CN-370000-GC774-A16.pdf

PDF 542 KB Posted

Attached to
Master Agreement FL|GC774|348dff2cd17ee700a285db2c62f35a44
Contract number
GC774
Issued by
Florida

About this file

Document Summary

This is Amendment No. 16 to Agency Term Contract No. GC774 between the Florida Department of Environmental Protection (DEP) and Southeastern Petroleum Contractors, Inc., executed on February 25, 2014. The amendment modifies the rate schedule for petroleum contamination site response action services provided in the Central Region of Florida. The amendment was signed on May 8, 2024, by Jeffrey S. Burke (President/Sr Geologist) for the contractor and Jessica Kramer (Deputy Secretary) for the DEP, with an effective Rate Change Date of June 10, 2024.

The amendment adjusts rates for 291 pay items contained in Attachment D (Rate Schedule V3.6), implementing both rate increases and decreases for new work assignments offered on or after the Rate Change Date. Rate increases range from approximately 1.10% to 5.00%, with most increases capped at the maximum allowable 5% per contract provision 11.B. Select items experienced rate decreases, including Air, Volatile Organic Compounds (EPA Method TO-17) at -6.72%, Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13) at -25.31%, and Air, Volatile Organic Aromatics (EPA Method TO-15) at -28.09%. The contractor submitted detailed justification for the increases, which the DEP reviewed and approved. All pre-Rate Change Date work assignments and previously offered work assignments continue to apply the prior rate schedule. The new rates apply exclusively to new work assignments unless further modified by subsequent amendment.

View the file

Other files

File Type Posted
CN-370000-GC774-A10.pdf PDF
CN-370000-GC774-A11.pdf PDF
CN-370000-GC774-A17E2.pdf PDF
CN-370000-GC774-A18.pdf PDF
CN-370000-GC774-A8.pdf PDF
CN-370000-GC774-CMC.pdf PDF
CN-370000-GC774-CMC1.pdf PDF
CN-370000-GC774-CMC5.pdf PDF
CN-370000-GC774-CMC7.pdf PDF
CN-370000-GC774-A19.pdf PDF
CN-370000-GC774-A7.pdf PDF
CN-370000-GC774-AR1.pdf PDF
CN-370000-GC774-CMC8.pdf PDF
CN-370000-GC774-CO1.pdf PDF
CN-370000-GC774-A12.pdf PDF
CN-370000-GC774-A13.pdf PDF
CN-370000-GC774-A15E1.pdf PDF
CN-370000-GC774-A5.pdf PDF
CN-370000-GC774-A9.pdf PDF
CN-370000-GC774-CMC4.pdf PDF
CN-370000-GC774-CMC6.pdf PDF
CN-370000-GC774-CO2.pdf PDF
CN-370000-GC774.pdf PDF
PC-370000-GC774.pdf PDF
CN-370000-GC774-A14.pdf PDF
CN-370000-GC774-A2.pdf PDF
CN-370000-GC774-A3.pdf PDF
CN-370000-GC774-A4.pdf PDF
CN-370000-GC774-A6.pdf PDF
CN-370000-GC774-CMC2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.5) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.5) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and

WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC774 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and

SOUTHEASTERN PETROLEUM CONTRACTORS, INC. (hereinafter "Contractor") executed on

February 25, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC774

RATE INCREASE AND DECREASE

AMENDMENT NO. 16

Amendment No. 16

DEP Agency Term Contract No. GC774

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 16

DEP Agency Term Contract No. GC774

3.

4.

5.

6.

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

Attachment D, Rate Schedule (V3.6) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate Schedule (V3.6) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

587.08$ $610.00

599.05$ $610.00

828.40$ $860.00

645.78$ $678.00

1,515.10$ $1,590.85

7,246.35$ $7,608.66

11,775.00$ $12,363.75

741.70$ $765.00

125.78$ $132.00

103.02$ $108.17

2,879.85$ $2,975.00

27.84$ $29.23

33.28$ $34.94

32.40$ $34.00

48.00$ $50.40

46.80$ $49.14

52.80$ $55.44

39.62$ $41.60

41.07$ $43.12

47.20$ $49.56

Est %

Rate

Change (2)

+3.90%

+1.83%

+3.81%

+4.99%

+5.00%

+5.00%

+5.00%

2-1.

2-2.

