This amendment modifies a solicitation for a federal contract to modify vehicle platforms in a National Aeronautics and Space Administration facility. The contractor shall provide resources to fabricate and erect new platforms weighing approximately 300,000 pounds each in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. In addition to constructing new floors, rooms, walls and ceilings, the contractor must complete electrical, mechanical and other building system work while occupying the operational facility alongside ongoing operations between scheduled rocket launches. The performance period is tentatively scheduled from April 2022 through August 2024 in two modification work periods of approximately 10 and 8 months respectively, with an option to extend up to 6 months due to potential launch delays. The proposal due date remains October 12, 2021.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
80KSC021R0020, Amendment 03 (Continued) Page 2 of 3
14. The purpose of this amendment is to change the performance period in RFP Section F.1. and add a contract clause to RFP Section I.
A. Change RFP Section F.1., FAR 52.211-10, Commencement, Prosecution, and Completion of Work to read as follows:
* The Government will issue a restricted notice to proceed that allows the contractor to begin any off‐site work in accordance with all other contract requirements. Following anticipated NASA launches, the contracting officer will issue subsequent unrestricted notices to proceed for two on‐ site modification (work) periods. The first work period is tentatively scheduled to begin in April 2022 and January 2023. The second work period is tentatively scheduled to begin in December 2023 and end in August 2024. The start of each work period is subject to adjustment of up to six months due to delays in the NASA launch schedules. Currently, Modification Work Period 1 is 10 months and Modification Work Period 2 is 8 months. The Modification Work Periods are subject to change but each work period will be at least 6 months in duration and the total of the 2 work periods will be 18 months. Contractor shall install the corbel tracks as identified in Phase 1, Notes 8 and 9 on sheet V‐007 (as updated by the attached addenda – see Contract Attachment J‐ P) prior to the end of modification period one. Contractor shall start structural reinforcement modifications in drawing package 79K40725 and as identified in the Construction Phasing notes on S‐001R (as updated by the attached addenda – see Contract Attachment J‐P) at the start of modification period one unless otherwise agreed by the Contracting Officer. Contractor is requested to perform as much of the structural reinforcement modifications as possible in modification period one. Contractor shall complete the remainder of the work ready for use at the end of the second modification period, tentatively scheduled for August 15, 2024.
B. The following clause is added to RFP Section I (Contract Clauses):
FAR 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.
(DEVIATION 21-03)
(a) Definition. As used in this clause -
United States or its outlying areas means—
(1) The fifty States;
(2) The District of Columbia;
(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;
(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and
80KSC021R0020, Amendment 03 (Continued) Page 3 of 3
(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.
(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).
(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https://www.saferfederalworkforce.gov/contractors/.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the micro-purchase threshold, as defined in Federal Acquisition Regulation 2.101, performed in whole or in part within the United States or its outlying areas.
(End of clause)
C. The proposal due date remains October 12, 2021 at 2:00:00 PM EDT.
There are no other changes.
| Amendment 03 unsigned |
| Amendment 03 Pages 2-3 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 03 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: N/A |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Anthony M. Caruvana |
| Description[0]: See attached. |
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NASA/John F. Kennedy Space Center |
Mail Code OP-CS, Attn: Anthony Caruvana Kennedy Space Center, FL 32899
| NameandAddress[0]: |
| AdministeredBy[0]: NASA/John F. Kennedy Space Center |
Mail Code OP-CS, Attn: Anthony Caruvana Kennedy Space Center, FL 32899
| ContractIDCode[0]: | |
| ReqNumber[0]: N/A | |
| AmendmentNo[1]: 80KSC021R0020 | |
| ModificationNo[0]: | |
| ProjectNo[0]: 99500.1 | |
| Page[0]: 1 | |
| Pages[0]: 3 | |
| EffectiveDate[0]: See Block 16C | |
| Dated9B[0]: 9/9/2021 | |
| Dated10B[0]: | |
| CheckBox9[0]: Off | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2021-10-04T13:54:55-0400 | |
| ANTHONY CARUVANA |
| DateSigned[0]: |
| DateSigned[1]: 10/04/2021 |
| Copies[0]: 1 |
| CopiesReturned[0]: |