This document is a set of mechanical, electrical, and construction design drawings for a renovation project at a U.S. Department of Veterans Affairs (VA) facility located in Cincinnati, Ohio. The project involves a comprehensive upgrade of the medical gas systems, HVAC infrastructure, ductwork, piping, electrical systems, and lighting across multiple floors (first, second, third, and roof) of a healthcare facility.
The design documents, prepared by Heapy Engineering and JPA Architecture, include detailed plans for medical gas distribution, sanitary waste and vent systems, emergency exhaust systems, air terminal units, and various mechanical equipment. The project focuses on modernizing the facility's infrastructure, with specific attention to negative pressure patient rooms, medical gas zone valve cabinets, and critical room control sequences. The drawings are dated 10/17/2025 and are marked as "100% Construction Documents" for a fully sprinklered facility, with the project number 2019-05193 and state COA firm number 01528.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Accessory Not Included. Sold SeparatelyAccessory Not Included. Sold Separately
E ABCD
X
W
T.4
T.2
V.6
T.1
Q.2
12.1 17.3
EXISTING MEDICAL GAS
UP TO THIRD FLOOR
2 2
0.75" 0.5"
0.5"
0.75" 0.5"
0.5"
0.75"
0.5" 0.5"
0.5" 1.5" 0.5"
0.5"
1"
0.5" 0.5"
0.75"
0.75"
0.5" 0.5"
0.5" 0.75"
0.5"
MV
O2
MA
M V O
M
A
O
M V
M A
O2 MV
MA
MV
O2
M A
MV
O2 MA
O
M V
M A
0.75" 0.75"
1.5"
A271
Female
Locker Room
AAP
1" 2" 1"
1" 2" 1"
1" 1" 2"
M V
O
M A
O
M V
M A
M A
M V
O
ZVC
O
M A
M V
0.75" 0.75" 1.5"
A292B
Soiled
Utility
C226B Passageway
A270A Staff Toilet
A269
Staff
Lounge
A271A
Staff
Bathroom
A272
Conference
Room
A273 Office
A275 Electrical
A274
HAC
A276 On-Call
A276A Bathroom
A268 Office
A267
RN
Manager
A293
Pharmacy
Office
A286A Toilet
A287A Toilet
A283
Negative
Pressure
Bariatric Patient
Room
A288A Toilet
A289 Grief/Consult
A285
Patient
Room
A278
Patient
Room
A279
Patient
Room
A280
Negative
Pressure
Patient Room
A281
Equipment
Storage
A282
Negative
Pressure
Bariatric Patient
Room
A283A Toilet
A284
Negative
Pressure
Patient Room
A277 Clean Linen
A290
HUC
Station
C226I
Patient
Circulation
A284B Ante Room
Elevator
A270
Male
Locker Room
A271
Female
Locker Room
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:4
:4
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL SECOND FLOOR PLAN -
MEDICAL GAS
PG102
SVHKMB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - MEDICAL GAS
1. EXISTING TO REMAIN.
2. EXTEND MEDICAL GAS PIPING DOWN IN WALL AND CONNECT TO PATIENT
HEADWALL.
3. NEGATIVELY PRESSURIZED SPACE. SEAL ALL PENETRATIONS IN WALL AND/OR
CEILING AIRTIGHT.
A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.
B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL
GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING
FIXTURES LOCATED IN AN UNDISTURBED AREA.
C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,
SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/
MISSING LABELS AND/ OR FLOW ARROWS.
D. REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME
FOR THE IDENTIFICATION OF PIPING SYSTEMS.
E. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC, BSE,
OR MEDICAL EQUIPMENT SHALL HAVE SPILL/ LEAK PROTECTION AND LEAK
DETECTING SENSORS.
F COORDINATE ALL EXISTING PIPING AND NEW PIPING WITH NEW MEPT SYSTEMS
AND EQUIPMENT AND PATIENT LIFT SUPPORTS, RAILS, AND EQUIPMENT.
GENERAL NOTES
PLAN NOTES
KEYPLAN
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING PROJECT
PHASING. ALL WORK SHALL BE COORDINATED AND SCHEDULED WITH THIS
CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS SHALL BE IDENTIFIED
AT THE START OF CONSTRUCTION AND SHALL BE COORDINATED AND
SCHEDULED WITH THE VA.
PHASING NOTE
Revisions Date
MEDICAL GAS OR VACUUM
PIPING TO/FROM STATION
INLETS AND OUTLETS
SYSTEM AND SERVICE
AREA LABEL, TYPICAL
MEDICAL GAS OR VACUUM
PIPING TO/FROM
DISTRIBUTION SYSTEM
PRESSURE GAUGE/
VACUUM GAUGE, TYPICAL
NOTE:
1 REFER TO FLOOR PLANS FOR REQUIRED NUMBER OF
VALVES, VALVE SERVICES AND SIZES AT EACH
INDIVIDUAL LOCATION.
MIN. 45 DEGREES
BRANCH OR RUNOUT
TO STATION OUTLET,
INLET OR SPECIAL STATION
MAIN OR BRANCH PIPING
TRAP PRIMER, WITH DISTRIBUTION
UNIT WHEN SERVING MULTIPLE
DRAINS. LOCATE ABOVE CEILING
IN FINISHED AREAS.
0.5''SUPPLY SHALL BE
OFF TOP OF MAIN
COLD WATER MAIN
T P
T P
WALL
FINISHED CEILING
WHERE APPLICABLE
FLOOR DRAINS
FLOOR
TP
PIPING TO FLOOR DRAINS
SHALL BE RUN BELOW FLOOR,
UNLESS NOTED OTHERWISE.
INSTALL PIPING CONCEALED
IN WALL IN FINISHED AREAS.
INSTALL PIPING TIGHT TO WALL
SURFACE IN UNFINISHED AREAS.
UNION
BALL VALVE (SEE SPECS)
CHECK VALVE (SEE SPECS)FLOW CONTROLLER (SEE SPECS)
UNION
BALL VALVE (SEE SPECS)
FINISHED FLOOR8x8 STAINLESS STEEL
ACCESS PANEL
2"
WATER DAM
/2
/4
1' -4
4"
14 1/2"
MALE HOSE THREAD FOR
DIALYSIS CONNECTION
1/2" COPPER PIPE FOR DCW
TRAP PRIMER
2" DRAIN CONNECTION
REDUCED PRESSURE
BACKFLOW PREVENTER
STAINLESS STEEL BOX
WITH SIDE HINGED
COVER AND LATCH.
16 1/2"
/2
FLUSH VALVE
CL
STOP2.
5"
.5
T O
R
IM
FINISHED FLOOR
4" ELECTRICAL BOX -
REFER TO DIVISION 26
DRAWINGS.
PROVIDE COVERPLATE.
GRAB BAR. REFER TO
ARCHITECTURAL DETAILS
FOR ADDITIONAL
INFORMATION.
