Atttachment J-P Drawings and Specification Addenda.pdf
PDF 629 KB Posted
- Attached to
- Modify Vehicle Assembly Building High Bay-3 Platforms for Block 1B Federal contract opportunity
- Solicitation number
- 80KSC021R0020
About this file
This document package includes specifications and drawings for a federal construction contract to modify platforms in a Vehicle Assembly Building. The contractor shall fabricate and install new platforms weighing approximately 300,000 pounds each, consisting of support structures, mechanical and electrical systems for platform movement, and communications, lighting and fire suppression systems. Additional scope includes new floors and rooms, as well as modification and extension of building systems including fire suppression pipes and valves, fire alarm, high-pressure gas tubing, and electrical power. Work will occur at heights from 280 to 450 feet above ground and must be completed during operational downtime between launches, with potential for dual occupancy. The specifications include requirements for materials, cleaning and passivation of stainless steel, and construction phasing.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-P
Drawings and Specification Amendments
Dated 8/30/2021
Note - Deleted text is shown striked through and new text is underlined.
Drawing 79K40461 Volume 1
All Sheets - Tasks indicated as occurring in Phase 3 are not in contract.
Sheet V-002 – Delete Sheets C-002, S-101T, S-400T, and S-500T from the index.
Sheet V-007 Mandatory Inspection List – Add MP-11 as follows:
Reference drawings: FP1343, FP3053, FP5013, FP5033, and
FP5043
Construction Phase: Phase 2 MIP Description: Prior to any other testing of the Fire Protection equipment, verify complete installation of each quad valve assembly and all components in accordance with specification 79K40462, section 21 13 29.00 (Water Spray Fixed Systems), Part
3.2 (Actuated Butterfly Valve Installation) in the presence of the Contracting Officer’s Representative. Provide hardcopies of applicable contract documentation (drawing sheets and specification), approved shop drawings, manufacturers’ installation instructions for various components, and a certificate for the correct installation, including presence of the upstream labels on valves, written confirmation of manufacturer’s intended orientation to ensure proper operation and prevent water hammer, and signatures of personnel who verified the installation.
Sheet V-007 Mandatory Inspection List – Add MP-12 as follows:
Reference drawings: FP1343, FP3053, FP5013, FP5033, and
FP5043
Construction Phase: Phase 2 MIP Description: After complete installation of each quad valve assembly and all components, adjust the flow control valves for each assembly in accordance with specification 79K40462, section 21 13 29.00 (Water Spray Fixed Systems), Parts 2.2.4.2 (Actuated Butterfly Valves) and 3.6.3.2 (Type II Riser Valve Dry Cycle Test).
Manually activate each quad valve assembly and record the time for the valves to fully open. Deactivate the quad valve assemblies and record the time for the valves to fully close. Submit all results to the Contracting Officer for review and approval.
Sheet V-007 Construction Phasing Notes, Phase 1 – Delete Note 8 in its entirety.
Sheet V-007 Construction Phasing Notes, Phase 1 – Add following:
Note 8: FABRICATION OF VEHICLE PLATFORM CORBEL
TRACKS.
Note 9: INSTALLATION OF VEHICLE PLATFORM CORBEL
TRACKS IN THE VAB.
Note 10: REINFORCING OF THE VAB EXISTING
STRUCTURE (PER DRAWING PACKAGE 79K40725) IN HB-3.
Sheet V-007 Construction Phasing Notes, Phase 2 – Delete Notes 1, 2, 4, and 13 in their entirety Sheet V-007 Construction Phasing Notes, Phase 2 – Change Note 3 as follows:
From: NOTE 3. REINFORCING OF THE VAB EXISTING
STRUCTURE (PER DRAWING PACKAGE 79K40725).
To: NOTE 3. REINFORCING OF THE VAB EXISTING
STRUCTURE (PER DRAWING PACKAGE 79K40725) IN HB-1,
HB-2, HB-4, AND TRANSFER AISLE.
Sheet V-007 Construction Phasing Notes, Phase 2 – Change Note 5 as follows:
From: NOTE 5. FABRICATION AND INSTALLATION OF NEW
CATWALK AND MECHANICAL PLATFORM ADDITION FOR
QUAD VALVES (PER THIS DRAWING PACKAGE) AND STRAND
JACK PLATFORM EGRESS (PER DRAWING PACKAGE
79K40596) AT VAB LEVEL 34.