2-4.

3-16.

5-9.

5-11.

Hand Auger Boring ≤ 10 foot total depth

Sonic Core Sampling - 5 or 10 foot (during boring)

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Direct Push Technology (DPT) Rig and Equipment

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule

Activities

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

Receptor Survey and Exposure Pathway Identification

(excludes report)

Site Reconnaissance/Field Measurement Visit

Loader/Backhoe Mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Pay

Item No.

3-14.a.

3-7.a.

3-10.a.

5-1.b.

5-2.

5-3.a.

5-6.

5-7.

5-17.

5-13.

5-14.

5-15.

5-16.

+5.00%

+5.00%

+5.00%

+3.14%

+4.95%

+5.00%

+3.30%

+4.99%

+4.99%

+4.94%

+5.00%

+4.99%

+5.00%

25.34$ $26.60

38.42$ $40.34

55.00$ $57.75

40.83$ $42.87

50.06$ $52.56

60.98$ $64.02

71.45$ $75.02

11.57$ $12.14

261.52$ $274.59

763.82$ $802.01

1,575.00$ $1,653.75

350.00$ $367.50

410.00$ $430.50

17.59$ $18.46

23.00$ $24.15

27.94$ $29.33

33.00$ $34.65

438.00$ $459.90

167.06$ $175.41

221.10$ $232.15

253.21$ $265.87

64.81$ $68.05

28.74$ $30.17

28.74$ $30.17

72.45$ $74.75

82.40$ $86.52

507.23$ $532.59

79.86$ $83.85

+4.98%

+4.98%

+5.00%

+5.00%

+5.00%

9-20.

8-12.

8-6.

9-9.

6-5.

Removal and Reinstallation of 12-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Removal of Well Pad and Manhole

Removal of Well Vault - 2 x 2 x 2 foot

Removal and Reinstallation of 8-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

6-6.

6-7.

6-8.

Installation of Well Vault - 4 x 4 x 2 foot

Installation of Well Vault - 2 x 2 x 2 foot

7-2.

7-3.

7-4.

7-5.

7-1.

6-9.b.

6-10.

6-11.

6-12.

6-14.

6-15.

7-7.

8-1.

8-2.

8-13.

Surface Casing - 8 inch diameter

Surface Casing - 6 inch diameter

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Soil, Texture, (See Gee 7 Bauder [1966])

Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Soil/Sediment Sample Collection

Above Grade Well Completion

Additional Well Screen > 20 feet - 2 inch diameter

Surface Casing - 12 inch diameter

Surface Casing - 10 inch diameter

Well Installation - 6 inch diameter

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA

624, EPA 6021 or EPA 8260)

Water, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Soil, PCBs [or Aroclors] (EPA 8082)

6-4.

6-1.

6-2.a.

9-26.

9-29.

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+4.93%

+5.00%

+5.00%

+5.00%

+4.97%

+5.00%

+5.00%

+5.00%

+4.95%

+5.00%

+4.97%

+3.17%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

11.70$ $12.25

18.43$ $19.35

27.93$ $28.75

14.34$ $15.00

14.77$ $15.00

45.50$ $46.00

989.02$ $1,038.47

989.02$ $1,038.47

9-58.

9-59.

9-61.

9-62.

9-63.

9-52.

9-56.

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

9-48.

9-41.

9-43.

9-44.

9-45.

9-46.

9-47.

9-39.

9-40.

9-38. +4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.70%

+4.99%

+2.94%

+4.60%

+1.56%

+1.10%

+5.00%

261.52$ $274.59

261.52$ $274.59

235.17$ $240.00

77.39$ $81.25

115.50$ $121.27

100.39$ $101.00

299.00$ $215.00

301.24$ $225.00

316.25$ $295.00

242.09$ $254.19

242.09$ $254.19

8.36$ $8.77

12.78$ $13.41

8.36$ $8.77

16.57$ $17.39

49.04$ $51.49

37.72$ $39.60

+4.95%

+5.00%

+4.98%

+5.00%

+4.90%

+4.93%

+4.90%10-2.c.

10-2.d.

10-7.

10-8.

9-64.

9-65.

9-72.

9-73.

10-1.c.

10-1.d.

9-67.

9-78.

9-80.

9-68.

9-69.

9-70.

9-71.