PROVIDE HARDWIRED WALL
MOUNTED OPERATOR
WITH MANUAL OVERRIDE
FLUSH BUTTON.
0.75" CONDUIT - REFER TO
DIVISION 26 DRAWINGS.
PROVIDE LOW VOLTAGE
WIRING.
FAUCET, REFER
TO SPECIFICATIONS
NON-AERATED FLOW
CONTROL DEVICE
8"
ASSE 1070
THERMOSTATIC
MIXING VALVE
OFFSET WASTE
8"
TRAP PARALLEL
TO WALL
PROVIDE LAV SHIELD
ENCLOSURE.
LOOSE KEY / STOP
ESCUTCHEON
FINISHED FLOOR6"
FAUCET, REFER
TO SPECIFICATIONS
NON-AERATED FLOW
CONTROL DEVICE
COUNTERTOP
OFFSET WASTE
TRAP PARALLEL
TO WALL
FINISHED FLOOR
ENCLOSURE -
REFER TO
GENERAL
TRADES
DRAWINGS.
ESCUTCHEON
LOOSE KEY
/STOP
8"
/4
ASSE 1070
THERMOSTATIC
MIXING VALVE
CONCRETE FILL
TILE FLOOR
CEMENT BED
LOOSE GRAVEL AT
WEEP HOLES 3mm TO 6mm SIZE
NICKEL BRONZE
ADJUSTABLE STRAINER
(FLUSH WITH FINISHED
FLOOR)
CLAMP WATERPROOF
MEMBRANE INSIDE OF
DRAIN BODY
WATERPROOF
MEMBRANE
STRUCTURAL SLAB
FLASHING CLAMP WITH
WEEP HOLES
THREADED, CAULKED
OR NO-HUB
CONNECTION
PROVIDE A METAL SUPPORT
PLATE WHEN DRAIN IS
INSTALLED IN AN EXISTING
FLOOR - CAULK AROUND DRAIN
PRIOR TO RE-GROUTING
NOTE:
SLOPE MEMBRANE LINER 2% TO DRAIN.
DETAIL NOTES
1. CONTROL VALVE. T/P TYPE.
2. BACKING REQUIRED FOR SUPPORT OF ALL SHOWER ACCESSORIES.
3. GRAB BARS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
4. HAND SHOWER IN MOUNTED POSITION.
5. HAND SHOWER IN HANGING (DRAINING) POSITION.
6. 60" RUBBER LINED CRS, CHROME PLATED METAL FLEXIBLE
OR WHITE VINYL REINFORCED HOSE.
7. 24" SLIDE BAR & SWIVEL HANGER.
8. VACUUM BREAKER
72"
44"
2" MIN.
75" MIN.
7 1/2"
12"
C L C L
C L
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:4
:2
A
M
Renovate MICU/SICU
10/17/2025
SCHEDULES & DETAILS
P601
SVHKMB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
FIXTURE SCHEDULE
SYMBOL
MOUNTING
HEIGHT DESCRIPTION
FLOW FIXTURE UNITS SUPPLY WASTE & VENT
REMARKSGPM GPF DRAINS
WATER
COLD HOT TEPID OUTLET VENT DIRECT INDIRECTCOLD HOT
P101 17" TO RIM WATER CLOSET/ FLOOR SET/ WALL OUTLET/ ELONGATED
BOWL/ ADA
- 1.6 4 10 0 1" 4" 2" ● HARD-WIRED/ SENSOR OPERATED FLUSH VALVE/ MANUAL
OVERRIDE
P418 34" TO RIM LAVATORY/ WALL HUNG/ 20" x 18"/ ADA 0.5 - 1 0.7 0.7 0.5" 0.5" 1.25" 1.5" ● HARD-WIRED/ SENSOR OPERATED/ GOOSENECK SPOUT/
LAV SHIELD/ T'STATIC MIXING VALVE
P419 C'TOP SOLID
SURFACE
LAVATORY/ C'TOP/ PATIENT ROOM 0.5 - 2 1 1 0.5" 0.5" 1.25" 1.5" ● HARD-WIRED/ SENSOR OPERATED/ GOOSENECK SPOUT/
T'STATIC MIXING VALVE
P502 FLOOR SET MOP BASIN/ 28" x 28" x 12"/ 6" DROP FRONT/ TERRAZO - - 3 2.25 2.25 0.5" 0.5" 1.5" 1.5" ● PAIL HOOK FAUCET/ VACUUM BREAKERS/ CROSS
HANDLES/ INTEGRAL CHECKSTOPS
P505 30" TO RIM CLINIC SERVICE SINK/ WALL HUNG/ FLUSH VALVE/ BED PAN
WASHER
- - 6 10 4 1.5" 1.5" 3" 1.5" ● ELBOW BLADE HANDLES/ BEDPAN WASHER/ RIM GUARD
P528 C'TOP SINK/ SST/ SINGLE COMP'T/ 21" x 22" 1.5 - 2 3 3 0.5" 0.5" 1.5" 1.5" ● WRISTBLADE HANDLES/ GOOSENECK SPOUT/ T'STATIC
MIXING VALVE
P701 SHOWER HEAD & VALVE 2.0 - 0 0 0 0.5" 0.5" PRESSURE AND THERMOSTATIC BALANCING VALVE/
VACUUM BREAKER/ HAND HELD HOSE WITH 3-PORT VALVE
P809 - DIALYSIS SUPPLY AND DRAIN BOX - - 2 1 1 0.5" 0" 2" 1.5" -
FIXTURE SCHEDULE NOTES:
1 SUPPLY SIZES IN THIS SCHEDULE ARE FIXTURE CONNECTION SIZES. DOMESTIC COLD WATER SUPPLY SIZES SERVING FLUSH VALVES SHALL BE MINIMUM ONE PIPE SIZE LARGER THAN THE INDICATED CONNECTION SIZE, OR SIZED AS
SHOWN ON THE FLOOR PLANS. PIPING AT FLUSH VALVE CONNECTION OF A SIZE EQUAL TO THE CONNECTION SIZE, SHALL BE LIMITED TO A MAXIMUM OF 2 FEET IN DEVELOPED LENGTH AND INCLUDE A MAXIMUM OF ONE 90 DEGREE ELBOW FITTING. FULL SIZE MANIFOLDS, WHERE INDICATED ON THE FLOOR PLANS, SHALL BE PROVIDED FULL SIZE THE LENGTH OF THE PIPING CHASE AND TERMINATED WITH A FULL SIZE CAP.
2 PROVIDE NON-AERATED FLOW CONTROL DEVICE ON LAVATORY AND SINK FAUCETS. DO NOT USE AERATORS.
3 PROVIDE CHECK VALVE ON SUPPLIES SERVING LAVATORIES AND SINKS.
SCALE: NONE
MEDICAL GAS ZONE VALVE CABINET
A
SCALE: NONE
BRANCH TAKE-OFF PIPING - MEDICAL GAS
B
DRAIN SCHEDULE
SYMBOL DESCRIPTION
BODY STRAINER / GRATE TOP FINISH
C.I. S.S. C.R. BRASS RD. SQ. ADJUST. FLAT RECESS DOME
NICKLE
BRONZE C.I. C.R. S.S.
FD1 3" LIGHT DUTY/ DOUBLE DRAINAGE/ VANDAL RESISTANT/ TYPE C/ TRAP PRIMER CONNECTION ● ● ● ●
SCALE: NONE
TRAP PRIMER
C
SCALE: NONE
FLOW CONTROLLER ASSEMBLY
D
SCALE: NONE
P-809 DIALYSIS BOX DETAIL
H
SCALE: NONE
P-101 WATER CLOSET
E
SCALE: NONE
P-418 LAVATORY
F
SCALE: NONE
P-419 LAVATORY
G
DRAIN SCHEDULE NOTES:
1 PROVIDE THREADED PLUG FOR ALL TRAP PRIMER CONNECTIONS NOT USED.
SCALE: NONE
FD1 - TYPE "C" FLOOR DRAIN
I
SCALE: NONE
P-701 SHOWER
J
3" - SAN
4" -
SAN4" -
SAN
4" -
SAN
4" -
SAN
4" -
SAN
1.
5"
S
A N
2"
SAN
4" - SAN
1.5"
4" - SAN
1.5" - S A
N
1.5" -
SAN
4" - SAN
1.5"
1.5" - SAN
4" -
SAN
1.5" - SAN
4" -
SAN
4" -
SAN
4" -
SAN
4"
2" -
SAN
2" - SAN
2" - SAN
4"
2" -
SAN
4"
1.5" - SAN
2" - SAN
4" -
SAN
3"
2"
4"
2"
1.5"
4"
2"
4"
2" 2"
4"
2"
2"
1.
5"
1.5"
3"
1.5"
2"
3"
1.5"
1.5"
3"
3"
1.5"
1.5"
1.5"
2"
2"
2"
1.5"
2"
1.5"
1.5"
1.5"
2"
2"
1.5"
1.5"
1.5"
P101
P101
P101
P101
P101
P101
P101
P418
P418
P419
P419
P419
P419
P419
P419
P419
P419P419
P419
P528
P101
P419
P419
P419
P419
P419
P419
P419
P419
P419
P419
P505
P418
P809
P809
P809
P809 P809
P101
P809P809
P418
P809
P809
P809
2"
SAN
2"
4"
4"
2" 2"
1.
5"
2"
2"
1.
5"
1.5"
1.
5"
2"
2"
1.
5"
1.
5"
1.
5"
1.
5"
1.
5"
2"
2"
2"
2"
1.
5"
4" -
SAN
1.
5"
2"
2"
2"
A278A
A278
A279A
A279
A280A
A280
A280B
A282A
A282B
A282
A283B
A283
A283A
A284A
A284
A284B
A285
A285A
A286
A286A
A287A
A288
A291
A292B
SAN
CRV
CO
4"
3" -
SAN
4" - SAN
1.5" - SAN
2" - V
4" - SAN
2" -
SAN
4"
S A
N
4" -
SAN
3" - V
2"
3"
1.
5"
3"
1.
5"
2" 4"
3"
1.
5"
2"
3" 3"
2"
2"
2"
2"
1.
5"
1.
5"
2" 4"
1.5"
2"
4"
2"
1.5"
1.
5"
2"
2"
2"
4"
4"
4"
2"
2"
1.5"
4"
4"
1.
5"
3"
1.5"
2"
2"
2" 2"
CO
CO
2" 2"
1.5"
1.5"
2"
2ND FLR
2"
2"
2"
2"
1.5"
2"
2ND FLR
2"
2"
2"
2"
2"
2"
2"
2"
1.5"
2"
1.5"
1.5"
1.5"
1.5"
CRP
CRP
C R
P
CRP
CRP
CRP
CRP
3RD FLR
1.5"
CRV
3RD FLR
2ND FLR
2ND FLR
1ST FLR
2ND FLR
3RD FLR
3RD FLR
3RD FLR
3RD FLR
3RD FLR
3RD FLR
2ND FLR
3RD FLR
3RD FLR
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:4
:2
A
M
Renovate MICU/SICU
10/17/2025
SANITARY WASTE AND VENT
DIAGRAM
P901
SVHKMB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
SANITARY WASTE AND VENT DIAGRAM
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON
THIS PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS WITH BAS)
BAS - BUILDING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BR - BOTTOM REGISTER
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CD - CEILING DIFFUSER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CG - CEILING GRILLE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CHGR - CHILLED WATER GLYCOL SOLUTION RETURN
CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CR - CEILING REGISTER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWR - CONDENSER WATER RETURN
CWS - CONDENSER WATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DWG - DRAWING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EWT - ENTERING WATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HC - HVAC (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
S - SPRINKLER (WET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TR - TOP REGISTER
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
V - VENT
VAC - VACUUM
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
WB - WET BULB
WCO - WALL CLEANOUT
GENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS
NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS
REFER TO SCHEDULES.
H1 H1OR EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
EQUIPMENT, UNLESS NOTED OTHERWISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
DUCTWORK, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,
UNLESS NOTED OTHERWISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
HVAC PIPING DESIGNATIONS
CHILLED WATER SUPPLY PIPECHS
CONDENSER WATER SUPPLY PIPECWS
CONDENSER WATER RETURN PIPECWR
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT WATER SUPPLY PIPEHWS
HEATING HOT WATER RETURN PIPEHWR
WATER MAKE-UP PIPEMU
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPANSION TANK PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETURN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC
MEDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUMPED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTWORKCONICAL
FITTING
ACOUSTIC
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
RECTANGULAR BRANCH DUCTWORK
SQUARE TEE WITH TURNING VANES
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND / OVAL
DUCTWORK SHALL BE PROVIDED WITH
TURNING VANES. REFER TO
SPECIFICATIONS FOR ADDITIONAL DETAILS.
EXISTING DUCTWORK TO REMOVED
RETURN AIR, RELIEF AIR, OR TRANSFER AIR
DUCTWORK. (UP AND DOWN) RADIUSED
OR SQUARE WITH TURNING VANES.
SUPPLY AIR OR OUTDOOR AIR DUCTWORK.
(UP AND DOWN) RADIUSED OR SQUARE
WITH TURNING VANES.
EXHAUST AIR DUCTWORK. (UP AND DOWN)
RADIUSED OR SQUARE WITH TURNING
VANES.
RECTANGULAR AND ROUND / OVAL
DUCTWORK RISE / DROP WITH 90° RADIUSED
OR SQUARE ELBOWS AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (WITH TURNING VANES)
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND DUCTWORK
SHALL BE PROVIDED WITH TURNING VANES.
ACCESS DOOR OR PANEL
DUCTWORK RISE IN DIRECTION OF AIR
FLOW
DUCTWORK DROP IN DIRECTION OF AIR
FLOW
DUCTWORK WITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIMENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTWORK
FLEXIBLE CONNECTION
DUCTWORK CONSTRUCTED OF SPECIAL
MATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTWORK DIMENSIONS
(W x H)26x20
ROUND DUCTWORK DIMENSIONS (DIA)26ø
OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER
TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM
OF GRILLE.
A3 10ø
MANUAL BALANCING DAMPER WITH LOCKING DEVICE
BDD = BACK DRAFT DAMPER
CBD = COUNTER-BALANCED BACK DRAFT DAMPER
SD = SMOKE DAMPER
FS = COMBINATION FIRE - SMOKE DAMPER
MDD = MOTORIZED DAMPER
AFMS = AIR FLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.
HUMIDITY SENSOR - DUCT MOUNTED
SG1
20x12
BOG: 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE
SCHEDULE FOR VARIOUS DESIGNATIONS).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE
DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE
SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES
TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)
D OR S = DYNAMIC OR STATIC
STATIC PRESSURE SENSOR - DUCT MOUNTED
C
CARBON DIOXIDE SENSOR - DUCT MOUNTED
S
TEMPERATURE SENSOR - DUCT MOUNTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
COMBINATION SHUTOFF AND BALANCING VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED
TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
10"
TOE: 3' - 0"
BOE: 0' - 6"
CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR
CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED WATER RETURN PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
PIPE RISER
RADIUS'D BRANCH
RADIUS'D TEE
EXISTING DUCTWORK TO REMAIN
UNLESS NOTED OTHERWISE ON DRAWINGS,
15° MAX FOR DIVERGING, 30° MAX FOR
CONVERGING TRANSITION
EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.
SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING
HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH
COORDINATE WITH ARCHITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO
MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
H
HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
C
CO
CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET
ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
S
S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.
STATIC PRESSURE SENSOR.SP
STRAINER WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
DRAIN VALVE WITH HOSE END CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN
AND OUT
EXPANSION JOINT
MANUAL AIR VENT
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
2 PORT AUTOMATIC CONTROL VALVE
3 PORT AUTOMATIC CONTROL VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM GAUGE WITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS
PIPE DISCHARGE AIR GAPPED TO FLOOR DRAIN
UNLESS NOTED OTHERWISE. FOR STEAM
SYSTEMS PIPE DISCHARGE TO OUTDOORS.
WATER METERM
PRESSURE GAUGE WITH COCK AND SIPHON LOOP
BI-METALIC STEAM TRAP AND DRIP ASSEMBLY
THERMODYNAMIC STEAM TRAP AND DRIP
ASSEMBLY
INVERTED BUCKET STEAM TRAP AND DRIP
ASSEMBLY
FLOAT AND THERMOSTATIC STEAM TRAP AND
DRIP ASSEMBLY
THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
BM
TD
IB
FT
TS
FLOW METER
F
UNION
CLEANOUT
STRAINER
AUTOMATIC PRESSURE INDEPENDENT CONTROL
VALVE
M
32. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL
OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN
ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH
CAN BE ANTICIPATED.
33. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES,
SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.
34. HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE
PRESSURE IN CONSTRUCTION AREAS. COORDINATE WITH THE COR.
35. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL
BE REMOVED.
36. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED
SPACES. ALL CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
37. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO
MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO
SOURCE.
38. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL
PLAN(S) SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE
ALL INCIDENTAL AND/ OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN
BUT IS ASSOCIATED WITH THE REMOVAL WORK.
39. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE.. EXAMPLES OF
THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND
STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
40. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE
CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS
OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED
AND SCHEDULED WELL IN ADVANCE WITH THE COR.
41. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK,
CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE
AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED
TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN END OF THE DUCT.
42. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED. REFER
TO AIR TERMINAL UNIT SCHEDULE(S).
43. APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND
EQUIPMENT, AND TO THE CENTER OF PIPES.
44. REFER TO ELECTRICAL DRAWINGS FOR VARIABLE SPEED MOTOR CONTROLLERS ASSOCIATED
WITH MECHANICAL EQUIPMENT.
45. ALL INSULATED DUCTWORK AND PIPING SHALL HAVE DAMPER/ VALVE HANDLE EXTENSIONS.
46. CONTROL CONTRACTORS RESPONSIBILITIES ARE LISTED IN SPECIFICATION SECTION
23 09 23.
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. THE DRAWINGS AND SPECIFICATIONS SHALL BE CAREFULLY STUDIED DURING THE COURSE
OF BIDDING AND CONSTRUCTION. ANY ERRORS, OMISSIONS OR DISCREPANCIES ENCOUNTERED
SHALL BE REFERRED IMMEDIATELY TO THE ARCHITECT/ ENGINEER FOR INTERPRETATION OR
CORRECTION.
3. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
4. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL
DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
5. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED
AND/ OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT.
6. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING
FOR WORK INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE ROOFING
WORK. WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND
INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT
CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH
INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.
7. REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING
CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR WORK. THE
VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED
JOINTLY AT ALL TIMES. REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE
NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL
TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS
INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) THRU THE CONTRACTING OFFICER FOR CLARIFICATION BEFORE
PROCEEDING.
8. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE
CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON
THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE
OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS. REFER TO SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.
9. ALL WORK MUST BE COORDINATED WITH THE COR TO MAINTAIN OPERATION OF THE
EXISTING FACILITY.
10. COORDINATE ALL WORK WITH THE WORK OF OTHERS. KEEP INFORMED OF THE PROGRESS
AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS. COORDINATE AND EXPEDITE WORK
WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.
11. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES
AND STANDARDS.
12. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/ OR
AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN
PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD
VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES
BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS
WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION
OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH
THE WORK.
13. FITTING OR PLACING WORK INTO OR ON THE WORK OF OTHERS CONSTITUTES ACCEPTANCE
OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR THE WORK TO BE
CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO
CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED IN
UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
14. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE
SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE
COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION
OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER
A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR
ENCAPSULATED AND THE AREA DECLARED SAFE.
15. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND
FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH
FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/ OR FIRE-STOPPED AS REQUIRED TO
MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE-RATED
PENETRATION REQUIREMENTS AND DETAILS ARE MET.
16. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE
RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH
0-HOUR RATED WALLS & FLOORS SHALL BE SEALED TO RETARD PASSAGE OF SMOKE.
17. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
18. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
19. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AND AUTOMATIC CONTROL DAMPERS. COORDINATE
SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
20. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE
SIZES AND LOCATIONS WITH OTHER TRADES.
21. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL
UNITS, FILTERS, COILS, ETC.
22. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT,
REFER TO STANDARD DETAILS AND PIPING SCHEMATICS.
23. DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES
SHOWN ARE FACE SIZES.
24. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING
DIFFUSERS, REGISTERS, AND GRILLES.
25. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
26. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED
WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
27. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/ FLOOR/ ROOF THAT IS TO REMAIN,
PATCH WALL/ FLOOR/ ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-USED.
28. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
29. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE
CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.
30. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
31. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE
VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE
CONTRACTOR.
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:1
A
M
Renovate MICU/SICU
10/17/2025
ABBREVIATION, LEGEND,
GENERAL NOTES, AND INDEX
M001
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
INDEX OF DRAWINGS - MECHANICAL
SHEET NUMBER SHEET NAME
M001 ABBREVIATION, LEGEND, GENERAL NOTES, AND INDEX
MD101 PARTIAL FIRST FLOOR PLAN - MECHANICAL - REMOVALS
MD102 PARTIAL SECOND FLOOR PLAN - MECHANICAL - REMOVALS
MD103 PARTIAL THIRD FLOOR PLAN - MECHANICAL - REMOVALS
MD104 PARTIAL ROOF PLAN - MECHANICAL - REMOVALS
MH101 PARTIAL FIRST FLOOR PLAN - DUCTWORK - NEW WORK
MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK - NEW WORK
MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK - NEW WORK
MH104 PARTIAL ROOF PLAN - DUCTWORK - NEW WORK
MP102 PARTIAL SECOND FLOOR PLAN - PIPING - NEW WORK
M501 DETAILS
M502 DETAILS
M503 DETAILS
M601 SCHEDULES
M602 SCHEDULES
M901 CONTROLS
M902 CONTROLS
HVAC GENERAL NOTES
TT
T
T T
T
T
T
T
T
T
T
T
C116 Waiting
C106
PEA
C116A
PEC
C116B
PEC
C107 Exam
C108 Exam
C116G
PIV
Register
C*1*11 Corridor
C119 Police
C119I Holding
C116C
PEC
36x14
UP36x14UP8x14
UP?
x8
10x8 8x6
8x4
14x8
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:3
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL FIRST FLOOR PLAN -
MECHANICAL - REMOVALS
MD101
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
PLAN NOTES
1. REMOVE DUCT BACK TO THIS POINT FOR RECONNECTION IN NEW WORK.
2. REMOVE EXISTING EXHAUST RISER. PATCH AND REPAIR FLOOR TO MATCH EXISTING.
3. EXHAUST AIR VALVE AND ASSOCIATED CONTROLS INSTALLED UNDER PROJECT
539-20-102.
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN - MECHANICAL - REMOVALS
KEYPLAN
GENERAL NOTES
A. WHERE SHOWN AS HEAVY, BOLD DASHED LINES, REMOVE DUCT SYSTEM
COMPLETELY, INCLUDING HANGERS, ATTACHMENTS, AND ASSOCIATED CONTROLS.
B. PHASE ALL DEMOLITION AND NEW WORK FOR THE ISOLATION EXHAUST SYSTEM IN
ORDER TO MINIMIZE THE DOWNTIME OF EXISTING EXHAUST FUNCTIONALITY. NEW
SYSTEM SHALL BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING ANY EXISTING
ISOLATION EXHAUST SYSTEMS.
C. ALL EQUIPMENT IS TO BE TURNED OVER TO VA FOR PROPER REMOVAL FROM
INVENTORY LIST.
PHASING NOTE:
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING THE
REQUIRED PROJECT PHASING. ALL WORK SHALL BE COORDINATED AND
SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS
SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION AND SHALL BE
COORDINATED AND SCHEDULED WITH THE VA.
ROOF
UP
42x24 DOWN
FROM AH-5
TO AH-5
72x26
TO AH-4
FD
FD FD FD
12x6
12x6 x8
18x8 18x10 26x8 x1 x612 x1 x8 x1
8x
12x6 x1 x1
24x12
22x10 x1
10x8
10x8 x8
18x1030x7 x1 x1
8x
14x8
8ø
14x8
12x8
12x8
16x812x8
42x12
56x12
36x14
42x14
16x10
12x8
8x6
12x6 x8
10x4
10x6 x8
8x6 x8 ø x8 x6
6x
12x10
8ø
36x18 x8 x8
10x6 x4
6ø x4
7ø x6
12x10 x8
6ø
56x14 x2
6ø
12x12
8ø
8ø
8ø
8x ø
12x6
12x6
8ø x1
0 12x6
12x10
8ø x8
20x8
8x x4 x6
8x20 x2
12x6
12ø
8x4 x1
8x
14x10 x8 x812x6 x8
10ø
16x15
12x10
6ø
6ø
6ø
6ø 8ø
6x
10x6
10x6
6ø
6ø
6ø
6ø
8ø
8x
6x8
8ø
8ø
6ø
6ø
10x6 8ø
6ø
6ø
6ø
8x4
10ø
6ø
12x6
12x6 6ø
8ø
8ø 8ø
8ø
8ø
6ø
6ø
12ø4ø
8ø
8ø 8ø 8ø
8ø 8ø x8
6ø
8x8
12ø x1
10x4
8ø
8ø
6ø
12ø
9ø
8ø
8ø
8ø
8ø
8ø
8ø
6ø
TYP.
TYP.
TYP.
TYP.
UP10x10
1.5" -
1.5" -
1.25" - 1.25" -
1" -
1" -
0.75" -
0.75" -
3" - HWR
3" - HWS
6"
C H
S 6"
C
H R
6" - CHR
6" - CHS
3" - HWR
3" - HWS
4" -
4" -
0.75" - HWS
0.75" - HWR
1" - 1" -
3" - HWS
3" - HWR
4" - CHS
4" - CHR
3" - LPS
3" - LPC
UP20x8
UP8x14
UP36x14
UP36x14
VAV-
5-11VAV-
5-8
VAV-
5-12
VAV-5-7
VAV-
5-13
VAV-
5-15
VAV-
5-17
UP16x8
UP16x8
VAV-5-18
VAV-5-20
VAV-5-19
VAV-5-21
VAV-
5-22
VAV-
5-23
VAV-
5-25
VAV-
5-24
UP16x8
UP26x8
VAV-5-26
VAV
5-26
VAV-
5-16
VAV-5-1
HWS
HWR
UP14x8
UP14x8
ACU-250
RS/RL
UP
0.
5"
R
L
0.75" HWS
0.75" HWR
0.5" - RL
0.5" - RS
60x16
72x22 UP TO AH-4 60x16 UP TO AH-4
10BID ITEM #2
DN6x18
UP18x6
13 13
13 13
13 13
13 13
VAV
5-2
VAV
5-6
VAV
5-5
VAV-5-10
VAV-5-9
VAV-5-4
VAV
5-3
VAV
5-14
1 1
1 1
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:3
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL SECOND FLOOR PLAN -
MECHANICAL - REMOVALS
MD102
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - MECHANICAL - REMOVALS
PLAN NOTES
1. REMOVE DUCTWORK AS INDICATED. PATCH AND SEAL EXISTING TO REMAIN
AIRTIGHT. PATCH INSULATION TO MATCH EXISTNIG.
