Attch 1_Bid Form.pdf
PDF 59 KB Posted
- Attached to
- B7 Electrical Svc Upgrade & 2nd Floor Structural Spt Federal contract opportunity
- Solicitation number
- N40085-20-B-2531
About this file
This bid form solicits pricing for electrical service upgrades and structural support repairs at the Portsmouth Naval Shipyard in Kittery, Maine. Offerors are asked to provide unit pricing for electrical work on Buildings B72 and B7, structural work on Building B7, and general overhead and profit rates. Pricing is requested as a firm fixed price for CLIN 0001. The related federal contract opportunity is solicitation number N40085-20-B-2531 for electrical service upgrades and second floor structural support repairs at the Portsmouth Naval Shipyard. The Department of the Navy, Naval Facilities Engineering Command is listed as the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1419 B7 Electric Svc and 2nd Flr.pdf | ||
| RFI 2 - B7 Elect Svc Upgrade 20B2531.pdf | ||
| N4008520B2531 0003.pdf | ||
| RFIS - B7 Elect Svc Upgrade 20B2531.pdf | ||
| N4008520B2531 0002.pdf | ||
| SV B7 Sign-In.pdf | ||
| N4008520B2531 0001.pdf | ||
| Attch 6_eOMSI WKBK 1650933 B7 ELECTRICAL SVC UPGRADE.pdf | ||
| Attch 9_Temp Shoring Specs.pdf | ||
| Attch 2_PNSYDIV1 Specs 152020.pdf | ||
| N4008520B2531.pdf | ||
| Attch 10_Permanent Structural Shoring.pdf | ||
| Attch 4_PNSY Div 1 Submittal Reg 1650933.pdf | ||
| Attch 11_Tech Specs DIV26 Electrical.pdf | ||
| Attch 3_Tech Specs - Permanent Shoring and Heater.pdf | ||
| Attch 5_Drawings B7 Electrical Svc - Signed.pdf | ||
| Attch 8_Electrical Systems and Const. Stds PNSY.pdf | ||
| SOW B7 Elec Svc Upgrade and 2nd Flr Spt_02-25-20.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
B7 Electrical Service Upgrade
PROJECT LOCATION
Portsmouth Naval Shipyard Kittery, ME
CONTRACTOR:
DATE:
MATERIAL LABOR EQUIPMENT LINE ITEM
ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL
1 Electrical Work, B72 & B7 ea
2 Structural Work, B7 ea
Sub-KTR Performance Value (1) $ -
Prime KTR Div 01 & Project Management Costs (2) $ -
Subtotal (3) $ -
General Home Office Overhead (G&A) (%) $ -
Profit (%) $ -
Bond (%) $ -
CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -
NOTE:
Refer to Scope of Work.
CLIN 0001 - BASE BID
QUANTITY
BID FORM Page 1 of 1
File details come from the government source that posted it. Updated .