Attachment IV- 2025-10-17 MICU Bid Drawings1 10-17-2025.pdf

PDF 19 MB Posted

Attached to
Z2DA--Renovate MICU/SICU 539-20-104
Solicitation number
36C25026B0001_1
Issued by

About this file

This file is an architectural design document for a Department of Veterans Affairs (VA) Medical Center renovation project located in Cincinnati, Ohio. The project involves completely renovating approximately 11,000 square feet on the 2nd floor of the Medical Intensive Care Unit (MICU), including comprehensive demolition and reconstruction of medical spaces. The renovation will create new patient rooms, offices, conference rooms, staff lounges, locker rooms, clean supply rooms, a pharmacy office, work areas, and a Healthcare Unit (HUC) station, with a specific focus on installing a new HEPA pandemic filtration system that provides negative pressure capabilities for patient rooms to meet pandemic preparedness standards.

The comprehensive renovation includes detailed architectural plans for structural modifications, medical gas and plumbing systems, electrical infrastructure, and mechanical systems. The project scope encompasses not just the 2nd floor area, but also requires coordinating plumbing and HVAC connections above and below the construction zone, as well as rooftop work to integrate new and existing air handling equipment. The design documents specify precise technical requirements for wall types, floor finishes, medical equipment placement, patient room configurations, and specialized systems like patient lift supports and medical gas outlets, with a targeted completion date of October 17, 2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

EXTERIOR ELEVATION

INTERIOR ELEVATION

SEE 700 SERIES SHEETS

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

SEE SHEET A001

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

XX

TOILET ACCESSORY TAGX SIGNAGE TAGX

TEMPORARY WALLS

Ludlow Ave.

C lif to n A v e

CINCINNAT

I STATE

TECH.

Hopple St.

M.L.K. Dr.

McMillan St.

UNIV. OF

CINCINNAT

I

W.H.T Rd.

VAMC

3200 VINE ST.

M.L.K. Dr.

V in e

S t.

ZOO

Jefferson A ve.

UNIV.

HOSPITAL

Mitchell Ave.

R ea di ng

R d.

V ic to ry

P kw

y. XAVIER

UNIV.

Loading Dock Contractor Access at

Basement Level

Freight Elevator

AREA OF

WORK

2ND FLOOR

BUILDING 1 BUILDING 2

BUILDING 2

BUILDING 8

BUILDING 14

BUILDING 15

BUILDING 3

E S

H

IE

L D

S S

T

VINE ST

G O

O D

M A

N S

T

Roof Access at 4th Floor Stair #6

Emergency Room Entrance

Main Building Entrance

Second Floor:

Corridor from freight elevator to MICU

Basement: Corridor dock to freight elevator.

No Contractor parking on campus.

PARKING GARAGE

Crane lift staging at Main Building Entrance. Contractor to coordinate with COR

Contractor to coordinate with COR for facility guidelines regarding contractor personel entrances.

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Department of Veterans Affairs Medical Center

ARCHITECTURE PLANNING INTERIOR DESIGN

3131 NEWMARK DRIVE, SUITE 200

MIAMISBURG, OHIO 45342

937.461.3290 P

JPA ARCHITECTURE

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

THP LIMITED INC.

STRUCTURAL ENGINEER

100 E. EIGHTH STREET

CINCINNATI, OH 45202

513.241.3222 P

513.241.2981 F

TERRACON CONSULTANTS

611 LUNKEN PARK DRIVE

CINCINNATI, OH 45226

513. 321. 5816 P

/1 /2

:1

:2

A

M

Renovate MICU/SICU

10/17/2025

COVER SHEET

G001

SOTH

19018.00

539-20-104

Cincinnati, Ohio

Renovate MICU/SICU

3200 Vine Street Cincinnati, Ohio 45220 PROJECT #: 539-20-104

100% CONSTRUCTION

DOCUMENTS

GENERAL CONSTRUCTION NOTES

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE

CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,

INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA

PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE

ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND

DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13

WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT

EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH

ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT

ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF

NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO

REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND

DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW

MATERIALS.

DRAWING INDEXVICINITY MAP GRAPHIC SYMBOLS

N Scale:Scale: 1" = 80'-0"1" = 80'-0"

CAMPUS PLAN

G001 COVER SHEET

G100 CODE DATA

G101 SEQUENCE OF CONSTRUCTION

AD102 SECOND FLOOR DEMOLITION PLAN

A101-N FIRST FLOOR NOTE PLAN

A102-D SECOND FLOOR DIMENSION PLAN

A102-N SECOND FLOOR NOTE PLAN

A103-N THIRD FLOOR DEMOLITION & NOTE PLAN

A104 ROOF PLAN

A121 FIRST FLOOR REFLECTED CEILING PLAN

A122 SECOND FLOOR REFLECTED CEILING PLAN

A123 THIRD FLOOR REFLECTED CEILING PLAN

A401 INTERIOR ELEVATIONS

A402 INTERIOR ELEVATIONS

A403 INTERIOR ELEVATIONS (PASSAGEWAYS)

A404 INTERIOR ELEVATIONS (PASSAGEWAYS)

A405 INTERIOR ELEVATIONS (PATIENT ROOMS)

A406 INTERIOR ELEVATIONS (PATIENT ROOMS)

A407 INTERIOR ELEVATIONS (WORKSTATIONS)

A510 HEADWALL DETAILS

A511 CASEWORK SECTIONS & DETAILS

A512 PPE CABINET SECTIONS & DETAILS

A513 WORKSTATION DETAILS

A514 WORKSTATION DETAILS

A515 GRAB BAR DETAILS

A601 DOOR SCHEDULE & DETAILS

AF101-F FLOOR FINISH PLAN

AF101-P WALL PROTECTION PLAN

AF101-W WALL FINISH PLAN

AF601 FINISH SCHEDULE

AF603 FURNITURE AND EQUIPMENT PLAN

S001 GENERAL NOTES

S102 FIRST AND SECOND FLOOR PLAN

S103 THIRD FLOOR PLAN

S104 ROOF PLAN

S105 PATIENT LIFT PLAN

S301 DETAILS

FX001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

FX102 PARTIAL SECOND FLOOR PLAN

P001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

PD101 PARTIAL FIRST FLOOR PLAN - REMOVALS

PD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

PL101 PARTIAL FIRST FLOOR PLAN - DRAINAGE & DISTRIBUTION

PL102 PARTIAL SECOND FLOOR PLAN - DRAINAGE

PP102 PARTIAL SECOND FLOOR PLAN - DISTRIBUTION

PG102 PARTIAL SECOND FLOOR PLAN - MEDICAL GAS

P601 SCHEDULES & DETAILS

P901 SANITARY WASTE AND VENT DIAGRAM

M001 ABBREVIATION, LEGEND, GENERAL NOTES, AND INDEX

MD101 PARTIAL FIRST FLOOR PLAN - MECHANICAL - REMOVALS

MD102 PARTIAL SECOND FLOOR PLAN - MECHANICAL - REMOVALS

MD103 PARTIAL THIRD FLOOR PLAN - MECHANICAL - REMOVALS

MD104 PARTIAL ROOF PLAN - MECHANICAL - REMOVALS

MH101 PARTIAL FIRST FLOOR PLAN - DUCTWORK - NEW WORK

MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK - NEW WORK

MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK - NEW WORK

MH104 PARTIAL ROOF PLAN - DUCTWORK - NEW WORK

MP102 PARTIAL SECOND FLOOR PLAN - PIPING - NEW WORK

M501 DETAILS

M502 DETAILS

M503 DETAILS

M601 SCHEDULES

M602 SCHEDULES

M901 CONTROLS

M902 CONTROLS

E001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS

ED102 PARTIAL SECOND FLOOR PLAN - REMOVALS

ED104 PARTIAL ROOF PLAN - REMOVALS

EL102 PARTIAL SECOND FLOOR PLAN - LIGHTING

EP102 PARTIAL SECOND FLOOR PLAN - POWER

EP104 PARTIAL ROOF PLAN - POWER

E401 PARTIAL SINGLE LINE DIAGRAM

E501 DETAILS

E600 LUMINAIRES SCHEDULE

E601 SCHEDULES

T001 ABBREVIATIONS, LEGEND & INDEX OF DRAWINGS

TD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

TN101 SECOND FLOOR COMPOSITE PLAN

TN102 PARTIAL SECOND FLOOR PLAN - NEW WORK

TN202 PARTIAL SECOND FLOOR PLAN - PATHWAYS

T400 ENLARGED PLANS

T401 ENLARGED PLANS

T402 ENLARGED PLAN - SIGNALS CLOSET - REMOVALS

T403 ENLARGED PLAN - SIGNALS CLOSET - NEW WORK

T404 ENLARGED PLAN - CLEAN SUPPLY A249 - REMOVALS

T405 ENLARGED PLAN - EQUIPMENT ROOM A250 - NEW WORK

T501 DETAILS - SECURITY

T502 DETAILS - TECHNOLOGY OUTLETS

T503 DETAILS - RESPITE ROOM

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO

BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE

SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT

THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,

HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS

AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL

WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS

SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A

PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS

INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL

SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE

THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR

SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED

WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF

THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO

AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER

RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS

RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS

IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY

FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.

13. CONTRACTOR SHALL PROVIDE ALL CONTRACTOR PPE ITEMS, INCLUDING

ITEMS RELATED TO COVID INFECTION MITIGATION.

Revisions Date

0-HR Smoke Partition

1-HR Fire Barrier

2-HR Fire Barrier

Means of Egress

Existing Wall to Remain

New Wall

Fire Extinguisher

CODE LEGEND

24 SF

Clean Linen

302 SF

Patient Room

101 SF

RN Manager

127 SF

Office

305 SF

Negative Pressure Patient Room

185 SF

Equipment Storage

88 SF

Office

31 SF

Male Locker Room

32 SF

Staff Toilet

245 SF

Staff Lounge

38 SF

Staff Bathroom

90 SF

Female Locker Room

324 SF

Conference Room

28 SF

HAC

29 SF

Electrical

92 SF

On-Call

34 SF

Bathroom

Waiting Room

C218

Grief/Consult

A289

Toilet

C217

596 SF

Passageway

355 SF

Corridor

46 SF

Toilet

Ante Room

A282B

Corridor

C226

Soiled Utility

A292B

Clean Linen

A277

Patient Room

A278

Patient Room

A279

Negative Pressure Patient Room

A280

Patient Room

A285

Patient Room

A287

Patient Room

A288

Toilet

A278A Toilet

A279A

Toilet

A280A

Toilet

A287A

Ante Room

A280B

RN Manager

A267

Office

A273

Toilet

A288A Toilet

A285ANegative Pressure Patient Room

A286

Toilet

A286A

Office

A268

Male Locker Room

A270

Staff Toilet

A270A

Staff Lounge

A269

Staff Bathroom

A271A

Female Locker Room

A271

Conference Room

A272

HAC

A274

Electrical

A275

On-Call

A276 Bathroom

A276A

Passageway

C226B

Corridor

C226G

Negative Pressure Bariatric Patient Room

A282

Toilet

A282A

Work Area

A294A Nourishment

A291

HUC Station

A290

Clean Supply

A292

Pharmacy Office

A293 Work Area

A294

Passageway

C226C

Passageway

C226D

Passageway

C226E

Passageway

C226F

Negative Pressure Bariatric Patient Room

A283

Ante Room

A283B

Toilet

A283A

Ante Room

A284B

Toilet

A284A

Comms Closet

A292A

96'-6"

147'-2"

Suite 9,066 sf

Total Travel Distance= 174' (Maximum 200'-0")

Total Travel Distance= 211' (Maximum 200'-0")

Gas Storage

A294B

12#

12#

12#

Passageway

C226A

22' - 4 7/8"

/4

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:2

A

M

Renovate MICU/SICU

10/17/2025

CODE DATA

G100

S0TH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

CODE PLAN

Code Data: NFPA 101 Life Safety Code (2018 Edition)

Construction Type: Type I (322)

Use Group: Health Care Occupancy

Height: Partial 1 story renovation of an existing 4 story building

Area: 9,888 SF

Occupant Load: 38 occupants

Protection: Fully suppressed

Chapter 6 Classification of Occupancy and Hazard of Contents

6.1.5 Health Care Occupancy.

6.2.2.3 Ordinary Hazard Contents.

Chapter 7 Means of Egress

7.1.3.1 Exit access corridors shall be 1 hour rated except where serving 30 or less persons.

7.2.1.4.3.1 Any door leaf in a means of egress leaves more than one-half of the required width of the corridor.

7.3.1.2 Occupant Load Factor based on Inpatient Treatment Department is 240 SF / person: 55 persons.

7.4 Number of means of Egress: 2.

7.5.1.2.1 Corridors to lead to means of egress without passing through any intervening spaces other than corridors, lobbies or spaces permitted to be open to the corridor.

7.5.1.2.2 Corridors not required to be fire resistance rated shall be permitted to open into open floor plan areas.

Chapter 8 Features of Fire Protection Table A.8.2.1.2 Fire Resistance Ratings for Type I (333) Construction (per NFPA 220 Table 4.1.1)

- Columns: 3 hours

- Beams, Girders, Trusses: 3 hours

- Floor rating 3 hours

- Interior Nonbearing Walls: 0 hour

Table 8.3.4.2 Minimum Fire Rating for Opening Protectives in Fire Resistance Rated Assemblies

- 1 hour fire barrier requires 3/4 hour door with a vision panel no larger than 1296 in.2

- Smoke barriers require 1/3 hour door with a vision panel no larger than 1296 in.2

8.4.1 Smoke Partitions shall limit the transfer of smoke.

8.5.1 Smoke Barriers shall restrict the transfer of smoke and have 1 hour fire resistance rating.

8.5.3 Fire Barriers that meet requirements of Section 8.5 shall be permitted to be used as a smoke barrier.

Chapter 9 Building Service and Fire Protection Equipment

9.6 Fire Detection, Alarm and Communications Systems. Fire alarm system required per Section 19.3.4.1.

9.7 Automatic sprinkler system required by Section 19.4.2.1.

9.9 Portable fire extinguishers shall be installed, inspected, and maintained in accordance with NFPA 10.

Chapter 10 Interior Finish, Content and Furnishings Table A.10.2.2 Interior Finish Classification Limitations for Health Care (Existing)

Exit Access Corridors: Class A or B.

Other Spaces: Class A or B.

