This file is an architectural design document for a Department of Veterans Affairs (VA) Medical Center renovation project located in Cincinnati, Ohio. The project involves completely renovating approximately 11,000 square feet on the 2nd floor of the Medical Intensive Care Unit (MICU), including comprehensive demolition and reconstruction of medical spaces. The renovation will create new patient rooms, offices, conference rooms, staff lounges, locker rooms, clean supply rooms, a pharmacy office, work areas, and a Healthcare Unit (HUC) station, with a specific focus on installing a new HEPA pandemic filtration system that provides negative pressure capabilities for patient rooms to meet pandemic preparedness standards.
The comprehensive renovation includes detailed architectural plans for structural modifications, medical gas and plumbing systems, electrical infrastructure, and mechanical systems. The project scope encompasses not just the 2nd floor area, but also requires coordinating plumbing and HVAC connections above and below the construction zone, as well as rooftop work to integrate new and existing air handling equipment. The design documents specify precise technical requirements for wall types, floor finishes, medical equipment placement, patient room configurations, and specialized systems like patient lift supports and medical gas outlets, with a targeted completion date of October 17, 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EXTERIOR ELEVATION
INTERIOR ELEVATION
SEE 700 SERIES SHEETS
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
SEE SHEET A001
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAGX
TEMPORARY WALLS
Ludlow Ave.
C lif to n A v e
CINCINNAT
I STATE
TECH.
Hopple St.
M.L.K. Dr.
McMillan St.
UNIV. OF
CINCINNAT
I
W.H.T Rd.
VAMC
3200 VINE ST.
M.L.K. Dr.
V in e
S t.
ZOO
Jefferson A ve.
UNIV.
HOSPITAL
Mitchell Ave.
R ea di ng
R d.
V ic to ry
P kw
y. XAVIER
UNIV.
Loading Dock Contractor Access at
Basement Level
Freight Elevator
AREA OF
WORK
2ND FLOOR
BUILDING 1 BUILDING 2
BUILDING 2
BUILDING 8
BUILDING 14
BUILDING 15
BUILDING 3
E S
H
IE
L D
S S
T
VINE ST
G O
O D
M A
N S
T
Roof Access at 4th Floor Stair #6
Emergency Room Entrance
Main Building Entrance
Second Floor:
Corridor from freight elevator to MICU
Basement: Corridor dock to freight elevator.
No Contractor parking on campus.
PARKING GARAGE
Crane lift staging at Main Building Entrance. Contractor to coordinate with COR
Contractor to coordinate with COR for facility guidelines regarding contractor personel entrances.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
3131 NEWMARK DRIVE, SUITE 200
MIAMISBURG, OHIO 45342
937.461.3290 P
JPA ARCHITECTURE
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
THP LIMITED INC.
STRUCTURAL ENGINEER
100 E. EIGHTH STREET
CINCINNATI, OH 45202
513.241.3222 P
513.241.2981 F
TERRACON CONSULTANTS
611 LUNKEN PARK DRIVE
CINCINNATI, OH 45226
513. 321. 5816 P
/1 /2
:1
:2
A
M
Renovate MICU/SICU
10/17/2025
COVER SHEET
G001
SOTH
19018.00
539-20-104
Cincinnati, Ohio
Renovate MICU/SICU
3200 Vine Street Cincinnati, Ohio 45220 PROJECT #: 539-20-104
100% CONSTRUCTION
DOCUMENTS
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
DRAWING INDEXVICINITY MAP GRAPHIC SYMBOLS
N Scale:Scale: 1" = 80'-0"1" = 80'-0"
CAMPUS PLAN
G001 COVER SHEET
G100 CODE DATA
G101 SEQUENCE OF CONSTRUCTION
AD102 SECOND FLOOR DEMOLITION PLAN
A101-N FIRST FLOOR NOTE PLAN
A102-D SECOND FLOOR DIMENSION PLAN
A102-N SECOND FLOOR NOTE PLAN
A103-N THIRD FLOOR DEMOLITION & NOTE PLAN
A104 ROOF PLAN
A121 FIRST FLOOR REFLECTED CEILING PLAN
A122 SECOND FLOOR REFLECTED CEILING PLAN
A123 THIRD FLOOR REFLECTED CEILING PLAN
A401 INTERIOR ELEVATIONS
A402 INTERIOR ELEVATIONS
A403 INTERIOR ELEVATIONS (PASSAGEWAYS)
A404 INTERIOR ELEVATIONS (PASSAGEWAYS)
A405 INTERIOR ELEVATIONS (PATIENT ROOMS)
A406 INTERIOR ELEVATIONS (PATIENT ROOMS)
A407 INTERIOR ELEVATIONS (WORKSTATIONS)
A510 HEADWALL DETAILS
A511 CASEWORK SECTIONS & DETAILS
A512 PPE CABINET SECTIONS & DETAILS
A513 WORKSTATION DETAILS
A514 WORKSTATION DETAILS
A515 GRAB BAR DETAILS
A601 DOOR SCHEDULE & DETAILS
AF101-F FLOOR FINISH PLAN
AF101-P WALL PROTECTION PLAN
AF101-W WALL FINISH PLAN
AF601 FINISH SCHEDULE
AF603 FURNITURE AND EQUIPMENT PLAN
S001 GENERAL NOTES
S102 FIRST AND SECOND FLOOR PLAN
S103 THIRD FLOOR PLAN
S104 ROOF PLAN
S105 PATIENT LIFT PLAN
S301 DETAILS
FX001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
FX102 PARTIAL SECOND FLOOR PLAN
P001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
PD101 PARTIAL FIRST FLOOR PLAN - REMOVALS
PD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
PL101 PARTIAL FIRST FLOOR PLAN - DRAINAGE & DISTRIBUTION
PL102 PARTIAL SECOND FLOOR PLAN - DRAINAGE
PP102 PARTIAL SECOND FLOOR PLAN - DISTRIBUTION
PG102 PARTIAL SECOND FLOOR PLAN - MEDICAL GAS
P601 SCHEDULES & DETAILS
P901 SANITARY WASTE AND VENT DIAGRAM
M001 ABBREVIATION, LEGEND, GENERAL NOTES, AND INDEX
MD101 PARTIAL FIRST FLOOR PLAN - MECHANICAL - REMOVALS
MD102 PARTIAL SECOND FLOOR PLAN - MECHANICAL - REMOVALS
MD103 PARTIAL THIRD FLOOR PLAN - MECHANICAL - REMOVALS
MD104 PARTIAL ROOF PLAN - MECHANICAL - REMOVALS
MH101 PARTIAL FIRST FLOOR PLAN - DUCTWORK - NEW WORK
MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK - NEW WORK
MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK - NEW WORK
MH104 PARTIAL ROOF PLAN - DUCTWORK - NEW WORK
MP102 PARTIAL SECOND FLOOR PLAN - PIPING - NEW WORK
M501 DETAILS
M502 DETAILS
M503 DETAILS
M601 SCHEDULES
M602 SCHEDULES
M901 CONTROLS
M902 CONTROLS
E001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS
ED102 PARTIAL SECOND FLOOR PLAN - REMOVALS
ED104 PARTIAL ROOF PLAN - REMOVALS
EL102 PARTIAL SECOND FLOOR PLAN - LIGHTING
EP102 PARTIAL SECOND FLOOR PLAN - POWER
EP104 PARTIAL ROOF PLAN - POWER
E401 PARTIAL SINGLE LINE DIAGRAM
E501 DETAILS
E600 LUMINAIRES SCHEDULE
E601 SCHEDULES
T001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS
TD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
TN101 SECOND FLOOR COMPOSITE PLAN
TN102 PARTIAL SECOND FLOOR PLAN - NEW WORK
TN202 PARTIAL SECOND FLOOR PLAN - PATHWAYS
T400 ENLARGED PLANS
T401 ENLARGED PLANS
T402 ENLARGED PLAN - SIGNALS CLOSET - REMOVALS
T403 ENLARGED PLAN - SIGNALS CLOSET - NEW WORK
T404 ENLARGED PLAN - CLEAN SUPPLY A249 - REMOVALS
T405 ENLARGED PLAN - EQUIPMENT ROOM A250 - NEW WORK
T501 DETAILS - SECURITY
T502 DETAILS - TECHNOLOGY OUTLETS
T503 DETAILS - RESPITE ROOM
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. CONTRACTOR SHALL PROVIDE ALL CONTRACTOR PPE ITEMS, INCLUDING
ITEMS RELATED TO COVID INFECTION MITIGATION.
Revisions Date
0-HR Smoke Partition
1-HR Fire Barrier
2-HR Fire Barrier
Means of Egress
Existing Wall to Remain
New Wall
Fire Extinguisher
CODE LEGEND
24 SF
Clean Linen
302 SF
Patient Room
101 SF
RN Manager
127 SF
Office
305 SF
Negative Pressure Patient Room
185 SF
Equipment Storage
88 SF
Office
31 SF
Male Locker Room
32 SF
Staff Toilet
245 SF
Staff Lounge
38 SF
Staff Bathroom
90 SF
Female Locker Room
324 SF
Conference Room
28 SF
HAC
29 SF
Electrical
92 SF
On-Call
34 SF
Bathroom
Waiting Room
C218
Grief/Consult
A289
Toilet
C217
596 SF
Passageway
355 SF
Corridor
46 SF
Toilet
Ante Room
A282B
Corridor
C226
Soiled Utility
A292B
Clean Linen
A277
Patient Room
A278
Patient Room
A279
Negative Pressure Patient Room
A280
Patient Room
A285
Patient Room
A287
Patient Room
A288
Toilet
A278A Toilet
A279A
Toilet
A280A
Toilet
A287A
Ante Room
A280B
RN Manager
A267
Office
A273
Toilet
A288A Toilet
A285ANegative Pressure Patient Room
A286
Toilet
A286A
Office
A268
Male Locker Room
A270
Staff Toilet
A270A
Staff Lounge
A269
Staff Bathroom
A271A
Female Locker Room
A271
Conference Room
A272
HAC
A274
Electrical
A275
On-Call
A276 Bathroom
A276A
Passageway
C226B
Corridor
C226G
Negative Pressure Bariatric Patient Room
A282
Toilet
A282A
Work Area
A294A Nourishment
A291
HUC Station
A290
Clean Supply
A292
Pharmacy Office
A293 Work Area
A294
Passageway
C226C
Passageway
C226D
Passageway
C226E
Passageway
C226F
Negative Pressure Bariatric Patient Room
A283
Ante Room
A283B
Toilet
A283A
Ante Room
A284B
Toilet
A284A
Comms Closet
A292A
96'-6"
147'-2"
Suite 9,066 sf
Total Travel Distance= 174' (Maximum 200'-0")
Total Travel Distance= 211' (Maximum 200'-0")
Gas Storage
A294B
12#
12#
12#
Passageway
C226A
22' - 4 7/8"
/4
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:2
A
M
Renovate MICU/SICU
10/17/2025
CODE DATA
G100
S0TH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
CODE PLAN
Code Data: NFPA 101 Life Safety Code (2018 Edition)
Construction Type: Type I (322)
Use Group: Health Care Occupancy
Height: Partial 1 story renovation of an existing 4 story building
Area: 9,888 SF
Occupant Load: 38 occupants
Protection: Fully suppressed
Chapter 6 Classification of Occupancy and Hazard of Contents
6.1.5 Health Care Occupancy.
6.2.2.3 Ordinary Hazard Contents.
Chapter 7 Means of Egress
7.1.3.1 Exit access corridors shall be 1 hour rated except where serving 30 or less persons.
7.2.1.4.3.1 Any door leaf in a means of egress leaves more than one-half of the required width of the corridor.
7.3.1.2 Occupant Load Factor based on Inpatient Treatment Department is 240 SF / person: 55 persons.
7.4 Number of means of Egress: 2.
7.5.1.2.1 Corridors to lead to means of egress without passing through any intervening spaces other than corridors, lobbies or spaces permitted to be open to the corridor.
7.5.1.2.2 Corridors not required to be fire resistance rated shall be permitted to open into open floor plan areas.
Chapter 8 Features of Fire Protection Table A.8.2.1.2 Fire Resistance Ratings for Type I (333) Construction (per NFPA 220 Table 4.1.1)
- Columns: 3 hours
- Beams, Girders, Trusses: 3 hours
- Floor rating 3 hours
- Interior Nonbearing Walls: 0 hour
Table 8.3.4.2 Minimum Fire Rating for Opening Protectives in Fire Resistance Rated Assemblies
- 1 hour fire barrier requires 3/4 hour door with a vision panel no larger than 1296 in.2
- Smoke barriers require 1/3 hour door with a vision panel no larger than 1296 in.2
8.4.1 Smoke Partitions shall limit the transfer of smoke.
8.5.1 Smoke Barriers shall restrict the transfer of smoke and have 1 hour fire resistance rating.
8.5.3 Fire Barriers that meet requirements of Section 8.5 shall be permitted to be used as a smoke barrier.
Chapter 9 Building Service and Fire Protection Equipment
9.6 Fire Detection, Alarm and Communications Systems. Fire alarm system required per Section 19.3.4.1.
9.7 Automatic sprinkler system required by Section 19.4.2.1.
9.9 Portable fire extinguishers shall be installed, inspected, and maintained in accordance with NFPA 10.
Chapter 10 Interior Finish, Content and Furnishings Table A.10.2.2 Interior Finish Classification Limitations for Health Care (Existing)
Exit Access Corridors: Class A or B.
Other Spaces: Class A or B.
10.2.8.1 Automatic Sprinklers permit use of Class B In lieu of Class A and Class C In lieu of Class B.
Chapter 18 New Health Care Occupancies
18.1.1.1.4 The area of work is an existing hospital and therefore falls under Chapter 18.
Table 18.1.6.1 Construction Type Limitations: Type I (333), sprinklered, no story limitations.
18.1.7 Occupant Load per Table 7.3.1.2.
18.2.2.2.5.1 Door locking arrangements are permitted where the clinical needs of patients require specialized security measures.
18.2.2.2.6 Doors lock in accordance with paragraph above shall:
- Have either remote control of locks from within smoke compartment, keys for all locks to be carried by staff at all times or other reliable means of unlocking doors.
- Have only one locking device per door.
18.2.3.4 Corridors in hospitals shall be not less than 8 feet in clear an unobstructed width.
18.2.5.2 Dead end corridors shall not exceed 30’.
18.2.5.3 Common path of travel shall not exceed 100’.
18.2.5.4 Every corridor shall have access to not less than two approved exits without passing through any intervening spaces other than corridors or lobbies.
18.2.5.6.5 Rooms within suites shall not be required to an exit access door leading directly to an exit access corridor.
18.2.5.7.1.2 Suite Separation – Suites shall be separated from remainder of the building by walls and doors (0-hr smoke partitions).
18.2.5.7.2.4 Sleeping Suite Travel Distance
(A) Travel distance between any point in a sleeping suite and an exit access door to another suite, an exit access corridor door, or a horizontal exit door from that suite shall not exceed 100 ft.
(B) Travel distance between any point in a sleeping suite and an exit shall not exceed 200ft.
*** Given the need to utilize the exterior wall for patient rooms The AHJ is allowing the current sleeping suite travel distance to exceed the requirements of 18.2.5.7.2.4. The addition of the corridor C226 is an improvement towards code compliance from the existing MICU suite configuration.
18.2.6.2.1 Travel distance from any point in a room to exit shall not exceed 200’.
18.3.2.1.2 Boiler/Fuel fire equipment rooms, laundries larger than 100 SF, soiled linen rooms with volume exceeding 64 gal and storage rooms larger than 100 SF shall be protected by 1 hour fire barriers.
18.3.2.1.3 Storage rooms (clean supply and clean linen) larger than 50 SF but not exceeding 100 SF shall be protected by smoke partitions.
18.3.2.4 Areas where medical gas is stored or administer and he operation, testing and maintenance of medical gases shall be in accordance with NFPA 99.
18.3.4.1 Health care occupancies shall be provided with a fire alarm system IAW Section 9.6.
18.3.5.1 Building containing health care occupancies shall be protected throughout by approved, supervised automatic sprinkler systems IAW Section 9.7.
18.3.5.12 Portable fire extinguishers shall be provided IAW Section 9.9.
18.3.6.2.2 No fire resistance rating is required for corridor walls.
18.3.6.2.3 Corridor walls shall form a barrier to limit the transfer of smoke but are not required to be smoke barriers or smoke partitions.
18.3.6.3.1 Corridor doors shall be doors constructed to resist the passage of smoke.
18.3.7.3 Smoke barrier shall be constructed IAW Section 8.5 and shall have 1 hour fire resistive rating.
18.3.7.6 Doors in smoke barriers shall have 20 minute fire resistive rating.
18.3.7.5.1 Not less than 30 net SF of accumulation space per resident/patient shall be provided in smoke compartment on either side of smoke partition.
- The doors shall not be required to swing in the direction of egress travel.
UP
EMERGENCY DEPT.
WOMEN'S CLINIC
POLICE
DEPT.
ELEVATOR
A302
Office
C119B
Office
C119C
Lockers
C119D
Toilet
C119E
Evidence
C119F
Armory
C119G
Stor.
C119H Holding
C119K
Interview Room
C119J
Toilet-Male
C117
Toilet-Female
C118 Holding
C119I
Police
C119
PIV Registrar
C116G
PEC
C116H
PEC
C116F
Waiting
C116
PEC
C116E
Exam
C110
Office
C116D
Electric
C109
Exam
C108
PEC
C116B
PEC
C116C
PEC
C116A
Exam
C107PEA
C106
Corridor
C101
Alcove
C111
Exam
C112
Exam
C113
Exam
C114
Exam
C115
Clerk
C102
Waiting Room
C103
Exam Room
C104
Toilet
C104A
Stor
C104B
HAC
C105
Exam
C122F
Employee Health
C122A
Exam
C122C
Office
C122B
Toilet-Female
C123
Toilet-Male
C124
003003003003
MICU
Waiting Room
C218
Grief/Consult
A289
Toilet
C217
Corridor
C226
Soiled Utility
A292B
Clean Linen
A277
Patient Room
A278
Patient Room
A279
Negative Pressure Patient Room
A280
Negative Pressure Patient Room
A284
Patient Room
A285
Patient Room
A287
Patient Room
A288
Toilet
A278A Toilet
A279A Toilet
A280A
Toilet
A287A
Ante Room
A280B
RN Manager
A267
Office
A273
Toilet
A288A Toilet
A285A
Negative Pressure Patient Room
A286
Toilet
A286A
Equipment Storage
A281
Office
A268
Male Locker Room
A270
Staff Toilet
A270A
Staff Lounge
A269
Staff Bathroom
A271A
Female Locker Room
A271
Conference Room
A272
HAC
A274
Electrical
A275
On-Call
A276 Bathroom
A276A
Passageway
C226B
Corridor
C226G
Negative Pressure Bariatric Patient Room
A282Toilet
A282A
Ante Room
A282B
Work Area
A294A
Nourishment
A291
HUC Station
A290
Clean Supply
A292
Pharmacy Office
A293 Work Area
A294
Passageway
C226C Passageway
C226D
Passageway
C226E
Passageway
C226F
Negative Pressure Bariatric Patient Room
A283
Toilet
A283A
Ante Room
A283B
Ante Room
A284B
Toilet
A284A
Comms Closet
A292A
Elevator
Gas Storage
A294B
002.0
002.0
002.0 002.0
002.0
Typ.
Typ.
Typ.Typ.
Typ.
ROOF
002.2
002.2
TYP
TYP
002.2
TYP
002.1002.1
002.1
SICU
Negative Pressure Patient Room
A387A
Patient Room
A387B
Patient Room
A387C Patient Room
A387D
Patient Room
A387E
Patient Room
A387F
Patient Room
A387G
Shower
A387H
Patient Room
A387I Patient Room
A387J
Nurse Station
A387
Soc. Wrk.
A383
Conference Room
A385
Family Wtng.
C310
Lactation
C312
Grieve Consult
C313
Tlt.
C313B
Negative Pressure Patient Room
A387K
Linen Clos.
A389
Nurse Off.
A390
Soil Utility
A391
Equip. Stor.
A392
Elec.
A395
Sig.
A396
Clean Supply
A397
HAC
A380
Lounge
A382
Tlt.
A382A
M. Lock.
A382B Female Locker
A382C
Respiratory Therapy
A384
Pharm.
A386
Tlt.
A388
Corridor
C*3*18
ICU Dir. Off.
C314
002.0
002.0
002.0
002.0
003003003003
002.1
002.2
002.3
002.4
002.5
Typ.
Typ.
Typ.
