RECOMMENDED QUALITY ASSURANCE PROVISIONS AND SPECIAL INSPECTION REQUIREMENTS
1. PR/MIPR
FA8577-21-C-0002
2. NATIONAL STOCK NUMBER
Electronic Integrated Sensor Suite (EISS)
3. POINT OF INSPECTION
SOURCE DESTINATION
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
SOURCE DESTINATION
5. ITEM MANAGER
EDWARD WALLER
PHONE
468-4916
6. EQUIPMENT SPECIALIST
HOWARD T. KITCHENS
PHONE
472-5553
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
CERTIFICATE OF CONFORMANCE FAR 52-246-11
FAR 52.246-15 ISO 9001:2000
CONTRACTOR RESPONSIBILITY AS 9100
FOR INSPECTION NATO AQAP 2070
FAR 52.246-1 (or equivalent)
STANDARD INSPECTION COMMERCIAL ITEM INSPECTION
FAR 52.246-2, -3, -4, -5 OR -6 FAR 52.212-4
AS APPLICABLE TO CONTRACT OTHER (Describe in Block 8)
8. REMARKS
BLK 2, 5 & 6: This form applies to Contractor Logistics Support (CLS) for the Electronic Integrated Sensor Suite (EISS) installed on the RQ-4 Weapon System to include the Mission Control and Launch Recovery Element. You may call the above phone number should you need assistance with any matters.
BLK 3 & 4:
Point of Inspection and Point of Acceptance vary by CLIN. They are broken down as follows:
Point of Inspection is Source/Point of Acceptance is Source applies to the following CLINs [all CLINS except FSR]:
BASIC: 0001, 0003, 0004, 0005, 0006, 0007, 0010, 0011, 0012, 0013
OPTION I: 1001, 1003, 1004, 1005, 1006, 1007, 1010, 1011, 1012, 1013
OPTION II: 2001, 2003, 2004, 2005, 2006, 2007, 2010, 2011, 2012, 2013
OPTION III: 3001, 3003, 3004, 3005, 3006, 3007, 3010, 3011, 3012, 3013
OPTION IV: 4001, 4003, 4004, 4005, 4006, 4007, 4010, 4011, 4012, 4013
Point of Inspection is Destination/Point of Acceptance is Destination applies to the following CLINs [FSR]:
BASIC: 0002
OPTION I: 1002
OPTION II: 2002
OPTION III: 3002
OPTION IV: 4002
8a. OZONE DEPLETING SUBSTANCES (ODS)
STATEMENT (BLOCK)
" I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN ONLY
BE MET BY THE USE OF A CLASS I ODS"
WAIVER (BLOCK) (SEE AF FARS
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
9. QUALITY PRE-AWARD SURVEY
YES NEW SOURCE AFMC PARTICIPATION RECOMMENDED
NO PREVIOUS
10. J023 CODES
A. I&A
B. CQR
C
11. NAME OF TECHNICAL AUTHORITY
MOLLY STATHAM
ORGANIZATION/SYMBOL
AFLCMC/WIGE
PHONE
497-4648
DATE
20201209
AFMC FORM 807, 20080416 PREVIOUS EDITION IS OBSOLETE
INSTRUCTION FOR COMPLETING THE AFMC FORM 807
Quality Assurance provisions must include all inspections (by reference, where appropriate) to be performed to ensure that the item offered conforms to the technical requirements. The technical authority is responsible for providing contract quality requirements for all buys IAW FAR Part 46. Quality provisions as annotated on the AFMC Form 807 will not be downgraded without coordination from the technical authority.
NOTE: The technical authority is the chief engineer of the responsible system or lead engineer of the end-item. Technical authority may be delegated by the chief engineer of the responsible system or lead engineer of the end-item to those having technical competence and capability to perform the required activities. The end-item is defined as equipment that can be used by itself to perform a military function (AFI 63-1201).
The technical authority will complete the AFMC Form 807 as follows: Blocks not identified are self-explanatory.
(Block 3): Point of Inspection - Must be source or destination, where inspection means examining and testing supplies or services by a government representative to determine whether they conform to contract requirements. This will be the location of the inspection or the location of potential inspection by the government as the government always retains the rights to inspect even if you make the contractor responsible for inspection (i.e.
applying FAR 52.246-1). Note: Per DFARS 246.402, on contracts less than 250K, the following three requirements must be met before source inspection can be considered. (1) Significant product technical requirements (e.g., drawings or performance requirements) are in the contract. (2) Critical characteristics or acquisition issues are identified in either a quality assurance letter of instruction (QALI) which describes how to identify or determine if these conditions have been met or they are described in the technical requirements portion of the contract. (3) Contract must be for a manufacture or producer and have critical characteristics identified and specific Government verification identified as necessary and feasible to perform at these non manufactures or non producers. If the contract is less than $250K, and all three criteria have not been met, there are no waiver procedures as no waivers are allowed. The only exception is when source inspection is required by DoD regulation or required by Memorandum of Agreement between the acquiring dept or agency and the contract administration agency.