Air, Polycyclic Aromatic Hydrocarbons (EPA Method

TO-13)

Air, Volatile Organic Aromatics (EPA Method TO-

15)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328

High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO-

17)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, Methane (EPA SOP RSK-175)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Conventional Soil Excavation and Loading > 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

+4.99%

+5.00%

+0.61%

-28.09%

-25.31%

-6.72%

+5.00%

+5.00%

+5.00%

+2.05%

229.82$ $241.29

41.91$ $44.00

35.19$ $36.94

25.01$ $26.26

25.35$ $26.61

59.89$ $62.88

2,264.46$ $2,377.67

4,528.95$ $4,755.39

6,793.43$ $7,133.10

8,303.10$ $8,718.25

2.23$ $2.34

1.49$ $1.56

63.38$ $66.54

219.65$ $230.63

33.81$ $35.50

39.84$ $41.83

1.61$ $1.69

1.57$ $1.64

211.32$ $221.88

8.34$ $8.75

10.15$ $10.65

1.93$ $2.02

0.85$ $0.89

0.42$ $0.44

+4.99%

+4.99%

+4.97%

+5.00%

+4.97%

12-5.

12-6.

12-7.

#57 Stone

Clean Overburden Used As Backfill, Compaction and

Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and

Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) ≤ 300 cubic yards

LDA Excavation and Loading With Driven Casing <

300 cubic yards

Grass - Seed and Mulch

Grass - Sod

Remove and Dispose Petroleum Storage Tank - >

1,000 to 5,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - ≤

1,000 gal. capacity

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off

Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Contact Water

(bulk)

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Mixed Debris

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank - >

10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - >

5,000 to 10,000 gal. capacity

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

12-18.

13-1.

13-3.

13-4.

13-6.

13-7.

10-17.

10-11.b.

10-14.

10-15.

10-15.a.

10-15.b.

11-3.

11-4.

12-1.

12-2.

11-1.

11-2.

12-9.

12-14.

12-16.

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+4.93%

+4.70%

+4.99%

+5.00%

+5.00%

+4.99%

+4.97%

+4.46%

+5.00%

+4.92%

+4.93%

+4.66%

+4.71%

+4.76%

52.80$ $55.44

75.45$ $78.09

90.54$ $93.71

24.13$ $25.33

7,970.97$ $8,369.51

10,076.94$ $10,580.78

13,677.48$ $14,361.35

5,736.66$ $6,023.16

4,000.57$ $4,200.59

5,887.54$ $6,181.91

6,944.41$ $7,291.63

461.27$ $484.33

264.15$ $277.35

641.57$ $673.64

6,325.00$ $6,641.25

4,862.03$ $5,105.13

9,922.50$ $10,418.62

4,053.69$ $4,256.37

3,774.12$ $3,962.82

5,736.66$ $6,000.00

4,631.21$ $4,862.77

5,819.77$ $6,110.75

4,780.00$ $5,019.00

+5.00%

+3.50%

+3.50%

+4.97%

+5.00%

+5.00%

+5.00%

16-24.

18-4.

18-5.

18-6.

18-10.

18-22.

18-2.

17-5.

18-20.

18-17.

18-18.

18-19.

16-18.

16-20.

16-22.

15-1.a.

15-1.b.

15-1.c. Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1 Technology

Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 11-20 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Recovery/Treatment Points

Trenching and Installation of Additional 1-10 Lines

Greater Than 30 Lines

Trenching and Installation of 1-10 Plumbing (and

Electrical) Lines in Trench

Supplemental System O&M Package - Add Thermox or Catox Treatment

Groundwater Treatment System - Stand Alone Large -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small -

Short Term ≤ 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Long Term > 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Long Term > 6 mos.

MPE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

MPE System - Medium - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

15-4.a.

15-4.b.

15-4.c.

15-1.d.

18-26.

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.59%

6,000.92$ $6,300.96

539.72$ $566.70

698.22$ $733.13

325.00$ $341.25

425.50$ $446.77

608.02$ $638.42

7,377.00$ $7,745.85

8,136.39$ $8,543.20

2,090.00$ $2,163.00

3,610.00$ $3,736.35

1,736.08$ $1,796.84

679.32$ $713.28

1,118.00$ $1,173.90

712.87$ $737.82

1,434.14$ $1,505.84

938.53$ $985.45

1,502.64$ $1,555.23

12,950.00$ $13,597.50

16,905.00$ $17,500.00

1,735.00$ $1,821.75

3,200.00$ $3,360.00

775.00$ $802.12

2,900.00$ $3,001.50

355.00$ $372.75

1,935.00$ $2,005.00

1,255.00$ $1,298.92

691.00$ $725.55

504.00$ $529.20

330.00$ $346.50

120.76$ $126.79

+5.00%

+5.00%

+3.62%

+3.50%

+5.00%

+5.00%

+5.00%

+4.99%

19-20.

19-21.

19-23.

19-24.

19-25.

19-8.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

19-26.

20-2.

18-58.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

19-18.

19-19.

18-56.

Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Carbon Off Gas Treatment - Add On - Large - Long

Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

MPE System - Large - Long Term > 6 mos.

Level 1 Remedial Action Plan

Pilot Test Report

Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan

Receptor and Exposure Pathway Report

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Long Term > 6 Months

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short

Term ≤ 6 mos.

Level 2 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Remedial Action Plan

Project Manager (Key)

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action Interim Report

Remedial Action General Report

Operation & Maintenance Report, Quarterly or Non-

Annual

Letter/NPDES Report

18-38.

18-35.

18-36.

18-28.

18-39.

18-40.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+3.49%

+3.50%

+3.50%

+5.00%

+5.00%

+3.50%

+5.00%

+5.00%

+3.50%

+5.00%

+5.00%

+3.50%

+3.50%

+3.52%

105.00$ $110.25

104.82$ $110.06

90.85$ $95.39

78.75$ $82.68

70.35$ $73.86

66.55$ $69.87

50.40$ $52.92

153.70$ $161.38

153.70$ $160.00

153.70$ $160.00

153.70$ $160.00

664.09$ $697.29

664.09$ $697.29

664.09$ $697.29

996.34$ $1,046.15

996.34$ $1,046.15

331.36$ $347.92

664.23$ $697.44

627.90$ $659.29

498.16$ $523.06

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+5.00%

20-9.

20-10.

21-1.

20-8.

20-4.

20-5.

20-6.

20-7.

Professional Geologist (Key)

Professional Engineer (Key)

Administrative

Draftsperson

Field Technician (Key)

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Remediation System

Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology

Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil-

Boring Logging (Use hourly rate on site specific basis)

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Hydrogeologist/Modeler (Key)

Geologist/Geoscientist (Key)

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

21-9.

21-2.

21-3.

21-4.

21-5.

+5.00%

+5.00%

+4.10%

+4.10%

+4.10%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

332.11$ $348.71

331.38$ $347.94

331.38$ $347.94

331.38$ $347.94

415.10$ $435.85

384.36$ $403.57

246.46$ $258.78

246.46$ $258.78

249.08$ $261.53

332.11$ $348.71

495.00$ $519.75

664.09$ $697.29

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00% P.E. Review, Evaluation and Certification of a Level

1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot

Test Report

P.E. Review, Evaluation and Certification of a Pilot

Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Review, Evaluation and Certification of a Non-

Annual Natural Attenuation or Post RA Monitoring

Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved

Monitoring Plan

P.E. Review, Evaluation and Certification of a Level

2 Natural Attenuation Monitoring Plan

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a

Soil Source Removal Report That Includes a

Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering

Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a

Conditional NFA

P.E. Design and Certification of Plans and Project

Oversight of Installation for Engineering Controls

(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-13.

21-15.

21-16.

21-18.

21-19.

21-20.

21-10.

21-21.

21-22.

21-23.

+5.00%

+5.00%

+5.00%

663.87$ $697.06

166.03$ $174.33

332.11$ $348.71

498.16$ $523.06

664.23$ $697.44

246.46$ $258.78

498.16$ $523.06

498.16$ $523.06

332.11$ $348.71

166.03$ $174.33

331.32$ $347.88

498.16$ $523.06

446.25$ $468.56

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%21-31.

21-32.

21-33.

21-34.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of Annual

PARM Report

P.E. Review, Evaluation, and Certification of

Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

Notes:

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level

4 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

3 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Remedial Action Plan

21-29.

21-30.

21-24.

21-25.

21-26.

21-27.

21-28.

+5.00%

+5.00%

+5.00%

+5.00%

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

File details come from the government source that posted it. Updated .