To: NOTE 5. FABRICATION AND INSTALLATION OF NEW
CATWALK AND MECHANICAL PLATFORM ADDITION FOR
QUAD VALVES (PER THIS DRAWING PACKAGE) AND STRAND
JACK PLATFORM EGRESS (PER DRAWING PACKAGE
79K40596) AT VAB LEVEL 34.
Sheet V-007 Construction Phasing Legend – Change Phasing Legend as follows:
From: THE CONSTRUCTION PHASING LEGEND APPLIES TO
ALL SHEETS IN THE FOLLOWING DRAWING PACKAGES:
- 79K40461, MODIFY VAB FOR SLS BLOCK 1B CREW
- 79K40596, INSTALL VAB HB-3 SLS PLATFORM LIFTING
SUPPORT STRUCTURE
- 79K40725, MODIFY VAB FOR SLS BLOCK 1B CREW -
STRUCTURAL REINFORCEMENTS
SEE SHEET V-007 IN DRAWING PACKAGE 79K40461 FOR
CONSTRUCTION PHASING NOTES.
To: THE CONSTRUCTION PHASING LEGEND APPLIES TO
ALL SHEETS IN THE FOLLOWING DRAWING PACKAGES:
- 79K40461, MODIFY VAB FOR SLS BLOCK 1B CREW
- 79K40596, INSTALL VAB HB-3 SLS PLATFORM LIFTING
SUPPORT STRUCTURE
- 79K40725, MODIFY VAB FOR SLS BLOCK 1B CREW -
STRUCTURAL REINFORCEMENTS
SEE SHEET V-007 IN DRAWING PACKAGE 79K40461 FOR
CONSTRUCTION PHASING NOTES.
IF A PHASE NUMBER AND CORRESPONDING PHASING
PHANTOM LINE BUBBLE IS INDICATED AROUND THE
SHEET NUMBER IN ZONE A2, THEN THAT PHASE APPLIES
TO THE ENTIRE SHEET UNLESS NOTED OTHERWISE. IF A
SHEET DOESN’T HAVE A PHASE DESIGNATOR, THEN IT
APPLIES/ IS FOR INFORMATION RELATED TO ALL PHASES.
(example below)
PHASE 3 ITEMS ARE NOT IN CONTRACT.
Sheet V-007 Project Notes – Add Note F:
NOTE F - PROJECT NOTES ARE PROVIDED FOR
INFORMATION OF THE OVERALL SEQUENCE OF
OPERATIONS THAT WAS ANTICIPATED DURING DESIGN.
SOME OF THESE ITEMS/ TASKS ARE IN PHASE 3 OR OTHER
TASK ORDERS THAT ARE NOT INCLUDED IN THIS CURRENT
PROJECT SCOPE.
Sheet V-009 Specific Note N change as follows:
From: DRILL HOLES 24” APART WHILE PLATFORM IS IN THE
EXTENDED POSTION ACCORDING TO FOLLOWING DETAIL.
To: DRILL HOLES 24” APART WHILE PLATFORM IS IN THE
EXTENDED POSTION ACCORDING TO FOLLOWING PAINTING
DETAIL ON SHEET V-008.
Sheet V-010 Add new note to sheet:
PLATFORM ELEVATIONS INDICATED ARE NOMINAL.
COORDINATE EXACT ELEVATIONS WITH CORBEL HOLES.
Sheet C-002 – Delete this sheet in its entirety Sheet C-003 – Change plan, general notes, and specific notes as shown in sketch CSK-001 Sheet S-101T – Delete this sheet in its entirety Sheet S-400T – Delete this sheet in its entirety Sheet S-500T – Delete this sheet in its entirety
Sheet S-001 – Delete Special Inspection Notes in entirety Sheet S-003 Structural Steel Note 4 change as follows:
From: WELDING: ALL WELDING SHALL BE IN CONFORMANCE
WITH AWS D1.1, EXCEPT THAT THE WELDING OF THE
PLATFORMS SHALL BE IN CONFORMANCE WITH AWS D17.1.
To: WELDING: ALL WELDING SHALL BE IN CONFORMANCE
WITH AWS D1.1, EXCEPT THAT THE WELDING OF THE
VEHICLE PLATFORMS, ELEVATOR LANDING PLATFORMS
(ELPs), AND VEHICLE PLATFORM CORBEL TRACKS SHALL BE
IN CONFORMANCE WITH AWS D17.1.