(Block 4): Point of Acceptance - Must be either source or destination. Cannot be both. This is the point of government acceptance, where acceptance means act of an authorized representative of the government by which either the government, or itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of contract.
(Block 7): Contract Quality Requirement/Special Inspection Requirements.
Select One: (Note: The appropriate requirement should be selected based on technical description, complexity, application and FAR Part 12, paragraph 12.301, and FAR Part 46, paragraph 46, 402, and 46.403).
CERTIFICATE OF CONFORMANCE FAR 52.246-15: Allows the contractor to ship materiel without or in lieu of Government source inspection. Requires authorization by cognizant contract administration office in writing to ship any supplies for which the contract would otherwise require inspection at the source.
CONTRACTOR RESPONSIBILITY FOR INSPECTION, FAR 52.246-1: Should be used on all small purchase contracts where the contracting officer has determined that the Government does not have a need to inspect the supplies or services in advance of their tender for acceptance. Under this clause we still have a recourse with the contractor if nonconforming materiel is delivered and the Government always retains the rights to inspect, even if there is no initial desire or identified need.
STANDARD INSPECTION FAR 52.246-2, -3, 04, -5 OR -6 AS APPLICABLE TO CONTRACT: Used when the purchasing office determines there is a need for government inspection of supplies or services. Can be used either in conjunction with higher-level contract quality requirements or by themselves. Should be used when a Commercial Technical Description is used for a complex or critical item or when a Military-Federal Technical Description is used for a noncomplex or noncritical item.
HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52-246-11: NATO AQAP 2070, AS9100, ISO 9001:2000 (2000 version or equivalent).
Quality Systems - ISO 9001:2000 specifies requirements for a quality management system for any organization that needs to demonstrate its ability to consistenly provide product that meets customer and applicable regulatory requirements and aims to enhance customer satisfaction. The 2000 version of ISO 9001 incorporates the1994 versions of ISO 90001, 9002 and 9003 and the 1995 versions of NATO ACAP 100, 120 and 130. However, the 1994/1995 versions are no longer valid as they expired on 15 Dec 2003. AS9100 is the quality standard for the aerospace industry. NATO AQAP 2070 is the Allied Quality Assurance Publication for use with NATO participants.
COMMERCIAL ITEM INSPECTION, FAR Part 52.212-4: Should be used when items meet description of a commercial item as defined in FAR Part 12.
OTHER: Provide details in block 8. Such as when a higher level of contract quality requirements is desired, but when these higher requirements do not include ISO or equivalent requirements. A Quality Assurance Letter of Instruction (QALI) or specific requirements to be placed in the contract must be identified in block 8 or attached. These are developed by the technical authority and describes critical characteristics or performance requirements and provides guidance on how to identify or address these issues.
(Block 8): Identify if the item is a critical safety item (CSI). If the item's criticality code is "E", F", or "S". If item is CSI, a QALI must be generated for the item.
(Block 8a): For this block (Ozone Depleting Substance (ODS)), the engineering entity signing the IMT 807 must mark one of the the two blocks. Technical entity must decide if an ODS Statement is required or if an ODS Waiver is required. If an ODS Waiver is required, please refer to AF FARS 5323 for appropriate action. If no waiver is required, the engineer must mark the ODS Statement.
(Block 9): Quality Pre-Award Survey Recommended - FAR Part 9, paragraph 9.104-1 requires a contracting officer to determine that a contractor is responsible before awarding a contract. A preaward survey may be requested and used whenever there is not sufficient information to determine responsibility.
- Select yes or no depending on your desire for a pre-award survey.
- Select New Source or Previous Source.
- AFMC Participation Recommended. May be recommended if AFMC participation on the preaward survey would be beneficial.
(Block 10): Codes:
(1) Block 10A: I&A (Inspection and Acceptance Code)
CODE INSPECTION ACCEPTANCE
1 SOURCE
2 DESTINATION
3 SOURCE
4 SOURCE BY COC
5 SOURCE BY COD
6 SOURCE
SOURCE
DESTINATION
DESTINATION
SOURCE
DESTINATION
PACKAGING PLANT
(2) BLOCK 10B. CQR (Contract Quality Requirement)
CODE INSPECTION
A B C D, E, F G H I
CERTIFICATE OF CONFORMANCE
CONTRACTOR RESPONSBILITY FOR INSPECTION
STANDARD INSPECTION
NO LONGER USED
NATO AQAP 2070, ISO 9001:2000 (OR EQUIV)
COMMERCIAL ITEM
OTHER
AFMC FORM 807, 20080416
| INSTRUCTION FOR COMPLETING THE AFMC FORM 807 |
| CODE INSPECTION ACCEPTANCE |
| CODE INSPECTION |
| AFMC FORM 807, 20080416 |
File details come from the government source that posted it. Updated .