EXTERIOR ELEVATION
INTERIOR ELEVATION
SEE 700 SERIES SHEETS
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
SEE SHEET A001
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAGX
TEMPORARY WALLS
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:3
A
M
Renovate MICU/SICU
10/17/2025
SEQUENCE OF CONSTRUCTION
G101
SOTH
19018.00
539-20-104
Cincinnati, Ohio
BID SET
N Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"
1st Floor Plan N
Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"
2nd Floor - MICU Plan
N Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"
Rooftop Plan N
Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"
3rd Floor- SICU Plan
SEQUENCE OF CONSTRUCTION
GRAPHIC SYMBOLS
All days given above are conceptual except. Final allocation of days to be determined by contractor. Time frame in item X above shall not exceed X days.
001 Construction start dependent on completion of shop drawing process and procurement and delivery of ductwork, air valves, etc.
002.0 Shut down one 2nd floor isolation room at a time, rooms A280, A282, A283, A284, and A286. Shut down adjacent rooms as required, so steel can be installed and floor opening can be cut properly. Corresponding rooms on the 3rd floor will be shut down as well 5 spaces, 2 weeks per room. Coordinate lift of pandemic exhaust fans to the roof when 3rd floor spaces are vacated.
002.1 Owner vacates 3rd floor SICU to 2nd floor MICU for
installation of pandemic exhaust fans, HEPA, and condenser unit. 30 days.
002.2 On the 3rd floor, provide new duct for existing 2nd floor isolation rooms. Remove existing ductwork and install new. Enlarge roof penetration for new ductwork and reconnect to existing rooftop duct installed under the ED project. 3 weeks.
002.3 Connect existing ductwork on the 2nd floor.
002.4 Have new exhaust system pull exhaust air from existing
space using temporary air valves installed under the ED project.
002.5 Install new isolation exhaust through room 387F to room 284 (future new isolation room)- New floor penetration between 2nd/3rd floors shall be made. The existing room on Level 2 shall be temporarily shut down for new slab penetration. Cap below 3rd level slab. 2 weeks.
003 Owner vacates 2nd floor MICU unit and relocates, along with SICU to 3rd floor SICU. 30 days for owner move
004 Construct new Communications Room A292A Demo existing Philips Telemetry data cabling from existing Clean Supply A249 to existing outlet locations. Re-cable existing Philips Telemetry outlets with new data cabling to new Comm Room and terminate on new rack mounted hardware. Coordinate with owner’s vendor (Philips) for relocation of existing Telemetry network equipment.Switch over other related systems identified on the drawings.
005 Contractor demolishes and reconstructs 2nd floor MICU.
240 days
006 Exhaust fan system to be commissioned and rebalanced to new airflows in the MICU project.
007 Project Complete, owner to occupy 2nd floor MICU. 30 days for owner move
5.
B 24.123.117.317.115.913.112.212.1
12.1
11.110.89.2
6.9
4.2 6.5
Fa
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
2.08 2.01
2.03
2.03
2.03
2.08
2.03
2.03
2.03
2.08
2.08
2.08
2.03
2.08
2.08
2.03
2.08
2.03
2.03
2.03
2.03
2.142.14
2.032.03
2.14
2.08
2.03
2.08
2.08
2.06 2.06
2.06
2.062.06
2.06
2.06
2.06
2.06
2.06
2.06
2.062.06
2.06
2.10
2.06
2.02
2.03
2.03
2.03 2.03
2.02
2.02
2.03
2.01
2.03
2.02
2.10
2.10
2.10
2.10
2.03
2.02 2.02
2.10
2.10 2.10
2.03
2.01
2.08
2.03
2.02
2.03
2.02
2.02
2.03
2.02
2.03
2.08
2.11
2.112.11
2.06
2.10
2.06
2.10
2.02
2.08
2.03
2.06
2.10
2.10
2.06
2.06
2.10
2.01
2.01 2.01
2.03
2.03
2.20
2.14
2.06
2.03
2.29
2.29
2.29
2.29
Typ.
1.03
2.31
2.31
1.08
2.07
2.07
2.07
2.07
2.07 2.07
2.07
2.07
2.06
2.06
2.03
2.06
2.08
2.18
2.06
2.06
2.18
2.03
2.06
2.08
2.10
2.18
2.03
2.06
2.21
2.06
2.18
2.03
2.08
2.16
2.06
2.16
2.16
2.18
2.06
2.06
2.18
2.06
2.10
2.21
2.07
2.07
2.07
2.07
2.07
2.03
2.312.31
2.20 2.20
2.20
2.20
2.06
2.08
2.10 2.11
2.06
2.10
2.03
2.08
2.03
2.06
2.10
2.06
2.10
2.06
2.07
2.20
2.20
2.16
Pat. Room
A280
Pat. Room
A281
Pat. Room
A282
Pat. Room Negative Pressure
A283
Pat. Room Neg. Pressure
A284 Pat. Room
Neg. Pressure
A285
Pat. Room Neg. Pressure
A286
Pat. Room
A287
Pat. Room
A288
Pat. Room Neg. Pressure
A289
Pat. Room
A290
Pat. Room
A291
Pat. Room
A292
Pat. Room
A293
2.06
WAITING
C218
TLT
C217
LINEN
A294
LINEN
A295
LINEN
A299
OFFICE
A298 MEDICATION
A277
STAFF TLT
A297
CLEAN
SUPPLY
A296
WORK ROOM
A250A
SIG. CLOSET
A250CORRIDOR
C*2*4
CLEANN
SUPPLY
ROOM
A251A
OFFICE
A251B
SOIL
A278OFFICE
A267
OFFICE
A268
M. LOCKERS
A270
TOILET
A270A
STAFF
LOUNGE
A269
F. LOCKERS
A271
TOILET
A271A
CONFERENCE
A272
RN
MANAGER
A273
TOILET
A276A
ON CALL
A276
ELEC
A275
HAC
A274
NURSE
STATION
A279
2.14
2.02
2.14
2.02
2.14
2.14
2.14
2.14
2.14
2.26
2.26
2.27
2.14
2.272.272.27
2.27 2.27
2.27
2.27
2.27
2.27
2.27 2.27
2.28
2.14 Typ.
2.14 Typ.
Typ.
2.14 Typ.
2.14 Typ.
2.14
2.41
2.14 2.14
2.14
2.14
2.14
2.02
2.38
2.35
2.34
2.37
2.33
2.35
2.33 2.33 2.33
2.33
2.33
2.33
2.33
2.33
2.332.33
2.37
2.45
2.12
2.12
2.02
2.03
2.08
2.02
2.02
2.02
2.14
2.14
2.14
2.10
2.14
2.26
2.26
2.02
2.02
2.02 2.20
2.10
2.20
2.10
2.14
2.02
2.26
2.10
2.20
2.02
2.26
2.10
2.14
2.02
2.26
2.10
2.20
2.02
2.02
2.10
2.20
2.26
2.02
2.08
2.02
2.08
2.02
2.26
2.14
2.02
2.02
2.02
2.14
2.02
2.02
2.14
2.02
2.14
2.02
2.20
2.26 2.26
2.27
2.022.02
2.26
2.02
2.33
2.29
2.02
2.02 2.02
2.11
2.02 2.10
2.06
2.10 2.02
2.14
2.03
2.08
T1.0
1.121.12
2.07
1.13
Bid Item #2
2.10
2.06
2.10
2.35
2.35
2.29
2.29
2.29
2.29
2.29
2.29
2.292.29
2.29
2.29
2.29 2.292.29
2.18
2.08
2.29
BB
CC
AA
A.6A.6
2.06
2.10
LEGEND
Wall to be Demolished
Existing Wall to Remain
New Wall
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:5
A
M
Renovate MICU/SICU
10/17/2025
SECOND FLOOR DEMOLITION
PLAN
AD102
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
GENERAL DEMOLITION NOTES
A. Remove all existing partitions and construction shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process.
Coordinate any required changes to these systems with the C.O.R.
F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
G. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. All existing walls to remain have full height wall covering to be removed. Contractor to patch and repair walls as required to receive new finish.
KEYNOTES
1.03 Contractor to coordinate with COR for placement of trash dumpster feed by chute from second floor in this general area.
1.08 Contractor to coordinate with COR for placement of trash chute from second floor in this general area. Remove and reinstall window as required.
1.12 Contractor path to construction area.
1.13 Contractor emergency exit only.
2.01 Remove existing window.
2.02 Remove existing base cabinets, wall cabinets and
countertop.
2.03 Remove existing plumbing fixtures and all associated
accessories. See Plumbing Drawings.
2.06 Remove existing acoustic ceiling tile, grid, lights and all ceiling mounted accessories this area.
2.07 Remove existing door leafs. Frame to remain.
2.08 Remove ceramic wall tile and prepare wall for new
scheduled finishes.
2.10 Remove existing LVT flooring and rubber base. Prepare
subfloor for new scheduled finish this area.
2.11 Remove existing nurse station system's furniture.
Contractor to turn over to owner.
2.12 Remove shower tile, mortar, and curb. See detail
A/AF101-F.
2.14 Remove existing gypsum board soffit and support framing.
2.16 Remove existing ceramic floor, base, and setting material.
Prepare subfloor for new scheduled finish.
2.18 Remove existing carpet flooring and rubber base. Prepare subfloor for new scheduled finish and base this area.
2.20 Remove existing patient lifts and supports and deliver all components to owner as directed by COR.
2.21 Mechanical chase, to remain.
2.26 Remove existing full height wardrobe.
2.27 Remove existing wall mounted countertop and wall
bracket.
2.28 Remove existing column cover.
2.29 Remove existing window sill.
2.31 Remove existing lockers.
2.33 Remove existing ICU/CCU door.
2.34 Remove existing PAR-BIN storage system. Protect and
reinstall as indicated on new work plan.
2.35 Existing floor slab expansion joint to remain. Contractor to protect during demolition and construction operations.
2.37 Lockers to be removed and relocated by owner.
2.38 Existing elevator may not be used for construction
activities.
2.41 Remove existing pneumatic tube station. Salvage and turn over to owner.
2.45 New penetration thru second floor slab. See Structural and Mechanical drawings.
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
2nd Floor - MICU DEMOLITION PLAN
5.
BD 24.123.117.317.115.913.112.212.1
12.1
11.110.89.2
6.9
4.2 6.5
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
Employee I.D.
C119A
Office
C119B
Office
C119C
Lockers
C119D
Toilet
C119E
Evidence
C119F
Police
C119
PIV Registrar
C116G
Holding
C119I
Toilet-Female
C118
Toilet-Male
C117
Interview Room
C119J
Holding
C119K
Armory
C119G
PEC
C116F
PEC
C116H
Stor.
C119H
C116C116
PEC
C116C Office
C116D PEC
C116E
PEC
C116B
PEC
C116A
EMERGENCY DEPARTMENT WAITING ROOM
POLICE DEPARTMENT
WOMEN'S CLINIC
EMERGENCY DEPARTMENT
Exam
C108
Exam
C107
PEA
C106
Exam
C122D
Nurse Pract.
A144C
Nurse Pract.
A144B
Office
C130C
Office
C130D Office
C121
Exam
C110
Social Work
SVC
C130
Office
C130A
Exam
C130B
Signals
C128
Tele.
C127
Stair 5
S*1*5
Stair 9
S*1*9
Toilet-Male
C124
Toilet-Female
C123 Employee Health
C122A
Exam
C122C
Stair 6
S*1*6 Clerk
C102
Waiting Room
C103
Exam Room
C104
HAC
C105
Electric
C109
Alcove
C111
Exam
C112
Exam
C113
Exam
C114Exam
C115
Toilet
C104A
Stor
C104B
Corridor
C101
Office
C122B
Decon Trailer
A147E
Closet
C119L
Nursing Lounge
A158a
Elec.
HAC
F. Tlt.
Phys.
Phys.
Phys.
Phys.
Nurse Manager
Chief Nurse Office
Tlt.
A158a
Stair 9
On Call
A155
Tlt.
A155a
Sig.
Cl. Stor.
A147d
Pub. Tlt.
Secl.
Secl.
A152
Minor Surgery
A153
Triage
C120
Chief Off.
A151
Soil. Util.
A157
PCMM
Coordinator
A146a
Quality Manager
Squad Stor.
A150a
Heart Exam
A148
Heart Exam
A149
Heart Exam
A150
Meds
A158b
Decon Trailer
Nutrition
A136a
1.04
1.05
1.06
1.06
1.06
T1.0T1.0 T1.0
T1.0
T1.0T1.0
1.091.09
TYP.
ELEVATOR
NURSES STATION
2.38
A101-N
1.06
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
BB
CC
AA
A.6A.6
2nd Floor 739'-11"
10.8
11.1
2nd Floor 109'-11"
Exterior
2.49
22.08
2.47
2.48
Interior
7.187.18
9.03
As Required
1'-9 1/2" +/-
A s r e q u ir e d
/8
22.09
9.12
LEVEL 2 T/SLAB
181'-11"
LEVEL 2
111'-11"
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:3
A
M
Renovate MICU/SICU
10/17/2025
FIRST FLOOR NOTE PLAN
A101-N
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
KEYNOTES
1.04 Main Entrance to Emergency Department. Contractor to
maintain access and egress at all times.
1.05 Emergency department is shown in July 2020
configuration. There is a separate design project underway for the Emergency Department and it may be either unchanged, under construction and/or construction complete with a new layout at the time the renovate MICU/SICU project is under construction.
1.06 Unshaded area equals area of work on floor above.
1.09 Temporary partitions as required to seperate overhead
work from VA patients, visitors, and staff. Coordinate final location of temporary partitions with COR. Maintain access through corridors with minimum passage width of 48" at all times. Multiple configurations of temporary partitions maybe required to complete work.
2.38 Existing elevator may not be used for construction
activities.
2.47 Existing exterior concrete plaster soffit to remain.
Contractor to access work from inside of building.
Contractor to protect soffit during construction.
2.48 Existing clerestory windows to remain.
2.49 Remove and reinstall portions of existing gypsum ceiling as required to complete work.
7.18 Air and moisture barrier.
9.03 6" non-structural metal framing, 16" o.c.
9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
22.08 Sanitary pipe penetration. See plumbing drawings.
22.09 All soffit dimensions should be held to minimum required to accommodate sanitary pipe transition into building.
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
1st Floor - NOTE PLAN
General Notes - First Floor
A. The first floor plan and first floor reflected ceiling plan are provided to illustrate the layout and usage of the first floor below the area of second floor work.
B. Demolition and new construction at this level is to be above ceiling plumbing, mechanical, electrical, fire protection and/or technology work.
C. Contractor to remove and reinstall ceilings as required to install new work.
D. See plumbing, mechanical, electrical, fire protection and/or technology for additional information.
E. Temporary partitions will be required at the first floor in all public areas/corridors to separate and protect VA patients, visitors and staff from areas of construction.
F. Final layout of temporary partitions to be closely coordinated with the COR prior to erection.
G. Minimum 48” wide means of egress to be maintained at all times.
H. Temporary partitions may need to be relocated one or more times to facilitate new work, life safety egress and owner’s operations.
I. First floor and first floor above ceiling work to be completed during second or third shift or on weekends. Contractor to coordinate with COR.
J. Limitation to Police Deptartment Access.
Scale:Scale: 3/4" = 1'-0"3/4" = 1'-0"1
PIPE PENETRATION DETAIL
B 24.123.117.317.115.913.112.212.1
12.1
11.110.89.2
6.9
4.2 6.5
Fa
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
Soiled Utility
A292B
Clean Linen
A277
Patient Room
A278
Patient Room
A279
Negative Pressure Patient Room
A280
Patient Room
A287
Patient Room
A288
Toilet
A278A Toilet
A279A
Toilet
A280A
Toilet
A287A
Ante Room
A280B
RN Manager
A267
Office
A273
Toilet
A288A Toilet
A285ANegative Pressure Patient Room
A286
Toilet
A286A
Equipment Storage
A281
Office
A268
Male Locker Room
A270
Staff Toilet
A270A
Staff Lounge
A269
Staff Bathroom
A271A
Female Locker Room
A271
Conference Room
A272
HAC
A274
Electrical
A275
On-Call
A276 Bathroom
A276A
Grief/Consult
A289
Negative Pressure Bariatric Patient Room
A282
Toilet
A282A
Ante Room
A282B
Pharmacy Office
A293
Passageway
C226B
Clean Supply
A292
Nourishment
A291 Work Area
A294A
HUC Station
A290
Passageway
C226C Negative Pressure Bariatric Patient Room
A283
Ante Room
A283B
Toilet
A283A
Ante Room
A284B
Work Area
A294
Negative Pressure Patient Room
A284
Passageway
C226E
Passageway
C226D
Patient Room
A285
5" 5' - 6"
4 7/8" 10' - 10 3/8"
4 7/8"
10' - 4 7/8" 4 7/8"
5' - 6"
4 7/8"
5' - 6 1/8"
4 7/8" 10' - 1" 4 7/8" 10' - 3 5/8" 4 7/8" 5' - 6"
/8
/4
/4
/8 "9
/8
/8
/8
/8
/8
10 1/2"2' - 4 1/8"
1' - 1 7/8" 8"
8' - 0 1/2"4' - 6"8' - 0 1/2"4' - 0 3/4"
1' - 7 3/4"
4' - 8"
1' - 8 1/4"
4' - 3 1/2"8' - 0 1/2"9"8' - 0 1/2"
3' - 0 1/8"1' - 7 3/4"
2' - 3 3/4"
1' - 7 1/8"
S2.0 S2.0
S2.0S2.0
S2.0
S1.0-F
S2.0S2.0
S2.0
S2.0
S2.0
S1.1
S2.0S2.0
S1.1
S2.0
S1.0-FS1.0-F S2.0
S1.1
S2.0
S1.1
S2.0 S2.0S2.0
S2.0
S2.0 S2.0S2.0
S2.0S2.0
S2.0
S1.1 S1.1
S2.0S2.0
S2.0
S2.0
S2.0
S2.0
S2.0
6' - 2 1/4"
4 7/8"
6' - 6 3/4"
4 7/8"
7' - 7 7/8"
1' - 5 3/8"
5' - 6"
4 7/8"
8' - 8 3/4" 6' - 7 7/8"4 7/8" 7' - 8 7/8"
4 7/8"
8' - 3 3/4" 4 7/8"
/8
/8
/4
/8
/8
/4
4 7/8"
14' - 7"
4 7/8"
13' - 11 5/8"
4 7/8" 6' - 3"
1' - 5 1/2"11' - 7 3/8"
1' - 4 1/2"
/4
/8
/8
/4
/4
/8
/8
/4
/4
/8
"7
/4
/2
/8
/8
/8
/2
/2
5 5/8" 8' - 0 1/2" 3' - 0 1/4" 1' - 7 7/8"
5' - 1" 1' - 7 7/8"
2' - 11 5/8" 8' - 0 1/2" 9" 8' - 0 1/2" 3' - 2 3/8"
1' - 7 7/8" 2' - 4 1/4"
4 7/8"
7' - 3 3/8"
8' - 10" 4 7/8"
Align
S1.0-N
S1.0-N
Align
A102-D
/8
/4
' - 0
/4
' - 2
/2
" 4
/8
' - 1
/8
/8
' - 5
/4
' - 2
/4
4 7/8"
9' - 9 3/4"
1' - 10 7/8"
1' - 2 5/8"
8' - 2"
20' - 8 3/8" 19' - 9" 4' - 5"
4 7/8"
14' - 4" 4 7/8" 6' - 3 3/4"
/8
/8
/8
/8
/2
/8
4 7/8"
4' - 0 1/8" 4 7/8" 11' - 10 3/4" 4 7/8"
7' - 8"
1' - 1"
Gas Storage
A294B
S1.1
HEADWALL CENTERLINE
/4
/8
' - 0
/8
' - 6
/8
' - 0
/8
/8
7' - 11 3/8"
1' - 5 1/2"
5' - 4"
7 1/4"
2' - 6" 3' - 11 3/4" 8' - 0 1/2" 8 1/2" 8' - 0 1/2" 2' - 0 3/8"
/4
/4
/4
4 1/4"
9 1/8"
Comms Closet
A292A
S1.0-F
S2.0 S2.0
S2.0
S1.1
S2.0
S1.1
S2.0
ALIGN
ALIGN
/4
/2
/4
/2
S1.1
S2.0
S2.0
S2.0S2.0S2.0
S2.0
S2.0
S2.0
S1.1
S2.0 S2.0
S2.0
S2.0
' - 5
/2
Passageway
C226A
Toilet
A284A
T1.0T1.0
T1.0
T1.0
T1.0
T1.0
Bid Item #2
135.00°
/8
/8
/8
4' - 4 5/8"
1' - 7 1/4"
3' - 3 1/2"
4 7/8"
5' - 6 1/2"
4 1/4"
/8
/8
5' - 6"
4 7/8" 4' - 0 1/8"
5 1/2"
8' - 0 1/2" 2' - 2 7/8"
1' - 8"
2' - 4"
9 5/8"
/4
/8
/8
4 7/8" 9' - 2"
Staff Respite
A271B
Passageway
C226F
S1.1
S2.0 S2.0 S2.0
S2.0
S2.0S2.0
S1.1
S2.0
S1.1
S2.0
S1.1
S1.0-F
S1.0-F
S1.0-F
S1.0-FS1.0-F
S2.0
S2.0
S1.0-FS1.0-F
/8
/8
/8
/8
/4
/2
/8
S2.0
4 7/8" 17' - 10 5/8" 4 7/8" 1' - 7 1/8"
4 7/8"
163.67°
S1.0-F
S1.0-F
Nourishment
A291
HUC Station
A290
Clean Supply
A292
Pharmacy Office
A293
Passageway
C226C
20' - 8 3/8"
/4
/4
/4
/8
/4
/8
2' - 0 3/4" 4 7/8"
7' - 5" 4 7/8" 1' - 7 1/8" 4 7/8"
1' - 2"
2' - 2"
S2.0
S2.0
S1.0-F
S1.0-F
1' - 2" 3' - 9" 4 1/4" 3' - 8 3/8" 4 7/8" 8' - 11" 4 7/8"
/8
/8
S2.0
S2.0
S2.0
S1.0
4 7/8"
9.129.12
9.02
9.40
7.82
7.82
STRUCTURE ABOVE
FIN. CEILING
FLOOR SLAB
4 7/8"
Min STC 45 @ Patient Room Walls
S1.0-F
1-HR RATED
FIRE BARRIER
U.L. #U465
4 7/8"
9.129.12
9.02
9.40
7.82
7.82
4 7/8"
S1.0-N
4 7/8"
9.129.12
9.02
7.82
7.82
4 7/8"
S1.1
9.129.12
9.03
9.40
7.82
7.82
7 1/4"
STRUCTURE ABOVE
FIN. CEILING
FLOOR SLAB
S2.0
9.02
7.13
7.82
7.82
7.16
4 1/4"
9.40
@ EXTERIOR
WALL LOCATIONS
@ EXTERIOR
WALL LOCATIONS
@ INTERIOR WALL
LOCATIONS
9.12
T1.0
9.12
9.02
9.40
9.16
4 1/4"
9.61
1-HR RATED
FIRE BARRIER
U.L #U465
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:4
A
M
Renovate MICU/SICU
10/17/2025
SECOND FLOOR DIMENSION PLAN
A102-D
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. First floor level 100'-0" equals 728'-0".
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
2nd Floor - MICU DIMENSION PLAN N
Scale:Scale: 1/4" = 1'-0"1/4" = 1'-0"
2nd Floor - MICU DIMENSION PLAN - DETAIL
Scale:Scale: 1" = 1'-0"1" = 1'-0"1
WALL TYPES
KEYNOTES
7.13 Batt thermal wall insulation. R-11 min.
7.16 Vapor retarder. Seal all joints and penetratons.
7.82 Continuous acoustic sealant at non-rated walls /
fire-rated sealant at rated walls each side.
9.02 3 5/8" non-structural metal framing, 16" o.c.
9.03 6" non-structural metal framing, 16" o.c.
9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
9.16 Gypsum board soffit.
9.40 Acoustic insulation
9.61 Temporary walls shall have painted drywall finish.
24.123.117.317.115.913.112.212.1
12.1
11.110.89.2
6.9
4.2 6.5
Fa
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
Soiled Utility
A292B
Clean Linen
A277
Patient Room
A278 Patient Room
A279
Negative Pressure Patient Room
A280
Patient Room
A287
Patient Room
A288
Toilet
A278A Toilet
A279A
Toilet
A280A
Toilet
A287A
Ante Room
A280B
RN Manager
A267
Office
A273
Toilet
A288A Toilet
A285A
Negative Pressure Patient Room
A286
Toilet
A286A
Equipment Storage
A281
Office
A268
Male Locker Room
A270
Staff Toilet
A270A
Staff Lounge
A269
Staff Bathroom
A271A
Female Locker Room
A271
Conference Room
A272
HAC
A274
Electrical
A275
On-Call
A276
Bathroom
A276A
Grief/Consult
A289
Negative Pressure Bariatric Patient Room
A282Toilet
A282A
Ante Room
A282B
Pharmacy Office
A293
Passageway
C226B
Clean Supply
A292
Nourishment
A291
Work Area
A294A
HUC Station
A290
A401
B
A401
A
A402
A
A401
C
A
A404
A403
A403
Passageway
C226C Negative Pressure Bariatric Patient Room
A283
A
A403
A403
A
A401
E
A401
F
A401
D
Ante Room
A283B
Toilet
A283A
Ante Room
A284B
Work Area
A294
Negative Pressure Patient Room
A284
Passageway
C226E
Passageway
C226D
Patient Room
A285
A404
A276A
A276
A275
270A
C226D
C226F
279278
280B
280C
A277
292B
287A288A 285A
280A 279A
286A
283C
283B
283A
282C
282B
Passageway
C226F
C226B
Comms Closet
A292A
A
A402
A
A407
A
284A Toilet
A284A
284B
284C
A
9.38
9.38 9.38
9.38
9.38
9.38
1.01
1.01
6.11 Typ.
6.12
Typ.
10.41
10.41
9.19
Typ.
9.19 Typ.
9.19
9.19
Typ.
Typ.
14.04
1.01
A
Corridor
C226
Elevator
1.011.011.01
7.06
A401
D
A401
E
A401
E
A401
E
A401
E
A401
E A401
E
A403
A403
A402
A
A
A
A
A
271A
Gas Storage
A294B
294B
A510
9.199.199.19 Typ.
9.38
9.38
9.38
9.38
6.12
6.11
6.12
A510
A510
7.06
282A
11.07 11.07Typ.
Typ.
11.07 Typ.
11.08
11.07 8.14
A406
D
A406
D
A402
5.17
6.11
A101-N
A102-N
27.01
27.01
27.01
2.50
2.50
27.01
27.01
2.54
A601
22.10
22.10
22.10
22.10
22.10
22.10
22.10
22.10
22.10
22.10
A
A
A
A
A402
A
A
B
A
A
AA
A
A
AA
7.06
7.06
A
A515
278A
A405
A
A405
A Sim.
Sim. Sim.
Sim.
Sim.
Opp. Opp.
A405
A Opp.
A405
B
A405
C
Opp.
A406
E A406
E Sim.
A406
F
Passageway
C226A
23.1123.11
23.12
23.11
23.12
23.11
23.12 23.11
23.12
23.11
23.11
9.38
9.38
9.38
Typ.
26.0326.0326.03
9.55
9.55
9.55
9.55
8.14
23.12
1.12
9.61
Bid Item #2
7.04 7.04
7.047.04
7.04
7.04
7.107.10 7.107.10
7.107.10
7.107.10 7.107.10
7.107.10
Staff Respite
A271B 271B
8.25
8.25
7.34
7.34
7.34
7.34
BB
CC
AA
A.6A.6
292A
27.01
23.1
T.1T.1
23.1
10.03
9.02
9.029.02
9.029.02
9.329.32
9.32
/2
1' - 1 1/4"
9.12
6.11
6.05
9.12
Grief/Consult
A289
Corridor
C226
Soiled Utility
A292B
Patient Room
A287
Patient Room
A288
Toilet
A287A
Toilet
A288A Toilet
A286A
Passageway
C226B
Work Area
A294A Nourishment
A291
HUC Station
A290
Clean Supply
A292
Pharmacy Office
A293 Work Area
A294
14.05
14.04
14.0614.06
2.412.04
2.04
2.04
2.04
2.30
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:4
A
M
Renovate MICU/SICU
10/17/2025
SECOND FLOOR NOTE PLAN
A102-N
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
KEYNOTES
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. First floor level 100'-0" equals 728'-0".
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated
1.01 No architectural work this area.
1.12 Contractor path to construction area.
2.04 Existing section of pneumatic tube to be removed.
2.30 Existing section of pneumatic tube to remain.
2.41 Remove existing pneumatic tube station. Salvage and
turn over to owner.
2.50 Existing door actuator. See technology drawings.
2.54 Existing card reader. See technology drawings.
5.17 Infill opening in slab. See structural drawings.
6.05 2" x 6" presure treated wood blocking.
6.11 PPE Cabinet Type A. Typical at each Patient Room.
6.12 PPE Cabinet Type B. Typical at each Ante Room.
7.04 3" recessed wall expansion joint.
7.06 Existing 1 1/2" expansion joint covers to be removed, cleaned, buffed to remove minor scratches and blemishes and reinstalled and protected during construciton.
7.10 Drywall control joint.
7.34 3" expansion joint to be replaced and area around expansion joint repaired to provide a smooth surface for flooring installation.
8.14 Install blackout film at glazing behind casework.
8.25 18" x 18" wall mounted access panel. Coordinate with HVAC contractor for final location.
9.02 3 5/8" non-structural metal framing, 16" o.c.
9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
9.19 Solid Surface window sill. Typical at all exterior windows in area of work.
9.32 Built-up CFMF box column at ICU patient room doors:
Column to consist of (2) 6” 18 gauge studs with 1 5/8” flanges arranged flange tip to flange tip. Provide (2) 18 gauge track members - 3 5/8” x 1 ½” deep and cap the flanges on both sides. Connect track to each flange with #10-16 self-tapping screws, 16” o.c.
9.38 Construct room to limit the passage of air. Ensure that
gypsum wall board is fitted tight and sealed to deck above and floor slab providing a continuous barrier. Seal drywall construction at perimeter and corners. Seal all penetrations created by architectural and MEPFS items including, but not limited to, ducts, wall outlets, conduit, and pipes.
9.55 Gypsum board to be installed as Level 5 drywall finish.
9.61 Temporary walls shall have painted drywall finish.
10.03 Recessed curtain track.
10.41 Semi-recessed fire extinguisher cabinet.
11.07 Patient headwall. Typical at each patient room.
11.08 Bariatric patient headwall. Typical at each bariatric patient room.
14.04 New pneumatic tube station.
14.05 New pneumatic tube system route. Pneumatic tube
routing and design by pneumatic tube station manufacturer. Contractor to coordinate pneumatic tube system design with MEPFS trades.
14.06 Existing pneumatic tube penetration at third floor slab.
Section of pneumatic tube to remain.
22.10 Dialysis box. See Plumbing Drawings.
23.11 Analog room pressure monitor. Typical at negative
pressure rooms and Ante Room entrances. Align top of monitor to top of ICU door frame. See Mechanical Drawings.
23.12 Digital room pressure monitor. Typical at negative
pressure rooms. Mounting height 5'-0" AFF to centerline of screen. See mechanical drawings.
26.03 Electrical outlet. See electrical drawings.
27.01 Card Reader. See technology drawings.
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
2ND FLOOR - MICU NOTE PLAN
Scale:Scale: 1 1/2" = 1'-0"1 1/2" = 1'-0"1
ICU DOOR JAMB DETAIL
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
2ND FLOOR - PNEUMATIC TUBE PLAN
5.
B 24.123.117.317.115.913.112.212.1
12.1
11.110.89.24.2 6.5
Q.2
T.1
T.1A
T.2
T.4
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
Equip. Stor.
A392
Negative Pressure Patient Room
A387K
Patient Room
A387J
Patient Room
A387I
Patient Room
A387G
Shower
A387H
Patient Room
A387F
Patient Room
A387D
Negative Pressure Patient Room
A387A
T1.0
T1.0
T1.0
T1.0
T1.0T1.0
23.05
23.05
23.05
23.05
23.05
23.05
S2.0
S2.0
S2.0
S2.0 S2.0
S2.0S2.0
S2.0
23.06
23.07
23.07
1.09
1.09
8.25
8.25
8.25
8.25
8.25
BB
CC
AA
A.6A.6
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:5
A
M
Renovate MICU/SICU
10/17/2025
THIRD FLOOR DEMOLITION & NOTE
PLAN
A103-N
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
3RD FLOOR - MICU NOTE PLAN
KEYNOTES
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. First floor level 100'-0" equals 728'-0".
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated
1.09 Temporary partitions as required to seperate overhead
work from VA patients, visitors, and staff. Coordinate final location of temporary partitions with COR. Maintain access through corridors with minimum passage width of 48" at all times. Multiple configurations of temporary partitions maybe required to complete work.
8.25 18" x 18" wall mounted access panel. Coordinate with HVAC contractor for final location.
23.05 Remove and reinstall wall construction as required to
enlarge openings in floor and roof construction and replace existing HVAC risers with new and connect to rooftop ductwork. See mechanical drawings.
23.06 Duct removed by mechanical contractor close opening in
floor by general contractor.
23.07 General contractor to cut new opening in floor slab.
B 24.123.117.317.115.913.112.212.111.110.89.26.94.2 6.5
Fa
Q.2
T.1
T.1A
T.2
T.9
V.6
V.8
V.9
W
W.1
W.3
W.7
X
5.10
/4
1/8" / 12"
1/2" / 12"
/4
/1
" / 1
3/16" / 12"
/8
/4
2.092.092.092.09
2.092.092.092.09
23.13
2.15Typ.
23.15
2.46
2.15
2.15
23.13
Typ.
23.08
2.15
2.15
23.20
2.19
23.21 Typ.
23.21
Typ.
23.21 Typ.
23.22
23.22
23.23
2.22
2.23
2.22
23.01
23.01
5'-3" 26'-2"
7.35
/8
7.36
2.15
23.2423.2423.2423.24
Typ.
2.19
Typ.
2.22
2.22
2.15
BB
CC
AA
A.6A.6
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:1
:5
A
M
Renovate MICU/SICU
10/17/2025
ROOF PLAN
A104
SOTH
19018.00
539-20-104
Cincinnati, Ohio
100% CONSTRUCTION
DOCUMENTS
KEYNOTES
N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"
ROOF PLAN
2.09 Existing modified bitumin roof to remain.
2.15 Existing roof drains to remain. Contractor to protect
drains from construction debris.
2.19 Existing walkway pads to remain.
2.22 Existing relocatable pre-engineered stair system.
2.23 Existing steel mechanical…