Modify Vehicle Assembly Building High Bay-3 Platforms for Block 1B Federal contract opportunity
Solicitation number
80KSC021R0020
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This solicitation seeks proposals to modify platforms and construct new facilities in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The contractor shall fabricate and erect three new platforms weighing approximately 300,000 pounds each to support the Space Launch System Block 1B. Additional scope includes welding rail beams to a corbel structure attached to facility columns, constructing new floors, walls, ceilings, and extending building systems for fire suppression, alarms, nitrogen, helium and electrical power. Installation will take place between 280 to 450 feet above ground, requiring expertise in high-altitude construction and dual occupancy of the work area during ongoing facility operations. Proposals are due by the date specified in the solicitation, with award expected shortly thereafter. The period of performance involves completing construction during scheduled downtimes between launches.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(SEE ARCH)

(S

EE

A

RC

H)

(S

EE

A

RC

H) (S

EE

A

RC

H)

3/16 1-10

5/16

ALL FIXED GUARDRAIL

TOEBOARDS TO STRUCTURAL

STEEL MEMBER BELOW

(SEE ARCH)

ALL FIXED GUARDRAIL

POSTS TO STRUCTURAL

STEEL MEMBER BELOW

3/16

ALL FIXED

GUARDRAIL

POSTS

PERMANENT ELP GUARDRAILS:

VERTICAL "POSTS" - PIPE, 1-1/2", SCH 80, ASTM A53, GRADE B

HORIZONTAL "RAILINGS" - PIPE, 1-1/2", SCH 80, ASTM A53, GRADE B

"TOEBOARDS" - PLATE, 1/4", ASTM A572, GRADE 50

SEE "COMMON WELDING DETAILS" ON SHEET Q-8013 FOR ADDITIONAL

WELDING INFORMATION FOR ELP GUARDRAILS.

ALL ELP GUARDRAILS SHALL BE INSTALLED SUCH THAT THE TOP

SURFACE OF THE UPPER RAIL IS 42" ABOVE THE DECK.

SEE A-4123 FOR ADDITIONAL ELP GUARDRAIL INFORMATION.

SPECIFIC NOTES:

A.

B

C

D

PROJ. NAME NASA KSC MODIFY VAB

FOR SLS BLOCK 1B

PCN: 99500.1

ISSUED FOR

REFRENCE

CONTRACT AMENDMENT

FILE NO. 62019380-00

DRAWN

DATE

SKETCH

MERRICK 775 E. MERRIT ISLAND CAUSEWAY, SUITE 310 MERRIT ISLAND, FL 32952 321.249.2404 www.merrick.com

J.SPEERS SSK-001

79K40461, Vol. 1, S-5203

08.02.2021

3/4" = 1'-0"SSK-001

8 SECTION AT PERMANENT GUARDRAILS AT ELP

S-5203

Attachment J-O

Sheets
SSK-001 - Unnamed

File details come from the government source that posted it. Updated .