Sheet S-4203 Specific Note Flag Note B change as follows:
From: SEE SHEETS S-4213 AND Q-7503 TO Q-7533 FOR
LIFTING LUG ASSEMBLY DETAILS.
To: SEE SHEETS S-4213 AND Q-7503 TO Q-7533 FOR
LIFTING LUG ASSEMBLY DETAILS. SEE DETAIL 3/S-5203
FOR CONNECTION OF W10’s TO W10’s OF LIFTING LUG
ASSEMBLY.
Sheet S-4203 Legend change as follows:
From: SPAN DIRECTION OF INVERTED 1.5B 16 GAUGE METAL
DECK WITH 3/16" THICK STEEL PLATE ATTACHED TO METAL
DECK PER THE SDI FABRICATION REQUIREMENTS. PROVIDE
1-3/8" HOLE THRU TOP OF DECK FOR FASTENER
INSTALLATION. INSTALL 1/2" DIA. - 13 (A307/A325 HDG) THRU
BOLT WITH HEAVY DUTY, LOCKING HEX NUTS. ONLY 2
BOLTS PER 24" WIDE DECK PANEL AT EACH BEAM ARE
REQUIRED. PROVIDE TEST TITE CLEANOUT REPAIR PLUGS
(OR APPROVED EQUIVALENT) FOR ALL OPENINGS OF 2", 3"
OR 4" DIAMETER. EXTEND DECKING TO EDGE OF
PERIMETER BEAM FLANGES.
To: SPAN DIRECTION OF INVERTED 1.5B 16 GAUGE METAL
CELLULAR DECK WITH 3/16" THICK STEEL PLATE ATTACHED
TO METAL DECK PER THE SDI FABRICATION REQUIREMENTS
(SEE DETAIL 9/S-504 FOR DECKING DETAIL). PROVIDE 1-3/8"
HOLE THRU TOP OF DECK FOR FASTENER INSTALLATION.
INSTALL 1/2" DIA. - 13 (A307/A325 HDG) THRU BOLT WITH
HEAVY DUTY, LOCKING HEX NUTS. ONLY 2 BOLTS PER 24"
WIDE DECK PANEL AT EACH BEAM ARE REQUIRED. PROVIDE
TEST TITE CLEANOUT REPAIR PLUGS (OR APPROVED
EQUIVALENT) FOR ALL OPENINGS OF 2", 3" OR 4" DIAMETER.
EXTEND DECKING TO EDGE OF PERIMETER BEAM FLANGES.
Sheet S-4203 Detail 1 Zone C8-E8 Add Note (see example below):
PROVIDE (5) PLATES PER 2/S-5203, EQUALLY SPACED
Sheet S-4203 Detail 1 Zone F7 – Delete Square Groove Weld Symbol (see example below)
Sheet S-4203 Detail 2 Zone C5-E5 Add Note (see example below):
PROVIDE (5) PLATES PER 2/S-5203, EQUALLY SPACED
Sheet S-4203 Detail 2 Zone E4 – Delete Square Groove Weld Symbol (see example below)
Sheet S-4613 sheet number, zone A2 – change as follows:
From: “PHASE 2” callout at sheet number S-4613.
To: “PHASE 1” callout at sheet number S-4613.
Sheet S-5203 add specific notes and detail 8/S-5203 as shown in sketch SSK-001.
Sheet S-5203 Detail 2: Change the shift angle such that inside face of the vertical leg is on outside edge of plate as detailed below.
Sheet S-5223 Legend change as follows:
From: SPAN DIRECTION OF INVERTED 1.5B 16 GAUGE METAL
DECK WITH 3/16" THICK STEEL PLATE ATTACHED TO METAL
DECK PER THE SDI FABRICATION REQUIREMENTS. PROVIDE
1-3/8" HOLE THRU TOP OF DECK FOR FASTENER
INSTALLATION. INSTALL 1/2" DIA. - 13 (A307/A325 HDG) THRU
BOLT WITH HEAVY DUTY, LOCKING HEX NUTS. ONLY 2
BOLTS PER 24" WIDE DECK PANEL AT EACH BEAM ARE
REQUIRED. LONGITUDINALLY POSITION THE THRU BOLT
SUCH THAT IT IS CENTERED BETWEEN THE OUTERMOST
RIBS OF THE INVERTED DECK; TRANSVERSELY POSITION
THE THRU BOLT TO PROVIDE THE MINIMUM EDGE DISTANCE
PER AISC. PROVIDE TEST TITE CLEANOUT REPAIR PLUGS
(OR APPROVED EQUIVALENT) FOR ALL OPENINGS OF 2", 3"
OR 4" DIAMETER. EXTEND DECKING TO EDGE OF
PERIMETER BEAM FLANGES.
To: SPAN DIRECTION OF INVERTED 1.5B 16 GAUGE METAL
CELLULAR DECK WITH 3/16" THICK STEEL PLATE ATTACHED
TO METAL DECK PER THE SDI FABRICATION REQUIREMENTS
(SEE DETAIL 9/S-504 FOR DECKING DETAIL). PROVIDE 1-3/8"
HOLE THRU TOP OF DECK FOR FASTENER INSTALLATION.
INSTALL 1/2" DIA. - 13 (A307/A325 HDG) THRU BOLT WITH
HEAVY DUTY, LOCKING HEX NUTS. ONLY 2 BOLTS PER 24"
WIDE DECK PANEL AT EACH BEAM ARE REQUIRED.
LONGITUDINALLY POSITION THE THRU BOLT SUCH THAT IT
IS CENTERED BETWEEN THE OUTERMOST RIBS OF THE
INVERTED DECK; TRANSVERSELY POSITION THE THRU BOLT
TO PROVIDE THE MINIMUM EDGE DISTANCE PER AISC.
PROVIDE TEST TITE CLEANOUT REPAIR PLUGS (OR
APPROVED EQUIVALENT) FOR ALL OPENINGS OF 2", 3" OR 4"
DIAMETER. EXTEND DECKING TO EDGE OF PERIMETER
BEAM FLANGES.
Sheet S-5613 sheet number, zone A2 – change as follows:
From: “PHASE 2” callout at sheet number S-5613.
To: “PHASE 1” callout at sheet number S-5613.
Sheet AD1283 Zones D6 and C6 – Delete Flag Note U (2 places).
Sheet A-1323 Specific Notes – Delete Flag Note M in its entirety.
Sheet A-1323 Zones D6 and C6 – Delete Flag Note M (2 places).
Sheet A-1343 – Add extents of striping in new walkway in Tower F as mentioned in Flag Note P per example below.
Sheet A-4063 Detail 1 – Add extents of striping in new walkway in Tower F as mentioned in Specific Note B per example below.
Sheet A-4063 Detail 2 – Add extents of striping in new walkway in Tower F as mentioned in Specific Note B per example below.
Sheet A-4113 Specific Notes, Flag Note F – Add PHASE 1 callout and phantom line around note and change note as follows:
From: GALVANIZED STEEL SAFETY GATE. REF: SPEC
SECTION 05 52 2.4.
To: GALVANIZED STEEL SAFETY GATE. REF: SPEC SECTION
05 52 2.4 SPECIFICATION SECTION 05 52 00, PARAGRAPH 2.4.
Sheet A-4113 Specific Notes – add Note G as follows:
Note G – REFER TO DETAIL 8/S-5203 FOR FIXED GUARDRAIL
DETAILS AT THE ELP.
Sheet A-4123 Specific Notes, Flag Note A –change note as follows:
From: GALVANIZED STEEL SAFETY GATE. REF: SPEC
SECTION 05 52 2.4.
To: GALVANIZED STEEL SAFETY GATE. REF: SPEC SECTION
05 52 2.4 SPECIFICATION SECTION 05 52 00, PARAGRAPH 2.4.
Sheet A-4123 Specific Notes – add Notes G, H, and I as follows:
Note G – ALL GUARDRAILS SHALL BE INSTALLED SUCH THAT
THE TOP SURFACE OF THE UPPER RAIL IS 42” ABOVE THE
DECK.
Note H – CONTRACTOR MAY LEAVE EXTENSION OF
TOEBOARD LONGER THAN SPECIFIED AND FIELD TRIM THE
FINAL LENGTH.
Note I – SEE S-5203 FOR ADDITIONAL GUARDRAIL
INFORMATION.
Sheet A-5053 sheet number, zone A2 – change as follows:
From: “PHASE 1 & 3” callout at sheet number A-5053.
To: “PHASE 1 & 3, UNO” callout at sheet number A-5053.
Sheet A-5053 Specific Note B – add PHASE 2 & 3 callout and phantom lines around Note B.
Drawing 79K40461 Volume 2 contract.
Sheet Q-0013 Aluminum Design change as follows:
From:
PLATE OR SHEET – ALLOY 6060, TEMPTER T6, ASTM B209
STRUCTURAL SHAPES – ALLOY 6060, TEMPER T6, ASTM
B308
ANGLES – ALLOY 6060, TEMPER T6, ASTM B308
PIPE – ALLOY 6060, TEMPER T6, ASTM B241
ROUND TUBE – ALLOY 6060, TEMPER T6, ASTM B210
SQUARE OR RECTANGULAR TUBE – ALLOY 6060, TEMPER 6,
ASTM B241
To:
PLATE OR SHEET – ALLOY 6060, ALLOY 6061, TEMPTER T6,
ASTM B209
STRUCTURAL SHAPES – ALLOY 6060, ALLOY 6061, TEMPER
T6, ASTM B308
ANGLES – ALLOY 6060, ALLOY 6061, TEMPER T6, ASTM B308
PIPE – ALLOY 6060, ALLOY 6061, TEMPER T6, ASTM B241
ROUND TUBE – ALLOY 6060, ALLOY 6061, TEMPER T6, ASTM
B210
SQUARE OR RECTANGULAR TUBE – ALLOY 6060, ALLOY
6061, TEMPER 6, ASTM B241
Sheet Q-1203 Platform Insert Support Detail, Zone B6, change 4-1/2” dimension to 6” where shown:
Drawing 79K40461 Volume 3 contract.
Sheet Q-4003 Parts List, Line Item #29 changes as follows:
From: SAFETY GATE, PER SPECIFICATION SECTION 05 52 00
PARAGRAPH 2.3
To: SAFETY GATE, PER SPECIFICATION SECTION 05 52 00
PARAGRAPH 2.3 2.4.
Sheet Q-7523 Detail 2, Lifting Lug Detail, Material change as follows:
From: MATERIAL: ROD, ROUND, ASTM 4140 To: MATERIAL: ROD, ROUND, ASTM 4140 AISI 4140
Drawing 79K40461 Volume 4
Sheet FP-5013 add detail 3/FP5013 as shown in sketch FSPK001.
Sheet FP-5043 add model number for flow control valve (near Flag
Note V) as shown in sketch FPSK002.
Sheet FP-5043 add detail 7/FP5043, General Notes and Specific
Notes as shown in sketch FPSK003.
Sheet M-001 Legend add Pnuematic Valves and Components per sketch MSK-001.
Sheet M-501 add new detail 8, parts list and general notes per sketch
MSK-002.
Sheet M-1343 Specific Notes add Note C:
NOTE C – GN2 IS FED FROM THE 130 PSIG SYSTEM TO THE
SOLENOID CABINETS. PROVIDE 80 GALLON, 200 PSIG
RATED, ASME RATED ACCUMULATOR/ RECEIVER UPSTREAM
OF SOLENOID CABINET, AND PROVIDE ALL ASSOCIATED
COMPONENTS (SEE DETAIL 8/M-501).
Sheet M-4003 Detail 1 add new accumulator/receiver towers in E & F at VAB Level 34 as shown in Sketch MSK-003.
Sheet M-4003 GN2 Riser – Add new details 2 & 3 with tables as shown in sketch MSK-004.
Sheet FA-502 add new detail 4/FA502 and specific notes as shown in sketch FASK-001.
Sheet FA6013 add tamper switch at level 34.
Sheet FA6023 add tamper switch at level 34.
Specification 79K40462
All Specification Sections – Tasks indicated as Phase 3 are not in
Specification Section 01 11 00 part 1.2.1 change as follows:
From:
Phase 1 construction activities will consist of the following construction activities:
1. Fabrication of 4 new extensible platform halves.
2. Installation of mechanical, electrical, plumbing, and fire protection components on the new extensible platform halves.
3. Fabrication of 6 new inserts.
4. Fabrication of 2 new OMLs.
5. Fabrication of 6 new fixed landing platforms.
6. Fabrication of 4 new egress ramps.
7. Fabrication of 4 new elevator landing platforms.
8. Fabrication of 4 new strand jack support platforms (per drawing package
79K40596).
To:
Phase 1 construction activities will consist of the following construction activities:
1. Fabrication of 4 new extensible platform halves.
2. Installation of mechanical, electrical, plumbing, and fire protection components on the new extensible platform halves.
3. Fabrication of 6 new inserts.
4. Fabrication of 2 new OMLs.
5. Fabrication of 6 new fixed landing platforms.
6. Fabrication of 4 new egress ramps.
7. Fabrication of 4 new elevator landing platforms.
8. Fabrication of 4 new strand jack support platforms (per drawing package 79K40596).
8. Fabrication of vehicle platform corbel tracks.
9. Installation of vehicle platform corbel tracks in the VAB.
10. Reinforcing of the VAB existing structure (per drawing package
79K40725) in HB-3.
Specification Section 01 11 00 part 1.2.1 change as follows:
From:
Phase 2 will consist of the following construction activities:
1. Fabrication of vehicle platform corbel tracks and track support columns.
2. Installation of vehicle platform corbel tracks and track support columns in the VAB.
3. Reinforcing of the VAB existing structure (per drawing package
79K40725).
4. Installation of 4 new strand jack support platforms (per drawing package 79K40596).
5. Fabrication and installation of new catwalk and mechanical platform addition for quad valves (per this drawing package) and strand jack platform (per drawing package 79K40596) at VAB
LEVEL 34.
6. Fabrication and installation of new supports for piping/duct in
VAB HB-3.
7. Installation of 2 New Quad Valves and associated pipes.
8. Installation and testing of fire alarm and fire protection systems.
9. Programming of elevator controls for VAB elevator numbers 13 through 16.
10. Architectural modifications in VAB HB-3.
11. Installation of mechanical, electrical, and plumbing components for VAB HB-3.
12. Modification of gas lines (for quad valves) in the building.
13. Pressure grouting under Slap Stand slab panel in Transfer
Aisle.
14. Installation of 4 new extensible platform halves without inserts
(new Platform A at final Block lB elevation, new Platform Bat temporary elevation = 364'-0").
15. Installation of 6 new fixed landing platforms: at VAB Levels 24, 29, and 32.
16. Installation of 2 new egress ramps: new Platform A egress ramp will be installed at final Block 1B elevation; new Platform B egress ramp will be stored during Phase 2.
17. Installation of 4 new elevator landing platforms (new Platform A ELP at final Block 1B elevation, new Platform B ELP at temporary elevation = 364'-0").
18. Install, terminate, and test communication cables for new extensible halves of Platform A.
Phase 2 will consist of the following construction activities:
1. Fabrication of vehicle platform corbel tracks and track support columns.
2. Installation of vehicle platform corbel tracks and track support columns in the VAB.
3. Reinforcing of the VAB existing structure (per drawing package
79K40725) in HB-1, HB-2, HB-4, and Transfer Aisle.
4. Installation of 4 new strand jack support platforms (per drawing package 79K40596).
5. Fabrication and installation of new catwalk and mechanical platform addition for quad valves (per this drawing package) and strand jack platform (per drawing package 79K40596) at VAB
LEVEL 34.
6. Fabrication and installation of new supports for piping/duct in
VAB HB-3.
7. Installation of 2 New Quad Valves and associated pipes.
8. Installation and testing of fire alarm and fire protection systems.
9. Programming of elevator controls for VAB elevator numbers 13 through 16.
10. Architectural modifications in VAB HB-3.
11. Installation of mechanical, electrical, and plumbing components for VAB HB-3.
12. Modification of gas lines (for quad valves) in the building.
13. Pressure grouting under Slap Stand slab panel in Transfer
Aisle.
14. Installation of 4 new extensible platform halves without inserts (new Platform A at final Block lB elevation, new Platform Bat temporary elevation = 364'-0").
15. Installation of 6 new fixed landing platforms: at VAB Levels 24, 29, and 32.
16. Installation of 2 new egress ramps: new Platform A egress ramp will be installed at final Block 1B elevation; new Platform B egress ramp will be stored during Phase 2.
17. Installation of 4 new elevator landing platforms (new Platform A ELP at final Block 1B elevation, new Platform B ELP at temporary elevation = 364'-0").
18. Install, terminate, and test communication cables for new extensible halves of Platform A.
Specification Section 01 33 00 part 1.12 change as follows:
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory. design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work.
To:
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory. design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal.contract requirements.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work.
Specification Section 05 12 00 part 3.2.2 change as follows:
3.2.2. Tension Control Bolts
If Contractor elects to use tension control bolts, bolts must be installed in connection holes and initially brought to a snug tight fit.
After the initial tightening procedure, bolts must then be fully tensioned, progressing from the most rigid part of a connection to the free edges. Fastener pre-load shall not exceed 70% of the yield stress of the net cross-section.
To:
3.2.1.2 3.2.2 Tension Control Bolts
If Contractor elects to use tension control bolts, bolts must be installed in connection holes and initially brought to a snug tight fit.
After the initial tightening procedure, bolts must then be fully tensioned, progressing from the most rigid part of a connection to the free edges. Fastener pre-load shall not exceed 70% of the yield stress of the net cross-section.
Specification Section 01 45 35 Delete this section in its entirety.
Specification Section 22 15 14.00 40 part 1.1 add:
ASTM A380 Standard Practice for Cleaning, Descaling, and Passivation of Stainless-Steel Parts, Equipment, and Systems ASTM A967 Standard Specification for Chemical Passivation Treatments for Stainless Steel Parts NASA STD-8719.17 Requirements for Ground-Based Pressure Vessels and Pressurization Systems
Specification Section 22 15 14.00 40 part 3.1.2.1 change as follows:
From:
Ensure pipe, tubing, fittings, valves, equipment, and accessories is clean and free of all foreign material before being installed in their respective systems. Clean pipe by a method approved by the Contracting Officer. Purge lines with dry, oil-free compressed air after erection, but do not rely on purging for removing all foreign matter. Purge lines at a velocity equal to 1-1/2 times maximum normal flow velocity. During the progress of construction, protect open ends of pipe, fittings, and valves at all times to prevent the admission of foreign matter. Except when connections are actually underway, install plugs or caps on all pipe and component openings. Use plugs or caps that are commercially manufactured products.
To:
Ensure pipe, tubing, fittings, valves, equipment, and accessories is clean and free of all foreign material before being installed in their respective systems. Clean pipe by a method approved by the Contracting Officer. Purge lines with dry, oil-free compressed air after erection, but do not rely on purging for removing all foreign matter. Purge lines at a velocity equal to 1-1/2 times maximum normal flow velocity. During the progress of construction, protect open ends of pipe, fittings, and valves at all times to prevent the admission of foreign matter. Except when connections are actually underway, install plugs or caps on all pipe and component openings. Use plugs or caps that are commercially manufactured products. Stainless-steel materials and equipment will follow the requirements and comply with ASTM A967 for the specification of passivation of the stainless-steel parts.
Specification Section 22 15 14.00 40 part 3.3 change as follows:
Remove rust and dirt from the bore and exterior surface of all piping and equipment. Clean pipeline strainers, temporary and permanent, during purging operations, after startup, and immediately prior to final acceptance by the Government.
To:
Remove rust and dirt from the bore and exterior surface of all piping and equipment. Clean pipeline strainers, temporary and permanent, during purging operations, after startup, and immediately prior to final acceptance by the Government. Stainless-steel materials, piping, and equipment will follow the requirements and comply with ASTM A380 for cleaning, descaling, and passivation of stainless-steel parts.
Specification section 31 32 23 Delete this section in its entirety Specification section 31 99 99 Delete this section it its entirety Specification section 40 34 10 part 1.1 add:
ASTM A380 Standard Practice for Cleaning, Descaling, and
Passivation of Stainless-Steel Parts, Equipment, and Systems ASTM A967 Standard Specification for Chemical Passivation Treatments for Stainless Steel Parts NASA STD-8719.17 Requirements for Ground-Based Pressure Vessels and Pressurization Systems
Specification Section 40 34 10 part 1.3 change as follows:
From:
Tube Cleanliness; G
The Contractor shall submit for approval prior to the start of fabrication a cleaning procedure to show compliance with ISO 14952. The Contractor is also responsible for maintaining and preserving the cleanliness of all existing precision cleaned components, GFE and tubing in accordance with the cleanliness level indicated on the drawing. A certification of cleanliness shall be submitted in the final data package.
To:
Tube Cleanliness; G
The Contractor shall submit for approval prior to the start of fabrication a cleaning procedure to show compliance with ISO 14952, ASTM A380 and ASTM A967. The Contractor is also responsible for maintaining and preserving the cleanliness of all existing precision cleaned components, GFE and tubing in accordance with the cleanliness level indicated on the drawing. A certification of cleanliness shall be submitted in the final data package.
Specification Section 40 34 10 part 2.2 change as follows:
2.2 STAINLESS STEEL TUBING SYSTEM
Stainless steel tubing shall be fabricated and installed per KSC-SPEC-Z-0008. Tube material shall be AL6XN per KSC-SPEC- P-0027. Tubing thickness requirements are shown on the drawings.
All tubing shall be provided by the contractor.
NOTE: KSC-SPEC-Z-0008 does not address the use of AL6XN tube material. All requirements in KSC-SPEC-Z-0008 shall apply to AL6XN tubing except the following:
The test ball size used for checking the tube inside diameter after bending shall be 0.344" for 1/2"x0.049" wall tube and 0.250" for 3/8"x0.035" wall tube. Note: These tube sizes are not presently used for this project.
A schedule showing all tubing sizes and thicknesses shall be developed by the Contractor.
To:
Stainless steel tubing shall be fabricated and installed per KSC-SPEC-Z-0008. Tube material shall be AL6XN per KSC-SPEC- P-0027. Tubing thickness requirements are shown on the drawings.
All tubing shall be provided by the contractor. All tubing materials shall be cleaned and passivated per ASTM A380 and ASTM A967.
NOTE: KSC-SPEC-Z-0008 does not address the use of AL6XN tube material. All requirements in KSC-SPEC-Z-0008 shall apply to AL6XN tubing except the following:
The test ball size used for checking the tube inside diameter after bending shall be 0.344" for 1/2"x0.049" wall tube and 0.250" for 3/8"x0.035" wall tube. Note: These tube sizes are not presently used for this project.
A schedule showing all tubing sizes and thicknesses shall be developed by the Contractor.
Specification Section 40 34 10 part 3.7 change as follows:
3.7 CLEANING
Tube cleanliness shall be verified in accordance with ISO 14952, flushing media shall be per ISO 14952.
Required Cleanliness Levels:
Fluid Type Cleanliness Level (per ISO 14952)
Gaseous Nitrogen (GN2) 300A, Breathing Air (BA) l00A, and Gaseous Helium (GHe) 300A.
Submit the cleaning Procedure to the Government prior to cleaning implementation.
Waste water shall be disposed per Contractors submitted plan.
3.7 CLEANING
Tube cleanliness shall be verified in accordance with ISO 14952, flushing media shall be per ISO 14952. All tubing materials shall be cleaned and passivated per ASTM A380 and ASTM A967.
Required Cleanliness Levels:
Fluid Type Cleanliness Level (per ISO 14952)
Gaseous Nitrogen (GN2) 300A, Breathing Air (BA) l00A, and Gaseous Helium (GHe) 300A.
Submit the cleaning Procedure to the Government prior to cleaning implementation.
Waste water shall be disposed per Contractors submitted plan.
Specification Section 40 50 00 part 1.1 add:
ASTM A380 Standard Practice for Cleaning, Descaling, and Passivation of Stainless-Steel Parts, Equipment, and Systems ASTM A967 Standard Specification for Chemical Passivation Treatments for Stainless Steel Parts NASA STD-8719.17 Requirements for Ground-Based Pressure Vessels and Pressurization Systems
Specification Section 40 50 00 part 1.5 SD-11 change as follows:
Cleaning Reports
Note: See the following specification sections for detailed submittal requirements: 22 15 14.00 40, General Service Compressed-Air Systems, Low Pressure; 40 05 13.96, Welding Process Piping; and 40 34 10, Stainless Steel Tubing.
To:
Cleaning Reports
Systems shall also be in compliance with NASA STD-8719.17.
Note: See the following specification sections for detailed submittal requirements: 22 15 14.00 40, General Service Compressed-Air Systems, Low Pressure; 40 05 13.96, Welding Process Piping; and 40 34 10, Stainless Steel Tubing.
Specification Section 40 50 00 part 3.7 change as follows:
Refer to 40 34 10, "STAINLESS STEEL TUBING" for tubing cleaning. Surface cleanliness of fluid systems shall be in accordance with ASTM G93. Cleanliness and test method shall be specified in the design documentation. All piping shall be cleaned and verified clean, in accordance with ISO 14952 as follows:
To:
Refer to 40 34 10, "STAINLESS STEEL TUBING" for tubing cleaning. Surface cleanliness of fluid systems shall be in accordance with ASTM G93. Cleanliness and test method shall be specified in the design documentation. All piping shall be cleaned and verified clean, in accordance with ISO 14952, ASTM A380, and ASTM A967 as follows: