Attachment XI- ICRA 539-20-104 Renovate MICU_Permit.pdf

PDF 489 KB Posted

Attached to
Z2DA--Renovate MICU/SICU 539-20-104
Solicitation number
36C25026B0001_1
Issued by

About this file

This document is an Infection Prevention and Control Construction/Renovation/Maintenance Permit for a comprehensive MICU suite renovation project at a healthcare facility. The project is categorized as high patient risk (Level IV), with a project start date of 02/23/2026 and completion date of 02/23/2028. The permit will expire on 02/23/2030, and the project manager is Conner Appelgate, who can be reached at 513-284-1902.

The permit details extensive infection control measures across four levels of precautions, with specific requirements for dust control, containment, cleaning, and worker safety. Key requirements include using HEPA exhaust systems, maintaining negative air pressure, sealing penetrations in containment barriers, and implementing strict protocols for worker clothing, equipment cleaning, and waste management. An additional note recommends exhausting directly outdoors due to windows present during the renovation, with a contingency plan (Appendix A) if that option becomes unavailable. The document is signed by the Project Manager and Infection Preventionist, with signatures dated 8/27/2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank Page

File details come from the government source that posted it. Updated .