This request for proposal solicits bids for the design and construction of one Auxiliary Floating Dry Dock Medium. The Naval Sea Systems Command is seeking proposals on behalf of the U.S. Navy and Foreign Military Sales Boats and Craft Program Office. Interested offerors should submit proposals in response to solicitation number N00024-21-R-2243. The closing date for proposals was not specified. The RFP calls for the detail design and construction of one floating dry dock to meet requirements outlined in attachments to the solicitation document.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFDM FLOATING DRYDOCK DATA REQUIREMENTS
SOLICITATION NO.: N00024‐21‐R‐2243
REVIEWED AND DATE: 07 SEPTEMBER 2021
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 1
Auxiliary Floating Dry Dock, Medium (AFDM)
Data Requirements List Attachment J-2
07 SEPTEMBER 2021
Prepared by Naval Sea Systems Command
1333 Isaac Hull Ave. SE Washington Navy Yard, DC 20376-2101
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 2
FOREWORD
The Data Requirements List (DRL) identifies Contractor Data Item requirements in support of the design and construction of the Auxiliary Floating Dry Dock, Medium (AFDM). This foreword provides direction to clarify administrative and procedural questions. Emergent issues that are not addressed herein or otherwise provided for in source documents should be referred to Program Executive Office Ships PMS325.
I. CONTENT AND FORMAT OF SUBMITTALS
All submittals shall be prepared in the Contractor's format unless otherwise specified in the specific data item. Data item submittals shall be clear, legible, and prepared in the English language. Engineering drawings and associated lists shall be as identified in Engineering Drawing and Related Documentation Practices, American Society of Mechanical Engineers (ASME) Y14.100; Types and Applications of Engineering Drawings, ASME Y14.24 Associated Lists, ASME Y14.34 and Revision of Engineering Drawings and Associated Documents, Y14.35M. Calculations and design data shall be provided in metric standard units or in the inch-pound system; the convention for units of measure shall be consistent throughout the documentation.
Data Items shall be assigned a sequential one-character alphabet designation in the Revision Block to signify a change from the previous submittal. Revision letter designations shall be in alphabetical order. The first submittal of any data item shall be identified as Revision "-".
Revisions of submittals shall include a change log or be prepared in a "red line" format to allow for identification of changes from the previous submittal.
Electronic media and digital files shall be compatible with computers using Windows 7™ operating system, or latest available version, unless otherwise specified. The latest available versions of the following software products shall be utilized in the generation of data items, unless otherwise specified: Microsoft Office™ including Microsoft Project™, Adobe Acrobat™, WinZip™ or IGES™. Electronic files shall not be password protected. Schedules shall be Microsoft Project compatible. Alternative software or versions of software may be used if mutually agreed between the Contractor and the Government. Electronic files shall not be password protected. All textual PDF files shall be searchable.
Documents shall not be submitted in PDF format unless specified in the specific data item.
Drawings shall be submitted in an AutoCAD 2013 TM compatible format and PDF format, unless otherwise specified, and shall not be in "read only" format.
The first three characters of each digital filename shall be the Contractor's name or acronym. The filename shall include the applicable Data Item number and a Contractor determined designation, followed by a one-character revision letter, as applicable. The first submittal of each data item shall be assigned the revision"-“. Each file extension shall be the three-or four-character default
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 3
extension automatically assigned by the applicable software when a document is saved. Electronic files shall not be password protected.
All data deliveries shall include a Department of Defense (DoD) Distribution Statement in accordance with DoD Instruction 5230.24. The Contractor shall determine which statement is applicable for the data being delivered.
Each data item submittal shall include the following export restriction:
"WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate per provisions of OPNAVINST 551 0.161, Withholding of Unclassified Technical Data from Public Disclosure, 29 July 1985."
All submittals shall be provided with a cover sheet. Each data item shall be submitted with a separate letter of transmittal. The cover sheet shall provide the following information:
Contractor's name, correspondence serial number, and actual date of transmittal.
The Contract Number, Data Item Number, and Data Item Title.
Applicable revision letter and revision date.
Electronic media or digital file name and respective file date.
A brief explanation of the submittal, the reason for a document's change, or a more detailed discussion in the content of the submittal.
Distribution and quantity of copies being sent (not applicable to data provided at a shared location).
II. SUBMISSION SCHEDULE
The Contractor shall deliver all data requirements in accordance with the DRL.
DRL submission may address multiple barges, unless otherwise noted in the Data Item.
Periodic submission shall continue through Ship Delivery (SD), including awarded options, unless otherwise noted in the Data Item.
It is the responsibility of the Contract to notify the Government of changes which impact the content and accuracy of a previously submitted document so that the Government may make a determination as to whether the document warrants a revision. If the Government determines that there are significant enough changes which impact the content and accuracy of the document, the document shall be revised appropriately and resubmitted within 30 days or as otherwise agreed to between the Government and the Contractor.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 4
III. QUALITY CONTROL
The Contractor shall maintain internal quality control to ensure submittals are complete and adequate and should not rely on Government review comments to ensure the technical accuracy of data. The Contractor shall review submittals to ensure accuracy of language, flow, overall readability, as well as proofreading for grammar, spelling, and typographical errors.
IV. ACRONYMS
An alphabetical list of acronyms follows. The list includes those acronyms used most frequently in the Data Requirements List.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 5
ACRONYMS
ABS American Bureau of Shipping
AFDM Auxiliary Floating Dry Dock, Medium
ASME American Society of Mechanical Engineers
ACR Accepted Craft Report
AT Acceptance Trials
AWE Accepted Weight Estimate
BERP Bolted Equipment Removal Plates
BHP Brake Horsepower
BT Builder’s Trials
CAGE Commercial and Government Entity
CAS Chemical Abstract Service
CFE Contractor Furnished Equipment
CG Guided Missile Cruiser
CHT Collection Holding Transfer
CIB Craft Information Book
CLIN Contract Line Item Number
CMP Configuration Management Plan
CD Craft Delivery
CDI Craft Drawing Index
COSAL Coordinated Shipboard Allowance List
DAC Days After Contract Award
DARC Days After Receipt of Comments
DARP Days After Reporting Period
DDG Guided Missile Destroyer
DI Data Item(s)
DoD Department of Defense
DPT Days Prior To
DR Design Review
DRL Data Requirements List
ECP Engineering Change Proposal
EPLA Electrical Power Load Analysis
FCR Facility Certification Report
FEA Finite Element Analysis
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 6
FP Forward Perpendicular
FWR Final Weight Report
GFI Government Furnished Information
GFM Government Furnished Material
GUCL General Use Consumable List
HIDS Host Intrusion Detection System
HVAC Heating, Ventilation, and Air Conditioning
IAW In Accordance With
IDE Integrated Digital Environment
IEEE Institute of Electrical and Electronic Engineers
ILS Integrated Logistic Support
ILSMP Integrated Logistics Support Management Plan
IMO International Maritime Organization
IMS Integrated Master Schedule
INSURV Board of Inspection and Survey
IP Internet Protocol
IPB Illustrated Parts Breakdown
IPR Interim Progress Review
ISO International Organization for Standardization
IUID Item Unique Identification
LAN Local Area Network
LCS Littoral Combat Ship
LGC Logistics Guidance Conference
LSD Dock Landing Ship
MEL Master Equipment List
MIL-STD Military Standard
MTHLY Monthly
NAVSEA Naval Sea Systems Command
NECP Non-Engineering Change Proposal
NLT No Later Than
NPSH Net Positive Suction Head
NPSHR Net Positive Suction Head Required
NSTM Naval Ships’ Technical Manual
NVIC Navigation and Vessel Inspection Circular
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 7
OEM Original Equipment Manufacturer
OPNAVINST Office of the Chief of Naval Operations Instruction
OQE Objective Quality Evidence
PAC Post Award Conference
PO Purchase Order
PR Purchase Request
PRR Production Readiness Review
QTY Quantity
QWR Quarterly Weight Report
R/ASR Revisions as Required
RFV Request for Variance
SAWE Society of Allied Weight Engineers
SD Ship Delivery
SDS Safety Data Sheet
SNAME Society of Naval Architects and Marine Engineers
SOC Start of Construction
SOW Statement of Work
STANAG Standardization Agreement
SWBS Ship Work Breakdown Structure
T&S Trim and Stability
TBD To Be Determined
TCP Transmission Control Protocol
TM Technical Manual
TMI Technical Manual Index
UII Unique Item Identifier
USCG United States Coast Guard
VRS Vendor Recommended Spares
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 8
V. GLOSSARY
The items listed below are explanations of the headings and blocks on the Data Requirements List
(DRL).
1. PROGRAM NAME: The name of the program.
2. CONTRACT NO.: The Procurement Instrument Identification Number (i.e., the contract number, Purchase Request (PR) number, the Request for Proposal number, or other appropriate designator).
3. CLIN: The contract Line Item Number (CLIN) that is associated with the Data Item.
4. CONTRACTOR: The Contractor's name.
5. PREPARED AND APPROVED BY: The name and organization responsible for preparation and approval of the Data Items.
6. DATE: The date the Data Item was approved.
7. BLOCK I-DATA ITEM NO.: An identification number to support data item identified in the Statement of Work or Contract.
8. BLOCK 2-DATA ITEM TITLE: The title of the Data Item.
9. BLOCK 3-REFERENCE: The specific location within the Statement of Work or Contract that contains the tasking that generates a requirement for the data.
10. BLOCK 4-DATA DESCRIPTION: Details regarding the Data Item’s content characteristics and format requirements, if applicable.
11. BLOCK 5- APPROVAL/REVIEW REQUIREMENTS: The Government will review the Contractor’s submittal as indicated. The time period required for Government review will be as specified. The Government will comment on Data Items that require Government comment within the timeframe noted. The Government reserves the right to comment on all deliverables. The time period for Government review, identified in the data requirements list, commences at receipt of the data by the Government.
12. BLOCK 6-SUBMITTAL SCHEDULE: The scheduled date for initial data submission, incremental submittals, and resubmittals, as specified. In addition, details regarding Data Item submittal requirements are included. Submittal dates are often based on Contract events. Days identified are calendar days unless otherwise identified. Where scheduled date for data submission falls on a Saturday, Sunday or Federal Government holiday, the submission due date shall be the following Government working day. Revisions and subsequent periodic submissions shall incorporate the resolution of Government comments.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 9
13. BLOCK 7-DISTRIBUTION: Unless otherwise stated, all deliveries shall be in digital format submitted to the PMS325 Assistant Program Manager.
ADDRESSEE COMPLETE ADDRESS
PMS325IDE (NSERC)* DLGR_NSWC_NSERC@navy.mil
PMS325 Colin Foster; Project Manager Colin.foster@navy.mil
Program Manager’s Onsite Representative TBD
Craft TBD
VI. Data Item Extensions
In the event that the Contractor decides to submit separate items to fulfill a DRL Data Item requirement and to ensure that the IDE accounts for each item individually, the Contractor shall request a Data Item Extension/Re-designation from the Integrated Digital Environment (IDE) Data Manager via e-mail. The Data Item Extension/Re-designation allows the IDE to establish separate sub-tier items within the database allowing the Contractor and Government to submit, review, and track each item independently. By requesting a DRL Data Item Extension/Re-designation, the Contractor avoids the need to submit all of the individual items with each submission of the data item, even if only one of the items has been modified since the previous submission.
Examples of when the Contractor shall request DRL Data Item Extension/Re-designation include the Technical Manual data item. In such an instance, the Contractor shall request DRL Data Item Extension/Re-designation to establish separate items for each individual technical manual, thus allowing individual tracking of review comments, independent resubmissions of single technical manuals, and closure of comments on independent technical manuals. Another example would be for data items that require supporting calculations to be submitted with drawings. In such an instance, the Contractor shall request DRL Data Item Extensions/Re-designation to establish separate sub-tier items for the drawing and for the calculations.
Data Item Extension/Re-designation may be used for both the Data Item and a Sub-Data Item.
Examples are as follows: DI-011.01 and DI-021-12.01, where DI-011 and DI-021-12 are the Government assigned DRL item numbers specified herein and the .01 on each represent the number assigned to the DRL Data Item Extension/Re-designation requested by the Contractor. The Contractor shall submit a request for a Data Item Extension/Re-designation no later than 14 days prior to a scheduled data delivery. The request shall identify the Data Item number and title from contract Data Requirements List, Attachment J-2, and a listing of Contractor defined titles for each data component to be added or re-designated. The Government will provide the new designations, in IDE, within 2 business days after the receipt of the Contractor’s request.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 10
Data Item Extension/Re-designations shall not be considered contract modifications, but clarification of data submitted by the Contractor.
Data Item Extension/Re-designations shall comply with the same requirements as specified in the base Data Item. Subsequent deliveries of Data Item Extensions/Re-designations shall be processed in the same manner as the base data item submittals. The “revision” entered during data item upload shall match the revision listed on the data (i.e. drawing or report revision).
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 11
Table of Contents and List of Effective Pages
Data Item No.
Contract
Reference Data Item
Titles And Subtitles Change Status
DI-001 SOW C-3.042a
POST AWARD CONFERENCE AGENDA AND
MINUTES
BASIC
DI-002 SOW C-3.042a DESIGN REVIEW AGENDAS AND MINUTES BASIC
DI-003 SOW C-3.042a
LOGISTICS GUIDANCE CONFERENCE AGENDA
AND MINUTES
BASIC
DI-004 SOW C-3.042a
INTERIM PROGRESS REVIEW AGENDAS AND
MINUTES
BASIC
DI-005 SOW C-3.042b
PRODUCTION READINESS REVIEW AGENDA,
PRESENTATION, AND MINUTES
BASIC
DI-006 SOW C-3.042c INTEGRATED MASTER SCHEDULE BASIC
DI-007 SOW C-3.042c
DRAWING SCHEDULE AND DOCUMENTATION
SCHEDULE
BASIC
DI-008 SOW C-3.042c MATERIAL ORDERING SCHEDULE BASIC
DI-009 SOW C-3.042d PURCHASE ORDER INDEX BASIC
DI-010 SOW C-3.042e MASTER EQUIPMENT LIST BASIC
DI-011 SOW C-3.042f LAUNCHING AND DOCKING INFORMATION BASIC
DI-012 SOW C-3.042g CRAFT DAMAGE REPORT BASIC
DI-013 SOW C-3.045b FIRE AND FLOODING PROTECTION PLAN BASIC
DI-014 SOW C-3.070
CLASSIFICATION SOCIETY OR REGULATORY
BODY COMMUNICATIONS
BASIC
DI-015 SOW C-3.070
CLASSIFICATION SOCIETY AND REGULATORY
BODY CERTIFICATES, STATEMENTS, AND
LETTERS
BASIC
DI-016 SOW C-3.077
NAVSEA HAZARDOUS MATERIAL WAIVER
REQUEST
BASIC
DI-017 SOW C-3.077 SAFETY DATA SHEETS BASIC
DI-018 SOW C-3.080a
INTEGRATED LOGISTICS SUPPORT
MANAGEMENT PLAN
BASIC
DI-019 SOW C-3.080b
ITEM UNIQUE IDENTIFICATION (IUID)
INFORMATION
BASIC
DI-020 SOW C-3.083
VENDOR RECOMMENDED SPARES LISTING AND
STATISTICS
BASIC
DI-021 SOW C-3.085a
CONSTRUCTION DRAWINGS AND
DOCUMENTATION
BASIC
DI-021-01 SOW C-3.085a TRIM AND STABILITY BOOKLET BASIC
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 12
DI-021-02 SOW C-3.085a
ACOUSTIC TREATMENT AND INSULATION
SCHEDULE
BASIC
DI-021-03 SOW C-3.085a STABILITY REPORT BASIC
DI-021-04 SOW C-3.085a
BUCKLING AND ULTIMATE STRENGTH
ASSESSMENT
BASIC
DI-021-05 SOW C-3.085a PONTOON DECK LOAD CALCULATIONS BASIC
DI-021-06 SOW C-3.085a SEAKEEPING ANALYSIS BASIC
DI-021-07 SOW C-3.085a CRAFT DRAWING INDEX BASIC
DI-021-08 SOW C-3.085a
OEM COMMERCIAL WARRANTY SHEETS AND
REGISTRATION FORMS
BASIC
DI-021-09 SOW C-3.085a APPENDAGE DRAWING BASIC
DI-021-10 SOW C-3.085a FIRE STRUCTURAL PROTECTION DRAWING BASIC
DI-021-11 SOW C-3.085a HULL LINES DRAWING BASIC
DI-021-12 SOW C-3.085a MIDSHIP SECTION DRAWING BASIC
DI-021-13 SOW C-3.085a TYPICAL SECTION DRAWING BASIC
DI-021-14 SOW C-3.085a
COMPARTMENT ARRANGEMENT AND
OUTFITTING DRAWING
BASIC
DI-021-15 SOW C-3.085a GENERAL ARRANGEMENT DRAWING BASIC
DI-021-16 SOW C-3.085a MACHINERY ARRANGEMENT DRAWING BASIC
DI-021-17 SOW C-3.085a TOPSIDE ARRANGEMENT DRAWING BASIC
DI-021-18 SOW C-3.085a DECK AND PLATFORM DRAWING BASIC
DI-021-19 SOW C-3.085a CONTROL HOUSE STRUCTURAL DRAWING BASIC
DI-021-20 SOW C-3.085a BALLAST CONTROL CONSOLE ARRANGEMENT BASIC
DI-021-21 SOW C-3.085a
ELECTRICAL DISTRIBUTION SYSTEM ONE-LINE
DIAGRAM
BASIC
DI-021-22 SOW C-3.085a ELECTRICAL POWER LOAD ANALYSIS BASIC
DI-021-23 SOW C-3.085a ELECTRICAL POWER SYSTEM DIAGRAM BASIC
DI-021-24 SOW C-3.085a
ELECTRICAL SYSTEM FAULT CURRENT
ANALYSIS
BASIC
DI-021-25 SOW C-3.085a LIGHTING SYSTEM ONE-LINE DIAGRAM BASIC
DI-021-26 SOW C-3.085a PROTECTIVE DEVICE COORDINATION STUDY BASIC
DI-021-27 SOW C-3.085a SWITCHBOARD DETAILS BASIC
DI-021-28 SOW C-3.085a SHORE SERVICE CONNECTIONS DRAWING BASIC
DI-021-29 SOW C-3.085a
COMPUTER NETWORK DIAGRAMMATIC
DRAWING
BASIC
DI-021-30 SOW C-3.085a GENERAL ANNOUNCING SYSTEM DRAWING BASIC
DI-021-31 SOW C-3.085a
INTERIOR COMMUNICATION SYSTEM BLOCK
WIRING DIAGRAM
BASIC
DI-021-32 SOW C-3.085a TELEPHONE DIRECTORY BASIC
DI-021-33 SOW C-3.085a VIDEO SURVEILLANCE SYSTEM DRAWING BASIC
DI-021-34 SOW C-3.085a ALARM SYSTEM DRAWING BASIC
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 13
DI-021-35 SOW C-3.085a LIST OF CLOSURES BASIC
DI-021-36 SOW C-3.085a HVAC DIAGRAMS BASIC
DI-021-37 SOW C-3.085a STORES HANDLING DRAWING BASIC
DI-021-38 SOW C-3.085a FIRE CONTROL AND SAFETY PLANS BASIC
DI-021-39 SOW C-3.085a EQUIPMENT REMOVAL DRAWING BASIC
DI-021-40
SOW C-3.085a MOORING, SHIP HANDLING AND TOWING
DESIGN AND DIAGRAMS
BASIC
DI-021-41 SOW C-3.085a DRY DOCK CRANE REPORT AND DRAWINGS BASIC
DI-021-42
SOW C-3.085a
SHIP ACCESS BROWS BASIC
DI-021-43 SOW C-3.085a SHIP SERVICE BOOMS AND PLATFORMS BASIC
DI-021-44 SOW C-3.085a SHORE SERVICE PLATFORMS BASIC
DI-021-45 SOW C-3.085a FURNITURE AND EQUIPMENT OUTFITTING LIST BASIC
DI-021-46 SOW C-3.085a LIST OF LABELS AND MARKINGS BASIC
DI-021-47 SOW C-3.085a KEY TAG INDEX BASIC
DI-021-48 SOW C-3.085a CATHODIC PROTECTION DRAWING BASIC
DI-021-49 SOW C-3.085a PAINT SCHEDULE BASIC
DI-021-50 SOW C-3.085a DECK COVERING SCHEDULE BASIC
DI-021-51 SOW C-3.085a DOCKING PLAN BASIC
DI-021-52 SOW C-3.085a LADDERS AND HANDRAILS SCHEDULE BASIC
DI-021-53 SOW C-3.085a LIST OF GAUGES BASIC
DI-021-54
SOW C-3.085a PEDESTRIAN ACCESS RAMP ARRANGEMENT, LOAD CALCULATIONS, AND DETAILS
BASIC
DI-021-55 SOW C-3.085a VEHICLE BRIDGE DESIGN REPORT BASIC
DI-021-56
SOW C-3.085a VEHICLE BRIDGE ARRANGEMENT AND
PRODUCTION LEVEL DETAILS
BASIC
DI-022 SOW C-3.085C PRODUCTION LEVEL DATA PACKAGE BASIC
DI-023 SOW C-3.086A
COMMERCIAL TECHNICAL MANUALS AND
SUPPLEMENTAL DATA
BASIC
DI-024 SOW C-3.086A TECHNICAL MANUAL INDEX BASIC
DI-025 SOW C-3.086B CRAFT INFORMATION BOOK BASIC
DI-026 SOW C-3.088 CREW FAMILIARIZATION INFORMATION BASIC
DI-027 SOW C-3.092 TEST PROCEDURES BASIC
DI-028 SOW C-3.092 TEST REPORTS BASIC
DI-029 SOW-C-3.095 WHOLE CRAFT TEST PROCEDURES/REPORTS BASIC
DI-029-01 SOW C-3.095 ILLUMINATION SURVEY BASIC
DI-029-02 SOW C-3.095 AIRBORNE NOISE SURVEY BASIC
DI-029-03 SOW C-3.095 DEADWEIGHT SURVEY BASIC
DI-029-04 SOW C-3.095 SUBMERGENCE TEST BASIC
DI-029-05 SOW C-3.095 DEFLECTION TEST BASIC
DI-030 SOW C-3.092
QUALITY ASSURANCE PLAN AND RECORDS OF
TESTS AND INSPECTIONS
BASIC
DI-031 SOW C-3.094
BUILDER’S TRIAL/ACCEPTANCE TRIAL
PROCEDURES/AGENDAS
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 14
DI-032 SOW C-3.094 BUILDER’S TRIAL/ACCEPTANCE TRIAL REPORTS BASIC
DI-033 SOW C-3.096 WEIGHTS BASIC
DI-033-01 SOW C-3.096 ACCEPTED WEIGHT ESTIMATE BASIC
DI-033-02 SOW C-3.096 QUARTERLY WEIGHT REPORT BASIC
DI-033-03 SOW C-3.096 ACCEPTED CRAFT REPORT BASIC
DI-033-04 SOW C-3.096 FINAL WEIGHT REPORT BASIC
DI-034 CLAUSE C-222-H001 ACCESS CONTROL PLAN BASIC
DI-035 SOW C-3085a DAMAGE CONTROL BOOK BASIC
DI-036 CLAUSE C-243-H003 CONFIGURATION MANAGEMENT PLAN BASIC
DI-037 LEFT INTENTIONALLY BLANK BASIC
DI-038 SOW C-3085a TRANSPORTATION PLAN BASIC
DI-039 SOW C-3085a
BALLAST SYSTEM DESCRIPTION OF OPERATION
REPORT
BASIC
DI-040 SOW C-3085a TANK PLAN AND REPORT BASIC
DI-041 CLAUSE C-243-H003 REQUEST FOR VARIANCE BASIC
DI-042 CLAUSE C-243-H003
EQUIVALENT EQUIPMENT SUBSTITUTION
REQUEST
BASIC
DI-043 CLAUSE C-211-H005 PLANT PROTECTION PLAN BASIC
DI-044 CLAUSE C-211-H007 ADVERSE ENVIRONMENTAL CONDITION PLAN BASIC
DI-045 SOW C-3.077 LITHIUM BATTERY REPORT BASIC
DI-046 SOW C-3.085a
AUXILIARY SYSTEM DESIGN REPORT AND
DIAGRAMMATICS
BASIC
DI-046-01
SOW C-3.085a GRIT AND BLAST SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-02
SOW C-3.085a MACHINERY COOLING SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-03 SOW C-3.085a BALLAST SYSTEM REPORT AND DIAGRAM BASIC
DI-046-04
SOW C-3.085a COMPRESSED AIR SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-05
SOW C-3.085a TANK LEVEL INDICATION SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-06
SOW C-3.085a POTABLE WATER SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-07 SOW C-3.085a GRAY WATER SYSTEM REPORT AND DIAGRAM BASIC
DI-046-08 SOW C-3.085a BLACK WATER SYSTEM REPORT AND DIAGRAM BASIC
DI-046-09 SOW C-3.085a FUEL OIL SYSTEM REPORT AND DIAGRAM BASIC
DI-046-10 SOW C-3.085a CHT SYSTEM REPORT AND DIAGRAM BASIC
DI-046-11
SOW C-3.085a DECK AND SPACE DRAIN SYSTEM REPORT AND
DIAGRAM
BASIC
DI-046-12
SOW C-3.085a FILL, VENT, AND SOUNDING SYSTEM REPORT
AND DIAGRAM
BASIC
DI-046-13
SOW C-3.085a FIXED FIRE EXSTINGUISHING SYSTEM REPORT
AND DIAGRAM
BASIC
DI-046-14 SOW C-3.085a FIRE MAIN SYSTEM REPORT AND DIAGRAM BASIC
DI-047 SOW C-3085a
PRELIMINARY FACILITY CERTIFICATION
REPORT (FCR)
DI-048 SOW C-3085a DOCKING ARRANGEMENT DESIGN REPORT BASIC
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 15
DI-049 SOW-C-3.100
CYBERSECURITY INFORMTAION FOR CONTROL
SYSTEMS
BASIC
DI-049-01 SOW-C-3.100
CONTRACTOR FURNISHED EQUIPMENT
INFORMATION SYSTEMS USING DOD
INFORMATION
BASIC
DI-049-02 SOW-C-3.100
CONTROL AND COMMUNICATION SYSTEMS
MAPPING
BASIC
DI-049-03 SOW-C-3.100 UNNECESSARY SERVICES AND PROGRAMS BASIC
DI-049-04 SOW-C-3.100 HOST INTRUSION DETECTION SYSTEM BASIC
DI-049-05 SOW-C-3.100 CONTROL SYSTEM CONFIGURATION BASIC
DI-049-06 SOW-C-3.100 PATCH MANAGEMENT AND UPDATE PROCESS BASIC
DI-049-07 SOW-C-3.100 FIREWALL RULE SETS BASIC
DI-049-08 SOW-C-3.100 RESTORATION PROCEDURES BASIC
SOLICITATION NO.: N00024‐21‐R‐2243 CLIN: 1002
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 16
BLOCK 1-DATA ITEM NO.: DI-001
BLOCK 2-DATA ITEM TITLE:
POST AWARD CONFERENCE AGENDA AND
MINUTES
BLOCK 3-REFERENCE: SOW C-3.042a
BLOCK 4-DATA DESCRIPTION:
1. The Post Award Conference (PAC) Agenda shall identify the meeting name, date, time and location of the Post Award Conference. Materials to be presented during the Post Award Conference shall be provided with the agenda.
2. The agenda shall include as a minimum a discussion of the following:
a. Personnel Introductions.
b. Organization Overview.
1) Contractor Organization Discussion.
2) Roles and Responsibilities and Points of Contact.
3) Communication – Authorized Contractor Representatives.
c. Facilities Overview.
1) Site Layout.
2) Security and Access Control.
d. Planned Detail Design and Construction Approach.
e. Integrated Logistics Support Approach.
f. Regulatory Bodies Involvement.
g. Near Term Schedule.
1) Key Events.
2) Conferences and Reviews.
3) Deliverables.
h. Data Requirements List Review.
i. Government topics:
1) Personnel Introductions.
2) Organization Overview.
i.Major Organizations involved in the contract.
ii.Roles and Responsibilities and Points of Contact.
3) Program Overview.
i.Program Specifics, Contract and Technical Highlights.
ii.Government Furnished Property.
iii.Government expectations including the demonstration of production readiness.
iv.Proprietary information/data.
4) Communications.
i.Authorized Government Representatives.
ii.Email and letter correspondence.
iii.Regulatory Body correspondence.
iv.Submission of data.
j. Action Item Review.
k. Questions.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 17
BLOCK 1-DATA ITEM NO.: DI-001
BLOCK 2-DATA ITEM TITLE:
POST AWARD CONFERENCE AGENDA AND
MINUTES (Continued)
BLOCK 3-REFERENCE: SOW C-3.042a
3. The PAC Minutes shall identify date, time, and location of the Post Award Conference and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of presentations or documents not previously submitted shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
BLOCK 5-APPROVAL/REVIEW REQ.:
Allow 4 days for Government review and comment.
BLOCK 6-SUBMITTAL SCHEDULE:
Agenda NLT 10 DPT Post Award Conference; R/ASR 3 DARC. Minutes and final presentation materials to be submitted NLT 14 days after the Post Award Conference; R/ASR 7 DARC.
BLOCK 7-DISTRIBUTION: Addressee QTY
PMS325IDE 1
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 18
BLOCK 1-DATA ITEM NO.: DI-002
BLOCK 2-DATA ITEM TITLE: DESIGN REVIEW AGENDAS AND MINUTES
BLOCK 3-REFERENCE: SOW C-3.042a
BLOCK 4-DATA DESCRIPTION:
1. Design Review Agendas shall identify the meeting name, date, time and location of each Design Review (DR). Draft of materials to be presented during each Design Review meeting shall be provided with the agenda.
2. Design Review Agendas shall provide information regarding potential issues and decisions.
Information regarding craft design and construction status and results shall also be discussed. Items that will be updated prior to the next Design Review shall also be discussed.
3. The Design Review Agendas shall include discussion on the following topics, as applicable.
a. Detailed status of the evolving detail design.
b. Risk review including mitigation plans for all moderate and high risks.
c. Primary design drivers, constraints and other issues that are influencing the craft design.
d. Address assumptions and/or interpretations related to omissions, inconsistencies, errors, and conflicts, if any, in the requirements.
e. Status of Regulatory Body issues related to design approval and certification, including
American Bureau of Shipping (ABS) status.
f. Technical analyses and tradeoffs with supporting calculations and resulting derived design details.
g. Review of the 3D Product Model.
h. Status of data required by the DRL.
i. Status of questions submitted to the Government.
j. ECP, NECP, RFV Status.
k. Status of items that effect Production Readiness Review (PRR) exit criteria.
l. Review of Action Items.
4. Minutes shall identify date, time, and location of the applicable review and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of presentations or documents not previously submitted shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
BLOCK 5-APPROVAL/REVIEW REQ.:
Allow 4 days for Government review and comment.
BLOCK 6-SUBMITTAL SCHEDULE:
Agendas NLT 10 DPT each Design Review; R/ASR 3 DARC. Minutes and final presentation material to be submitted NLT 14 days after each Design Review; R/ASR 7 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 19
BLOCK 1-DATA ITEM NO.: DI-003
BLOCK 2-DATA ITEM TITLE: LOGISTICS GUIDANCE CONFERENCE
AGENDA AND MINUTES
BLOCK 3-REFERENCE: SOW C-3.042a
BLOCK 4-DATA DESCRIPTION:
1. Agenda shall identify the meeting name, date, time and location of the Logistics Guidance Conference (LGC). Materials to be presented shall be provided with the agenda.
2. In addition, the LGC Meeting agenda shall include the following as a minimum:
a. Proposed time schedule for discussion topics.
b. Overall plan for executing the Integrated Logistics Support (ILS) program.
c. ILS DRL Items development and submission.
d. Technical Manual (TM) identification, procurement, submission, and load-out.
e. Vendor Recommended Spares (VRS) identification, procurement, receipt, and stowage process.
f. Craft Familiarization.
g. Item Unique Identification (IUID).
h. Other items as required.
3. Minutes shall identify date, time, and location of the LGC and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included. Copies of presentations or documents not previously submitted shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
BLOCK 6-SUBMITTAL SCHEDULE:
Agenda NLT 10 DPT the LGC; R/ASR 3 DARC. Minutes and final presentation material to be submitted NLT 14 days after the LGC; R/ASR 3 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 20
BLOCK 1-DATA ITEM NO.: DI-004
BLOCK 2-DATA ITEM TITLE: INTERIM PROGRESS REVIEW AGENDAS
AND MINUTES
BLOCK 3-REFERENCE: SOW C-3.042a
BLOCK 4-DATA DESCRIPTION:
1. Each Interim Progress Review (IPR) Agenda shall identify the meeting name, date, time and location of each IPR. Materials to be presented during each IPR shall be provided with the agenda.
2. In addition, the IPR agendas shall include the following as a minimum:
a. Review of the progress of the design including schedule performance.
b. Review of the progress of the construction including schedule performance.
c. Material ordering status, including identification of critical and long-lead time items and their effect on the overall schedule.
d. Construction unit/module readiness.
e. Drawing status.
f. Regulatory Body review and approval status.
g. Current and anticipated problems and plans for resolution.
h. Quality metrics including process control and rework statistics.
i. Test status.
j. Risk Item status.
k. ILS program status.
i. Status of ILS DRL Items development and submission.
ii. Technical Manual (TM) Status (to include schedule submissions, submissions to date, and late status).
iii. Vendor Recommended Spares (VRS) procurement and receipt statistics.
iv. IUID status.
v. Craft Familiarization updates.
vi. Other items as required.
l. Schedule assessment and management for each craft to include, at a minimum:
i. Current schedule including description of tasks and events on the critical path and updated forecasts for completion of remaining work.
ii. Comparison of current Master Schedule against Master Schedule provided at previous review.
iii. Summary of recent and cumulative schedule performance, including any corrective actions taken to mitigate variances and any negative trends impacting schedule performance.
iv. Description of approved internal and contractual changes and impacts of each change, both positive and negative, to the Master Schedule and schedule performance.
m. Major sub-contractor status, to include manning, schedule, design integration and Master Schedule integration.
n. Workload manpower projections, including other ship/craft types currently under or planned to be under construction, at the Contractor’s facility.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 21
BLOCK 1-DATA ITEM NO.: DI-004
BLOCK 2-DATA ITEM TITLE: INTERIM PROGRESS REVIEW AGENDAS
AND MINUTES (Continued)
BLOCK 3-REFERENCE: SOW C-3.042a
o. Action Item status.
p. Any other issues critical to the craft design and construction.
q. Safety Risks.
3. IPR Minutes shall identify date, time, and location of the IPR and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included.
Copies of presentations or documents not previously submitted shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
Agendas NLT 10 DPT each IPR; R/ASR 3 DARC. Minutes and final presentation materials to be submitted NLT 14 days after each IPR; R/ASR 7 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 22
BLOCK 1-DATA ITEM NO.: DI-005
BLOCK 2-DATA ITEM TITLE: PRODUCTION READINESS REVIEW
AGENDA, PRESENTATION, AND MINUTES
BLOCK 3-REFERENCE: SOW C-3.042b
BLOCK 4-DATA DESCRIPTION:
1. The Production Readiness Review Agenda shall identify the meeting name, date, time and location.
2. In addition, the agenda and presentation shall include the following as a minimum:
a. Review of the PRR exit criteria listed in the Statement of Work. The Contractor shall demonstrate that it meets the PRR exit criteria prior to Start of Construction.
b. Status of Regulatory Body plans and Regulatory Body comments on those plans.
c. Status of Contract requirements.
1) Schedules (All).
2) Other Regulatory Body correspondence not addressed in 1 above.
3) Engineering Change Proposals (ECPs).
4) Non-Engineering Change Proposals (NECPs).
d. Review of Inspection System, Facility Certifications, and the Progressing System.
3. Review of the Production Information (Work Packages). Review that adequate production work packages are available for production.
4. Materials to be presented shall be provided with the agenda.
5. Minutes shall identify date, time, and location of the meeting and a chronological listing of each topic discussed. The minutes shall include applicable discussions, concerns, action items assigned and completed, and a list of the documentation discussed. A list of attendees shall be included.
Copies of presentations or documents not previously submitted shall also be included and identified in the minutes by document name, document revision, document date, and the digital file name and date.
Allow 14 days for Government review and comment.
Agendas 30 DPT the PRR; R/ASR 7 DARC. Presentation 3 DPT the PRR. Minutes 14 days after the PRR;
R/ASR 7 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 23
BLOCK 1-DATA ITEM NO.: DI-006
BLOCK 2-DATA ITEM TITLE: INTEGRATED MASTER SCHEDULE
BLOCK 3-REFERENCE: SOW C-3.042c
BLOCK 4-DATA DESCRIPTION:
1. The Integrated Master Schedule (IMS) shall present the overall plan for the design, construction, testing, and delivery of the crafts. The information will be used to verify attainability of program objectives and evaluate progress. The IMS shall depict all activities required for the performance of this Contract. The IMS schedule shall present key events, milestones, and the critical path. The IMS shall be capable of depicting and producing summary and detailed schedules.
2. Detailed schedules shall include all efforts required to complete milestones. Each schedule shall portray in chronological sequence, the actions, events, and requirements with corresponding planned start and completion dates and the actual start and completion dates, which shall be retained on each issue of that schedule. Each schedule shall be kept current with schedule modifications and completed tasks. Human resources shall be expressed in man-hours. As appropriate, a column, line or space shall be provided for comments, explanation of problems encountered, and any remarks providing clarification shall also be identified. The IMS- produced detailed schedules as follows.
a. DETAIL DESIGN SCHEDULE - The Detail Design Schedule shall include the systematic planning of shipbuilder design efforts, and established need dates for supporting requirements;
such as engineering analyses, mock-ups, design reviews, Production Readiness Review (PRR) and other pre-construction efforts.
b. ERECTION SEQUENCE SCHEDULE - The Erection Sequence Schedule shall include a systematic planning sequence of starting and completing Shipbuilder construction efforts and established need dates for supporting requirements. Subcontractor and critical construction events including unit construction, module erection, compartment closeout, and machinery installation shall be included.
c. SCHEDULE OF MAJOR MILESTONES AND KEY EVENTS - The Major Milestone and Key Events and Schedule shall identify key events leading up to the Contract milestones and shall identify critical paths for completion of each Contract milestones and shall identify critical paths for completion of each Contract milestone and key event. It shall also identify key events such as PRR, Start of Construction, Keel Laying, Launching, Immersion Test, Builder’s Dock Trials, Docking, Undocking, Builder’s Sea Trials, Acceptance Trials (AT), Transit and Craft Delivery (CD).
d. TEST AND TRIALS SCHEDULE - The Test and Trials Schedule shall identify the scheduled and actual sequence and completion of all major test and trial events leading to craft delivery.
The basic parameters of the Test Schedule shall include, the following:
1) Planned events, such as tests and trials.
2) Commencement and completion dates.
3) Ordering of prerequisite test and event items.
4) The Test Schedule shall clearly display the correct relationship of each prerequisite verification event for each dependent or subsequent verification event on a timeline.
5) The Test Schedule shall include:
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 24
BLOCK 1-DATA ITEM NO.: DI-006
BLOCK 2-DATA ITEM TITLE: INTEGRATED MASTER SCHEDULE
(Continued)
BLOCK 3-REFERENCE: SOW C-3.042c
6) Test Event number.
7) Test Event title.
8) Scheduled start date.
9) Scheduled completion date.
10) Actual start date.
11) Actual completion date.
3. Each schedule shall be highlighted to show changes from the previous submittal.
BLOCK 5-APPROVAL/REVIEW REQ
45 DAC. R/ASR 14 DPT each DR and/or IPR, 14 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 25
BLOCK 1-DATA ITEM NO.: DI-007
BLOCK 2-DATA ITEM TITLE: DRAWING SCHEDULE AND
DOCUMENTATION SCHEDULE
BLOCK 3-REFERENCE: SOW C-3.042c
BLOCK 4-DATA DESCRIPTION:
The Drawing Schedule and Documentation Schedule shall include a tabulated list of all drawings, modeling and simulation reports, analyses, and associated lists. The List shall include the following information:
1. Drawing Title.
2. Naval Sea Systems Command (NAVSEA) Drawing Number.
3. Planned Date of Initial Submission.
4. Actual Date of Initial Submission.
5. Scheduled Completion Date.
6. Actual Completion Date.
7. Revised Dates.
8. Date of Regulatory Body Submittal.
9. Regulatory Body approval, as required.
45 DAC. R/ASR 14 DPT each DR and/or IPR, 3 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 26
BLOCK 1-DATA ITEM NO.: DI-008
BLOCK 2-DATA ITEM TITLE: MATERIAL ORDERING SCHEDULE
BLOCK 3-REFERENCE: SOW C-3.042c
BLOCK 4-DATA DESCRIPTION:
The Material Ordering Schedule shall list materials, equipment, components and systems ordered and shall include the following:
1. Item and quantity being ordered.
2. Vendor.
3. Scheduled and actual dates of purchase order placement.
4. Shipyard need dates to support production.
5. Vendor promised delivery dates.
6. Actual delivery dates.
7. The initial schedule and order placement dates shall be retained on each issue of the schedule.
45 DAC. R/ASR 14 DPT each DR and/or IPR, 5 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 27
BLOCK 1-DATA ITEM NO.: DI-009
BLOCK 2-DATA ITEM TITLE: PURCHASE ORDER INDEX
BLOCK 3-REFERENCE: SOW C-3.042d
BLOCK 4-DATA DESCRIPTION:
1. The Purchase Order (PO) Index shall contain the following information for both specification and non-specification material:
a. PO Name.
b. Vendor’s Name, Address, Phone Number.
c. PO Number.
d. PO Date of Issue.
e. Received Date.
f. PO Dollar Value.
2. The index shall be provided in spreadsheet format.
PO Index due 60 DAC; MTHLY, 5 DARP thereafter until all PO activity is complete.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 28
BLOCK 1-DATA ITEM NO.: DI-010
BLOCK 2-DATA ITEM TITLE: MASTER EQUIPMENT LIST
BLOCK 3-REFERENCE: SOW C-3.042e
BLOCK 4-DATA DESCRIPTION:
1. The Master Equipment List (MEL) shall provide the following characteristics for the items identified as Master Equipment. The listing and identification of equipment shall be sorted by 3-digit Ship Work Breakdown Structure (SWBS). The MEL shall contain the following information:
a. Manufacturer.
b. Model Number.
c. Nomenclature.
d. Description.
e. Quantity.
f. Location.
g. Capacity/Rating.
h. CAGE Code.
i. Country of Manufacture.
45 DAC. R/ASR 14 DARC or as the need for change is identified.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 29
BLOCK 1-DATA ITEM NO.: DI-011
BLOCK 2-DATA ITEM TITLE: LAUNCHING AND DOCKING INFORMATION
BLOCK 3-REFERENCE: SOW C-3.042f
BLOCK 4-DATA DESCRIPTION:
1. The Launching and Docking Information shall include the following:
a. A description of construction of ground ways, sliding ways, foundation, and dry-dock, as applicable.
b. Inclination and camber of ways.
c. Specify the type and amount of lubricants, method of applications, and estimated coefficients of static and sliding friction.
d. Size and spacing of grease irons.
e. A description of the construction of the cradle, including fore and after poppets.
f. Number, size, and arrangement of wedges.
g. Description of outside shoring and blocking.
h. Description of internal shoring.
i. Arrangements for snubbing.
j. A statement of degree of completion of hull and machinery at launching.
k. Procedure and schedule for removing blocks and shores, removing grease irons, for wedging up, and letting go.
l. Customary launching calculations, indicating the following:
1) Estimated weight and center of gravity of craft.
2) Estimated drafts, list, trim, KM and GM when craft is waterborne.
3) Velocity and travel.
4) Drags, if used.
5) Estimated weight of cradle.
6) Unit pressure on groundways.
7) Expected distance between end of ways and water surface.
8) Way and pressure.
9) Fore poppet at pivoting.
10) Tipping and immersion.
11) Other engineering analyses that demonstrate the ability of the hull, appendages, and installed equipment to safely survive, without structural damage, all loads, including hydrodynamic loads, resulting from the launch evolution.
2. When other means of launching are proposed, the launching documentation shall contain information and computation comparable to the level of detail required above.
3. Where an alternate drydocking or launching method is proposed to be used, submit documentation to support the alternate proposal and identify any potential impact/modification to the craft structure, and include certification from an independent naval architectural firm, acceptable to the Contracting Officer, which shall certify that the method being proposed, including equipment and procedures, complies with sound naval architectural principles.
4. Provide Dockmaster qualifications.
5. Provide Docking and undocking procedures.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 30
BLOCK 1-DATA ITEM NO.: DI-011
BLOCK 2-DATA ITEM TITLE: LAUNCHING AND DOCKING INFORMATION
(Continued)
BLOCK 3-REFERENCE: SOW C-3.042f
Allow 14 days for Government review, comment and approval for content.
60 DPT craft launch; R/ASR 14 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 31
BLOCK 1-DATA ITEM NO.: DI-012
BLOCK 2-DATA ITEM TITLE: CRAFT DAMAGE REPORT
BLOCK 3-REFERENCE: SOW C-3.042g
BLOCK 4-DATA DESCRIPTION:
A Craft Damage Report shall document the occurrence, assessment of the cause, damage sustained, personnel injuries, proposed corrective action, and effects on the craft’s delivery schedule. Preliminary assessment of possible craft damage below the waterline shall be supported by underwater inspection and documented in the Craft Damage Report.
Allow 3 days for Government review and comment.
Notification NLT 24 hours after each incident; submit detailed report NLT 14 days after each incident;
R/ASR 7 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 32
BLOCK 1-DATA ITEM NO.: DI-013
BLOCK 2-DATA ITEM TITLE: FIRE AND FLOODING PROTECTION PLAN
BLOCK 3-REFERENCE: SOW C-3.045b
BLOCK 4-DATA DESCRIPTION:
1. The Fire and Flooding Protection Plan shall include, but not be limited to, a damage control organization chart; an outline of protection and detection systems and associated detectors, alarms, and telephones; fire, flooding, evacuation, and watch bills; pertinent instructions outlining the required precautions and actions regarding the following:
a. Flooding, both gross and local, detection, including flooding repair and dewatering procedures during construction.
b. Heavy snow and ice loading, excess firefighting water and flood water, which could cause static instability of the hull when afloat.
c. Welding, cutting, smoking, and electric arcing, and handling of combustible material, such as fuel oil, paint, wood staging and trash that could result in fire ignition.
d. Reduced accessibility on an incomplete craft.
2. The plan shall also contain requirements for inspection by roving patrols, and for controlling fires or flooding in security areas.
3. The plan shall include copies of the fire and flooding protection organization charts and instructions and identify how the fire and flooding protection organization chart and instructions will be kept up to date.
4. The plan shall identify locations of audio/visual alarms and charts in work areas that alert work force of emergency conditions requiring personnel to abandon craft.
5. The plan shall identify the schedule for training drill intervals.
Allow 21 days for Government review, comment and approval for content.
60 DPT SOC; R/ASR 10 DARC or need for change is identified in the Contractor’s facilities, organization, instructions, procedures, or construction applications that impact the fire/flooding protection requirements.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 33
BLOCK 1-DATA ITEM NO.: DI-014
BLOCK 2-DATA ITEM TITLE: CLASSIFICATION SOCIETY OR
REGULATORY BODY COMMUNICATIONS
BLOCK 3-REFERENCE: SOW C-3.070
BLOCK 4-DATA DESCRIPTION:
Provide copies of all incoming and outgoing communications on technical matters, including attachments/enclosures, between the Classification Society or Regulatory Bodies and the Contractor or his Subcontractors. Communications shall include letters, emails, and conversation notes.
Communications shall be provided 14 DPT each DR and/or IPR; 5 DARP; 14 DARC.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 34
BLOCK 1-DATA ITEM NO.: DI-015
BLOCK 2-DATA ITEM TITLE: CLASSIFICATION SOCIETY AND
REGULATORY BODY CERTIFICATES,
STATEMENTS, AND LETTERS
BLOCK 3-REFERENCE: SOW C-3.070
BLOCK 4-DATA DESCRIPTION:
1. Classification Society and Regulatory Body Certificates, Statements of Compliance, and letters of compliance shall contain the Contract number, a statement that identifies the purpose, applicability of this certification, and verification that the Contractor has complied with the Contract requirements.
2. Where Classification Society and Regulatory Body Certificates of compliance are presented as evidence of quality, such certificates shall indicate that the material or equipment was previously tested and met all performance requirements and shall contain verification data, refer to witnessing inspectors or present other verifiable quality data.
3. Classification Society and Regulatory Body Certificates, Statements, and Letters shall include the following:
a. Interim Class Certificate.
b. Certificate of Classification.
c. International Load Line Certificate.
d. International Tonnage Certificate.
e. Panama Canal Tonnage Certificate.
f. Stability Approval Letter.
g. Survey for Load Lines.
h. Load Line Assignment Letter.
i. Intact and Damage Stability Report.
j. Inclining Experiment Report.
k. Statement of Compliance for Institute of Electrical and Electronic Engineers (IEEE) Standard 45
Series.
l. Statement of Compliance for USCG Navigation Rules and Regulations Handbook for navigational lights.
m. Statement of Compliance for Environmental Protection Agency regulations.
n. ABS Statement of Compliance for CDC/USPHS VSP 2011 Construction Guidelines for Sanitary
Construction.
o. ABS Statement of Compliance for NAVSHIP Drawing No. 804-4444650-D, Surface Ship
Sewage Discharge Connections for material and design requirements for quick disconnect male coupling and dust cap.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 35
BLOCK 1-DATA ITEM NO.: DI-015
BLOCK 2-DATA ITEM TITLE: CLASSIFICATION SOCIETY AND
REGULATORY BODY CERTIFICATES,
STATEMENTS, AND LETTERS (Continued)
BLOCK 3-REFERENCE: SOW C-3.070
Allow 14 days for Government review.
Copies of certificates shall be submitted 14 days after receipt; original certificates shall be provided at CD.
Certification verification data shall be submitted 10 days after request from the Government for copy of the verification of equipment/ test certification.
Craft 1*
* Originals shall be provided with the craft.
APPROVED BY DIEGO E. KING, PMS325 DATA MANAGER PAGE | 36
BLOCK 1-DATA ITEM NO.: DI-016
BLOCK 2-DATA ITEM TITLE: NAVSEA HAZARDOUS MATERIAL WAIVER
REQUEST
BLOCK 3-REFERENCE: SOW C-3.077
BLOCK 4-DATA DESCRIPTION:
1. A NAVSEA Hazardous Material Waiver Request shall be provided for each prohibited substance the Contractor finds necessary to incorporate in the design, construction, operation or maintenance of the craft. The request shall contain the following information:
a. Material to be used…