CN-370000-GC895-T5.pdf

PDF 251 KB Posted

Attached to
Master Agreement FL|GC895|da7de3909ed4af5eeb424b0327e60ca5
Contract number
GC895
Issued by
Florida

About this file

Task Assignment Notification Form – DEP Contract GC895-05

This document is a Task Assignment Notification Form for an indefinite delivery contract between the Florida Department of Environmental Protection (DEP) and the Orange County Environmental Protection Division. The task assignment, designated as GC895-05, establishes the scope of work, compensation structure, and performance requirements for petroleum cleanup site management services in Orange County for the fiscal year July 1, 2020 to June 30, 2021.

The Local Program will receive a fixed cost base compensation of $1,329,930.00 annually for management of 470 non-Low Score Assessment (LSA) source properties, with the total task assignment value of $1,396,426.50. Compensation rates vary by remediation phase: $3,150.00 per source property annually for planning phase activities (site assessment and remedial action plan development); $6,300.00 per year for the first two years of remediation phase activities (remedial action construction, operation and maintenance, and source removal), then $3,150.00 thereafter; and $1,890.00 per year for monitoring phase activities (natural attenuation monitoring, post-active remediation monitoring, and well abandonment). Low Score Assessment sites receive one-time payments of $3,150.00 upon purchase order issuance, and Non-Program and Voluntary Cleanup sites are compensated at 75 percent of standard rates. Performance incentive bonuses of $1,000.00 are available upon issuance of Site Rehabilitation Completion Orders, with a maximum annual performance incentive cap of 5 percent of total non-LSA compensation. The contract incorporates a retainage structure where 5 percent of monthly compensation is withheld, with up to 80 percent release based on four performance metrics (deliverable review turnaround times, change request turnaround times, Storage Tank Contamination Monitoring database data entry accuracy, and OCULUS document insertion timeliness), and an additional 20 percent release contingent upon achieving 98 percent inspection compliance of assigned source properties. Monthly payments may range from 95 to 104 percent of proportional compensation, plus an additional 1 percent potential payment at task assignment completion.

View the file

Other files

File Type Posted
CN-370000-GC895-CO1.pdf PDF
CN-370000-GC895-T3.pdf PDF
CN-370000-GC895-T5CO2.pdf PDF
CN-370000-GC895-T10.pdf PDF
CN-370000-GC895-T4.pdf PDF
CN-370000-GC895-T4CO1.pdf PDF
CN-370000-GC895-T5CO1.pdf PDF
CN-370000-GC895-T8.pdf PDF
CN-370000-GC895-TA7CO1.pdf PDF
CN-370000-GC895-CMC2.pdf PDF
CN-370000-GC895-T1.pdf PDF
CN-370000-GC895-T6.pdf PDF
CN-370000-GC895-T7.pdf PDF
CN-370000-GC895.pdf PDF
CN-370000-GC895-A1R1.pdf PDF
CN-370000-GC895-T2.pdf PDF
CN-370000-GC895-T9.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

DEP Contract No. GC895, Attachment C, Page 1 of 4

TASK ASSIGNMENT NOTIFICATION FORM

DEP Agreement Number: GC895 Task Assignment #: GC895-05

Local Program Name: Orange County Environmental Protection Division

LP Contract Manager: David D. Jones Phone #: (407) 836-1406

DEP Contract Manager: David G. Warfel Phone #: (850) 245-8891

Task Description: (use additional pages if necessary)

See attached .

Deliverables: See Attachment A, Paragraphs A, B, C and E.

Task Assignment Type Amount not to Exceed

Fixed Cost: $ 1,396,426.50 Task Performance Period July 1, 2020 to June 30, 2021

Total Task Assignment Value: $ 1,396,426.50

Organization Code E.O. Object Code Module Category Fiscal Year GAA Line Item # Budget Representative Approval

37450401002 JN 131545 4713 104138 00 GAA TBD

DEP Contract Manager Date

Cost Center Administrator Date

Program Administrator Date

Division Director Date

Deputy Secretary Date

Secretary Date

Contractor Representative Date

6/16/2020

David G. Warfel Digitally signed by David G. Warfel Date: 2020.06.18 14:57:00 -04'00'

Susan Fields Digitally signed by Susan Fields Date: 2020.06.18 15:34:30 -04'00'

Natasha Lampkin Digitally signed by Natasha Lampkin Date: 2020.06.18 16:32:51 -04'00'

Tim J. Bahr Digitally signed by Tim J. Bahr Date: 2020.06.29 16:33:47 -04'00'

John Truitt Digitally signed by John Truitt Date: 2020.06.29 17:06:24 -04'00'

Justin Wolfe Digitally signed by Justin Wolfe Date: 2020.07.02 11:17:16 -04'00'

David D. Jones Digitally signed by David D. Jones Date: 2020.06.16 09:56:18 -04'00'

Monica J. Brady Digitally signed by Monica J. Brady Date: 2020.06.29 15:20:39 -04'00'

Brady_MJ Line

Brady_MJ Typewritten Text

DEP Contract No. GC895, Attachment C, Page 2 of 4

Task Assignment No. 5 (07/01/2020 – 06/30/2021) A. Tasks

Local Program performs all work as specified in Attachment A of the Contract GC895.

B. Performance Measures

Department Contract Manager shall review deliverable documentation to ensure that work has been performed as specified in the Scope. The Department Contract Manager will notify the Local Program of acceptance or any deficiencies in the work and/or deliverables. The Local Program will be given an opportunity to remedy deficiencies at no additional cost to the Department. In addition, the Department Contract Manager will perform a detailed performance analysis to determine retainage release on a monthly basis, per Paragraph D below.

C. Compensation

Fixed costs include all expenses associated with vehicle operation and maintenance, lease, or rental (including vehicle maintenance cost for field visits and operation and maintenance (O&M) inspections; all travel costs associated with Department training and/or meetings with Department representative(s) within Florida) all costs for staffing, including salaries, fringe benefits, rent, utilities, any overhead and indirect expenses; general administrative expenses and all other costs related to the performance of the work specified in the Attachment A of the Contract and this Task Assignment.

1. Level of Effort.

If the Local Program has been assigned more than one site (discharge) at a source property, the Local Program will only be compensated for the site with the highest level of effort.

Retainage will be withheld as specified in Paragraph D for the following activities:

a. The Local Program will be compensated at a rate of $3,150.00 per source property per year in planning phase

(site assessment (SA), including interim source removal, and remedial action plan (RAP)).

b. Remediation phase (remedial action construction (RAC), operation and maintenance (O&M) and source removal (SR)); because more effort is expected and required in managing sites in these phases, source properties with sites in remediation phase will be compensated at a rate of $6,300.00per year for the first two

(2) years after a RAP Approval Order, UIC Approval Order, or County-issued approval letter, if no Order is required, is issued for a Level 1 or Level 2 RAP or a Level 4 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract), and $ 3,150.00 after the first two (2) years. For a Level 1, 2 or 3 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract) the source property will be compensated at a rate of $6,300.00for one (1) year after a RAP Approval Order, UIC Approval Order or County-issued approval letter if no Order is required, is issued, and $ 3,150.00 for subsequent years. This includes SRs (not interim source removals under SA) which will be paid at $6,300.00for one (1) year and $ 3,150.00 for subsequent years.

c. Sites in monitoring phase (natural attenuation monitoring (NAM), post active remediation monitoring (PARM), long term natural attenuation monitoring (LTNAM), and well abandonment for site closure (WASC)); because minimal effort is expected and required for sites in this phase, the Local Program will be compensated at a rate of $1,890.00 per year.

d. Non-Program and Voluntary Cleanup sites: The Local Program will be compensated at 75% of the level of effort cost as described above.

Retainage will not be withheld for the following activities:

a. Sites that are low score assessments (LSAs): for LSA sites, the Local Program will receive a one-time payment of $ 3,150.00 per source property once the first LSA purchase order is issued.

DEP Contract No. GC895, Attachment C, Page 3 of 4

b. Once an LSA is complete, and if the Local Program determines that the site may qualify for conditional closure without remediation, either because a Conditional Closure Application or a No Further Action Proposal with Conditions has been submitted, the site may be paid at a rate of $3,150.00on an annual basis until the Conditional Site Rehabilitation Completion Order or LSSI No Further Action Order is issued, or it is determined that conditional closure is not achievable without remediation.

2. Performance Incentives

a. In order to encourage more efficient site cleanup, and in addition to the fixed cost payments, the Local

Program shall be paid an additional target payment of $1000.00, when the following is completed at a site:

i. A Site Rehabilitation Completion Order (SRCO) per Chapter 62-780.680, F.A.C., or Low Score Site

Initiative No Further Action Approval Order per Section 376.3071(12), F.S., is issued, but only if the order is submitted to the Department within 60 days of the approval of the no further action proposal or well abandonment report, whichever is later. The number of discharges listed in a SRCO should correspond with the number of discharges listed in the no further action proposal. For example, if multiple discharges were proposed for no further action in a report, only one SRCO shall be submitted.

b. 5% PERFORMANCE INCENTIVE PAYMENT MAXIMUM -The maximum amount that can be paid annually is 5% of the total non-LSA source property compensation amount, even if more performance incentives are met. Performance incentives must be billed for on the invoice for the month they are achieved.

3. Cost reimbursement: No cost reimbursement will be made under this Task Assignment.

D. Financial Consequences

No payment will be made for unsatisfactory work. In addition, retainage will be withheld in the amount of 5% of 1/12 of the total non-LSA source property compensation.

Retainage

1. 5% of 1/12 of total non-LSA source property compensation will be withheld as retainage each month.

2. Based on the level to which performance measures are met, up to eighty percent (80%) of the retainage will be released the month after the invoice is submitted. Performance for purposes of obtaining the eighty percent (80%) retainage is based on the following four (4) performance measures:

a. Performance Measure 1: Turnaround times for deliverable reviews – Percentage of deliverable reviews that met turnaround times (Attachment T of Contract) will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;

b. Performance Measure 2: Turnaround times for requests for change – Percentage of requests for change that met turnaround times will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;

c. Performance Measure 3: Data entry correctly and timely completed in the Storage Tank Contamination Monitoring (STCM) database – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely updated in STCM (Paragraphs A.1.a., A.1.e, A.1.i., and A.1.l. of Attachment A). The overall percentage of data correctly and timely updated or entered in STCM will be extrapolated from the Department’s review; and

d. Performance Measure 4: Document correctly and timely inserted into OCULUS – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely inserted into STCM (Paragraphs A.1.e., A.1.f, A.1.g.iii, A.1.h, A.1.i., and A.1.m. of Attachment A). The overall percentage will be extrapolated from the Department’s review.

DEP Contract No. GC895, Attachment C, Page 4 of 4

3. Performance Measures: Monthly Retainage Release Schedule

a. The percentage calculated for each of the above four performance metrics will be averaged, and that average will be used to determine how much retainage will be released;

b. If the average of the four monthly performance metrics is 90% or above, then 80% of withheld retainage will be released the following month;

c. If the average of the four monthly performance metrics is at least 80%, but less than 90%, then 60% of withheld retainage will be released the following month and 20% of the withheld retainage will be forfeited.

d. If the average of the four monthly performance metrics is at least 70%, but less than 80%, then 40% of withheld retainage will be released the following month and 40% of the withheld retainage will be forfeited.

e. If the average of the four monthly performance metrics is below 70%, then 0% of the withheld retainage will be released the following month and 80% of the withheld retainage will be forfeited.

4. The remaining twenty percent (20%) of retainage will be withheld from each monthly payment and shall be released at the end of the Task Assignment if 98% of all assigned source properties were visited or inspected during the fiscal year pursuant to Paragraph A.1.g of Attachment A of the Contract, based on self-reporting by the Local Program and a percentage of those will be verified by the Department. See attached List of Source Properties Requiring Inspection in FY 20/21 for list of source properties that are assigned to be visited inspected.

Failure to meet the 98% target shall result in forfeiture of this retainage.

E. Budget Summary

The total Task Assignment (TA) amount for TA #5 of DEP Contract No. GC895 is $ 1,396,426.50. The Local Program will be paid an annual fixed cost base rate of $1,329,930.00 for petroleum cleanup site management, $1,329,930.00.00 of which will be for petroleum cleanup site management of 470 non-Low Score Assessment (LSA) source properties. Additional funds are considered in this Task Assignment for compensation associated with the completion of Performance Incentives (see Paragraph C.2., above). However, the actual payment amount may be less than the Task Assignment amount, based on the Local Program’s performance.

1. Payments for each month can range from 95% to 104% of 1/12 of the total non-LSA source property compensation amount, plus LSA costs (per Paragraph C.1.e above). An additional 1% of 1/12 of the total non- LSA source property compensation amount could be paid at the end of the Task Assignment.

2. SRCOs that are issued do not reduce the total non-LSA source property compensation amount for this Task Assignment.

3. If an additional number of source properties (increase of 5% or 15 sites, whichever is greater) are assigned to the

Local Program during a Task Assignment period, a Task Assignment Change Order may be issued to provide compensation for the increased number of source properties if the Local Program makes a written request.

List of Source Properties Requiring Inspection in FY 20/21

*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal year, a field visit or O&M inspection will not be required"

488513203 488521646 498513690 488512738 488513004 488513256 488627746 488838100 488842120 488944029 489045952 489300579 489601161 489700773 489700840 489802042 489803691 489804183 489805451 489807927 489808121 489808604 489813848 498520956 598516594 598731742 598943005 488513029 489803669 498520964 499047117 489100712 489803747 358622912 489802892 498732820 499200096 489803632 599100177 488521578 488521678 489103586 489802844 489809257 489810404 489201333 598516679 598516780 489102647 488513358 599300614 499810534 488513517

498732826 598631355 358509826 358509880 358509971 358509977 358510078 358622967 358629293 359202376 359401902 488512571 488512654 488512696 488512764 488512808 488512902 488512932 488512960 488512977 488512983 488513053 488513093 488513116 488513309 488513321 488513370 488513393 488513463 488513483 488513485 488513584 488513585 488513595 488520431 488521426 488521597 488521612 488521731 488521752 488622603 488627039 488627617 488627927 488628011 488628041 488732899 488735489 488736138 488840956 488943447 489045638 489101588

489201277 489201760 489300671 489501610 489501884 489701287 498513747 498513749 498520976 498628557 499101448 598516546 598516571 598516589 598516592 598516626 598516633 598516639 598516658 598516699 598516733 598516767 598520830 598521477 598622553 599103487 358623003 488512720 488513002 488513440 488513488 488513521 488622599 489103109 489600279 498513686 498622661 498627092 498840539 598631208 598631308 488513156 358509816 358510082 358629455 359803776 488512575 598520643 598631312 598943949 358509837 488626951 598944030

358509922 358629275 488513548 489100102 598516549 488512659 488512786 488513126 488513131 489102998 498735509 598516722 598732499 488513202 598516752 598629355 358510118 498735498 488512800 488840711 598631405 488622592 598631363 488513481 488513430 488841478 489102502 489803654 489804852 489805860 499045950 598839536 488513181 488521966 488627538 488733618 489046318 489401281 489804008 498521967 599046227 488513383 488513368 488513512 489100237 498838856 488513123 488513190 488513192 488513390 488513508 488516745 488521506

488521774 488626957 488631018 488944988 489046013 489800423 489801337 489802883 489803631 489809810 498627124 598520651 598520668 598521814 598630732 598731879 599811785 488521930 489800642 489816885 489602590 488521493 488513001 359804632 488521602 488513429 488630759 489101298 489802724 489815965 499812475 598842248 488841638 489601364 499800846 488627275 488513367 488512729 358509901 358509908 358509919 358510117 358622973 358629451 358732749 359200646 488512862 488513274 488521607 488521765 489101221 498731909 499101481

*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal

499601211 598516724 598520812 598840397 358510074 358510134 358622885 488512892 488513129 358509893 488512984 488513135 598516568 598520662 598945475 358509890 358509933 358509961 358944679 359103131 359200054 488512733 488512767 488512851 488512941 488513552 488513559 488513594 488521536 488521601 488521938 488627900 488630133 488630138 488944101 488944242 489046956 489201828 489801194 498513648 498513652 498513729 498732901 498735337 498735492 499804054 598516737 599201607 489201935 488512580 488512888 488628550 498513727

499808085 598516588 598516597 598516643 598516751 598732703 599045623 358509871 358510018 358510029 358629926 358630192 358942894 358944763 359200220 359701284 359800673 359802141 488512569 488512572 488512581 488512582 488512591 488512629 488512638 488512711 488512725 488512796 488512973 488512975 488512979 488512987 488512990 488513071 488513189 488513194 488513227 488513331 488513352 488513391 488513432 488513545 488521473 488521526 488521614 488521618 488521667 488521692 488521707 488521729 488521889 488521913 488622616

488627095 488627431 488627469 488627610 488627650 488627965 488735162 488840672 488841701 488944159 489201461 489201808 489202036 489401415 489812903 498513689 498513766 498622680 498627075 498627091 498838298 498942694 499400260 598516550 598516553 598516681 598521247 598631379 598731599 598842397 359100011 488512940 488512981 488513197 488513509 488513514 488622226 488840203 358622986 488512850 488512805 488512830 358629310 359817646 488513395 489202123 488512583 488512760 488622537 488512972 489804238 488630402 489800843

499802083 489815444 358509823 358509911 358629304 359102250 488512699 488512845 488512869 488513130 488513188 488513285 488513396 488513415 488513475 488513477 488513523 488622614 488625311 488626312 489200077 489300853 489808072 498513617 498513757 498627088 598516700 598622634 598842225 598943607 358629449 488512883 488513127 488513157 488513380 488513502 488627434 488942992 498513670 498841426 598516670 358509956 358623005 488512609 488512613 488521475 488945283 488628016

*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal

C - TA Notification Form - Orange 20-21.pdf
Orange TA Site List 20-21

File details come from the government source that posted it. Updated .