This solicitation is for modification work to platforms and facilities in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The contractor shall fabricate and erect new platforms weighing approximately 300,000 pounds each that can move along rail beams. In addition, new floors, rooms, walls and ceilings shall be constructed. Ancillary work includes modifying and extending fire suppression, alarm, nitrogen, helium and electrical systems throughout the over 500-foot-tall steel structure. Installation will take place at heights ranging from approximately 280 to 450 feet above ground, requiring experience accessing, delivering materials to, and fitting up bolting and welding materials at such heights. Work must be completed during operational downtimes between launches, with dual occupancy of workspace anticipated.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL TAMPER SWITCH PER
MANUFACTURER'S INSTRUCTIONS.
CONNECT TAMPER SWITCH TO
TRANSPONDER #1, SPARE ZONE.
SPECIFIC NOTES:
A.
B
PROJ. NAME
ISSUED FOR
REFRENCE
FILE. NO. 62019380-00
DRAWN
DATE
SKETCH
PCN: 99500.1
NASA KSC MODIFY VAB
FOR SLS BLOCK 1B
CONTRACT AMENDMENT
MERRICK 775 E. MERRIT ISLAND CAUSEWAY, SUITE 310 MERRIT ISLAND, FL 32952 321.249.2404 www.merrick.com
O.TRUJILLO
08.10.2021
FASK-
79K40461, Vol. 4 FA502
Attachment J-L