Folsom Substation Upgrade
Solicitation number
89503321BWA000001
Issued by

About this file

This document provides details for a federal contract opportunity for the Folsom Substation Upgrade project. The Department of Energy is soliciting bids for replacing and upgrading existing line jumpers, disconnect switches, fittings, hardware, expansion tubes and associated equipment to meet or exceed existing transmission line rating operating limits at the Folsom and Roseville Substations. The acquisition is set aside for small businesses with a NAICS code of 237130 and size standard of $36.5 million. The project value is estimated between $500,000 and $1,000,000. The solicitation and specifications are available electronically with no hard copies distributed. An optional site visit will be held on July 21, 2021 with RSVPs due by July 14. Questions are due by July 26, 2021 via email. Bids are due in non-electronic format. The contractor must be registered in SAM and have an active Online Representations and Certifications.

View the file

Other files

File Type Posted
Updated Drawings_07_29_21.pdf PDF
SF 30_Amd_0001.pdf PDF
Site Visit Attendance.pdf PDF
Attachment A-Bid Schedule.xlsx XLSX spreadsheet
Attachment D-SubmittalLog.pdf PDF
Attachment B-Specifications.pdf PDF
1442.pdf PDF
Attachment E- Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DRAWINGS

FOLSOM SUBSTATION

RATINGS UPGRADE

STATE

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 1016

CALIFORNIA

FOLSOM SUBSTATION

RATINGS UPGRADE

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. FOL 0015 Rev. C – Location, Access Road & Vicinity Map

2. RSC 0015 Rev. A – Location, Access Road & Vicinity Map

ELECTRICAL:

3. FOL 0001 Rev. N EI – Switching Diagram (Existing Installation)

4. FOL 0001 Rev. O – Switching Diagram

5. FOL 1000 Rev. L EI – Arrangement Plan (Existing Installation)

6. FOL 1000 Rev. M – Arrangement Plan

7. FOL 1010-1 Rev. D EI – 230KV Plan Sheet 1 of 3 (Existing Installation)

8. FOL 1010-1 Rev. E – 230KV Plan Sheet 1 of 3

9. FOL 1010-2 Rev. C EI – 230KV Plan Sheet 2 of 3 (Existing Installation)

10. FOL 1010-2 Rev. D – 230KV Plan Sheet 2 of 3

11. FOL 1010-3 Rev. C EI – 230KV Plan Sheet 3 of 3 (Existing Installation)

12. FOL 1010-3 Rev. D – 230KV Plan Sheet 3 of 3

13. FOL 1100 Rev. F – 230KV Equipment and Material Index

14. FOL 1110 Rev. E EI – 230KV Sections A-A, C-C (Existing Installation)

15. FOL 1110 Rev. F – 230KV Sections A-A, C-C

16. FOL 1113 Rev. C EI – 230KV Section D-D (Existing Installation)

17. FOL 1113 Rev. D – 230KV Section D-D

18. FOL 1120 Rev. B EI – 230KV Area Sections G-G and H-H (Existing Installation)

19. FOL 1120 Rev. C – 230KV Area Sections G-G and H-H

20. FOL 1121 Rev. C EI – 230KV Area Sections I-I and J-J, Details A & B (Existing Installation)

21. FOL 1121 Rev. D – 230KV Area Sections I-I and J-J, Details A & B

22. RSC 0001 Rev. I FIO – Switching Diagram (For Information Only)

23. RSC 1000 Rev. F FIO – Arrangement Plan (For Information Only)

24. RSC 1010 Rev. F EI – 230KV Area Plan (Existing Installation)

25. RSC 1010 Rev. G – 230KV Area Plan

26. RSC 1100 Rev. G – Equipment and Material Index

27. RSC 1110 Rev. B EI – 230KV Bus Structure Sections A-A and B-B (Existing Installation)

28. RSC 1110 Rev. C – 230KV Bus Structure Sections A-A and B-B

29. RSC 1113 Rev. C EI – 230KV Bus Structure Sections G-G and H-H (Existing Installation)

30. RSC 1113 Rev. D – 230KV Bus Structure Sections G-G and H-H https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

#0

Dam Rd

Folsom Dam Rd

Folsom Auburn Rd

Lakeside Way

Bluebird Ln

Shady Oaks Dr

Lark Ln

Pierpoint Cir

Robin Ln

Pin e L n

Allan Ct

USBR

Security Gate

Folsom

#0

#0 Substations

! Gate Access_Roads

This cartographic product and GIS data were prepared in accordance with professional practice standards. Data is only as accurate as its primary source and is spatially relative-grade. It should not replace or be used in place of survey data. Refer to metadata for source and accuracy.

This map and data are the property of WAPA/DOE and are intended for planning and analysis only. No reproduction or copying of this product is allowed without the sole consent of WAPA/DOE. To contact WAPA about this map, please call 1-866-767-9272

Path: G:\Projects\FolsomSubReallignment\Driving_Directions.mxd Source: SNR, TeleAtlas

200 0 200 400 600100 Feet

1 2 3

5 6 8 9

Adjoining 7.5' Quadrangle Names Center quad is this site

1. Roseville

2. Rocklin

3. Pilot Hill

4. Citrus Heights

5. Folsom

6. Clarksville

7. Carmichael

8. Buffalo Creek

9. Folsom SE

FOL

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

SIERRA NEVADA REGION - FOLSOM, CALIFORNIA

FOLSOM SUBSTATION

CALIFORNIA

LOCATION, ACCESS ROAD, & VICINITY MAP

DESIGNED ____________________ APPROVED __________________________J.W. Geist

GIS

1" = 400'

Site Coordinates Lat: 38° 42' 27.47" N Long: 121° 09' 39.19" W

05/30/08

N5521 - DR

Revised and Redrawn in GISC

R.M. McCafferty

August 31, 1984 0015

From: Folsom Office

1. Head NORTH on Folsom BLVD / Folsom-Auburn RD

2. Turn RIGHT onto Folsom Dam RD

3. Proceed STRAIGHT to Road Block

4. Turn RIGHT and pull up to the security gate

5. CHECK IN with the security guard at the gate Total Estimated Time: 10 min.

Total Estimated Distance: 4 miles

#0

§̈¦80

£¤65

Portm arnock Cir

Bl ac kh ea th Ln

Peridot St

Heritage Dr

Diamond Oaks Rd

Nicklaus Cir Shasta St

Grider Ct

Murray Way

Treese Way

Grider Dr

Lilly Cross Dr

As till

W ay

Hanisch Dr

Ma nz an ita

Av e

Walton WaySpyglass Ct

Nugget Ct

Berry St Re ser ve

Dr

Galleria Cir

Cr ee ks ide

R idg e D r

Antelope Creek Dr

Roseville Pkwy

Ga lle ria B lvd

E Roseville Pkwy

Tay lor

Rd

Atlantic St

Wills Rd

Ha rd ing B lvd

Enwood Rd

Shadow Rdg

Sharp Cir

Sierra Gate Plz

Lead Hill Blvd

N S un ris e A ve

Automall Dr

Automall Dr

Eureka Rd

Lead Hill Blvd

Me dic al Pla za Dr

Lava Ridge Ct

Lead Hill Blvd

Private Rd

Rocky Ridge Dr

Folsom - Roseville

Roseville - Elverta

Roseville - Fiddyment

Cottonwood - Roseville

Sta te

Hw y 6

Atlantic St

Sierra Blvd

Ver non S t

Washington Blvd

Zola A ve

Alta Vista Ave

Lincoln St

Main St

Oak St

Folsom Rd

Tahoe Ave

Grove St

Elefa St

Yosemite St

Church St

Shearer St

Coronado Ave

W Atlan tic

St

Private Rd

Sequoia St

Ca mp o S t

Pleasant St

Evelyn Ave

Estates Dr

Al ta

Av e

High St

Tre howell

Dr

Center St

Roseville St

Pla ce r S t

Pa rk

Dr

Mariposa St

James Dr

Pullen St

Circuit Dr

N Grant St

Parry St

Ash St Maciel Ave

Ni les

Av e

Donner Ave

Sharon Way

Pacific St

Linda Dr

Ne va da Av e

S L inc oln St

Taylor St

Westwood Dr

S Grant St

Thomas St

El Dorado Ave

Lead Hill Dr

Alola St

Jefferson St

Britta in St

Somerset Way

Crescent Dr

Branstetter St

San Juan Ave

Doyle St

Valencia Ave

Stonehouse Ct

Chantilly Ct

Waterfield Dr

Be lve de re

Cir

Co rte z A ve

Chip Shot Ct

Bernice Ave

Wo od cre st

Ct

Eggleston St

Short St

Estates Ct

Plumber Way

Church St

Oak St

Stonehouse Ct

State Hwy 65

Private Rd

Washington Blvd Atlantic St

Roseville

WAPA

WAPA

#0

#0 Substations "S Tower

WAPA

WAPA_ROW

! Gate Access Road

This cartographic product and GIS data were prepared in accordance with professional practice standards. Data is only as accurate as its primary source and is spatially relative-grade. It should not replace or be used in place of survey data. Refer to metadata for source and accuracy.

This map and data are the property of WAPA/DOE and are intended for planning and analysis only. No reproduction or copying of this product is allowed without the sole consent of WAPA/DOE.

Official Use Only May be exempt from public release under the Freedom of Information Act (5 U.S.C.552) Exemption 2 - Circumvention of statute.

Western review required before public release.

Name/Org: Steve Tuggle, N1415 Date: 05/05/06

Path: G:\Projects\LocationMaps\Substations\RSC__SUB_0015.mxd Source: SNR, TeleAtlas

500 0 500 1,000 1,500250 Feet

1 2 3

5 6 8 9

Adjoining 7.5' Quadrangle Names Center quad is this site

1. Sheridan

2. Lincoln

3. Gold Hill

4. Pleasant Grove

5. Roseville

6. Rocklin

7. Rio Linda

8. Citrus Heights

9. Folsom

July 7, 1987 RSC 0015

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

SIERRA NEVADA REGION - FOLSOM, CALIFORNIA

ROSEVILLE SUBSTATION

CALIFORNIA

LOCATION, ACCESS ROAD, & VICINITY MAP

DESIGNED ____________________ APPROVED __________________________WAPA Don Warner

GIS

1" = 1,000'

Roseville

"S

"S"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S "S

"S "S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

"S

0_1

TOS

7_1

6_4 0_20_3

TOS

159_4

159_5

RSC

I 8

Atlantic St

Ga lle ria B lvd

Berry St

Tay lor

Rd

Roseville Pkwy

Eureka Rd

E Atlantic St

Wi lls

R d Eureka Rd

Atlantic St

I 8

Site Coordinates

Lat: 38° 45' 42.21" N Long: 121° 15' 51.12" W

WAPA WAPA

From: Folsom

1. Head NORTH on Folsom BLVD.

2. Turn LEFT on DOUGLAS BLVD.

3. Turn RIGHT onto EUREKA RD.

4. Turn LEFT onto LEAD HILL BLVD.

5. Turn RIGHT onto HARDING BLVD.

6. HARDING BLVD becomes GALLERIA BLVD.

7. Turn RIGHT into SUBSTATION

Total Estimated Time: 20 min.

Total Estimated Distance: 12.5 miles

A 06/01/06

N5 - RP

Revised and Redrawn in GIS

WAPA F 6400.9

(4-85) D SIZE (22 X '34)

z

I v

EL 244.30...:El--+--4�:fF::Q:====�=====n====�!======:�

EL 258.30

I

I<) z z

:a: �--:_� -t .... _-_-_-_-.-.... -_-_-_-_-_�-t ... _-_-_-_-_-_,-.,-_-_-_-:..-m

';' z U) :a:

I v

U) I

{t)

I

EL 244. 3 O-:E l-+---¥1:::=(IJ=:ll===::=:(l!.!=;ji==Jsl:::::::=::=,<iJ.=IJf=:l�=::::z:;�===:::C�

102-0

SECT I ON A-A t 1010> i

I I I

13-0

39-0

I

I I

10-0

EL 258.30

z

-��===M======:=:=======llp=====::::!.!,.=f]p�-:;---f � - EL 244.30 I r<> ll'l,_,,..__.......,._,,.._..,,...__,,......,-:-,,__,,..__,,..""-""-,,.._..,,...__,,._,....__,,.._.I.Al I

I

U)

12-0 12-0 14-0 25-0

102-0

SECTION B-B t10101

25-0

I O 8 16

1,1 l I 111111 I

SCALE OF FEET

14-0

I z c'.:t'.:==::::;;::;;::====:::'.t:::====::;::;===:::'.t:J---r ::a:

12-0 12-0

I c.o r<>

I

I I z

I

2-0

EL 258.30

EXPLANATION

*----- S E E DRAWING RSC 1010 FOR CANTILEVER

D !MENS IONS .

• _____ U S E 3-0 LONG ALU MINUM TUBING.

0 ______ INDICATES ITEMS FURNISHED ANO INSTALLED

UNDER STAGE 02.

----� INDICATES ITEMS FURNISHED ANO INSTALLED

UNDER PREVIOUS STAGE.

NOTE

I. THE HEIGHT 'OF THE SW ITCH SUPP ORT SHALL BE

DET ERMINED BY THE CONTRACTOR IN ORDER TO

ALIGN THE CENTERLINE OF THE TUBING TO THE

CENTERLINE OF THE SWITCH TERMINAL. THE

BOTTOM OF SWITCH INSULAT ORS SHALL BE AT A

MIN I MUM HEIGHT OF 8-6.

REFERENCE DRAWINGS

EQUIPMENT AND MATERIAL INDEX------- RSC 110 0

230KV AREA PLAN _______ _____ _ ____ RSC 101 0

EXPLANATION

Q INDICATES MATERIAL TO BE REMOVED AND DISPOSED

FO R FOLS OM SUBSTATI ON RATINGS UPGRADE

EXISTING INSTALLATION

REVISED FOR STAGE 02 WORK

MAY 13, 1987 RSC

NON�ORIGINAL

Cover Page
Project Drawings
fol_0015c
rsc_0015a
fol_0001n_ei
fol_0001o
fol_1000l_ei
fol_1000m
fol_1010_1d_ei
fol_1010_1e
fol_1010_2c_ei
fol_1010_2d
fol_1010_3c_ei
fol_1010_3d
fol_1100f
fol_1110e_ei
fol_1110f
fol_1113c_ei
fol_1113d
fol_1120b_ei
fol_1120c
fol_1121c_ei
fol_1121d
rsc_0001i_fio
rsc_1000f_fio
rsc_1010f_ei
rsc_1010g
rsc_1100g
rsc_1110b_ei
rsc_1110c
rsc_1113c_ei
rsc_1113d

File details come from the government source that posted it. Updated .