21$ -$ -$ 41,417.21$

Task 3 3-1. Per Round Trip 1 687.48$ 687.48$ 0 0 -$ 1

12-6. Per Drum 2 225.68$ 451.36$ 0 0 -$ 2 12-13. Per Drum 1 225.68$ 225.68$ 0 0 -$ 1 23-1. NOT BILLABLE 7000 1.00$ 7,000.00$ n/a n/a n/a 7000

RETAINAGE 836.45$ -$ -$ 836.45$

SUBTOTAL 8,364.52$ -$ -$ 8,364.52$

TOTAL COST 49,781.73$ -$ -$ 49,781.73$

Version: 2.1 Owner Cost Share: -$ -$ -$ -$

FDEP Cost Share: 49,781.73$ -$ -$ 49,781.73$ Retainage: 4,978.17$ -$ -$ 4,978.17$

FDEP Less Retainage: 44,803.56$ -$ -$ 44,803.56$

Task Manager Approval:

Print Name

Signature

Contingent Funding - Allowance only to be used as offset for field change orders

Draftsperson Administrative

Geologist/Geoscientist (Key)

Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Impacted Soil (includes drum) Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

GPR Survey (per day)

1/2 day DPT

Dioxins Analysis (soil), EPA Method 8290

EDB Analysis (soil), EPA Method 8260

DETAIL INVOICE, Page 4 of 4

PAY

ITEM

UNIT OF

MEASURE UNITS PAY ITEM PRICE TOTAL EXTENDED

PRICE UNITS UNITS EXTENDED

PRICE UNITS

This Invoice Balance Previously Invoiced

DESCRIPTION

PO Rate Sheet

Date of Review Letter

Petroleum Products Corporation Request Date:

8732818 PO/WO (if available):

3130 SW 19 Street, Pembroke Park, Florida SPI # (if available):

Geosyntec Consultants Subcontractor Company Name:

Joe Applegate Subcontractor Contact/Title:

850-518-1832 Subcontractor Phone:

japplegate@geosyntec.com Subcontractor Email:

Brittany Anding 850-245-8856 Property Owner:

Brittany.Anding@FloridaDEP.gov Responsible Party:

Project Description:

Task # (Optional) Item # Unit of Measure Qty Price Extended Price

22-1 Per Sample 2.00 $350.00 $ 700.00 22-2 Per Sample 2.00 $15.00 $ 30.00 22-3 Per Sample 7.00 $15.00 $ 105.00 22-4 Per Sample 2.00 $15.00 $ 30.00 22-5 Per Sample 7.00 $15.00 $ 105.00 22-6 Per Sample 2.00 $75.00 $ 150.00 22-7 Per Sample 7.00 $75.00 $ 525.00

SGS North America Susan Gaudios Account Manager

3/13/2023 susan.gaudios@sgs.com

Florida Department of Environmental Protection Petroleum Restoration Program

Standardized Quote Form

This form is required to submit a quote to the Petroleum Restoration Program (PRP) for goods and services not covered by the Agency Term Contract fixed price schedule or the LSSI Work Order template or fixed rate schedules. To be considered, standardized quotes must be submitted concurrently to the site manager and the requesting contractor listed below, along with any backup documentation as needed. Please see instructions tab for more details. NOTE: Additional quotes may be requested.

Facility Name:

9-Digit Facility ID #:

Facility Address:

Quote Requested from (if in-house, enter PRP Contractor information)Quote Requested by PRP Contractor:

Contractor Contact:

Contractor Phone:

Contractor Email:

Site Manager Name:

Vanadum Analysis (soil), EPA Method 6010 Vanadum Analysis (water), EPA Method 6010

Site Manager Phone:

Site Manager Email:

Analytical costs for non SPI lab analyses.

Item Description

Dioxins Analysis (soil), EPA Method 8290 Antimony Analysis (soil), EPA Method 6010 Antimony Analyis (water), EPA Method 6010

407-615-0447

1,4-Dioxane Analysis (soil), EPA Method 522 8260SIM 1,4-Dioxane Analysis (water), EPA Method 522 8260SIM

Use dropdown to identify winning/non-selected bid

WINNING BID

Pay Items 22-1. and 22-2.

22-8 Per Sample 2.00 $35.00 $ 70.00 Subtotal: 3,500.00$

Shipping & Handling:

SUBCONTRACTOR: By submitting this form, the subcontractor attests that they are not a related party to the PRP Contractor that requested the quote. Tax:

Total: 3,500.00$

Susan Gaudios Account Manager Date Quote Expires 407-615-0447 (recommend 3 months or more) susan.gaudios@sgs.com

EDB (1,2-dibromoethane) (soil), EPA Method 8260

Florida has a very broad public records law and any communications to or from state officials or employees are considered public records and will be made available to the public and media upon request. Please do not include in your response any confidential disclaimers or documentation designated or marked as “trade secret,” “proprietary,” “confidential,” etc. See, e.g., sections 119.071(1)(f), 626.84195, and 815.045, F.S.; and defined in sections 688.002, 501.171(11)(d), and 812.081, F.S.

Quote Submitted By (update if other than person(s) listed in the header):

Subcontractor Contact/Title:

Subcontractor Phone:

Subcontractor Email:

22-2.

Pay Items 22-1. and 22-2.

6/30/2023 brock_md Line brock_md Line

3130 SW 19 Street, Pembroke Park, Florida SPI # (if available):

Geosyntec Consultants Subcontractor Company Name:

Joe Applegate Subcontractor Contact/Title:

850-518-1832 Subcontractor Phone:

japplegate@geosyntec.com Subcontractor Email:

Brittany Anding 850-245-8856 Property Owner:

Brittany.Anding@FloridaDEP.gov Responsible Party:

Project Description:

Task # (Optional) Item # Unit of Measure Qty Price Extended Price

22-1 Per Sample 2.00 $495.00 $ 990.00 22-2 Per Sample 2.00 $10.00 $ 20.00 22-3 Per Sample 7.00 $10.00 $ 70.00 22-4 Per Sample 2.00 $10.00 $ 20.00 22-5 Per Sample 7.00 $10.00 $ 70.00 22-6 Per Sample 2.00 $85.00 $ 170.00

Use dropdown to identify winning/non-selected bid

1,4-Dioxane Analysis (soil), EPA Method 522

Contractor Phone:

Contractor Email:

Site Manager Name:

Vanadum Analysis (soil), EPA Method 6010 Vanadum Analysis (water), EPA Method 6010

Site Manager Phone:

Site Manager Email:

Analytical costs for non SPI lab analyses.

Item Description

Dioxins Analysis (soil), EPA Method 8290 Antimony Analysis (soil), EPA Method 6010 Antimony Analyis (water), EPA Method 6010

813-280-8340

Eurofins Jess Hornsby

3/13/2023 jess.hornsby@et.eurofinsus.com

Florida Department of Environmental Protection Petroleum Restoration Program

Standardized Quote Form

This form is required to submit a quote to the Petroleum Restoration Program (PRP) for goods and services not covered by the Agency Term Contract fixed price schedule or the LSSI Work Order template or fixed rate schedules. To be considered, standardized quotes must be submitted concurrently to the site manager and the requesting contractor listed below, along with any backup documentation as needed. Please see instructions tab for more details. NOTE: Additional quotes may be requested.

Facility Name:

9-Digit Facility ID #:

Facility Address:

Quote Requested from (if in-house, enter PRP Contractor information)Quote Requested by PRP Contractor:

Contractor Contact:

NON-SELECTED

22-7 Per Sample 7.00 $85.00 $ 595.00 22-8 Per Sample 53.00 $35.00 $ 1,855.00

Subtotal: 3,790.00$ Shipping & Handling:

SUBCONTRACTOR: By submitting this form, the subcontractor attests that they are not a related party to the PRP Contractor that requested the quote. Tax:

Total: 3,790.00$

6/30/2023 Jess Hornsby / Client Services Manager Date Quote Expires 813-280-8340 (recommend 3 months or more) jess.hornsby@et.eurofinsus.com

Florida has a very broad public records law and any communications to or from state officials or employees are considered public records and will be made available to the public and media upon request. Please do not include in your response any confidential disclaimers or documentation designated or marked as “trade secret,” “proprietary,” “confidential,” etc. See, e.g., sections 119.071(1)(f), 626.84195, and 815.045, F.S.; and defined in sections 688.002, 501.171(11)(d), and 812.081, F.S.

Quote Submitted By (update if other than person(s) listed in the header):

Subcontractor Contact/Title:

Subcontractor Phone:

Subcontractor Email:

1,4-Dioxane Analysis (water), EPA Method 522 EDB (1,2-dibromoethane) (soil), EPA Method 8260

22-2.

3130 SW 19 Street, Pembroke Park, Florida SPI # (if available):

Geosyntec Consultants Subcontractor Company Name:

Joe Applegate Subcontractor Contact/Title:

850-518-1832 Subcontractor Phone:

japplegate@geosyntec.com Subcontractor Email:

Brittany Anding 850-245-8856 Property Owner:

Brittany.Anding@FloridaDEP.gov Responsible Party:

Project Description:

Task # (Optional) Item # Unit of Measure Qty Price Extended Price

22-1 Per Sample 2.00 $795.00 $ 1,590.00 22-2 Per Sample 2.00 $15.00 $ 30.00 22-3 Per Sample 7.00 $15.00 $ 105.00 22-4 Per Sample 2.00 $15.00 $ 30.00 22-5 Per Sample 7.00 $15.00 $ 105.00 22-6 Per Sample 2.00 $85.00 $ 170.00 22-7 Per Sample 7.00 $85.00 $ 595.00

Pace labs Eugene Aman AE

3/13/2023 eugene.aman@pacelabs.com

Florida Department of Environmental Protection Petroleum Restoration Program

Standardized Quote Form

This form is required to submit a quote to the Petroleum Restoration Program (PRP) for goods and services not covered by the Agency Term Contract fixed price schedule or the LSSI Work Order template or fixed rate schedules. To be considered, standardized quotes must be submitted concurrently to the site manager and the requesting contractor listed below, along with any backup documentation as needed. Please see instructions tab for more details. NOTE: Additional quotes may be requested.

Facility Name:

9-Digit Facility ID #:

Facility Address:

Quote Requested from (if in-house, enter PRP Contractor information)Quote Requested by PRP Contractor:

Contractor Contact:

Contractor Phone:

Contractor Email:

Site Manager Name:

Vanadum Analysis (soil), EPA Method 6010 Vanadum Analysis (water), EPA Method 6010

Site Manager Phone:

Site Manager Email:

Analytical costs for non SPI lab analyses.

Item Description

Dioxins Analysis (soil), EPA Method 8290 Antimony Analysis (soil), EPA Method 6010 Antimony Analyis (water), EPA Method 6010

904-509-9225

1,4-Dioxane Analysis (soil), EPA Method 522 1,4-Dioxane Analysis (water), EPA Method 522

Use dropdown to identify winning/non-selected bid

NON-SELECTED

22-8 Per Sample 53.00 $42.00 $ 2,226.00 Subtotal: 4,851.00$

Shipping & Handling:

SUBCONTRACTOR: By submitting this form, the subcontractor attests that they are not a related party to the PRP Contractor that requested the quote. Tax:

Total: 4,851.00$ 6/15/2023

Eugene Aman AE Date Quote Expires 904-509-9225 (recommend 3 months or more) eugene.aman@pacelabs.com

EDB (1,2-dibromoethane) (soil), EPA Method 8260

Florida has a very broad public records law and any communications to or from state officials or employees are considered public records and will be made available to the public and media upon request. Please do not include in your response any confidential disclaimers or documentation designated or marked as “trade secret,” “proprietary,” “confidential,” etc. See, e.g., sections 119.071(1)(f), 626.84195, and 815.045, F.S.; and defined in sections 688.002, 501.171(11)(d), and 812.081, F.S.

Quote Submitted By (update if other than person(s) listed in the header):

Subcontractor Contact/Title:

Subcontractor Phone:

Subcontractor Email:

22-2.

3130 SW 19 Street, Pembroke Park, Florida SPI # (if available):

Geosyntec Consultants Subcontractor Company Name:

Joe Applegate Subcontractor Contact/Title:

850-518-1832 Subcontractor Phone:

japplegate@geosyntec.com Subcontractor Email:

Brittany Anding 850-245-8856 Property Owner:

Brittany.Anding@FloridaDEP.gov Responsible Party:

Project Description:

Task # (Optional) Item # Unit of Measure Qty Price Extended Price

22-9 Full Day 1.00 $1,300.00 $ 1,300.00 Subtotal: 1,300.00$

Shipping & Handling:

SUBCONTRACTOR: By submitting this form, the subcontractor attests that they are not a related party to the PRP Contractor that requested the quote. Tax:

Total: 1,300.00$

Use dropdown to identify winning/non-selected bid

Contractor Phone:

Contractor Email:

Site Manager Name:

Site Manager Phone:

Site Manager Email:

Conduct one day of utility locates using GPR surveying methods at the 12 soil boring locations.

Item Description

GPR Survey (per day)

561-923-9758

GeoView Craig Fusaro/Project Manager

3/13/2023 cfusaro@geoviewinc.com

Florida Department of Environmental Protection Petroleum Restoration Program

Standardized Quote Form

This form is required to submit a quote to the Petroleum Restoration Program (PRP) for goods and services not covered by the Agency Term Contract fixed price schedule or the LSSI Work Order template or fixed rate schedules. To be considered, standardized quotes must be submitted concurrently to the site manager and the requesting contractor listed below, along with any backup documentation as needed. Please see instructions tab for more details. NOTE: Additional quotes may be requested.

Facility Name:

9-Digit Facility ID #:

Facility Address:

Quote Requested from (if in-house, enter PRP Contractor information)Quote Requested by PRP Contractor:

Contractor Contact:

22-3.

WINNING BID

Pay Item 22-3.

6/30/2023 Craig Fusaro@geoviewinc.com Date Quote Expires 861-923-9758 (recommend 3 months or more) cfusaro@geoviewinc.com

Florida has a very broad public records law and any communications to or from state officials or employees are considered public records and will be made available to the public and media upon request. Please do not include in your response any confidential disclaimers or documentation designated or marked as “trade secret,” “proprietary,” “confidential,” etc. See, e.g., sections 119.071(1)(f), 626.84195, and 815.045, F.S.; and defined in sections 688.002, 501.171(11)(d), and 812.081, F.S.

Quote Submitted By (update if other than person(s) listed in the header):

Subcontractor Contact/Title:

Subcontractor Phone:

Subcontractor Email:

Pay Item 22-3.

3130 SW 19 Street, Pembroke Park, Florida SPI # (if available):

Geosyntec Consultants Subcontractor Company Name:

Joe Applegate Subcontractor Contact/Title:

850-518-1832 Subcontractor Phone:

japplegate@geosyntec.com Subcontractor Email:

Brittany Anding 850-245-8856 Property Owner:

Brittany.Anding@FloridaDEP.gov Responsible Party:

Project Description:

Task # (Optional) Item # Unit of Measure Qty Price Extended Price

2 22-4. Reimbursable* 1.00 $1,000.00 $ 1,000.00 Subtotal: 1,000.00$

Shipping & Handling:

SUBCONTRACTOR: By submitting this form, the subcontractor attests that they are not a related party to the PRP Contractor that requested the quote. Tax:

WINNING BID

JAEE Environmental Service, Inc.

Willie Smitherman/President

5/15/2023 jaee@bellsouth.net

Florida Department of Environmental Protection Petroleum Restoration Program

Standardized Quote Form

This form is required to submit a quote to the Petroleum Restoration Program (PRP) for goods and services not covered by the Agency Term Contract fixed price schedule or the LSSI Work Order template or fixed rate schedules. To be considered, standardized quotes must be submitted concurrently to the site manager and the requesting contractor listed below, along with any backup documentation as needed. Please see instructions tab for more details. NOTE: Additional quotes may be requested.

Facility Name:

9-Digit Facility ID #:

Facility Address:

Quote Requested from (if in-house, enter PRP Contractor information)Quote Requested by PRP Contractor:

Contractor Contact:

Contractor Phone:

Contractor Email:

Site Manager Name:

Site Manager Phone:

Site Manager Email:

Conduct one half day of DPTto install soil borings for headspace screening and lab collection. Back fill all soil borings and patch asphalt.

Item Description

1/2 day DPT

954.476.8333

Use dropdown to identify winning/non-selected bid

Pay Item 22-4.

Total: 1,000.00$ 6/30/2023

Willie Smitherman/President Date Quote Expires

954.476.8333 (recommend 3 months or more) jaee@bellsouth.net

Florida has a very broad public records law and any communications to or from state officials or employees are considered public records and will be made available to the public and media upon request. Please do not include in your response any confidential disclaimers or documentation designated or marked as “trade secret,” “proprietary,” “confidential,” etc. See, e.g., sections 119.071(1)(f), 626.84195, and 815.045, F.S.; and defined in sections 688.002, 501.171(11)(d), and 812.081, F.S.

Quote Submitted By (update if other than person(s) listed in the header):

Subcontractor Contact/Title:

Subcontractor Phone:

Subcontractor Email:

Pay Item 22-4.

REQUIRED DOCUMENTS FOR INVOICING

PAY

ITEM PAY ITEM DESCRIPTION UNIT OF MEASURE REQUIRED DOCUMENTATION FOR INVOICING

1. OFFICE ACTIVITIES

1-1. File Review Per Review Historical Summary Worksheet 1-2. Site Health & Safety Plan Per Site Complete HASP

1-2.a. Site Health & Safety Plan for Continued Work at no cost to FDEP Per Site Complete HASP 1-3. Notice of Discovery of Contamination Package (Initial or TPOC) Per Package Complete noticing package 1-4. Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Reimbursable* Copy of permit and receipt 1-5. Off-Site Property Access Agreement Per Agreement Copy of executed access agreement

1-5.a. Site Property Access Agreement for Source Property at no cost to FDEP Per Agreement Copy of executed access agreement 1-6. Project Specific Financial Guarantee Bond (if required by DEP) Reimbursable* Documentation of paid bond 1-7. 6% Handling Fee for Cost Reimbursable Items % Surcharge Approval for payment of Reimbursable Items

2. FIELD ACTIVITIES - GENERAL

2-1. Site Reconnaissance/Field Measurement Visit Per Visit Area survey table, location map, area map, site map, photo documentation and field notes 2-2. Receptor Survey and Exposure Pathway Identification (Excludes report) Per Survey Receptor Survey Worksheet, DOH map and well data 2-3. Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order) Reimbursable* Surveyor invoice and electronic and hard copy of PLS 2-4. Contractor Oversight for Non-Price Schedule Activities Per Day Field Notes

3. MOBILIZATION

3-1. Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-2. Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-3. Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-4. Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-5. Work Trailer - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-6. Work Trailer - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-7. DPT Rig Mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle ownership and where it mobilized from 3-8. DPT Rig Mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle ownership and where it mobilized from 3-9. Drill Rig Mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle ownership and where it mobilized from 3-10. Drill Rig Mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle ownership and where it mobilized from 3-11. Excavator Mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-12. Excavator Mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-15. Loader/Backhoe Mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-16. Loader/Backhoe Mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-17. Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-18. Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-19. Drum Compactor mobilization - ≤ 100 miles each way Per Round Trip Field notes - documenting vehicle type 3-20. Drum Compactor mobilization - > 100 miles each way Per Round Trip Field notes - documenting vehicle type

4. MEALS AND LODGING

4-1.a. Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Per Person, Per Day Field notes documenting personnel and travel times to and from site (with properly completed travel voucher)

4-1.b. Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S. Reimbursable* Field notes documenting personnel and travel times to and from site (with properly completed travel voucher)

Page 1 of 8 6/9/2023F&TS Schedule of Pay Items 10-06-22

5. DRILLING AND BORING

5-1.a.1. Split Spoon Sampling – 2 foot (during boring) < 50 feet Per Spoon Field notes and boring logs 5-1.a.2. Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Per Spoon Field notes and boring logs 5-1.a.3. Split Spoon Sampling – 2 foot (during boring) > 100 feet Per Spoon Field notes and boring logs 5-1.b. Sonic Core Sampling - 5 or 10 foot (during boring) Per Core Field notes and boring logs 5-1.c. DPT Core Sampling - 4 or 5 foot (during boring) Per Core Field notes, boring logs and calibration logs 5-2. Hand Auger Boring ≤ 10 foot total depth Per Boring Field notes and boring logs

5-3.a. Direct Push Boring Per Foot Field notes, boring logs and calibration logs 5-4. Direct Push Boring with Cone Penetrometer Test Probe (CPT) Per Foot Field notes, boring logs and calibration logs 5-5. Direct Push Boring with Membrane Interface Probe (MIP) Per Foot Field notes, boring logs and calibration logs 5-6. HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-7. HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-8. HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs 5-9. HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-10. HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-11. HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs 5-12. HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-13. HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-14. HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs 5-15. Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-16. Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-17. Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs 5-18. Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-19. Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-20. Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs 5-21. Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Per Foot Field notes and boring logs 5-22. Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Per Foot Field notes and boring logs 5-23. Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth Per Foot Field notes and boring logs

6. WELL INSTALLATION

6-1. Well Installation - 1 inch diameter Per Foot Field notes, well construction and development logs, well permits and photo documentation

6-2.a. Well Installation - 2 inch diameter (Vertical) Per Foot Field notes, well construction and development logs, well permits and photo documentation 6-2.b. Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling) Per Foot Field notes, well construction and development logs, well permits and photo documentation 6-3.a. Well Installation - 4 inch diameter (Vertical) Per Foot Field notes, well construction and development logs, well permits and photo documentation 6-3.b. Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Per Foot Field notes, well construction and development logs, well permits and photo documentation 6-4. Well Installation - 6 inch diameter Per Foot Field notes, well construction and development logs, well permits and photo documentation 6-5. Surface Casing - 6 inch diameter Per Foot Field notes 6-6. Surface Casing - 8 inch diameter Per Foot Field notes 6-7. Surface Casing - 10 inch diameter Per Foot Field notes 6-8. Surface Casing - 12 inch diameter Per Foot Field notes

6-9.a. Additional Well Screen > 20 feet - 1 inch diameter Per Foot Field notes 6-9.b. Additional Well Screen > 20 feet - 2 inch diameter Per Foot Field notes 6-9.c. Additional Well Screen > 20 feet - 4 inch diameter Per Foot Field notes 6-9.d. Additional Well Screen > 20 feet - 6 inch diameter Per Foot Field notes 6-10. Above Grade Well Completion Per Well Field notes and photo documentation 6-11. Installation of Well Vault - 2 x 2 x 2 foot Per Vault Field notes and photo documentation

Page 2 of 8 6/9/2023F&TS Schedule of Pay Items 10-06-22

6-12. Installation of Well Vault - 4 x 4 x 2 foot Per Vault Field notes and photo documentation 6-13. Well Redevelopment Per Well Field notes and photo documentation

6-14. Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed Per Well Field notes and photo documentation

6-15. Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed Per Well Field notes and photo documentation

7. WELL ABANDONMENT

7-1. Grout and Abandon Well, 1 to 2 inch diameter Per Foot Field notes, well completion report/permit and photo documentation 7-2. Grout and Abandon Well, > 2 to 4 inch diameter Per Foot Field notes, well completion report/permit and photo documentation 7-3. Grout and Abandon Well, > 4 to 6 inch diameter Per Foot Field notes, well completion report/permit and photo documentation 7-4. Grout and Abandon Well, > 6 inch diameter Per Foot Field notes, well completion report/permit and photo documentation 7-5. Removal of Well Vault - 2 x 2 x 2 foot Per Vault Field notes and photo documentation 7-6. Removal of Well Vault - 4 x 4 x 2 foot Per Vault Field notes and photo documentation 7-7. Removal of Well Pad and Manhole Per Well Field notes and photo documentation

8. SAMPLE COLLECTION AND FIELD TESTING

8-1. Monitoring Well Sampling with Water Level, ≤ 100 foot depth Per Well Field notes, well sampling and calibration logs and sample chain of custody form 8-2. Monitoring Well Sampling with Water Level, > 100 foot depth Per Well Field notes, well sampling and calibration logs and sample chain of custody form 8-3. Domestic Water Well Sampling Per Well Field notes, well sampling and calibration logs and sample chain of custody form 8-4. Other Water Sampling Per Sample Field notes, well sampling and calibration logs and sample chain of custody form 8-5. Free Product Sample Collection Per Sample Field notes and sample chain of custody form 8-6. Soil/Sediment Sample Collection Per Sample Field notes, well sampling and calibration logs and sample chain of custody form 8-7. Water Level or Free Product Gauging Per Well Field notes and updated tables 8-8. Free Product Gauging & Bailing Per Well Field notes and updated tables

8-9. Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Per Sample Field notes and sample chain of custody form

8-10. Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Per Sample Field notes and sample chain of custody form

8-11. Electronic Data Deliverables (EDD) Per Sampling Event ADaPT zip file including the Lab EDD, Error Log, Field EDD, and Merged database file

8-12. Survey Latitude/Longitude of Existing Monitor Wells Per Well Field notes and updated tables (electronic file format) 8-13. Survey Latitude/Longitude of New Monitor Wells Per Well Field notes and updated tables (electronic file format)

8-14.

Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

Per Sample Field notes and sample chain of custody form

9. LABORATORY ANALYSIS

9.A. SOIL/SEDIMENT ANALYSIS

9-1. Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (Multiple Methods) Per Sample Lab Report, ADaPT upload and updated tables

9-2. Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Per Sample Lab Report, ADaPT upload and updated tables 9-3. Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Per Sample Lab Report, ADaPT upload and updated tables 9-4. Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Per Sample Lab Report, ADaPT upload and updated tables 9-5. Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Per Sample Lab Report, ADaPT upload and updated tables 9-6. Soil, Priority Pollutant Volatile Organics (EPA 8260) Per Sample Lab Report, ADaPT upload and updated tables

9-7. Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270]) Per Sample Lab Report, ADaPT upload and updated tables

Page 3 of 8 6/9/2023F&TS Schedule of Pay Items 10-06-22

9-8. Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Per Sample Lab Report, ADaPT upload and updated tables 9-8.a. Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Per Sample Lab Report, ADaPT upload and updated tables 9-9. Soil, PCBs [or Aroclors] (EPA 8082) Per Sample Lab Report, ADaPT upload and updated tables

9-10. Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Per Sample Lab Report, ADaPT upload and updated tables

9-11. Soil, Arsenic (EPA 6010 or EPA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .