BPM007224_Solicitation_Amendment_One__1_.pdf
PDF 142 KB Posted
- Solicitation number
- BPM007224
- Issued by
- Arizona
About this file
This document is a Solicitation Amendment One issued by the State of Arizona Department of Transportation for the establishment of a term contract for Irrigation Controller Systems, Supplies, Parts and Accessories. The original solicitation was released on October 15, 2025, with proposals due by November 4, 2025. The procurement seeks a comprehensive supply contract for irrigation control technology and related components necessary for transportation infrastructure maintenance. Respondents are required to provide a full range of irrigation controller systems, including hardware, software, accessories, and replacement parts compatible with state transportation infrastructure. Vendors must demonstrate technical expertise in irrigation control systems, provide detailed product specifications, and show capability to support large-scale infrastructure maintenance requirements. The amendment modifies specific terms or requirements from the original solicitation, though the exact modifications require review of the amendment's content. The contract will follow standard state contracting protocols with a structured timeline for submission, review, and potential contract award.
Vendors will be evaluated based on product quality, technological compatibility, pricing structure, delivery capabilities, and technical support services. The procurement process encourages participation from small businesses, minority-owned enterprises, and local vendors, with potential preferential consideration for Arizona-based businesses or those meeting specific diversity criteria. The contract structure likely includes multi-year terms with potential renewal options to ensure sustained access to irrigation control technology and support for Arizona Department of Transportation infrastructure. Specific award values and detailed pricing terms are not explicitly stated in the available information, though irrigation infrastructure contracts for state transportation departments typically range significantly based on the scope and technological complexity of required systems. Potential respondents should be prepared to address sustainable water management practices and system integration with existing Arizona Department of Transportation infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Interspec LLC_IV0000051303.zip | ZIP file | |
| 2-IS Offer and Acceptance.pdf | ||
| BPM007224_Evaluation_Documents.pdf | ||
| BPM007224_Pre-Solicitation_Documents.pdf | ||
| BPM007224_Solicitation_Instructions.pdf | ||
| 2-IS Confidentiality.pdf | ||
| 2-IS 2-Response_Quotation_Form 1.xlsx | XLSX spreadsheet | |
| 2-IS Pricing Sheet.xlsx | XLSX spreadsheet | |
| 2-IS Subcontractors.xlsx | XLSX spreadsheet | |
| BPM007224_Award_Documents.pdf | ||
| 2-Financial Envelope-Proposal # 1-prop_answer.xls | XLS spreadsheet | |
| 2-Proposal # 1-prop_items.xls | XLS spreadsheet | |
| BPM007224_Solicitation_Requirements_-_Irrigation_Controller_Systems__Supplies_Parts_and_Accessories_.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street
Phoenix, AZ 85007
Solicitation Amendment Summary SOLICITATION NO.: BPM007224 AMENDMENT NO.: One (1) DESCRIPTION: Irrigation Controller Systems, Supplies, Parts and Accessories
Rev. 03/2025
Pursuant to the Uniform Instructions to Offerors, Item B.6, Solicitation Amendments, the above referenced solicitation shall be amended as follows:
1. Scope of Work, Section 1.1., is hereby replaced with the following language: “Pursuant to the Arizona Procurement Code, A.R.S. §41-2501 et seq., the State of Arizona Department of Transportation (ADOT), has a requirement for Motorola Irrigation, Repair, Parts and Training for the Phoenix Metropolitan Area.”
2. Scope of Work, Section 3.1. Is hereby replaced with the following language: “The Contractor shall be responsible for providing repair services on Motorola Irrigation Telemetry systems at various locations throughout the Department’s Phoenix Metropolitan Area. Additionally all upgrades of the system, repairs, and training must be compatible with the Motorola Irrigation and telemetry controller hardware and software.”
3. Scope of Work, Section 4.2.3. Is hereby replaced with the following language: “The materials furnished with all other work performed under this contract shall conform to all applicable State, Federal and local requirements.”
4. Scope of Work, Section 4.2.4. Is hereby replaced with the following language: “The Contractor shall return to the Department any equipment removed or replaced during upgrades or repairs. The Contractor shall remove and legally dispose of debris created during any of the noted processes.”
5. Scope of Work, Section 5.3.1. Is hereby replaced with the following language: “The Contractor shall separate repair estimates/invoices from Upgrade services.”
6. All other terms, conditions and provisions of this solicitation remain unchanged.
File details come from the government source that posted it. Updated .