10.2.8.1 Automatic Sprinklers permit use of Class B In lieu of Class A and Class C In lieu of Class B.

Chapter 18 New Health Care Occupancies

18.1.1.1.4 The area of work is an existing hospital and therefore falls under Chapter 18.

Table 18.1.6.1 Construction Type Limitations: Type I (333), sprinklered, no story limitations.

18.1.7 Occupant Load per Table 7.3.1.2.

18.2.2.2.5.1 Door locking arrangements are permitted where the clinical needs of patients require specialized security measures.

18.2.2.2.6 Doors lock in accordance with paragraph above shall:

- Have either remote control of locks from within smoke compartment, keys for all locks to be carried by staff at all times or other reliable means of unlocking doors.

- Have only one locking device per door.

18.2.3.4 Corridors in hospitals shall be not less than 8 feet in clear an unobstructed width.

18.2.5.2 Dead end corridors shall not exceed 30’.

18.2.5.3 Common path of travel shall not exceed 100’.

18.2.5.4 Every corridor shall have access to not less than two approved exits without passing through any intervening spaces other than corridors or lobbies.

18.2.5.6.5 Rooms within suites shall not be required to an exit access door leading directly to an exit access corridor.

18.2.5.7.1.2 Suite Separation – Suites shall be separated from remainder of the building by walls and doors (0-hr smoke partitions).

18.2.5.7.2.4 Sleeping Suite Travel Distance

(A) Travel distance between any point in a sleeping suite and an exit access door to another suite, an exit access corridor door, or a horizontal exit door from that suite shall not exceed 100 ft.

(B) Travel distance between any point in a sleeping suite and an exit shall not exceed 200ft.

*** Given the need to utilize the exterior wall for patient rooms The AHJ is allowing the current sleeping suite travel distance to exceed the requirements of 18.2.5.7.2.4. The addition of the corridor C226 is an improvement towards code compliance from the existing MICU suite configuration.

18.2.6.2.1 Travel distance from any point in a room to exit shall not exceed 200’.

18.3.2.1.2 Boiler/Fuel fire equipment rooms, laundries larger than 100 SF, soiled linen rooms with volume exceeding 64 gal and storage rooms larger than 100 SF shall be protected by 1 hour fire barriers.

18.3.2.1.3 Storage rooms (clean supply and clean linen) larger than 50 SF but not exceeding 100 SF shall be protected by smoke partitions.

18.3.2.4 Areas where medical gas is stored or administer and he operation, testing and maintenance of medical gases shall be in accordance with NFPA 99.

18.3.4.1 Health care occupancies shall be provided with a fire alarm system IAW Section 9.6.

18.3.5.1 Building containing health care occupancies shall be protected throughout by approved, supervised automatic sprinkler systems IAW Section 9.7.

18.3.5.12 Portable fire extinguishers shall be provided IAW Section 9.9.

18.3.6.2.2 No fire resistance rating is required for corridor walls.

18.3.6.2.3 Corridor walls shall form a barrier to limit the transfer of smoke but are not required to be smoke barriers or smoke partitions.

18.3.6.3.1 Corridor doors shall be doors constructed to resist the passage of smoke.

18.3.7.3 Smoke barrier shall be constructed IAW Section 8.5 and shall have 1 hour fire resistive rating.

18.3.7.6 Doors in smoke barriers shall have 20 minute fire resistive rating.

18.3.7.5.1 Not less than 30 net SF of accumulation space per resident/patient shall be provided in smoke compartment on either side of smoke partition.

- The doors shall not be required to swing in the direction of egress travel.

UP

EMERGENCY DEPT.

WOMEN'S CLINIC

POLICE

DEPT.

ELEVATOR

A302

Office

C119B

Office

C119C

Lockers

C119D

Toilet

C119E

Evidence

C119F

Armory

C119G

Stor.

C119H Holding

C119K

Interview Room

C119J

Toilet-Male

C117

Toilet-Female

C118 Holding

C119I

Police

C119

PIV Registrar

C116G

PEC

C116H

PEC

C116F

Waiting

C116

PEC

C116E

Exam

C110

Office

C116D

Electric

C109

Exam

C108

PEC

C116B

PEC

C116C

PEC

C116A

Exam

C107PEA

C106

Corridor

C101

Alcove

C111

Exam

C112

Exam

C113

Exam

C114

Exam

C115

Clerk

C102

Waiting Room

C103

Exam Room

C104

Toilet

C104A

Stor

C104B

HAC

C105

Exam

C122F

Employee Health

C122A

Exam

C122C

Office

C122B

Toilet-Female

C123

Toilet-Male

C124

003003003003

MICU

Waiting Room

C218

Grief/Consult

A289

Toilet

C217

Corridor

C226

Soiled Utility

A292B

Clean Linen

A277

Patient Room

A278

Patient Room

A279

Negative Pressure Patient Room

A280

Negative Pressure Patient Room

A284

Patient Room

A285

Patient Room

A287

Patient Room

A288

Toilet

A278A Toilet

A279A Toilet

A280A

Toilet

A287A

Ante Room

A280B

RN Manager

A267

Office

A273

Toilet

A288A Toilet

A285A

Negative Pressure Patient Room

A286

Toilet

A286A

Equipment Storage

A281

Office

A268

Male Locker Room

A270

Staff Toilet

A270A

Staff Lounge

A269

Staff Bathroom

A271A

Female Locker Room

A271

Conference Room

A272

HAC

A274

Electrical

A275

On-Call

A276 Bathroom

A276A

Passageway

C226B

Corridor

C226G

Negative Pressure Bariatric Patient Room

A282Toilet

A282A

Ante Room

A282B

Work Area

A294A

Nourishment

A291

HUC Station

A290

Clean Supply

A292

Pharmacy Office

A293 Work Area

A294

Passageway

C226C Passageway

C226D

Passageway

C226E

Passageway

C226F

Negative Pressure Bariatric Patient Room

A283

Toilet

A283A

Ante Room

A283B

Ante Room

A284B

Toilet

A284A

Comms Closet

A292A

Elevator

Gas Storage

A294B

002.0

002.0

002.0 002.0

002.0

Typ.

Typ.

Typ.Typ.

Typ.

ROOF

002.2

002.2

TYP

TYP

002.2

TYP

002.1002.1

002.1

SICU

Negative Pressure Patient Room

A387A

Patient Room

A387B

Patient Room

A387C Patient Room

A387D

Patient Room

A387E

Patient Room

A387F

Patient Room

A387G

Shower

A387H

Patient Room

A387I Patient Room

A387J

Nurse Station

A387

Soc. Wrk.

A383

Conference Room

A385

Family Wtng.

C310

Lactation

C312

Grieve Consult

C313

Tlt.

C313B

Negative Pressure Patient Room

A387K

Linen Clos.

A389

Nurse Off.

A390

Soil Utility

A391

Equip. Stor.

A392

Elec.

A395

Sig.

A396

Clean Supply

A397

HAC

A380

Lounge

A382

Tlt.

A382A

M. Lock.

A382B Female Locker

A382C

Respiratory Therapy

A384

Pharm.

A386

Tlt.

A388

Corridor

C*3*18

ICU Dir. Off.

C314

002.0

002.0

002.0

002.0

003003003003

002.1

002.2

002.3

002.4

002.5

Typ.

Typ.

Typ.

EXTERIOR ELEVATION

INTERIOR ELEVATION

SEE 700 SERIES SHEETS

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

SEE SHEET A001

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

XX

TOILET ACCESSORY TAGX SIGNAGE TAGX

TEMPORARY WALLS

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:3

A

M

Renovate MICU/SICU

10/17/2025

SEQUENCE OF CONSTRUCTION

G101

SOTH

19018.00

539-20-104

Cincinnati, Ohio

BID SET

N Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"

1st Floor Plan N

Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"

2nd Floor - MICU Plan

N Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"

Rooftop Plan N

Scale:Scale: 1/16" = 1'-0"1/16" = 1'-0"

3rd Floor- SICU Plan

SEQUENCE OF CONSTRUCTION

GRAPHIC SYMBOLS

All days given above are conceptual except. Final allocation of days to be determined by contractor. Time frame in item X above shall not exceed X days.

001 Construction start dependent on completion of shop drawing process and procurement and delivery of ductwork, air valves, etc.

002.0 Shut down one 2nd floor isolation room at a time, rooms A280, A282, A283, A284, and A286. Shut down adjacent rooms as required, so steel can be installed and floor opening can be cut properly. Corresponding rooms on the 3rd floor will be shut down as well 5 spaces, 2 weeks per room. Coordinate lift of pandemic exhaust fans to the roof when 3rd floor spaces are vacated.

002.1 Owner vacates 3rd floor SICU to 2nd floor MICU for

installation of pandemic exhaust fans, HEPA, and condenser unit. 30 days.

002.2 On the 3rd floor, provide new duct for existing 2nd floor isolation rooms. Remove existing ductwork and install new. Enlarge roof penetration for new ductwork and reconnect to existing rooftop duct installed under the ED project. 3 weeks.

002.3 Connect existing ductwork on the 2nd floor.

002.4 Have new exhaust system pull exhaust air from existing

space using temporary air valves installed under the ED project.

002.5 Install new isolation exhaust through room 387F to room 284 (future new isolation room)- New floor penetration between 2nd/3rd floors shall be made. The existing room on Level 2 shall be temporarily shut down for new slab penetration. Cap below 3rd level slab. 2 weeks.

003 Owner vacates 2nd floor MICU unit and relocates, along with SICU to 3rd floor SICU. 30 days for owner move

004 Construct new Communications Room A292A Demo existing Philips Telemetry data cabling from existing Clean Supply A249 to existing outlet locations. Re-cable existing Philips Telemetry outlets with new data cabling to new Comm Room and terminate on new rack mounted hardware. Coordinate with owner’s vendor (Philips) for relocation of existing Telemetry network equipment.Switch over other related systems identified on the drawings.

005 Contractor demolishes and reconstructs 2nd floor MICU.

240 days

006 Exhaust fan system to be commissioned and rebalanced to new airflows in the MICU project.

007 Project Complete, owner to occupy 2nd floor MICU. 30 days for owner move

5.

B 24.123.117.317.115.913.112.212.1

12.1

11.110.89.2

6.9

4.2 6.5

Fa

Q.2

T.1

T.1A

T.2

T.4

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

2.08 2.01

2.03

2.03

2.03

2.08

2.03

2.03

2.03

2.08

2.08

2.08

2.03

2.08

2.08

2.03

2.08

2.03

2.03

2.03

2.03

2.142.14

2.032.03

2.14

2.08

2.03

2.08

2.08

2.06 2.06

2.06

2.062.06

2.06

2.06

2.06

2.06

2.06

2.06

2.062.06

2.06

2.10

2.06

2.02

2.03

2.03

2.03 2.03

2.02

2.02

2.03

2.01

2.03

2.02

2.10

2.10

2.10

2.10

2.03

2.02 2.02

2.10

2.10 2.10

2.03

2.01

2.08

2.03

2.02

2.03

2.02

2.02

2.03

2.02

2.03

2.08

2.11

2.112.11

2.06

2.10

2.06

2.10

2.02

2.08

2.03

2.06

2.10

2.10

2.06

2.06

2.10

2.01

2.01 2.01

2.03

2.03

2.20

2.14

2.06

2.03

2.29

2.29

2.29

2.29

Typ.

1.03

2.31

2.31

1.08

2.07

2.07

2.07

2.07

2.07 2.07

2.07

2.07

2.06

2.06

2.03

2.06

2.08

2.18

2.06

2.06

2.18

2.03

2.06

2.08

2.10

2.18

2.03

2.06

2.21

2.06

2.18

2.03

2.08

2.16

2.06

2.16

2.16

2.18

2.06

2.06

2.18

2.06

2.10

2.21

2.07

2.07

2.07

2.07

2.07

2.03

2.312.31

2.20 2.20

2.20

2.20

2.06

2.08

2.10 2.11

2.06

2.10

2.03

2.08

2.03

2.06

2.10

2.06

2.10

2.06

2.07

2.20

2.20

2.16

Pat. Room

A280

Pat. Room

A281

Pat. Room

A282

Pat. Room Negative Pressure

A283

Pat. Room Neg. Pressure

A284 Pat. Room

Neg. Pressure

A285

Pat. Room Neg. Pressure

A286

Pat. Room

A287

Pat. Room

A288

Pat. Room Neg. Pressure

A289

Pat. Room

A290

Pat. Room

A291

Pat. Room

A292

Pat. Room

A293

2.06

WAITING

C218

TLT

C217

LINEN

A294

LINEN

A295

LINEN

A299

OFFICE

A298 MEDICATION

A277

STAFF TLT

A297

CLEAN

SUPPLY

A296

WORK ROOM

A250A

SIG. CLOSET

A250CORRIDOR

C*2*4

CLEANN

SUPPLY

ROOM

A251A

OFFICE

A251B

SOIL

A278OFFICE

A267

OFFICE

A268

M. LOCKERS

A270

TOILET

A270A

STAFF

LOUNGE

A269

F. LOCKERS

A271

TOILET

A271A

CONFERENCE

A272

RN

MANAGER

A273

TOILET

A276A

ON CALL

A276

ELEC

A275

HAC

A274

NURSE

STATION

A279

2.14

2.02

2.14

2.02

2.14

2.14

2.14

2.14

2.14

2.26

2.26

2.27

2.14

2.272.272.27

2.27 2.27

2.27

2.27

2.27

2.27

2.27 2.27

2.28

2.14 Typ.

2.14 Typ.

Typ.

2.14 Typ.

2.14 Typ.

2.14

2.41

2.14 2.14

2.14

2.14

2.14

2.02

2.38

2.35

2.34

2.37

2.33

2.35

2.33 2.33 2.33

2.33

2.33

2.33

2.33

2.33

2.332.33

2.37

2.45

2.12

2.12

2.02

2.03

2.08

2.02

2.02

2.02

2.14

2.14

2.14

2.10

2.14

2.26

2.26

2.02

2.02

2.02 2.20

2.10

2.20

2.10

2.14

2.02

2.26

2.10

2.20

2.02

2.26

2.10

2.14

2.02

2.26

2.10

2.20

2.02

2.02

2.10

2.20

2.26

2.02

2.08

2.02

2.08

2.02

2.26

2.14

2.02

2.02

2.02

2.14

2.02

2.02

2.14

2.02

2.14

2.02

2.20

2.26 2.26

2.27

2.022.02

2.26

2.02

2.33

2.29

2.02

2.02 2.02

2.11

2.02 2.10

2.06

2.10 2.02

2.14

2.03

2.08

T1.0

1.121.12

2.07

1.13

Bid Item #2

2.10

2.06

2.10

2.35

2.35

2.29

2.29

2.29

2.29

2.29

2.29

2.292.29

2.29

2.29

2.29 2.292.29

2.18

2.08

2.29

BB

CC

AA

A.6A.6

2.06

2.10

LEGEND

Wall to be Demolished

Existing Wall to Remain

New Wall

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:5

A

M

Renovate MICU/SICU

10/17/2025

SECOND FLOOR DEMOLITION

PLAN

AD102

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

GENERAL DEMOLITION NOTES

A. Remove all existing partitions and construction shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.

B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line.

C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.

D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.

E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process.

Coordinate any required changes to these systems with the C.O.R.

F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.

G. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.

H. Remove existing corner guards in areas to be remodeled.

J. All existing walls to remain have full height wall covering to be removed. Contractor to patch and repair walls as required to receive new finish.

KEYNOTES

1.03 Contractor to coordinate with COR for placement of trash dumpster feed by chute from second floor in this general area.

1.08 Contractor to coordinate with COR for placement of trash chute from second floor in this general area. Remove and reinstall window as required.

1.12 Contractor path to construction area.

1.13 Contractor emergency exit only.

2.01 Remove existing window.

2.02 Remove existing base cabinets, wall cabinets and

countertop.

2.03 Remove existing plumbing fixtures and all associated

accessories. See Plumbing Drawings.

2.06 Remove existing acoustic ceiling tile, grid, lights and all ceiling mounted accessories this area.

2.07 Remove existing door leafs. Frame to remain.

2.08 Remove ceramic wall tile and prepare wall for new

scheduled finishes.

2.10 Remove existing LVT flooring and rubber base. Prepare

subfloor for new scheduled finish this area.

2.11 Remove existing nurse station system's furniture.

Contractor to turn over to owner.

2.12 Remove shower tile, mortar, and curb. See detail

A/AF101-F.

2.14 Remove existing gypsum board soffit and support framing.

2.16 Remove existing ceramic floor, base, and setting material.

Prepare subfloor for new scheduled finish.

2.18 Remove existing carpet flooring and rubber base. Prepare subfloor for new scheduled finish and base this area.

2.20 Remove existing patient lifts and supports and deliver all components to owner as directed by COR.

2.21 Mechanical chase, to remain.

2.26 Remove existing full height wardrobe.

2.27 Remove existing wall mounted countertop and wall

bracket.

2.28 Remove existing column cover.

2.29 Remove existing window sill.

2.31 Remove existing lockers.

2.33 Remove existing ICU/CCU door.

2.34 Remove existing PAR-BIN storage system. Protect and

reinstall as indicated on new work plan.

2.35 Existing floor slab expansion joint to remain. Contractor to protect during demolition and construction operations.

2.37 Lockers to be removed and relocated by owner.

2.38 Existing elevator may not be used for construction

activities.

2.41 Remove existing pneumatic tube station. Salvage and turn over to owner.

2.45 New penetration thru second floor slab. See Structural and Mechanical drawings.

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

2nd Floor - MICU DEMOLITION PLAN

5.

BD 24.123.117.317.115.913.112.212.1

12.1

11.110.89.2

6.9

4.2 6.5

Q.2

T.1

T.1A

T.2

T.4

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

Employee I.D.

C119A

Office

C119B

Office

C119C

Lockers

C119D

Toilet

C119E

Evidence

C119F

Police

C119

PIV Registrar

C116G

Holding

C119I

Toilet-Female

C118

Toilet-Male

C117

Interview Room

C119J

Holding

C119K

Armory

C119G

PEC

C116F

PEC

C116H

Stor.

C119H

C116C116

PEC

C116C Office

C116D PEC

C116E

PEC

C116B

PEC

C116A

EMERGENCY DEPARTMENT WAITING ROOM

POLICE DEPARTMENT

WOMEN'S CLINIC

EMERGENCY DEPARTMENT

Exam

C108

Exam

C107

PEA

C106

Exam

C122D

Nurse Pract.

A144C

Nurse Pract.

A144B

Office

C130C

Office

C130D Office

C121

Exam

C110

Social Work

SVC

C130

Office

C130A

Exam

C130B

Signals

C128

Tele.

C127

Stair 5

S*1*5

Stair 9

S*1*9

Toilet-Male

C124

Toilet-Female

C123 Employee Health

C122A

Exam

C122C

Stair 6

S*1*6 Clerk

C102

Waiting Room

C103

Exam Room

C104

HAC

C105

Electric

C109

Alcove

C111

Exam

C112

Exam

C113

Exam

C114Exam

C115

Toilet

C104A

Stor

C104B

Corridor

C101

Office

C122B

Decon Trailer

A147E

Closet

C119L

Nursing Lounge

A158a

Elec.

HAC

F. Tlt.

Phys.

Phys.

Phys.

Phys.

Nurse Manager

Chief Nurse Office

Tlt.

A158a

Stair 9

On Call

A155

Tlt.

A155a

Sig.

Cl. Stor.

A147d

Pub. Tlt.

Secl.

Secl.

A152

Minor Surgery

A153

Triage

C120

Chief Off.

A151

Soil. Util.

A157

PCMM

Coordinator

A146a

Quality Manager

Squad Stor.

A150a

Heart Exam

A148

Heart Exam

A149

Heart Exam

A150

Meds

A158b

Decon Trailer

Nutrition

A136a

1.04

1.05

1.06

1.06

1.06

T1.0T1.0 T1.0

T1.0

T1.0T1.0

1.091.09

TYP.

ELEVATOR

NURSES STATION

2.38

A101-N

1.06

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

BB

CC

AA

A.6A.6

2nd Floor 739'-11"

10.8

11.1

2nd Floor 109'-11"

Exterior

2.49

22.08

2.47

2.48

Interior

7.187.18

9.03

As Required

1'-9 1/2" +/-

A s r e q u ir e d

/8

22.09

9.12

LEVEL 2 T/SLAB

181'-11"

LEVEL 2

111'-11"

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:3

A

M

Renovate MICU/SICU

10/17/2025

FIRST FLOOR NOTE PLAN

A101-N

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

KEYNOTES

1.04 Main Entrance to Emergency Department. Contractor to

maintain access and egress at all times.

1.05 Emergency department is shown in July 2020

configuration. There is a separate design project underway for the Emergency Department and it may be either unchanged, under construction and/or construction complete with a new layout at the time the renovate MICU/SICU project is under construction.

1.06 Unshaded area equals area of work on floor above.

1.09 Temporary partitions as required to seperate overhead

work from VA patients, visitors, and staff. Coordinate final location of temporary partitions with COR. Maintain access through corridors with minimum passage width of 48" at all times. Multiple configurations of temporary partitions maybe required to complete work.

2.38 Existing elevator may not be used for construction

activities.

2.47 Existing exterior concrete plaster soffit to remain.

Contractor to access work from inside of building.

Contractor to protect soffit during construction.

2.48 Existing clerestory windows to remain.

2.49 Remove and reinstall portions of existing gypsum ceiling as required to complete work.

7.18 Air and moisture barrier.

9.03 6" non-structural metal framing, 16" o.c.

9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.

22.08 Sanitary pipe penetration. See plumbing drawings.

22.09 All soffit dimensions should be held to minimum required to accommodate sanitary pipe transition into building.

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

1st Floor - NOTE PLAN

General Notes - First Floor

A. The first floor plan and first floor reflected ceiling plan are provided to illustrate the layout and usage of the first floor below the area of second floor work.

B. Demolition and new construction at this level is to be above ceiling plumbing, mechanical, electrical, fire protection and/or technology work.

C. Contractor to remove and reinstall ceilings as required to install new work.

D. See plumbing, mechanical, electrical, fire protection and/or technology for additional information.

E. Temporary partitions will be required at the first floor in all public areas/corridors to separate and protect VA patients, visitors and staff from areas of construction.

F. Final layout of temporary partitions to be closely coordinated with the COR prior to erection.

G. Minimum 48” wide means of egress to be maintained at all times.

H. Temporary partitions may need to be relocated one or more times to facilitate new work, life safety egress and owner’s operations.

I. First floor and first floor above ceiling work to be completed during second or third shift or on weekends. Contractor to coordinate with COR.

J. Limitation to Police Deptartment Access.

Scale:Scale: 3/4" = 1'-0"3/4" = 1'-0"1

PIPE PENETRATION DETAIL

B 24.123.117.317.115.913.112.212.1

12.1

11.110.89.2

6.9

4.2 6.5

Fa

Q.2

T.1

T.1A

T.2

T.4

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

Soiled Utility

A292B

Clean Linen

A277

Patient Room

A278

Patient Room

A279

Negative Pressure Patient Room

A280

Patient Room

A287

Patient Room

A288

Toilet

A278A Toilet

A279A

Toilet

A280A

Toilet

A287A

Ante Room

A280B

RN Manager

A267

Office

A273

Toilet

A288A Toilet

A285ANegative Pressure Patient Room

A286

Toilet

A286A

Equipment Storage

A281

Office

A268

Male Locker Room

A270

Staff Toilet

A270A

Staff Lounge

A269

Staff Bathroom

A271A

Female Locker Room

A271

Conference Room

A272

HAC

A274

Electrical

A275

On-Call

A276 Bathroom

A276A

Grief/Consult

A289

Negative Pressure Bariatric Patient Room

A282

Toilet

A282A

Ante Room

A282B

Pharmacy Office

A293

Passageway

C226B

Clean Supply

A292

Nourishment

A291 Work Area

A294A

HUC Station

A290

Passageway

C226C Negative Pressure Bariatric Patient Room

A283

Ante Room

A283B

Toilet

A283A

Ante Room

A284B

Work Area

A294

Negative Pressure Patient Room

A284

Passageway

C226E

Passageway

C226D

Patient Room

A285

5" 5' - 6"

4 7/8" 10' - 10 3/8"

4 7/8"

10' - 4 7/8" 4 7/8"

5' - 6"

4 7/8"

5' - 6 1/8"

4 7/8" 10' - 1" 4 7/8" 10' - 3 5/8" 4 7/8" 5' - 6"

/8

/4

/4

/8 "9

/8

/8

/8

/8

/8

10 1/2"2' - 4 1/8"

1' - 1 7/8" 8"

8' - 0 1/2"4' - 6"8' - 0 1/2"4' - 0 3/4"

1' - 7 3/4"

4' - 8"

1' - 8 1/4"

4' - 3 1/2"8' - 0 1/2"9"8' - 0 1/2"

3' - 0 1/8"1' - 7 3/4"

2' - 3 3/4"

1' - 7 1/8"

S2.0 S2.0

S2.0S2.0

S2.0

S1.0-F

S2.0S2.0

S2.0

S2.0

S2.0

S1.1

S2.0S2.0

S1.1

S2.0

S1.0-FS1.0-F S2.0

S1.1

S2.0

S1.1

S2.0 S2.0S2.0

S2.0

S2.0 S2.0S2.0

S2.0S2.0

S2.0

S1.1 S1.1

S2.0S2.0

S2.0

S2.0

S2.0

S2.0

S2.0

6' - 2 1/4"

4 7/8"

6' - 6 3/4"

4 7/8"

7' - 7 7/8"

1' - 5 3/8"

5' - 6"

4 7/8"

8' - 8 3/4" 6' - 7 7/8"4 7/8" 7' - 8 7/8"

4 7/8"

8' - 3 3/4" 4 7/8"

/8

/8

/4

/8

/8

/4

4 7/8"

14' - 7"

4 7/8"

13' - 11 5/8"

4 7/8" 6' - 3"

1' - 5 1/2"11' - 7 3/8"

1' - 4 1/2"

/4

/8

/8

/4

/4

/8

/8

/4

/4

/8

"7

/4

/2

/8

/8

/8

/2

/2

5 5/8" 8' - 0 1/2" 3' - 0 1/4" 1' - 7 7/8"

5' - 1" 1' - 7 7/8"

2' - 11 5/8" 8' - 0 1/2" 9" 8' - 0 1/2" 3' - 2 3/8"

1' - 7 7/8" 2' - 4 1/4"

4 7/8"

7' - 3 3/8"

8' - 10" 4 7/8"

Align

S1.0-N

S1.0-N

Align

A102-D

/8

/4

' - 0

/4

' - 2

/2

" 4

/8

' - 1

/8

/8

' - 5

/4

' - 2

/4

4 7/8"

9' - 9 3/4"

1' - 10 7/8"

1' - 2 5/8"

8' - 2"

20' - 8 3/8" 19' - 9" 4' - 5"

4 7/8"

14' - 4" 4 7/8" 6' - 3 3/4"

/8

/8

/8

/8

/2

/8

4 7/8"

4' - 0 1/8" 4 7/8" 11' - 10 3/4" 4 7/8"

7' - 8"

1' - 1"

Gas Storage

A294B

S1.1

HEADWALL CENTERLINE

/4

/8

' - 0

/8

' - 6

/8

' - 0

/8

/8

7' - 11 3/8"

1' - 5 1/2"

5' - 4"

7 1/4"

2' - 6" 3' - 11 3/4" 8' - 0 1/2" 8 1/2" 8' - 0 1/2" 2' - 0 3/8"

/4

/4

/4

4 1/4"

9 1/8"

Comms Closet

A292A

S1.0-F

S2.0 S2.0

S2.0

S1.1

S2.0

S1.1

S2.0

ALIGN

ALIGN

/4

/2

/4

/2

S1.1

S2.0

S2.0

S2.0S2.0S2.0

S2.0

S2.0

S2.0

S1.1

S2.0 S2.0

S2.0

S2.0

' - 5

/2

Passageway

C226A

Toilet

A284A

T1.0T1.0

T1.0

T1.0

T1.0

T1.0

Bid Item #2

135.00°

/8

/8

/8

4' - 4 5/8"

1' - 7 1/4"

3' - 3 1/2"

4 7/8"

5' - 6 1/2"

4 1/4"

/8

/8

5' - 6"

4 7/8" 4' - 0 1/8"

5 1/2"

8' - 0 1/2" 2' - 2 7/8"

1' - 8"

2' - 4"

9 5/8"

/4

/8

/8

4 7/8" 9' - 2"

Staff Respite

A271B

Passageway

C226F

S1.1

S2.0 S2.0 S2.0

S2.0

S2.0S2.0

S1.1

S2.0

S1.1

S2.0

S1.1

S1.0-F

S1.0-F

S1.0-F

S1.0-FS1.0-F

S2.0

S2.0

S1.0-FS1.0-F

/8

/8

/8

/8

/4

/2

/8

S2.0

4 7/8" 17' - 10 5/8" 4 7/8" 1' - 7 1/8"

4 7/8"

163.67°

S1.0-F

S1.0-F

Nourishment

A291

HUC Station

A290

Clean Supply

A292

Pharmacy Office

A293

Passageway

C226C

20' - 8 3/8"

/4

/4

/4

/8

/4

/8

2' - 0 3/4" 4 7/8"

7' - 5" 4 7/8" 1' - 7 1/8" 4 7/8"

1' - 2"

2' - 2"

S2.0

S2.0

S1.0-F

S1.0-F

1' - 2" 3' - 9" 4 1/4" 3' - 8 3/8" 4 7/8" 8' - 11" 4 7/8"

/8

/8

S2.0

S2.0

S2.0

S1.0

4 7/8"

9.129.12

9.02

9.40

7.82

7.82

STRUCTURE ABOVE

FIN. CEILING

FLOOR SLAB

4 7/8"

Min STC 45 @ Patient Room Walls

S1.0-F

1-HR RATED

FIRE BARRIER

U.L. #U465

4 7/8"

9.129.12

9.02

9.40

7.82

7.82

4 7/8"

S1.0-N

4 7/8"

9.129.12

9.02

7.82

7.82

4 7/8"

S1.1

9.129.12

9.03

9.40

7.82

7.82

7 1/4"

STRUCTURE ABOVE

FIN. CEILING

FLOOR SLAB

S2.0

9.02

7.13

7.82

7.82

7.16

4 1/4"

9.40

@ EXTERIOR

WALL LOCATIONS

@ EXTERIOR

WALL LOCATIONS

@ INTERIOR WALL

LOCATIONS

9.12

T1.0

9.12

9.02

9.40

9.16

4 1/4"

9.61

1-HR RATED

FIRE BARRIER

U.L #U465

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:4

A

M

Renovate MICU/SICU

10/17/2025

SECOND FLOOR DIMENSION PLAN

A102-D

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

GENERAL NOTES

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.

C. All wood blocking to be fire retardent treated.

D. First floor level 100'-0" equals 728'-0".

E. All partitions shall be type 'S1.0' unless noted otherwise.

F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

2nd Floor - MICU DIMENSION PLAN N

Scale:Scale: 1/4" = 1'-0"1/4" = 1'-0"

2nd Floor - MICU DIMENSION PLAN - DETAIL

Scale:Scale: 1" = 1'-0"1" = 1'-0"1

WALL TYPES

KEYNOTES

7.13 Batt thermal wall insulation. R-11 min.

7.16 Vapor retarder. Seal all joints and penetratons.

7.82 Continuous acoustic sealant at non-rated walls /

fire-rated sealant at rated walls each side.

9.02 3 5/8" non-structural metal framing, 16" o.c.

9.03 6" non-structural metal framing, 16" o.c.

9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.

9.16 Gypsum board soffit.

9.40 Acoustic insulation

9.61 Temporary walls shall have painted drywall finish.

24.123.117.317.115.913.112.212.1

12.1

11.110.89.2

6.9

4.2 6.5

Fa

Q.2

T.1

T.1A

T.2

T.4

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

Soiled Utility

A292B

Clean Linen

A277

Patient Room

A278 Patient Room

A279

Negative Pressure Patient Room

A280

Patient Room

A287

Patient Room

A288

Toilet

A278A Toilet

A279A

Toilet

A280A

Toilet

A287A

Ante Room

A280B

RN Manager

A267

Office

A273

Toilet

A288A Toilet

A285A

Negative Pressure Patient Room

A286

Toilet

A286A

Equipment Storage

A281

Office

A268

Male Locker Room

A270

Staff Toilet

A270A

Staff Lounge

A269

Staff Bathroom

A271A

Female Locker Room

A271

Conference Room

A272

HAC

A274

Electrical

A275

On-Call

A276

Bathroom

A276A

Grief/Consult

A289

Negative Pressure Bariatric Patient Room

A282Toilet

A282A

Ante Room

A282B

Pharmacy Office

A293

Passageway

C226B

Clean Supply

A292

Nourishment

A291

Work Area

A294A

HUC Station

A290

A401

B

A401

A

A402

A

A401

C

A

A404

A403

A403

Passageway

C226C Negative Pressure Bariatric Patient Room

A283

A

A403

A403

A

A401

E

A401

F

A401

D

Ante Room

A283B

Toilet

A283A

Ante Room

A284B

Work Area

A294

Negative Pressure Patient Room

A284

Passageway

C226E

Passageway

C226D

Patient Room

A285

A404

A276A

A276

A275

270A

C226D

C226F

279278

280B

280C

A277

292B

287A288A 285A

280A 279A

286A

283C

283B

283A

282C

282B

Passageway

C226F

C226B

Comms Closet

A292A

A

A402

A

A407

A

284A Toilet

A284A

284B

284C

A

9.38

9.38 9.38

9.38

9.38

9.38

1.01

1.01

6.11 Typ.

6.12

Typ.

10.41

10.41

9.19

Typ.

9.19 Typ.

9.19

9.19

Typ.

Typ.

14.04

1.01

A

Corridor

C226

Elevator

1.011.011.01

7.06

A401

D

A401

E

A401

E

A401

E

A401

E

A401

E A401

E

A403

A403

A402

A

A

A

A

A

271A

Gas Storage

A294B

294B

A510

9.199.199.19 Typ.

9.38

9.38

9.38

9.38

6.12

6.11

6.12

A510

A510

7.06

282A

11.07 11.07Typ.

Typ.

11.07 Typ.

11.08

11.07 8.14

A406

D

A406

D

A402

5.17

6.11

A101-N

A102-N

27.01

27.01

27.01

2.50

2.50

27.01

27.01

2.54

A601

22.10

22.10

22.10

22.10

22.10

22.10

22.10

22.10

22.10

22.10

A

A

A

A

A402

A

A

B

A

A

AA

A

A

AA

7.06

7.06

A

A515

278A

A405

A

A405

A Sim.

Sim. Sim.

Sim.

Sim.

Opp. Opp.

A405

A Opp.

A405

B

A405

C

Opp.

A406

E A406

E Sim.

A406

F

Passageway

C226A

23.1123.11

23.12

23.11

23.12

23.11

23.12 23.11

23.12

23.11

23.11

9.38

9.38

9.38

Typ.

26.0326.0326.03

9.55

9.55

9.55

9.55

8.14

23.12

1.12

9.61

Bid Item #2

7.04 7.04

7.047.04

7.04

7.04

7.107.10 7.107.10

7.107.10

7.107.10 7.107.10

7.107.10

Staff Respite

A271B 271B

8.25

8.25

7.34

7.34

7.34

7.34

BB

CC

AA

A.6A.6

292A

27.01

23.1

T.1T.1

23.1

10.03

9.02

9.029.02

9.029.02

9.329.32

9.32

/2

1' - 1 1/4"

9.12

6.11

6.05

9.12

Grief/Consult

A289

Corridor

C226

Soiled Utility

A292B

Patient Room

A287

Patient Room

A288

Toilet

A287A

Toilet

A288A Toilet

A286A

Passageway

C226B

Work Area

A294A Nourishment

A291

HUC Station

A290

Clean Supply

A292

Pharmacy Office

A293 Work Area

A294

14.05

14.04

14.0614.06

2.412.04

2.04

2.04

2.04

2.30

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:4

A

M

Renovate MICU/SICU

10/17/2025

SECOND FLOOR NOTE PLAN

A102-N

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

KEYNOTES

GENERAL NOTES

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.

C. All wood blocking to be fire retardent treated.

D. First floor level 100'-0" equals 728'-0".

E. All partitions shall be type 'S1.0' unless noted otherwise.

F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated

1.01 No architectural work this area.

1.12 Contractor path to construction area.

2.04 Existing section of pneumatic tube to be removed.

2.30 Existing section of pneumatic tube to remain.

2.41 Remove existing pneumatic tube station. Salvage and

turn over to owner.

2.50 Existing door actuator. See technology drawings.

2.54 Existing card reader. See technology drawings.

5.17 Infill opening in slab. See structural drawings.

6.05 2" x 6" presure treated wood blocking.

6.11 PPE Cabinet Type A. Typical at each Patient Room.

6.12 PPE Cabinet Type B. Typical at each Ante Room.

7.04 3" recessed wall expansion joint.

7.06 Existing 1 1/2" expansion joint covers to be removed, cleaned, buffed to remove minor scratches and blemishes and reinstalled and protected during construciton.

7.10 Drywall control joint.

7.34 3" expansion joint to be replaced and area around expansion joint repaired to provide a smooth surface for flooring installation.

8.14 Install blackout film at glazing behind casework.

8.25 18" x 18" wall mounted access panel. Coordinate with HVAC contractor for final location.

9.02 3 5/8" non-structural metal framing, 16" o.c.

9.12 5/8" type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.

9.19 Solid Surface window sill. Typical at all exterior windows in area of work.

9.32 Built-up CFMF box column at ICU patient room doors:

Column to consist of (2) 6” 18 gauge studs with 1 5/8” flanges arranged flange tip to flange tip. Provide (2) 18 gauge track members - 3 5/8” x 1 ½” deep and cap the flanges on both sides. Connect track to each flange with #10-16 self-tapping screws, 16” o.c.

9.38 Construct room to limit the passage of air. Ensure that

gypsum wall board is fitted tight and sealed to deck above and floor slab providing a continuous barrier. Seal drywall construction at perimeter and corners. Seal all penetrations created by architectural and MEPFS items including, but not limited to, ducts, wall outlets, conduit, and pipes.

9.55 Gypsum board to be installed as Level 5 drywall finish.

9.61 Temporary walls shall have painted drywall finish.

10.03 Recessed curtain track.

10.41 Semi-recessed fire extinguisher cabinet.

11.07 Patient headwall. Typical at each patient room.

11.08 Bariatric patient headwall. Typical at each bariatric patient room.

14.04 New pneumatic tube station.

14.05 New pneumatic tube system route. Pneumatic tube

routing and design by pneumatic tube station manufacturer. Contractor to coordinate pneumatic tube system design with MEPFS trades.

14.06 Existing pneumatic tube penetration at third floor slab.

Section of pneumatic tube to remain.

22.10 Dialysis box. See Plumbing Drawings.

23.11 Analog room pressure monitor. Typical at negative

pressure rooms and Ante Room entrances. Align top of monitor to top of ICU door frame. See Mechanical Drawings.

23.12 Digital room pressure monitor. Typical at negative

pressure rooms. Mounting height 5'-0" AFF to centerline of screen. See mechanical drawings.

26.03 Electrical outlet. See electrical drawings.

27.01 Card Reader. See technology drawings.

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

2ND FLOOR - MICU NOTE PLAN

Scale:Scale: 1 1/2" = 1'-0"1 1/2" = 1'-0"1

ICU DOOR JAMB DETAIL

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

2ND FLOOR - PNEUMATIC TUBE PLAN

5.

B 24.123.117.317.115.913.112.212.1

12.1

11.110.89.24.2 6.5

Q.2

T.1

T.1A

T.2

T.4

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

Equip. Stor.

A392

Negative Pressure Patient Room

A387K

Patient Room

A387J

Patient Room

A387I

Patient Room

A387G

Shower

A387H

Patient Room

A387F

Patient Room

A387D

Negative Pressure Patient Room

A387A

T1.0

T1.0

T1.0

T1.0

T1.0T1.0

23.05

23.05

23.05

23.05

23.05

23.05

S2.0

S2.0

S2.0

S2.0 S2.0

S2.0S2.0

S2.0

23.06

23.07

23.07

1.09

1.09

8.25

8.25

8.25

8.25

8.25

BB

CC

AA

A.6A.6

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:5

A

M

Renovate MICU/SICU

10/17/2025

THIRD FLOOR DEMOLITION & NOTE

PLAN

A103-N

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

3RD FLOOR - MICU NOTE PLAN

KEYNOTES

GENERAL NOTES

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.

C. All wood blocking to be fire retardent treated.

D. First floor level 100'-0" equals 728'-0".

E. All partitions shall be type 'S1.0' unless noted otherwise.

F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction. Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated

1.09 Temporary partitions as required to seperate overhead

work from VA patients, visitors, and staff. Coordinate final location of temporary partitions with COR. Maintain access through corridors with minimum passage width of 48" at all times. Multiple configurations of temporary partitions maybe required to complete work.

8.25 18" x 18" wall mounted access panel. Coordinate with HVAC contractor for final location.

23.05 Remove and reinstall wall construction as required to

enlarge openings in floor and roof construction and replace existing HVAC risers with new and connect to rooftop ductwork. See mechanical drawings.

23.06 Duct removed by mechanical contractor close opening in

floor by general contractor.

23.07 General contractor to cut new opening in floor slab.

B 24.123.117.317.115.913.112.212.111.110.89.26.94.2 6.5

Fa

Q.2

T.1

T.1A

T.2

T.9

V.6

V.8

V.9

W

W.1

W.3

W.7

X

5.10

/4

1/8" / 12"

1/2" / 12"

/4

/1

" / 1

3/16" / 12"

/8

/4

2.092.092.092.09

2.092.092.092.09

23.13

2.15Typ.

23.15

2.46

2.15

2.15

23.13

Typ.

23.08

2.15

2.15

23.20

2.19

23.21 Typ.

23.21

Typ.

23.21 Typ.

23.22

23.22

23.23

2.22

2.23

2.22

23.01

23.01

5'-3" 26'-2"

7.35

/8

7.36

2.15

23.2423.2423.2423.24

Typ.

2.19

Typ.

2.22

2.22

2.15

BB

CC

AA

A.6A.6

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.jpaarch.com| 937.461.3290

VA Project No.

JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:1

:5

A

M

Renovate MICU/SICU

10/17/2025

ROOF PLAN

A104

SOTH

19018.00

539-20-104

Cincinnati, Ohio

100% CONSTRUCTION

DOCUMENTS

KEYNOTES

N Scale:Scale: 1/8" = 1'-0"1/8" = 1'-0"

ROOF PLAN

2.09 Existing modified bitumin roof to remain.

2.15 Existing roof drains to remain. Contractor to protect

drains from construction debris.

2.19 Existing walkway pads to remain.

2.22 Existing relocatable pre-engineered stair system.

2.23 Existing steel mechanical…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .