This is Amendment No. 16 to Agency Term Contract No. GC774 between the Florida Department of Environmental Protection (DEP) and Southeastern Petroleum Contractors, Inc., executed on February 25, 2014. The amendment modifies the rate schedule for petroleum contamination site response action services provided in the Central Region of Florida. The amendment was signed on May 8, 2024, by Jeffrey S. Burke (President/Sr Geologist) for the contractor and Jessica Kramer (Deputy Secretary) for the DEP, with an effective Rate Change Date of June 10, 2024.
The amendment adjusts rates for 291 pay items contained in Attachment D (Rate Schedule V3.6), implementing both rate increases and decreases for new work assignments offered on or after the Rate Change Date. Rate increases range from approximately 1.10% to 5.00%, with most increases capped at the maximum allowable 5% per contract provision 11.B. Select items experienced rate decreases, including Air, Volatile Organic Compounds (EPA Method TO-17) at -6.72%, Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13) at -25.31%, and Air, Volatile Organic Aromatics (EPA Method TO-15) at -28.09%. The contractor submitted detailed justification for the increases, which the DEP reviewed and approved. All pre-Rate Change Date work assignments and previously offered work assignments continue to apply the prior rate schedule. The new rates apply exclusively to new work assignments unless further modified by subsequent amendment.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.5) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.5) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and
WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC774 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and
SOUTHEASTERN PETROLEUM CONTRACTORS, INC. (hereinafter "Contractor") executed on
February 25, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC774
RATE INCREASE AND DECREASE
AMENDMENT NO. 16
Amendment No. 16
DEP Agency Term Contract No. GC774
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 16
DEP Agency Term Contract No. GC774
3.
4.
5.
6.
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
Attachment D, Rate Schedule (V3.6) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate Schedule (V3.6) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
587.08$ $610.00
599.05$ $610.00
828.40$ $860.00
645.78$ $678.00
1,515.10$ $1,590.85
7,246.35$ $7,608.66
11,775.00$ $12,363.75
741.70$ $765.00
125.78$ $132.00
103.02$ $108.17
2,879.85$ $2,975.00
27.84$ $29.23
33.28$ $34.94
32.40$ $34.00
48.00$ $50.40
46.80$ $49.14
52.80$ $55.44
39.62$ $41.60
41.07$ $43.12
47.20$ $49.56
Est %
Rate
Change (2)
+3.90%
+1.83%
+3.81%
+4.99%
+5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-16.
5-9.
5-11.
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and Equipment
Description
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
Receptor Survey and Exposure Pathway Identification
(excludes report)
Site Reconnaissance/Field Measurement Visit
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Pay
Item No.
3-14.a.
3-7.a.
3-10.a.
5-1.b.
5-2.
5-3.a.
5-6.
5-7.
5-17.
5-13.
5-14.
5-15.
5-16.
+5.00%
+5.00%
+5.00%
+3.14%
+4.95%
+5.00%
+3.30%
+4.99%
+4.99%
+4.94%
+5.00%
+4.99%
+5.00%
25.34$ $26.60
38.42$ $40.34
55.00$ $57.75
40.83$ $42.87
50.06$ $52.56
60.98$ $64.02
71.45$ $75.02
11.57$ $12.14
261.52$ $274.59
763.82$ $802.01
1,575.00$ $1,653.75
350.00$ $367.50
410.00$ $430.50
17.59$ $18.46
23.00$ $24.15
27.94$ $29.33
33.00$ $34.65
438.00$ $459.90
167.06$ $175.41
221.10$ $232.15
253.21$ $265.87
64.81$ $68.05
28.74$ $30.17
28.74$ $30.17
72.45$ $74.75
82.40$ $86.52
507.23$ $532.59
79.86$ $83.85
+4.98%
+4.98%
+5.00%
+5.00%
+5.00%
9-20.
8-12.
8-6.
9-9.
6-5.
Removal and Reinstallation of 12-inch Manhole and
Well Pad (well pad/manhole has been damaged or destroyed)
Monitoring Well Sampling with Water Level, > 100 foot depth
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Removal of Well Pad and Manhole
Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and
Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
6-7.
6-8.
Installation of Well Vault - 4 x 4 x 2 foot
Installation of Well Vault - 2 x 2 x 2 foot
7-2.
7-3.
7-4.
7-5.
7-1.
6-9.b.
6-10.
6-11.
6-12.
6-14.
6-15.
7-7.
8-1.
8-2.
8-13.
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Well Installation - 1 inch diameter
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Soil, Texture, (See Gee 7 Bauder [1966])
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection
Above Grade Well Completion
Additional Well Screen > 20 feet - 2 inch diameter
Surface Casing - 12 inch diameter
Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA
624, EPA 6021 or EPA 8260)
Water, Used Oil/Unknown Product Group-Table D of
Ch. 62-780, F.A.C., except for non-Priority Pollutant
Organics (multiple methods)
Soil, PCBs [or Aroclors] (EPA 8082)
6-4.
6-1.
6-2.a.
9-26.
9-29.
+5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+4.93%
+5.00%
+5.00%
+5.00%
+4.97%
+5.00%
+5.00%
+5.00%
+4.95%
+5.00%
+4.97%
+3.17%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
11.70$ $12.25
18.43$ $19.35
27.93$ $28.75
14.34$ $15.00
14.77$ $15.00
45.50$ $46.00
989.02$ $1,038.47
989.02$ $1,038.47
9-58.
9-59.
9-61.
9-62.
9-63.
9-52.
9-56.
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Residue-nonfilterable [Total Suspended
Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Organic Carbon, Total (SM 5310 B, SM 5310
C or EPA 9060)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA
2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
9-48.
9-41.
9-43.
9-44.
9-45.
9-46.
9-47.
9-39.
9-40.
9-38. +4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.70%
+4.99%
+2.94%
+4.60%
+1.56%
+1.10%
+5.00%
261.52$ $274.59
261.52$ $274.59
235.17$ $240.00
77.39$ $81.25
115.50$ $121.27
100.39$ $101.00
299.00$ $215.00
301.24$ $225.00
316.25$ $295.00
242.09$ $254.19
242.09$ $254.19
8.36$ $8.77
12.78$ $13.41
8.36$ $8.77
16.57$ $17.39
49.04$ $51.49
37.72$ $39.60
+4.95%
+5.00%
+4.98%
+5.00%
+4.90%
+4.93%
+4.90%10-2.c.
10-2.d.
10-7.
10-8.
9-64.
9-65.
9-72.
9-73.
10-1.c.
10-1.d.
9-67.
9-78.
9-80.
9-68.
9-69.
9-70.
9-71.
Air, Polycyclic Aromatic Hydrocarbons (EPA Method
TO-13)
Air, Volatile Organic Aromatics (EPA Method TO-
15)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline
PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328
High Resolution GC/FID)
Air, Volatile Organic Compounds (EPA Method TO-
17)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and
Isoalkanes (ASTM D3328 GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline
PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution
GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and
Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Conventional Soil Excavation and Loading > 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
+4.99%
+5.00%
+0.61%
-28.09%
-25.31%
-6.72%
+5.00%
+5.00%
+5.00%
+2.05%
229.82$ $241.29
41.91$ $44.00
35.19$ $36.94
25.01$ $26.26
25.35$ $26.61
59.89$ $62.88
2,264.46$ $2,377.67
4,528.95$ $4,755.39
6,793.43$ $7,133.10
8,303.10$ $8,718.25
2.23$ $2.34
1.49$ $1.56
63.38$ $66.54
219.65$ $230.63
33.81$ $35.50
39.84$ $41.83
1.61$ $1.69
1.57$ $1.64
211.32$ $221.88
8.34$ $8.75
10.15$ $10.65
1.93$ $2.02
0.85$ $0.89
0.42$ $0.44
+4.99%
+4.99%
+4.97%
+5.00%
+4.97%
12-5.
12-6.
12-7.
#57 Stone
Clean Overburden Used As Backfill, Compaction and
Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and
Testing ≤ 300 cubic yards
Clean Backfill Material, Compaction and Testing
(includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing
(includes transport) ≤ 300 cubic yards
LDA Excavation and Loading With Driven Casing <
300 cubic yards
Grass - Seed and Mulch
Grass - Sod
Remove and Dispose Petroleum Storage Tank - >
1,000 to 5,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - ≤
1,000 gal. capacity
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) ≤ 450 tons
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off
Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Contact Water
(bulk)
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted Soil
(includes drum)
Transport and Disposal of Mixed Debris
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
Remove and Dispose Petroleum Storage Tank - >
10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - >
5,000 to 10,000 gal. capacity
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
12-18.
13-1.
13-3.
13-4.
13-6.
13-7.
10-17.
10-11.b.
10-14.
10-15.
10-15.a.
10-15.b.
11-3.
11-4.
12-1.
12-2.
11-1.
11-2.
12-9.
12-14.
12-16.
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+4.93%
+4.70%
+4.99%
+5.00%
+5.00%
+4.99%
+4.97%
+4.46%
+5.00%
+4.92%
+4.93%
+4.66%
+4.71%
+4.76%
52.80$ $55.44
75.45$ $78.09
90.54$ $93.71
24.13$ $25.33
7,970.97$ $8,369.51
10,076.94$ $10,580.78
13,677.48$ $14,361.35
5,736.66$ $6,023.16
4,000.57$ $4,200.59
5,887.54$ $6,181.91
6,944.41$ $7,291.63
461.27$ $484.33
264.15$ $277.35
641.57$ $673.64
6,325.00$ $6,641.25
4,862.03$ $5,105.13
9,922.50$ $10,418.62
4,053.69$ $4,256.37
3,774.12$ $3,962.82
5,736.66$ $6,000.00
4,631.21$ $4,862.77
5,819.77$ $6,110.75
4,780.00$ $5,019.00
+5.00%
+3.50%
+3.50%
+4.97%
+5.00%
+5.00%
+5.00%
16-24.
18-4.
18-5.
18-6.
18-10.
18-22.
18-2.
17-5.
18-20.
18-17.
18-18.
18-19.
16-18.
16-20.
16-22.
15-1.a.
15-1.b.
15-1.c. Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup - 1 Technology
Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 1-10 Recovery/Treatment Points
Trenching and Installation of Additional 1-10 Lines
Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone Large -
Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small -
Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small -
Short Term ≤ 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity -
Long Term > 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity -
Long Term > 6 mos.
MPE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
MPE System - Medium - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
15-4.a.
15-4.b.
15-4.c.
15-1.d.
18-26.
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.59%
6,000.92$ $6,300.96
539.72$ $566.70
698.22$ $733.13
325.00$ $341.25
425.50$ $446.77
608.02$ $638.42
7,377.00$ $7,745.85
8,136.39$ $8,543.20
2,090.00$ $2,163.00
3,610.00$ $3,736.35
1,736.08$ $1,796.84
679.32$ $713.28
1,118.00$ $1,173.90
712.87$ $737.82
1,434.14$ $1,505.84
938.53$ $985.45
1,502.64$ $1,555.23
12,950.00$ $13,597.50
16,905.00$ $17,500.00
1,735.00$ $1,821.75
3,200.00$ $3,360.00
775.00$ $802.12
2,900.00$ $3,001.50
355.00$ $372.75
1,935.00$ $2,005.00
1,255.00$ $1,298.92
691.00$ $725.55
504.00$ $529.20
330.00$ $346.50
120.76$ $126.79
+5.00%
+5.00%
+3.62%
+3.50%
+5.00%
+5.00%
+5.00%
+4.99%
19-20.
19-21.
19-23.
19-24.
19-25.
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
19-26.
20-2.
18-58.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
19-18.
19-19.
18-56.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Carbon Off Gas Treatment - Add On - Large - Long
Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long
Term > 6 mos.
MPE System - Large - Long Term > 6 mos.
Level 1 Remedial Action Plan
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan
Receptor and Exposure Pathway Report
Supplemental Site Assessment Report
General Site Assessment Report
Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System -
Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short
Term ≤ 6 mos.
Level 2 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Remedial Action Plan
Project Manager (Key)
Well Abandonment/Site Restoration Report
Free Product Recovery Report
Remedial Action Interim Report
Remedial Action General Report
Operation & Maintenance Report, Quarterly or Non-
Annual
Letter/NPDES Report
18-38.
18-35.
18-36.
18-28.
18-39.
18-40.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+3.49%
+3.50%
+3.50%
+5.00%
+5.00%
+3.50%
+5.00%
+5.00%
+3.50%
+5.00%
+5.00%
+3.50%
+3.50%
+3.52%
105.00$ $110.25
104.82$ $110.06
90.85$ $95.39
78.75$ $82.68
70.35$ $73.86
66.55$ $69.87
50.40$ $52.92
153.70$ $161.38
153.70$ $160.00
153.70$ $160.00
153.70$ $160.00
664.09$ $697.29
664.09$ $697.29
664.09$ $697.29
996.34$ $1,046.15
996.34$ $1,046.15
331.36$ $347.92
664.23$ $697.44
627.90$ $659.29
498.16$ $523.06
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+5.00%
20-9.
20-10.
21-1.
20-8.
20-4.
20-5.
20-6.
20-7.
Professional Geologist (Key)
Professional Engineer (Key)
Administrative
Draftsperson
Field Technician (Key)
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Project Oversight for Remediation System
Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology
Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil-
Boring Logging (Use hourly rate on site specific basis)
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-2.
21-3.
21-4.
21-5.
+5.00%
+5.00%
+4.10%
+4.10%
+4.10%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
332.11$ $348.71
331.38$ $347.94
331.38$ $347.94
331.38$ $347.94
415.10$ $435.85
384.36$ $403.57
246.46$ $258.78
246.46$ $258.78
249.08$ $261.53
332.11$ $348.71
495.00$ $519.75
664.09$ $697.29
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% P.E. Review, Evaluation and Certification of a Level
1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot
Test Report
P.E. Review, Evaluation and Certification of a Pilot
Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Review, Evaluation and Certification of a Non-
Annual Natural Attenuation or Post RA Monitoring
Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved
Monitoring Plan
P.E. Review, Evaluation and Certification of a Level
2 Natural Attenuation Monitoring Plan
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a
Soil Source Removal Report That Includes a
Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering
Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a
Conditional NFA
P.E. Design and Certification of Plans and Project
Oversight of Installation for Engineering Controls
(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
21-11.
21-12.
21-13.
21-15.
21-16.
21-18.
21-19.
21-20.
21-10.
21-21.
21-22.
21-23.
+5.00%
+5.00%
+5.00%
663.87$ $697.06
166.03$ $174.33
332.11$ $348.71
498.16$ $523.06
664.23$ $697.44
246.46$ $258.78
498.16$ $523.06
498.16$ $523.06
332.11$ $348.71
166.03$ $174.33
331.32$ $347.88
498.16$ $523.06
446.25$ $468.56
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%21-31.
21-32.
21-33.
21-34.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of Annual
PARM Report
P.E. Review, Evaluation, and Certification of
Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
Notes:
P.G or P.E. Review, Evaluation and Certification of a
Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non-
Annual Operation and Maintenance Report That
Includes Significant Proposed Changes to the
Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of As-Built
Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level
4 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
3 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
1 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Remedial Action Plan
21-29.
21-30.
21-24.
21-25.
21-26.
21-27.
21-28.
+5.00%
+5.00%
+5.00%
+5.00%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.