2. REMOVE DUCT BACK TO THIS POINT FOR RECONNECTION IN NEW WORK.
3. REMOVE EXISTING EXHAUST RISER FOR REPLACEMENT IN NEW WORK.
4. REMOVE EXISTING DUCT RISERS THEN PATCH FLOOR TO MATCH EXISTING.
5. REMOVE VAV BOX AND ALL ASSOCIATED THERMOSTAT AND CONTROLS. REMOVE
ATTACHED HWS/R PIPING BACK TO MAIN AND CAP AND INSULATE.
6. REMOVE HWS/R BACK TO THIS POINT. CAP AND INSULATE WATERTIGHT.
7. REMOVE DUCT BACK TO THIS POINT. CAP AND SEAL AIRTIGHT.
8. REMOVE GRILLE AND DUCT AS INDICATED. MAINTAIN EXISTING FOR RECONNECTION
IN NEW WORK.
9. REMOVE SECTION OF VRF PIPING. MAINTAIN EXISTING FOR RECONNECTION IN NEW
WORK. PROVIDE BALL VALVES AND BRING REMAINDER OF VRF SYSTEM BACK
ONLINE. VRF SYSTEM (MINUS CASSETTE IN THIS PROJECT SCOPE) SHALL REMAIN IN
OPERATION DURING CONSTRUCTION. VERIFY EXTENT OF DEMOLITION AND
COORDINATE REQUIREMENTS WITH TRANE (VRF SYSTEM MANUFACTURER) PRIOR TO
PERFORMING ANY WORK.
10. BID ITEM #2 - SCOPE OF WORK IN THIS AREA INVOLVES DEMOLITION AND NEW WORK
FOR ALL BRANCH DUCTWORK, AIR CONTROL TERMINALS, HYDRONIC PIPING, AIR
DISTRIBUTION DEVICES, AND CONTROLS. DELETE ALL LABOR AND MATERIALS
ASSOCIATED WITH THE CONSTRUCTION, ALTERATION, PLUMBING, MECHANICAL AND
ELECTRICAL MODIFICATIONS TO THE OFFICE/CONFERENCE/BREAK ROOM WITHIN
THE DASHED LINE. AIR DUCT AND PIPING MAINS REVISIONS ARE PART OF BASE BID.
11. REMOVE EXISITNG AIR CONTROL VALVE AND ALL ASSOCIATED DUCTWORK,
CONTROLS, SUPPORTS, AND ROOM PRESSURE MONITORS THAT ARE INSTALLED
UNDER PROJECT 539-20-102.
12. DUCT INSTALLED UNDER PROJECT 539-20-102.
13. REMOVE EXISTING AIR DEVICE AND ALL ASSOCIATED ACCESSORIES, SUPPORTS, AND
DUCT CONNECTIONS AS INDICATED.
KEYPLAN
GENERAL NOTES
A. WHERE SHOWN AS HEAVY, BOLD DASHED LINES, REMOVE DUCT SYSTEM
COMPLETELY, INCLUDING HANGERS, ATTACHMENTS, AND ASSOCIATED CONTROLS.
B. PHASE ALL DEMOLITION AND NEW WORK FOR THE ISOLATION EXHAUST SYSTEM IN
ORDER TO MINIMIZE THE DOWNTIME OF EXISTING EXHAUST FUNCTIONALITY. NEW
SYSTEM SHALL BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING ANY EXISTING
ISOLATION EXHAUST SYSTEMS.
C. ALL EQUIPMENT IS TO BE TURNED OVER TO VA FOR PROPER REMOVAL FROM
INVENTORY LIST.
PHASING NOTE:
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING THE
REQUIRED PROJECT PHASING. ALL WORK SHALL BE COORDINATED AND
SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS
SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION AND SHALL BE
UP
8x14
16x8 x8
16x8
HAC
A380
Female Locker
A382C
M. Lock.
A382B
Lounge
A382
Tlt.
A382A
Respiratory Therapy
A384
Clean Supply
A397
Pharm.
A386
Sig.
A396
Corridor
C*3*18
Elec.
A395
Soil Utility
A391
Linen Clos.
A389
Tlt.
A388
Equip. Stor.
A392
Nurse Off.
A390
Negative Pressure Patient Room
A387K
Patient Room
A387J
Patient Room
A387I
Shower
A387H
Patient Room
A387G
Patient Room
A387F
Patient Room
A387E
Patient Room
A387D
Patient Room
A387C
Patient Room
A387B
Negative Pressure Patient Room
A387A
Nurse Station
A387
Conference Room
A385
ICU Dir. Off.
C314
Soc. Wrk.
A383
Family Wtng.
C310
Grieve Consult
C313
Lactation
C312
12x12
CR1
?x?
UP?
DN60x16 DN42x24
DN26x72 DN60x20 x1
UP36x14
DN36x14
UP16x16
UP36x16
8x
4x4
8x8
10x8 x1
10x8
8x8
CR1
12x12
CR1
24x24
TO EF
UP8x16
TO EF
TO EF
UP8x16
UP8x16
DN16x8 DN16x8
DN14x8
UP8x14
UP8x14
DN10x10
DN14x14
UP20x8
TO EF
TO EF
TO EF
TO EF
14x8
10x6
DN16x8
DN26x8
TO 1-EF-26
AHU-5 AHU-4
MECHANICAL
VESTIBULE
26x8
8x14 x1
UP14x12
UP19x19
10x10 x1
10x10
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:4
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL THIRD FLOOR PLAN -
MECHANICAL - REMOVALS
MD103
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
PLAN NOTES
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - MECHANICAL - REMOVALS
1. REMOVE EXISTING EXHAUST RISER THRU ROOF. EXISTING ROOF PENETRATION
SHALL BE MODIFIED AND REUSED IN NEW WORK.
2. EXHAUST AIR VALVE AND ASSOCIATED CONTROLS INSTALLED UNDER PROJECT
539-20-102.
3. REMOVE EXISTING DUCTWORK AND ASSOCIATED DAMPERS, SUPPORTS, ETC.
4. REMOVE DUCT RISER AND PATCH ROOF.
5. REMOVE DUCT DROP AND PATCH FLOOR TO MATCH EXISTING RATING.
KEYPLAN
GENERAL NOTES
A. WHERE SHOWN AS HEAVY, BOLD DASHED LINES, REMOVE DUCT SYSTEM
COMPLETELY, INCLUDING HANGERS, ATTACHMENTS, AND ASSOCIATED CONTROLS.
B. PHASE ALL DEMOLITION AND NEW WORK FOR THE ISOLATION EXHAUST SYSTEM IN
ORDER TO MINIMIZE THE DOWNTIME OF EXISTING EXHAUST FUNCTIONALITY. NEW
SYSTEM SHALL BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING ANY EXISTING
ISOLATION EXHAUST SYSTEMS.
C. ALL EQUIPMENT IS TO BE TURNED OVER TO VA FOR PROPER REMOVAL FROM
INVENTORY LIST.
PHASING NOTE:
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING THE
REQUIRED PROJECT PHASING. ALL WORK SHALL BE COORDINATED AND
SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS
SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION AND SHALL BE
ACCU-06
14x16
24x24
OPEN TO BELOW
138x38 36x36
1-EF27 DN14x8
DN14x8 DN8x14
DN16x12
DN16x12
DN36x14
24x24
22x36
22x36
24x24
HEPA-1
DN14x8
40x40
104x40
42x38
1-EF-25
DN14x12
EF-1EF-2
1 DN8x16
6 6
24x246
HEPA-2
CU-1
14x12 x1
16x10
16x8
DN6x18
1-EF-26
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:4
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL ROOF PLAN -
MECHANICAL - REMOVALS
MD104
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL ROOF PLAN - MECHANICAL - REMOVALS
PLAN NOTES
1. REMOVE DUCT THROUGH ROOF. MAINTAIN ROOF PENETRATION FOR REUSE.
PROVIDE TEMPORARY WEATHER COVER.
2. ACCU SERVING MULTIPLE VRF FAN-COIL UNITS. EVACUATE REFRIGERANT, AS
REQUIRED, TO PERMIT ADDITION OF ANOTHER FAN-COIL UNIT TO SYSTEM.
3. REMOVE DUCT. PATCH AND REPAIR ROOF DECK, INSULATION, AND ROOFING TO
MATCH EXISTING.
4. EXHAUST FAN AND ALL ASSOCIATED SUPPORTS, CONTROLS, AND ACCESSORIES
INSTALLED UNDER PROJECT 539-20-102.
5. BAG-IN / BAG-OUT HEPA FILTER MODULE AND ALL ASSOCIATED SUPPORTS AND
ACCESSORIES INSTALLED UNDER PROJECT 539-20-102.
6. DUCTWORK INSTALLED UNDER PROJECT 539-20-102.
7. CONDENSING UNIT AND ALL ASSOCIATED SUPPORTS, PIPING, CONTROLS, AND
ACCESSORIES INSTALLED UNDER PROJECT 539-20-102.
8. EXISTING EXHAUST FAN TO REMAIN.
9. REMOVE EXISTISTING EXHAUST FAN FOR RELOCATION IN NEW WORK. REFER TO
SHEETS MD103, MH103, AND MH104 FOR DUCT SYSTEM MODIFICATIONS AND NEW
LOCATION. FILL ROOF PENETRATION AND PATCH ROOF TO MATCH EXISTING.
KEYPLAN
GENERAL NOTES
A. WHERE SHOWN AS HEAVY, BOLD DASHED LINES, REMOVE DUCT SYSTEM
COMPLETELY, INCLUDING HANGERS, ATTACHMENTS, AND ASSOCIATED CONTROLS.
B. PHASE ALL DEMOLITION AND NEW WORK FOR THE ISOLATION EXHAUST SYSTEM IN
ORDER TO MINIMIZE THE DOWNTIME OF EXISTING EXHAUST FUNCTIONALITY. NEW
SYSTEM SHALL BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING ANY EXISTING
ISOLATION EXHAUST SYSTEMS.
C. ALL EQUIPMENT IS TO BE TURNED OVER TO VA FOR PROPER REMOVAL FROM
INVENTORY LIST.
PHASING NOTE:
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING THE
REQUIRED PROJECT PHASING. ALL WORK SHALL BE COORDINATED AND
SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS
SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION AND SHALL BE
TT
T
T T
T
T
T
T
T
T
T
T x1
4COORDINATE RELOCATION OF
JUNCTION BOX AND CONDUITS
WITH DIVISION 26.
UP32x16 UP16x6
C116 Waiting
C106
PEA
C116A
PEC
C116B
PEC
C107 Exam
C108 Exam
C116G
PIV
Register
C*1*11 Corridor
C119 Police
C119I Holding
C116C
PEC
14x8
20x10
105 CFM 1 70 CFM 1 70 CFM
1 70 CFM
1 175 CFM
10x8 x8
8x4
8x6
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT NO. STATE COA FIRM NO.
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
/1 /2
:5
:4
A
M
Renovate MICU/SICU
10/17/2025
PARTIAL FIRST FLOOR PLAN -
DUCTWORK - NEW WORK
MH101
AJGBRB
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
2019-05193 01528
PLAN NOTES
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN - DUCTWORK - NEW WORK
1. REBALANCE GRILLE TO INDICATED CFM.
KEYPLAN
GENERAL NOTES
1. LABEL ALL MECHANICAL EQUIPMENT PER SPECIFICATION, INCLUDING EXHAUST FANS,
VALVES, VAV BOXES, AND AIR VALVES. ANY OUTDOOR LABELING SHALL BE
WEATHER- RESISTANT. COORDINATE ALL LABELING WITH THE VA PRIOR TO
ORDERING THE LABELING.
PHASING NOTE:
A. REFER TO THE ARCHITECTURAL DOCUMENTS FOR A SEQUENCE OF
CONSTRUCTION PLAN, WHICH INCLUDES DETAILED NOTES REGARDING THE
REQUIRED PROJECT PHASING. ALL WORK SHALL BE COORDINATED AND
SCHEDULED WITH THIS CONSTRUCTION SEQUENCE. ALL REQUIRED SHUTDOWNS
SHALL BE IDENTIFIED AT THE START OF CONSTRUCTION AND SHALL BE
T TT
T
T
T
T T
T T
T
T
T
T
T
T
T
T
H
T T T
T
H
T H
S P
SP
SP
x1 x1 x8
36x18 x1
12x12
8ø x2 x2 x1
10x6 x1
20x8
14x8
Soiled Utility
A292B
Passageway
C226B
Staff Toilet
A270A A269
Staff
Lounge
Staff Bathroom
A271A
Conference Room
A272
Office
A273
Electrical
A275
HAC
A274
On-Call
A276
Bathroom
A276A
Office
A268
RN Manager
A267
Pharmacy Office
A293
Work Area
A294A
Toilet
A286A
Passageway
C226D
Toilet
A287A
Ante Room
A283B
Nourishment
A291
Corridor
C226
Corridor
C226G
Toilet
A288A
A285
Patient
RoomA286
Negative
Pressure
Patient Room
A287
Patient
Room
A288
Patient
Room
Patient Room
A278
Patient Room
A279
Negative Pressure Patient Room
A280
Equipment Storage
A281
Negative Pressure Bariatric Patient Room
A282
Toilet
A283A
A284
Negative
Pressure
Patient Room
Toilet
A285A
HUC Station
A290
Passageway
C226C
Clean Linen
A277
Ante Room
A280B
Toilet
A282A
A282B Ante Room
Toilet
A280A
Toilet
A279A
Toilet
A278A
Passageway
C226E
Passageway
C226F
Clean Supply
A292
Negative Pressure Bariatric Patient Room
A283
Ante Room
A284B
Toilet
A284A
A250
Comms
Closet
Elevator
2-01
2-05 2-06
2-07
2-11
2-13
2-14
2-17
2-18
2-25
2-21
2-03
2-04
2-122-23
2-22 x8
14x12 x1
12x10 x1
28x16 x8 x1 x8 x8 x8
44x14 40x14 x1
30x12
12x8
12x8
10x10
12x6 x1
12x8 x1 x8 x8
UP18x10 x8
12x8 x8
2-09
2-08
2-20
12x6
UP14x12
UP16x10
12x12
6x10
10ø
CD1
400 CFM
10ø
CD1
400 CFM
8ø
CD1
225 CFM
24x12
200 CFM
CR1
6ø
CD1
125 CFM
8ø
CD1
225 CFM
8ø
CD1
230 CFM
24x12
75 CFM
CR1
24x12
75 CFM
CR1
6ø
CD1
50 CFM
6ø
CD1
100 CFM
6ø
CD1
90 CFM
6ø
CD1
100 CFM
8ø
CD1
175 CFM
8ø
CD1
175 CFM
12x12
75 CFM
CR212x12
75 CFM
CR2
48"L- 8ø
CD3
175 CFM
48"L- 8ø
CD3
175 CFM
8ø
CD1
215 CFM
24x12
135 CFM
CR1
12x8 x4
10x4
48"L- 12ø
ER1
580 CFM
12x12
75 CFM
CR2
8ø
CD2
210 CFM
6ø
CD1
100 CFM
8ø
CD1
125 CFM
6ø
CD1
90 CFM
8ø
CD1
165 CFM
8ø
CD1
175 CFM
12x12
75 CFM
CR2
12x12
75 CFM
CR2
8ø
CD2
210 CFM
12x12
75 CFM
CR2
12x12
135 CFM
CR2
8ø
CD1
185 CFM
8ø
CD2
250 CFM
12x12
75 CFM
CR2
48"L- 10ø
CD7
275 CFM
48"L- 10ø
CD7
275 CFM
24x12
125 CFM
CR26ø
CD2
50 CFM
8ø
CD2
225 CFM 12x12
125 CFM
CR2
48"L- 12ø
ER1
600 CFM
48"L- 12ø
ER1
505 CFM
8ø
CD2
175 CFM
48"L- 10ø
CD4
180 CFM
48"L- 10ø
CD4
225 CFM
12x12
75 CFM
CR2
6ø
CD2
60 CFM
24x12
135 CFM
CR2
24x12
255 CFM
CG1
8ø
CD1
255 CFM
24x12
150 CFM
CR2
6ø
CD2
75 CFM
UP10x10
48"L- 8ø
CD4
210 CFM
RHS-1
EAV-4
EAV-5
EAV-3
EAV-2
EAV-1
RHS-3
UP14x12
RHS-4
RHS-11 RHS-9
RHS-7
RHS-6
RHS-5
RHS-2
2-10
2-15
2-16
16x8
2-24
E
2-02
24x12
125 CFM
CR1
24x12
115 CFM
CR2
6ø
CD2
40 CFM
6ø
CD8
50 CFM
D R
DN32x16
D
R
48"L- 12ø
ER1
575 CFM
D
R UP36x14
8ø
CD1
220 CFM
6ø
CD6
70 CFM
R
10x8
10x6 x1
16x10
12x12
10x14
48"L- 12ø
ER1
650 CFM
C226S
Female
Locker Room x8
24x24
1500 CFM
CG1
48"L- 8ø
CD4
345 CFM
48"L- 10ø
CD5
525 CFM
2-19
DN16x6
48"L- 10ø
CD4
215 CFM
48"L- 8ø
CD3
175 CFM
48"L- 8ø
CD3
190 CFM
48"L- 8ø
CD4
250 CFM
48"L- 8ø
CD3
165 CFM RHS-10
RHS-8
48"L- 8ø
CD4
175 CFM
x8
12x8
B 24.123.117.317.115.913.112.212.111.1
11.1
10.89.26.9
6.5
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
WW.1
W.3
W.7
X
CP
CP
CP
CP
CP
10x6
6ø
CD1
75 CFM
24x12
175 CFM
CR1
x6
10x10
75 CFM
CR2
26x8 EA UP
5UP16x10
6x
2-20
CP6
8 7
ACU-1
6ø
CD8
50 CFM
6ø
CD1
60 CFM
8ø
10x10
UP26x72
TO AH-4
UP42x24
TO AH-5
UP60x20
TO AH-5
14x12
10x6
CP
CP
CP
CP
CP
10x6
6x x1
8x x8
10BID ITEM #2
8x
2-24
13 75 CFM
16x8
16x8
C218
WAITING
C217
TLT.
Male Locker Room
A270
200 CFM
450 CFM
A294B
Gas
Storage x1
225 CFM
65 CFM
1335 CFM
VAV-5-4
VAV
5-3
70 CFM
90 CFM
36x18
6x6
50 CFM
CD9
44x16
10x12
26x16
8ø
EG1
225 CFM
10x10 8ø
EG1
225 CFM
10ø
8ø
EG1
225 CFM
8ø
EG1
225 CFM
8ø
EG1
225 CFM
UP20x8
24x12
220 CFM
CG1
24x12
90 CFM
CG1
10x6
Staff Respite
A271B
6ø
EG2
80 CFM
6ø
CD8
80 CFM
24x12
100 CFM
CG1
24x12
100 CFM
CG1
24x12
215 CFM
CG1
x8
18x8 x1
24x24
455 CFM
CG1
24x12
225 CFM
CG1
8ø
EG1
175 CFM
8x6
8x6
26x8
18x10
24x12
8ø 8x
8x4
9150 CFM
x1
12ø
CD1
415 CFM
12x108x6
14x12 x8
18x8 x1
10x16
46x14
8x8
24x16 32x12
1'-6"x0"-6" 1'-6"x0"-6"1'-6"x0"-6"
1'-6"x0"-6"
2'-0"x1'-0"
1'-6"x0"-6"
4'-0"x0"-6"
4'-0"x0"-6"
1'-6"x0"-6"
1'-6"x0"-6" 2'-6"x1"-0"
6ø
CD2
25 CFM
8x14
6ø
16x10
ABCDE
4a
8a
Da
X-S
W-S
V-S
U-S
T.4-S
T.2-S
Ta-S
9.2-S 10.8-S11-S 12-S12.2-S9-S6.5-S4.2-S
W.7-S
W.5-S
W.3-S
W.1-S
V.9-S
V.8-S
V.6-S
T.9-S
T.1A-S
T.1-S
T -S
Q.2-S
Q -S
P.2-S
6.9-S 11.9-S 13-S 15.9-S 17-S 17.3-S 23-S 24
T.5-S
23.622.2
Original
Original 22.6
22.3 Original
Original
22.13
10.
P-S
Pa.
Oa.
P.
Q.R Original
Ra.
S.
10.6.8.7.
Original
Original
T Original
Original
P-HH
P-II6.4. 5.
BB
CC
AA
A.6A.6
AREA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .