Attachment C - Leesburg WPCF_SPI-1_Bid-Ready Drawings_Vol 2 of 7.pdf
PDF 37 MB Posted
- Solicitation number
- IFB-124276
- Issued by
- Loudoun County, Virginia
About this file
This is a bid-ready drawing set for the Town of Leesburg, Virginia's Water Pollution Control Facility (WPCF) Solids Processing Improvements - Phase 1 project, prepared by Hazen and Sawyer engineering firm. The document comprises civil, landscape, and erosion control design drawings for construction services that include upgrades to existing structures and processes, addition of new facilities, relocation and demolition of underground utilities, startup of new solids processing facilities, and replacement of Digested Sludge Storage Tank B. The drawing set (Volume 2 of 7) contains detailed specifications for erosion and sediment control measures, landscape plans, and civil construction details necessary for contractor bidding under IFB No. 500640-FY27-02. The drawings are dated May 2026 and include comprehensive notes regarding material specifications, installation requirements, and maintenance protocols for temporary and permanent site improvements.
The design specifications detail dewatering filter bags with non-woven geotextile construction meeting minimum ASTM standards, drop inlet protection using Dandy Sack or approved equivalents, curb inlet filters, sediment traps with baffle systems, and landscape restoration including lawn seeding, vegetated swales, and aquatic plantings with geotextile erosion control matting. The landscape scope encompasses approximately 39,170 square feet of lawn seed mix, 7,669 square feet of upland and meadow seed mix, aquatic planting zones totaling 6,560 square feet across emergent, high marsh, and upland areas, and installation of temporary goose exclusion fencing around extended detention ponds. All construction work is required to comply with VDOT construction standards, current applicable codes, and specified reference documents. Contractor responsibilities include site decompaction, topsoil provision, seeding establishment with minimum 85% coverage, plant material installation from approved nurseries, and comprehensive maintenance during landscape guarantee and monitoring periods.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATEISSUED FOR APPROVEDBY
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
ES
E
AN
D S
C D
ET
AI
LS
.d w g
L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
NOTE:
SILT CONTROL SYSTEM TO BE USED IN CONJUNCTION WITH PUMP AROUND IF DEEMED
NECESSARY BY SEDIMENT CONTROL INSPECTOR TO TREAT ANY SEDIMENT-LADEN WATER
WITHIN THE DRY WORK AREA.
DEWATERING/FILTER BAG MATERIALS SPECIFICATIONS:
THE DEWATERING/FILTER BAG SHALL BE MADE OF NON-WOVEN GEOTEXTILE WITH A MINIMUM
SURFACE AREA OF 225 SQUARE FEET PER SIDE. ALL STRUCTURAL SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH THREAD. THE SEAM
STRENGTH SHALL WITHSTAND 100LB/IN USING ASTM D-4884 TEST METHOD. THE
DEWATERING/FILTER BAG SHALL HAVE A NOZZLE LARGE ENOUGH TO ACCOMMODATE A FOUR
INCH DISCHARGE HOSE. THE NOZZLE SHALL BE SEALED TIGHTLY AROUND THE DISCHARGE
HOSE WITH A STRAP OR SIMILAR DEVICE TO PREVENT UNTREATED WATER FROM ESCAPING.
THE GEOTEXTILE FABRIC SHALL BE A NON-WOVEN FABRIC WITH THE FOLLOWING PROPERTIES:
WEIGHT ASTM D-3776 10 OZ/YD
GRAB TENSILE ASTM D-4632 270 LBS
PUNCTURE ASTM D-4833 150 LBS
FLOW RATE ASTM D-4491 70 GAL/MIN/SQ FT
PERMITIVITY ASTM D-4991 1/1.3 SEC
UV RESISTANCE ASTM D-4355 70%
AOS % RETAINED ASTM D-4751 100
CONSTRUCTION:
THE DEWATERING/FILTER BAG SHALL BE INSTALLED OVER A 3 INCH GRAVEL BASE OR A STRAW
BALE BASE TO PROMOTE INFILTRATION AND DEWATERING OF THE FILTER BAG.
BAG PLACED ON
AGGREGATE OR STRAW
HIGH STRENGTH
DOUBLE STITCHED
"J" TYPE SEAMS
'-0
15'-0"
SEWN IN SPOUT
HIGH STRENGTH STRAPPING
FOR HOLDING HOSE IN PLACE
TOP VIEW
SIDE VIEW
AGGREGATE OR
STRAW UNDERLAYMENT
WATER FLOW FROM PUMP
PUMP DISCHARGE HOSE
OPENING ACCOMODATES
UP TO 4" DISCHARGE HOSE
C-31-0417
DEWATERING/FILTER BAG
SEDIMENT TRAP MAINTENANCE REQUIREMENTS:
1. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN VOLUME OF THE WET STORAGE. SEDIMENT REMOVAL FROM THE BASIN SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE SEDIMENTATION PROBLEMS.
2. FILTER STONE SHALL BE REGULARLY CHECKED TO ENSURE THAT FILTRATION PERFORMANCE IS MAINTAINED. STONE CHOKED WITH
SEDIMENT SHALL BE REMOVED AND CLEANED OR REPLACED.
3. THE STRUCTURE SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. THE HEIGHT OF THE STONE OUTLET SHOULD BE CHECKED TO ENSURE THAT ITS
CENTER IS AT LEAST ONE (1) FOOT BELOW THE TOP OF EMBANKMENT.
STORM INLET
DUMPING STRAPS
MANAGEABLE 2'
CONTAINMENT AREA
LIFT STRAPS
OPTIONAL
OVERFLOW PORTS
STORM SEWER
GRATE
REINFORCED
CORNERS
NOT TO SCALE
DROP INLET PROTECTION
NOTES
1. THE DANDY SACK* SHALL UTILIZE MONOFILAMENT FABRIC AND HAVE LIFTING STRAPS
TO ALLOW REMOVAL OF THE UNIT AND MANUAL INSPECTION OF THE STORM SEWER
SYSTEM.
2. INSTALL THE DANDY SACK* IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE DANDY SACK*.
INSPECTION OF DANDY SACK* SHOULD BE ON A REGULAR BASIS AND IMMEDIATELY
AFTER RAIN EVENTS.
4. IF THE UNIT IS MORE THAN 1/3 FULL OF ACCUMULATED SEDIMENT, THE UNIT MUST BE
EMPTIED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
5. DROP INLET PROTECTION SHALL MEET THE REQUIREMENTS OF C-SCM-04 OR
GREATER.
* OR APPROVED EQUAL
IP
ES5
CIVIL
EROSION AND SEDIMENT CONTROL DETAILS
N. CAROLLO
C. TRAYWICK
D. SKEGGS
TOP WIDTH = 10' MIN
OUTFALL LENGTH = 18' MIN
TOP OF WET
STORAGE =
258.0
TOP OF DRY
STORAGE = 260.0
5/15/2026
41 342
PS
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
ES
E
AN
D S
C D
ET
AI
LS
.d w g
L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
MANHOLE
CURB OPENING
WITHOUT GRATE
CURB INLET FILTER
DRAIN OR APPROVED
EQUAL
AGGREGATE
POUCH
OVERFLOW GAP
NOTES:
1. INSTALL CURB FILTERS AT ALL INLETS WITHOUT GRATES TO KEEP SILT, SEDIMENT AND
CONSTRUCTION DEBRIS OUT OF THE STORM SYSTEM
2. THE CURB FILTER SHALL BE DANDY CURB AS MANUFACTURED BY DANDY PRODUCTS INC., OR
APPROVED EQUAL. SUBMIT A SHOP DRAWING FOR THE CURB FILTERS.
3. THE CURB FILTER SHALL FORM OF A CYLINDRICAL TUBE PLACED IN FRONT OF AND EXTENDING
BEYOND THE INLET OPENING ON BOTH SIDES BY A MINIMUM OF 12 INCHES.
4. THE CURB FILTER SHALL HAVE A POUCH ON THE STREET SIDE OF THE UNIT FOR STONE
AGGREGATE TO HOLD THE FILTER IN PLACE.
5. THE CURB FILTER SHALL BE CONSTRUCTED OF A HIGH VISIBILITY ORANGE MONOFILAMENT
FABRIC.
6. FILL POUCH WITH #57 STONE AGGREGATE TO A LEVEL (AT LEAST HALF-FULL) THAT WILL KEEP UNIT IN PLACE DURING A RAIN EVENT AND CREATE A SEAL BETWEEN THE CURB FILTER AND THE
SURFACE OF THE STREET.
7. CENTER THE UNIT AGAINST CURB OR MEDIAN INLET OPENING SO THAT THE CURB SIDE OF THE UNIT CREATES A SEAL WITH THE CURB OR MEDIAN BARRIER AND INLET STRUCTURE. THERE WILL
BE APPROXIMATELY TWELVE (12) INCHES OF THE INLET PROTECTION UNIT OVERHANGING ON
EACH SIDE OF THE OPENING.
8. THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM SURFACE
AND VICINITY OF UNIT AFTER EACH RAIN EVENT.
CURB INLET PROTECTION
C-31-0414R
PS
TS
ES6
CIVIL
EROSION AND SEDIMENT CONTROL DETAILS
N. CAROLLO
C. TRAYWICK
D. SKEGGS
MU
PS
C-31-0438
PLYWOOD BAFFLES
POSTS MIN. SIZE 4" SQUARE
OR ROUND 5" ROUND. SET
AT LEAST 3' INTO THE
GROUND
SHEETS OF 4' X 8' X 1/2" EXTERIOR
PLYWOOD OR EQUIVALENT
8'
4'
6"
SET TOP OF PLYWOOD 6"
HIGHER THAN RISER CREST
ELEVATION OR OUTFALL
LENGTH OF BAFFLE PER PLANS
NOTES:
1. SEDIMENT TRAP MUST BE FREE, SMOOTH, LEVEL, AND DRY ENOUGH TO INSTALL BAFFLES.
2. THE CONTRACTOR SHALL INSPECT BAFFLES PRIOR TO SIGNIFICANT RAIN EVENT AND RESTORE ANY COMPONENT AS NEEDED TO MAINTAIN BAFFLE FUNCTION. AT A MINIMUM, INSPECT BAFFLES
WITHIN 24 HOURS OF A RAIN EVENT.
3. THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS THAT HAS
ACCUMULATED TO ONE HALF THE HEIGHT OF THE BARRIER. WHEN REMOVING SEDIMENT, CARE
SHOULD BE MADE TO AVOID DAMAGING BAFFLES OR RESULT IN UNDERMINING DURING
CLEANOUTS AND REPAIR ANY DAMAGED BAFFLES PROMPTLY.
4. CONTRACTOR SHALL RE-ANCHOR BAFFLES TO BASIN BOTTOM AND SIDES IF WATER IS OBSERVED
FLOWING UNDERNEATH OR AROUND THEM.
5. CONTRACTOR SHALL MAINTAIN ACCESS CORRIDORS FOR BASIN AND BAFFLE MAINTENANCE AND
SEDIMENT REMOVAL.
6. CONTRACTOR SHALL ENSURE THAT BAFFLES ARE FUNCTIONING AS DESIGNED. THE FOLLOWING
SHALL BE INSPECTED REGULARLY BEFORE AND AFTER EVERY STORM EVENT: NO FLOW BETWEEN
BAFFLE SHEETS OR BASIN BANK AREAS, NO UNDERMINING OR FLOWS UNDER BAFFLES, AND
BAFFLES HAVE NOT BEEN DISPLACED, MOVED OR KNOCKED OVER. IF BAFFLES ARE FOUND TO BE
DAMAGED, CONTRACTOR SHALL REPAIR THESE ISSUES IMMEDIATELY.
7. WHEN PERMANENT STORMWATER BASINS HAVE BEEN MODIFIED TO FUNCTION AS A TEMPORARY
SEDIMENT BASIN AND THE CONTRIBUTING WATERSHED HAS BEEN PERMANENTLY STABILIZED,
REMOVE TEMPORARY BAFFLES AND SEDIMENT FROM THE POOLING AREA TO MEET THE BASIN
DESIGN REQUIREMENTS.
42 342
X
X
L17 C2
L21 L2
C3 L23
L24
X
X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
XXX
X
270269
LO
D
LOD
LO
DLO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
DLOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D LO
D LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD LOD
LO
D
LOD
LOD LOD
LOD LO
D
LOD
LO
D
LO
D
LO
D
LODLOD
LO
D
LODLOD
LO
D
LO
D
LOD
LOD
LOD
LODLOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LO
DLOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LODLODLOD
LO
DLO
D
LO
D
LODLODLO
D
LOD
LO
D
LOD
LOD
LODLODLO
D
SEE SHEET L002
NOTES:
1. SEE LANDSCAPE NOTES ON L002.
2. SEE SHEETS L002 AND L003 FOR ENLARGED
LANDSCAPE PLANS TO SEE ADDITIONAL BMP
PLANTING ZONES, ADDITIONAL SEED MIXES, AND
LIMITS OF GRADING.
3. ALL AREAS DISTURBED SHALL BE SEEDED WITH
LAWN SEED MIX. SEE LAWN MIX SCHEDULE ON L004.
4. SEE PLANS PREPARED BY KIMLEY HORN TITLED
"DIGESTER SLUDGE STORAGE TANK B
REPLACEMENT" FOR LANDSCAPE RESTORATION.
GT-A
[300]
LIMITS OF
DISTURBANCE
NO. DATEISSUED FOR APPROVEDBY
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
L0
O
VE
R
AL
L
LA
N D
SC
AP
E
PL
AN
.d w g
L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
L001
LANDSCAPE
OVERALL LANDSCAPE PLAN
K.CROOKS
K.CROOKS
N.CAROLLO
0 35'17.5
SCALE: 1" = 35'
SEE SHEET L003
LAWN MIX, TYP
SEE NOTE 3.
LOD LIMIT OF DISTURBANCE
LEGEND:
LAWN SEED MIX
BMP PLANTING AND SEEDING,
SEE NOTE 2
LANDSCAPE RESTORATION,
SEE NOTE 4
LANDSCAPE RESTORATION,
SEE NOTE 4
BMP PLANTING AND SEEDING, TYP
SEE NOTE 2
43 342
MMazzochette Text Box
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LODLODLODLOD
5 26
NO. DATEISSUED FOR APPROVEDBY
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
L0
L
AN
D
SC
AP
E
PL
AN
.d w g L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
MATCHLINE SEE SHEET L003
ELECTRICAL
BUILDING
VEGETATED SWALE SEED MIX
0 10'5
SCALE: 1" = 10'
THICKENED
SLUDGE
PUMPING
STATION
FUTURE GT D
FUTURE
REACTOR
BASIN G
GT-A
GT-B
GT-C
NOTES:
1. SEE FULL LAWN SEED MIX EXTENTS ON DWG L001
2. SEE LANDSCAPE SCHEDULES ON DWG L004.
3. SEE LANDSCAPE DETAILS ON DWG L005.
LOD LIMIT OF DISTURBANCE
LEGEND:
VEGETATED SWALE SEED MIX
LAWN SEED MIX
LAWN SEED MIX, TYP
SEE NOTE 1
GENERAL NOTES:
1. ANY AREA OUTSIDE THE LIMITS OF DISTURBANCE IS NOT TO BE AFFECTED BY THE CONTRACT WITHOUT
PRE-APPROVAL FROM THE ENGINEER. ANY AREA AFFECTED BY THE CONTRACTOR SHALL BE RESTORED AS PER
THE DIRECTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE.
2. ALL SOFTSCAPE AREAS WITHIN THE WORK LIMITS SHALL BE PROTECTED FROM COMPACTION. CORRECTIVE DECOMPACTION MEASURES SHALL BE TAKEN IN THE CASE OF ANY COMPACTION AT THE DIRECTION OF THE
ENGINEER AND AT THE CONTRACTOR'S EXPENSE.
3. THE CONTRACTOR SHALL EXCAVATE AS NEEDED AND PROVIDE TOPSOIL TO ACHIEVE FINISHED GRADES IN ALL AREAS TO BE SEEDED OR OTHERWISE PLANTED. TOPSOIL SHALL BE 6" MINIMUM IN SEEDED AREAS.
4. REFER TO DWG L003 FOR SEEDING AND PLANTING SCHEDULE AND DETAILS. IF ANY ADDITIONAL AREAS THAT ARE NOT INDICATED ON THE PLANS ARE DISTURBED BY CONSTRUCTION ACTIVITIES, THE AREAS SHALL BE SEEDED WITH GRASS SEED FOR LAWN AREAS AS INDICATED IN SPECIFICATION 32 90 00 - PLANTING.
SEEDING:
1. ALL SCHEDULE, SUBMITTALS, PRODUCTS AND METHODS FOR SEEDING OPERATIONS SHALL BE IN
ACCORDANCE WITH SEEDING SCHEDULE ON DWG L003 AND SPECIFICATION 32 90 00 - PLANTING.
2. ALL SEED SHALL BE INTERAGENCY CERTIFIED UNDER THE AUSPICES OF A STATE SEED IMPROVEMENT
COOPERATIVE AND SHALL BEAR THEIR SEALS OF CERTIFICATION ON EACH BAG. PERMANENT SEED SHALL BE
75% PURE LIVE SEED MINIMUM.
3. SEED BROUGHT TO THE PROJECT SITE SHALL BE IN UNOPENED BAGS SHOWING THE NET WEIGHT, COMPOSITION OF MIX, SUPPLIERS NAME AND GUARANTEE OF ANALYSIS. SEED SHALL BE STORED IN ORIGINAL UNOPENED PACKAGES, KEPT DRY, AND NOT OPENED UNTIL NEEDED FOR USE. DAMAGED OR FAULTY PACKAGES SHALL NOT BE USED AND WILL BE REJECTED. SEED SHALL BE FRESH, RECLEANED SEED OF THE LATEST CROP AND BE IN CONFORMANCE WITH THE PLANTING SPECIFICATION. ALL SEED MATERIALS SHALL BE PROTECTED FROM DRYING OUT AND FROM WIND DAMAGE DURING DELIVERY. SEED MIXES AND
RATES AS INDICATED IN DWG L003 AND SPECIFICATION 32 90 00 - PLANTING.
4. SEED MIXTURE SHALL BE INSPECTED BY THE ENGINEER UPON ARRIVAL AT THE JOB SITE AND PRIOR TO INSTALLATION. ANY MATERIALS NOT IN COMPLIANCE WITH THE PLANTING SPECIFICATION WILL NOT BE
ACCEPTED AND SHALL BE REMOVED FROM THE JOB SITE IMMEDIATELY.
5. SEEDBED PREPARATIONS AND SEEDING SHALL BE AS STATED IN THE SPECIFICATION 32 90 00 - PLANTING.
6. DO NOT BROADCAST SEED BY MECHANICAL APPLICATION WHEN THE WIND VELOCITY IS SUCH TO PREVENT
UNIFORM SEED DISTRIBUTION.
7. ALL SEEDED AREAS SHALL BE COVERED WITH THE ROLLED EROSION CONTROL PRODUCT AS PER
SPECIFICATION 31 25 00 - EROSION CONTROL MATTING DETAIL, AND THE DETAIL ON DWG ES6.
8. SEEDED AREAS SHALL BE WATERED AT A MINIMUM OF ONCE PER WEEK UNTIL SEED HAS GERMINATED AND
BECOME ESTABLISHED.
9. ACCEPTABLE SEEDING ESTABLISHMENT WILL BE 85% COVERAGE OF THE OPEN AREA WITH THE SEEDED
SPECIES. ANY AREA NOT MEETING THIS REQUIREMENT SHALL BE RESEEDED WITH THE ORIGINAL SEED MIX AT
THE CONTRACTOR'S COST.
PLANTING:
1. ALL PLANTINGS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. IN THE EVENT THE ACTUAL
LIMITS OF SITE CLEARING AND STAGING AREAS DIFFER FROM THOSE SHOWN IN THE PLANS, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR PLANTINGS IN CONFORMANCE WITH THE SPECIFICATIONS.
2. ALL PLANT MATERIAL SHALL BE VIGOROUS, FREE OF INJURY OR DEFECTS. ALL PLANT MATERIAL SHALL BE
STOCK FROM AN APPROVED NURSERY AS PER THE SPECIFICATION.
3. PRIOR TO INSTALLATION, THE CONTRACTOR MUST STAKE OUT AND RECEIVE APPROVAL FROM THE ENGINEER
FOR LOCATIONS OF ALL PLANTINGS.
4. PLANTS SHALL BE INSTALLED IN "DRY" CONDITIONS AND NOT WHEN PLANTING LOCATIONS ARE WET OR
FROZEN.
5. THE CONTRACTOR SHALL INSTALL TEMPORARY GOOSE EXCLUSION FENCE AROUND THE EXTENDED DETENTION POND AS SHOWN ON THE LANDSCAPE PLAN. TEMPORARY GOOSE EXCLUSION FENCE MUST BE INSTALLED WHILE PLANTING SUCH THAT ALL NEW PLANTINGS ARE PROTECTED BY GOOSE EXCLUSION ON THE SAME DAY.
DO NOT INSTALL TEMPORARY GOOSE EXCLUSION FENCE OVER CHANNELS. TEMPORARY GOOSE EXCLUSION FENCE MUST BE INSPECTED AND REPAIRED AS OFTEN AS NECESSARY DURING THE LANDSCAPE GUARANTEE AND MONITORING PERIOD. TEMPORARY GOOSE EXCLUSION FENCE MUST BE REMOVED AT THE END OF THE MONITORING PERIOD. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL BY THE ENGINEER PRIOR TO
REMOVING THE TEMPORARY GOOSE EXCLUSION FENCE.
VEGETATED SWALE
50 ASI, 50 AMT, 50 CST, 50 CSV
50 DCP, 50 MRG, 50 PVG, 50 VHT
L002
LANDSCAPE
LANDSCAPE PLAN - AREA 1
K. CROOKS
K. CROOKS
K. WARD
44 342
MMazzochette
LO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LOD LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
NO. DATEISSUED FOR APPROVEDBY
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
L0
L
AN
D
SC
AP
E
PL
AN
.d w g L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
MATCHLINE SEE SHEET L002
REINFORCED CONCRETE
RETAINING WALL, SEE CIVIL DWGS
0 10'5
SCALE: 1" = 10'
LIMITS OF GRADING, TYP
LAWN SEED MIX, TYP
SEE NOTE 1
UPLAND AND MEADOW SEED MIX, TYP
HIGH MARSH
11 ASI, 11 CST, 11 HMS, 11 VHT
11 AMT, 11 JTU, 11 LSP, 11 PVG
3 CAM, 2 VCB
EMERGENT
33 IVC, 33 ACC, 33 PTV
28 PCD, 28 JEF, 28 SCP
VEGETATED SWALE SEED MIX
SEE SWALE PLANTING ON L001
NOTES:
1. SEE FULL LAWN SEED EXTENTS ON DWG L001.
2. SEE GENERAL, PLANTING, AND SEEDING NOTES ON
DWG L002.
3. SEE LANDSCAPE SCHEDULES ON DWG L004.
4. SEE LANDSCAPE DETAILS ON DWG L005.
OPEN WATER
FOREBAY TO EL 257.0
MICROPOOL TO 255.0
LOD LIMIT OF DISTURBANCE
LEGEND:
EMERGENT
FOREBAY: EL 257.0 - 258.0
MICROPOOL: EL 255.0 - 256.0
HIGH MARSH
FOREBAY: EL 258.0 - 258.5
MICROPOOL: EL 256.0 - 257.0
UPLAND
FOREBAY: EL. 258.5 - 264.0+
MICROPOOL: EL. 257.0 - 261.0
VEGETATED SWALE SEED MIX
LAWN SEED MIX
GOOSE EXCLUSION FENCE
GOOSE EXCLUSION FENCE, TYP
UPLAND AND MEADOW SEED MIX
UPLAND
170 AMT, 170 MGC, 170 PVG, 170 AMF
170 DCF, 170 RTP, 170 SZP, 170 ASY
30 VDT, 30 HPF, 30 RAG
EMERGENT
27 IVC, 27 ACC, 27 TV
27 PCD, 27 JEF, 27 SCP
OPEN WATER, TYP
CONCRETE FOREBAY WALL,
SEE STRU DWGS
MICROPOOL PERMANENT POOL ELEV. 255.5
FOREBAY PERMANENT POOL ELEV. 257.5
HIGH MARSH
19 ASI, 19 CST, 19 HMS, 19 VHT
19 AMT, 19 JTU, 19 LSP, 19 PVG
4 CAM, 5 VCB
PERMANENT POOL ELEVATION
L003
LANDSCAPE
LANDSCAPE PLAN - AREA 2
K. CROOKS
K. CROOKS
K. WARD
45 342
MMazzochette
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
L0
L
AN
D
SC
AP
IN
G D
ET
AI
LS
.d w g
L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
EMERGENT (614 SF)
FOREBAY: EL 257.0 - 258.0 ; MICROPOOL: EL 255.0 - 256.0
HIGH MARSH (447 SF)
FOREBAY: EL 258.0 - 258.5 ; MICROPOOL: EL 256.0 - 257.0
UPLAND (4,499 SF)
FOREBAY: EL 258.5 - 264.0+ ; MICROPOOL: EL 257.0 - 261.0
LANDSCAPE SCHEDULES SEEDING SCHEDULES
HIGH MARSH SEED MIX (472 SF)
FOREBAY: EL 258.0 - 258.5 ; MICROPOOL: EL 256.0 - 257.0
UPLAND AND MEADOW SEED MIX (7,669 SF)
FOREBAY: EL 258.5 - 264.0+ ;
MICROPOOL: EL 257.0 - 261.0
VEGETATED SWALE SEED MIX (1,410 SF)
LAWN SEED MIX (39,170 SF)
COVER CROP (9,551 SF)
NOTES:
1. SEE GENERAL, PLANTING, AND SEEDING NOTES ON
DWG L001.
2. SEE LANDSCAPE PLANS ON DWG L001, L002 AND
L003.
VEGETATED SWALE (1,410 SF)
L004
LANDSCAPE
LANDSCAPE SCHEDULE
K. CROOKS
K. CROOKS
K. WARD
46 342
MMazzochette
NOTES:
1. PRUNING, IF NECESSARY, MUST BE DONE BY A CERTIFIED ARBORIST.
2. NOTIFY ENGINEER IF IMPERVIOUS OR UNACCEPTABLE NATIVE SOIL TO BE REMOVED IS ENCOUNTERED IN
TREE PIT LOCATIONS.
3. ROTOTILL/CULTIVATE SOILS TO A DEPTH EQUAL TO THE DEPTH OF ROOT BALL AND TWO TIMES THE
DIAMETER OF THE ROOT BALL.
4. APPLY FERTILIZER AND MYCORRHIZAL INOCULANT PER PLANTING SPECIFICATION. TAMP SOIL IN 6"
LAYERS AROUND ROOT BALL AND WATER THOROUGHLY AFTER PLANTING. WATER THOROUGHLY AFTER
EXCAVATION AND AFTER PLANT INSTALLATION.
5. COMPLETELY UNWRAP OR CUT GIRDLING ROOTS. REMOVE ANY SOIL OR ROOTS ABOVE THE ROOT FLARE.
DO NOT DAMAGE MAIN ROOTS OR ROOT BALL WHEN INSTALLING TREE.
6. FOR CONTAINER: REMOVE ROOT BALL FROM CONTAINER. LOOSEN POT- BOUND, SPIRALLY-GROWING
ROOTS.
FOR B&B: CUT TWINE AND REMOVE BURLAP AND WIRE BASKET.
7. REMOVE AND DISPOSE OF ALL NON-BIODEGRADABLES FROM PLANTING HOLES AND ROOT BALL.
SET THE SHRUB ON
UNDISTURBED SOLID GROUND
IN THE CENTER OF THE AREA
SO THAT THE ROOT FLARE IS
LEVEL WITH THE
SURROUNDING SOIL
PLANTING SOIL AS
SPECIFIED
FINISHED GRADE AROUND
PLANT TO BE THE SAME AS
ORIGINAL GRADE OF PLANT
IN POT
3" SAUCER TO
RETAIN WATER
CLEAN PRUNE ONLY
DAMAGED, DISEASED AND
DEAD BRANCHES
DO NOT EXCAVATE EXISTING
SUBGRADE DEEPER THAN
ROOTS TO AVOID SETTLING
APPLY 3" MULCH ON
FINISHED GRADE, MULCH
IS NOT TO BE INSTALLED
WITHIN 3" OF THE STEM
OF THE SHRUB
EXISTING COMPACTED
SUBGRADE
48' (TYP)
48' (TYP)
1/4" TWINE ACROSS TOP OF
PLANTING
INDIVIDUAL CELL,
TYP
54" HIGH BLACK
EXTRUDED
PLASTIC FENCING,
MAX. MESH SIZE 1"
x 1"
GOOSE EXCLUSION FENCE - 3D
(SECTIONS NO LARGER THAN 2,310 S.F.)
1 1/2" HOT DIPPED
GALVANIZED
STAPLES (TYP.)
54"
4"
24"
2" X 2" X 82" NOTCHED
HARDWOOD STAKE
(UNTREATED)
2" HOT DIPPED
GALVANIZED ROOFING
NAILS TO SECURE TWINE
(TYP.)
BLACK EXTRUDED
PLASTIC FENCING MAX.
MESH SIZE 1" x 1"
12" (TYP)
PERIMETER GOOSE EXCLUSION FENCE - SECTION VIEW
AREA OF
INDIVIDUAL CELLS
NOT TO EXCEED
2,310 S.F.
VARIES
54" HIGH BLACK EXTRUDED PLASTIC FENCING, MAX.
MESH SIZE 1" x 1"
PERIMETER GOOSE EXCLUSION FENCE - PLAN VIEW
1 STRAND OF 1/4" TWINE ACROSS TOP OF
PLANTING (TYP).
10" STRIPS OF ORANGE BIODEGRADABLE
FLAGGING TAPE SPACED 2.0' O.C. ALONG TWINE.
NOTCHED
HARDWOOD
STAKE,
TYP.
STAPLE
SPACING
GOOSE EXCLUSION FENCE
APPLY OSMOCOTE TIME
RELEASE FERTILIZER PER
PLANTING SPECIFICATION
NOTES:
1. ALL PLASTIC WRAP MUST BE REMOVED PRIOR TO
PLANTING.
2. AFTER INSTALLING PLUG, FIRM INTO PLACE WITH FOOT
TAKING CARE NOT TO DEFORM PLUG.
1"
RECESSED
LOOSENED SOIL
ROOTS WHITE AND ROOTED THROUGH
SIDES AND BOTTOM AND FIRMLY
CONTAINED THEREIN. IF NOT PLANTED
IMMEDIATELY AFTER DELIVERED TO JOB
SITE, THE PLANTS MUST BE STORED OUT
OF DIRECT SUNLIGHT AND WIND WITH
THEIR POTS AND ASSOCIATED ROOT
MASSES MAINTAINED MOIST THROUGH
PERIODIC WATERING UNTIL THE TIME OF
PLANTING
NO. DATEISSUED FOR APPROVEDBY
PROJ.ENGR.
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
L0
L
AN
D
SC
AP
IN
G D
ET
AI
LS
.d w g
L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
TYPICAL SHRUB PLANTING DETAIL
NOT TO SCALE
TYPICAL PLUG PLANTING DETAIL
NOT TO SCALE
GOOSE EXCLUSION FENCING
NOT TO SCALE
NOTES:
1. SEE GENERAL, PLANTING, AND SEEDING NOTES ON
DWG L001.
2. SEE LANDSCAPE PLANS ON DWG L001,L002 AND
L003.
L005
LANDSCAPE
LANDSCAPE DETAILS
K. CROOKS
K. CROOKS
K. WARD
47 342
MMazzochette
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
C D
1.
dw g L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
CD1
DETAILS
CIVIL DETAILS - SHEET 1
N. CAROLLO
N. CAROLLO
D. SKEGGS
VDOT CONSTRUCTION STANDARDS
ALL CONSTRUCTION METHODS AND MATERIAL SHALL CONFORM TO THESE DRAWINGS, PROJECT
SPECIFICATIONS, STANDARDS WITH ALL CURRENT APPLICABLE CODES, AND, UNLESS OTHERWISE SPECIFIED, WITH THE CURRENT EDITIONS AND LATEST REVISIONS OF THE FOLLOWING REFERENCE
DOCUMENTS:
· VDOT ROAD AND BRIDGE STANDARDS
· VDOT ROAD AND BRIDGE SPECIFICATIONS
· INSTRUCTIONAL AND INFORMATIONAL MEMORANDA (MUTCD)
SPECIFIC STANDRADS AND DETAILS FROM THE CURRENT AND OR REVISED VERSION OF THE VDOT
ROAD AND BRIDGE STANDARDS INCLUDE:
DETAIL PAGE SHEET TITLE
EW-1 101.01 1 OF 1 STANDARD ENDWALL FOR PIPE
CULVERTS 12" - 36" CIRCULAR
ES-1 102.01 1 OF 1 FLARED END SECTION 12" - 60"
CONCRETE PIPE CULVERTS
T-DI-1 103.03 1 OF 1 STANDARD PRECAST TOP UNITS
DI-1 104.01 1 OF 1 STANDARD DROP INLET 12" - 24" PIPE:
MAXIMUM DEPTH (H) = 10
MH-1
106.01 1 OF 3 MANHOLE FOR 12" TO 48" PIPE
CULVERTS
106.02 2 OF 3 STANDARD MANHOLE FRAME AND
COVER
106.04 3 OF 3 STANDARD MANHOLE FRAME AND
COVER
IS-1 106.08 1 OF 1 STANDARD METHOD FOR SHAPING
MANHOLE AND INLET INVERT
ST-1 106.09 1 OF 1 STANDARD STEP
DSB-1 106.15 1 OF 1
DRAINAGE STRUCTURE BEDDING FOR
DROP INLET, MANHOLE, AND JUNTION
BOX
PB-1 107.01 1 OF 4
INSTALLATION OF PIPE CULVERTS AND
STORM SEWERS CIRCULAR PIPE BEDDING
AND BACKFILL - METHOD "A"
EC-1 113.01 1 OF 1 CULVERT OUTLET PROTECTION
SWM-1 114.02 1 OF 1 PRECAST STORMWATER MANAGEMENT
DRAINAGE STRUCTURE
SWM-DR
114.05 2 OF 5 STORMWATER MANAGEMENT (SWM)
DETAILS
114.05 3 OF 5 STORMWATER MANAGEMENT (SWM)
DETAILS
114.05 4 OF 5
STORMWATER MANAGEMENT DETAILS
TRASH RACK FOR SWM DRAINAGE
STRUCTURES
CG-2 201.01 1 OF 1 STANDARD 6" CURB
CG-6 201.03 1 OF 1 COMBINATION 6" CURB & GUTTER
TYPICAL TRENCH
C-01-0106
W
1/2 S
4' -0
" M
IN
(T
YP
" M
IN
FOR ASPHALT PAVEMENT OVER CONCRETE
CONCRETE - MATCH
EXISTING, 6" MIN
AGGREGATE BASE
COURSE, MATCH
EXISTING, 6" MIN
ASPHALT SURFACE
COURSE, MATCH
EXISTING, 1.5" MIN
EXISTING PAVEMENT
COMPACTED
BACKFILL
ASPHALT BASE
COURSE, 3" MIN
AGGREGATE BASE
COURSE, MATCH
EXISTING, 6" MIN
FOR ASPHALT PAVEMENT
SEE NOTE 1
NOTES:
1. SEE C-01-0107 FOR TRENCH
WIDTH, "W" VALUES.
2. SEE C-01-0100 THRU
C-01-0105 FOR PIPE BEDDING
DETAILS.
TYPE I SEPARATOR
GEOTEXTILE
TRENCH EXCAVATION LIMITS
DIAMETER
INTERNAL
OF PIPE
W
WIDTH OF TRENCH
MAX W=MIN
4"-6" 8"-10"
12" 14"-16"
18" 20",21"
24" 27" 30" 36" 42" 48" 54" 60" 72" 78" 84" 90" 96"
108"
3'-9" 3'-9" 3'-9" 4'-2" 4'-4" 4'-8"
4'-11" 5'-9" 6'-7" 7'-4" 8'-2" 8'-9" 9'-4"
9'-10" 11'-0" 11'-8" 12'-0" 12'-6" 13'-0" 14'-0"
2'-0" 2'-2"
O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2'
O.D.+2' O.D.+2'
O.D.+2' O.D.+2'
DEPTH
OF
CUT
S
MAXIMUM PAVEMENT
REPLACEMENT WIDTH
0-6' >6-8'
>8-10' >10-12'
S=W+4' S=W+8'
S=W+12' S=W+16'
W = TRENCH WIDTH AT BOTTOM OF
PIPE. TRENCH SIDE SLOPES SHALL
BE IN ACCORDANCE WITH OSHA
REQUIREMENTS.
C-01-0107
>12-14' S=W+20' >14-16' S=W+24' >16-18' S=W+28'
>18' S=W+32'
TYPICAL CONCRETE WALKWAY
4'1/2" EXPANSION JOINTS
48' MAX SPACING BETWEEN
4" THICK CONCRETE WALK
TYPICAL CONTRACTION JOINT
C-32-0520
1/2" EXPANSION JOINT MATL
REQUIRED WHEN WALK ABUTS
RIGID STRUCTURES
WHEN WIDTH OF SIDEWALK, PAD, ETC
EXCEEDS 6', LONGITUDINAL CONTRACTION
JOINTS SHALL BE PLACED AS REQUIRED
VARIES, SEE
PLAN FOR
WIDTH
PAVEMENT
1/ 2"
S
LO
PE
4' -0
4'
-4
6"
6" 6"
BOLLARD TYPE 1
C-32-0540R
NOTES:
1. UNLESS OTHERWISE NOTED, ALL BOLLARDS SHALL BE TYPE 1.
2. BOLLARD COVER SHALL BE POST GUARD MODEL CL1386F
7"Øx52" HIGH, YELLOW WITH REFLECTIVE RED STRIPES, OR
APPROVED EQUAL AND SECURED TO STEEL PIPE WITH
COMPRESSIVE FOAM STRIPS.
CLASS "B" CONCRETE
ENCASEMENT
6"Ø SCH 40 STEEL PIPE
FILLED WITH CONCRETE
BOLLARD TYPE 3
6"Ø SCH 40 STEEL PIPE
FILLED WITH CONCRETE
1 1/2"
TYP PL 3/8"X12"X12" GALV,
PAINTED PER SPEC
4-1/2"Ø GALV ADH
ANCHORS W/6" MIN
EMBED, ONE EACH
CORNER
3/16 1 1/2
TYP OF 4
SIDES
CLASS "B" CONCRETE
ENCASEMENT
4' -4
BOLLARD COVER POST,
SEE NOTE 2
BOLLARD COVER POST,
SEE NOTE 2
PROPOSED PIPELINE OVER EXIST PIPE
12"
MIN
PROPOSED
PIPELINE
6" MIN
12" MAX
PIPE
EXIST
PIPELINE
PROPOSED
PROPOSED PIPELINE UNDER PROPOSED PIPE
6" 6"PIPE
OD
PROP
PIPE
12" MAX
6" MIN
C-01-0120R
EXCAVATEABLE FLOWABLE FILL
FULL TRENCH WIDTH
(SEE NOTE 1)
CL
CL CL
CL
1" THICK MIN. COMPRESSIBLE
JOINT FILLER MATERIAL
SEE NOTE 2
NOTE:
1. NO ENCASEMENT REQUIRED FOR SPACE GREATER THAN 12".
2. WHEN MINIMAL SEPARATION (<6") BETWEEN PIPES IS PERMITTED BY THE
OWNER, EXISTING UTILITY SHALL BE WRAPPED IN NEOPRENE (1" MIN
THICKNESS) AT THE CROSSING LOCATION. MINIMUM WIDTH OF THE
NEOPRENE SHALL BE 1'.
3. THIS INTENT BEHIND THIS DETAIL IS TO ENSURE THE INTERSTITIAL SPACE
BETWEEN THE TWO PIPELINES IS ADEQUATELY COMPACTED.
ADDITIONAL NOTES:
1. CHAIN LINK FENCE SHALL NOT INCLUDE 3 STRANDS OF
BARBED WIRE ALONG THE TOP OF THE FENCE LINE.
2. CONTRACTOR SHALL INSTALL 2" BLACK HDPE PRIVACY SLATS
PER ULTIMATE SLAT PATENTED PRIVACY FENCE OR
APPROVED EQUAL.
48 342
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
C D
2.
dw g L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
CD2
DETAILS
CIVIL DETAILS - SHEET 2
N. CAROLLO
N. CAROLLO
D. SKEGGS
NEW ASPHALT PAVEMENT
AGGREGATE BASE COURSE
CUT BACK EXIST BASE
COURSE 12" MIN
CUT BACK EXIST
EXIST BASE COURSE
C-32-0550SEE
C-32-0555
RESURFACED ASPHALT PAVEMENT
TACK COAT
1" M
IN
TACK COAT
ASPHALT BASE
COURSE, 3.5" MIN
ASPHALT SURFACE
COURSE, 2" MIN
TYPICAL PAVEMENT JUNCTION WITH
RESURFACING OF EXISTING PAVEMENT
SURFACE COURSE
6" MIN FROM BASE
SLOPE
EXISTING SURFACE COURSE;
REPAIR HOLES, CRACKS, ETC.
BEFORE APPLYING TACK COAT
AND NEW ASPHALT
NEW ASPHALT PAVEMENT
AGGREGATE BASE COURSE
TACK COAT
CUT BACK EXIST BASE
COURSE 12" MIN
CUT BACK EXIST
TYPICAL PAVEMENT JUNCTION
EXIST BASE COURSE
C-32-0556
C-32-0550SEE
TACK COAT
ASPHALT SURFACE
COURSE, 2" MIN
ASPHALT BASE
COURSE, 3.5" MIN
SURFACE COURSE
6" MIN FROM BASE
SLOPE
EXIST SURFACE
COURSE
LONGITUDINAL CONTRACTION JOINT
T
L
#4 (30" LONG)
TIE BAR AT
2'-6" CENTERS
TRANSVERSE CONTRACTION JOINT
T
NOTES:
T/
L/2 L/2
C-32-0561
S-03-0201 S-03-0201
TYPE A
TYPE B
T
L
T/
L/2 L/2
S-03-0202
INTERIM OR PLANNED TRANSVERSE
OR LONGITUDINAL CONSTRUCTION
JOINT
TYPE C
A TRANSVERSE AND LONGITUDINAL
CONSTRUCTION JOINTS, TYPE C, SHALL BE
CONSTRUCTED AT THE END OF EACH DAYS
OPERATIONS (PLANNED JOINT) OR WHENEVER
THE PLACING OF CONCRETE IS SUSPENDED
FOR MORE THAN 30 MINUTES (INTERIM JOINT).
AN APPROVED HEADER SHALL BE USED AT
INTERIM JOINTS AND SHALL BE DESIGNED TO
PERMIT THE PLACEMENT OF TIE BARS AND
SHALL HOLD SUCH BARS IN THEIR CORRECT
LOCATIONS.
B PLANNED TRANSVERSE AND LONGITUDINAL
CONSTRUCTION JOINTS SHALL BE LOCATED AT
THE SAME SPACING REQUIRED FOR
CONTRACTION JOINTS. REFER TO JOINT
LAYOUT PLANS.
C VERTICAL TOLERANCE FOR PLACEMENT OF
DOWELS OR TIE BARS SHALL BE 1/4".
D JOINT TREATMENT AS INDICATED BY DETAIL
S-03-0202 IS NOT REQUIRED FOR INTERIM
JOINTS.
S-03-0201
EXPANSION (ISOLATION) JOINT
TYPE D
#4 (30" LONG)
TIE BAR AT 12"
CENTERS
CONCRETE
PAVEMENT
STONE BASE
3/4" ±1/4"
SUBGRADE
OR SUBBASE
T
ABUTTING SLAB
/STRUCTURE/CURB
OR SIDEWALK
PREMOLDED RESILIENT
JOINT FILLER
CONCRETE PAVEMENT CONTROL
JOINTS
PV-312
TTO/C 68
24" RAS
---V V
VALVE TYPE AND NUMBER,
IF APPLICABLE
NUMBER OF TURNS
TO OPEN OR CLOSE
PROCESS DESIGNATION
DIRECTION OF PIPE LINE
FLAT BRASS SURVEY MARKER,
MINIMUM 3" DIAMETER WITH
CORRUGATED ANCHOR STEM,
MODEL M/M-BCS-3 1/4FS BY
SURV-CAP OR EQUAL
C-33-0632
NOTES:
1. ENGRAVING SHALL BE MINIMUM 3/16" TALL CAPITAL LETTERS IN A BLOCK
FONT SIMILAR TO ARIAL, CENTERED AND SPACED AS SHOWN.
2. ALL MARKINGS SHALL BE NEATLY MACHINE ENGRAVED.
3. ALTERNATELY, MARKINGS MAY BE HAND STAMPED, PROVIDED STAMPING IS
DEEP ENOUGH TO WITHSTAND NORMAL TRAFFIC AND WEATHERING.
STAMPING OF DISK SHALL BE ACCOMPLISHED PRIOR TO SETTING IN
CONCRETE VALVE BOX PAD.
4. SUBMIT ONE SAMPLE FOR APPROVAL PRIOR TO ENGRAVING ALL MARKERS.
5. REGARDLESS OF ENGRAVING METHOD SELECTED, CONTRACTOR SHALL
PROVIDE COMPATIBLE STAMP SET AND ANVIL TO OWNER UPON
COMPLETION OF PROJECT FOR FUTURE REPAIR OF ENGRAVINGS.
RAISED HEXAGONAL
HEAD THREADED
PLUG
6" SCH 40 PVC
6" SCH 80 PVC RISER
LOCATE CLEAR OF
OBSTRUCTIONS
WYE OR 45° BEND
VA
R
IE
S
CLEANOUT
PERF DRAIN
FINISH GRADE
C-33-0620
VALVE BOX PAD,
SEE C-33-0631
2'-0" x 2'-0"
SQUARE CONCRETE PAD
6" M
IN
2" 4"
VALVE BOX TOP SECTION
WITH COVER AL
L
AR
O U
N D
3/ 4"
C H
AM
FE
R
TYPICAL
PAVEMENT
SECTION
SEE NOTE ABOVE
C-33-0631
VALVE BOX PAD
CENTER SECTION
(LENGTH AS REQD)
NOTE:
EMBED INTO CONCRETE PAD, BRASS DISK
WITH VALVE DATA PER DETAIL C-33-0632
FINISHED
GRADE
CLASS A-3 CONCRETE
9"
V A R
VARIES EXISTING DRIVEWAY
6 x 6 - W10 x W10 WWF6" SUB-BASE
(VDOT NO. 21A)
EXTEND SUB-BASE
12", BOTH SIDES
NOTES:
1. WIDTH OF VALLEY GUTTER VARIES, SEE SITE PLAN ON DWG C021 AND C022.
2. REFER TO GRADING SHEETS FOR FLOW LINE ELEVATION OF VALLEY GUTTER.
SEE NOTE 2
SEE NOTE 1
NTS
1DETAIL
XXX
VALLEY GUTTER
1":12"1":12"
6"
8"
AGGREGATE BASE
(VDOT 21-A)
SUBGRADE AND BASE COMPACTED TO
98% OF A MODIFIED PROCTOR ±2% OF
OPTIMUM MOISTURE
1/4":1' MIN 1/4":1' MIN
CONCRETE REINFORCED
WITH #4@12" CENTERED IN
PAVEMENT
FILTER GEOTEXTILE FABRIC
SEE NOTE 1
NOTES:
1. HEAVY DUTY CONCRETE
PAVEMENT IS TO BE A
MINIMUM OF 6" REINFORCED
CONCRETE.
2. CONTRACTION JOINT SHALL BE
PLACED AT INTERVALS EQUAL
TO THE PAVEMENT WIDTH
ASPHALT SURFACE
COURSE SM-9.5A
6"
SUBGRADE AND BASE
COMPACTED TO 98% OF A
MODIFIED PROCTOR ±2%
OF OPTIMUM MOISTURE
AGGREGATE BASE
(VDOT 21-A)
2" 3.5"
ASPHALT BASE
COURSE, BM-25.0A
NTS
3DETAIL
XXX
ASPHALT PAVEMENT TYPICAL SECTION
3'3'
"8"
EXISTING
ASPHALT
PAVEMENT
EXPANSION JOINT,
SEE DETAIL THIS SHEET
THICKENED EDGE
TYPICAL CONCRETE PAVEMENT JUNCTION WITH
EXISTING ASPHALT PAVEMENT
SCALE
4DETAIL
XXX NTS
5DETAIL
XXX
HEAVY DUTY CONCRETE PAVEMENT
MANUFACTURER TRENCH DRAIN
WITH SLOTTED COVER, SEE C026
FOR DETAILS
" M
IN
CLASS A2 CONCRETE
6" TRENCH DRAIN CONCRETE ENCASEMENT
NTS
22" MIN
SEE DWG C026 FOR GRADING PLAN
6" GRATE
EXPANSION JOINT WHERE
SIDE OF CHANNEL ABUTS
NEW CONCRETE
#3 OR #4 REBAR SUSPENSION METHOD.
LENGTH OF REBAR PER MANUFACTURER
RECOMMENDATIONS
SUBGRADE COMPACTED TO 98% OF A
MODIFIED PROCTOR +- 2% OF OPTIMUM
MOISTURE
8" 8"
1"
8"
MIN
8" M
IN
RECESS CHANNEL AND GRATE 1/4"
FOR VEHICULAR TRAFFIC
ATTACH MANUFACTURER FRAME TO
CHANNEL PER TRENCH DRAIN
SPECIFICATIONS
EXISTING OR NEW
CONCRETE (TYP.)
6" TRENCH DRAIN 90 DEGREE FLOW JOINT
NTS
SUBGRADE COMPACTED TO 98% OF A
MODIFIED PROCTOR +- 2% OF OPTIMUM
MOISTURE
2" M
IN
OPTIONAL CONSTRUCTION JOINT
4" M
IN
RECEIVING TRENCH DRAIN CHANNEL
ADJACENT
TRENCH DRAIN
DRILL 4 5/8" DIA. HOLE AT SIDE OF CHANNEL TO
ALLOW ADJACENT TRENCH DRAIN SECTION TO
CONNECT TO RECEIVING TRENCH DRAIN PER
MANUFACTURER RECOMMENDATION
SEE MANUFACTURER
INSTALLATION DETAILS FOR
MINIMUM CONCRETE
DIMENSIONS
APPLY WATERPROOF SILICON OR
ALL-PURPOSE CONSTRUCTION
ADHESIVE BETWEEN END OUTLET
AND ADJACENT CHANNEL
DOWNSPOUT CONNECTION TO TRENCH DRAIN
NTS
ADJACENT
TRENCH DRAIN
DOWNSPOUT, SEE
ARCH DWGS
2" M
IN
DOWNSPOUT TO FREELY
DISCHARGE TO TRENCH
DRAIN
49 342
CHECKED
DRAWN
DESIGNED
SHEET
DATE:
OF
NUMBER
DRAWING
31111-098
MAY 2026
1:
A
C
D C
\A C
C D oc s\
H az en a nd S aw ye r\3
-0
_W
PC
F
So lid s Pr oc es si ng
Im p
Ph I\
Pr oj ec t F ile s\
_D es ig n\ C iv il\
C D
3.
dw g L as tS av eB y:
C
TO
M
SI
C
J. HISE
IFB NO.
500640-
FY27-02
1 05/2026BID SET JTH
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
THE ORIGINAL
DRAWING.
H & S JOB
NUMBER
HAZEN AND SAWYER
1 SOUTH STREET, SUITE 1150
BALTIMORE, MARYLAND 21202
TOWN OF LEESBURG
LEESBURG, VIRGINIA
WATER POLLUTION CONTROL FACILITY
SOLIDS PROCESSING
IMPROVEMENTS - PHASE 1
CD3
DETAILS
CIVIL DETAILS - SHEET 3
N. CAROLLO
N. CAROLLO
D. SKEGGS
50 342