Folsom Substation Upgrade
Solicitation number
89503321BWA000001
Issued by

About this file

This document includes an attachment with bid schedule details and drawings for the Folsom Substation Ratings Upgrade project, as well as information about the related federal contract opportunity solicitation. The project involves replacing and upgrading existing line jumpers, disconnect switches, fittings, hardware, expansion tubes and associated equipment to meet or exceed existing transmission line rating operating limits at the Folsom and Roseville Substations. A site visit is scheduled for July 21, 2021 with an RSVP deadline of July 14, 2021. Questions are due by July 26, 2021. Bids are due based on the solicitation schedule. The estimated value is between $500,000 and $1,000,000. This is a 100% small business set-aside conducted by the Department of Energy under NAICS code 237130 with a $36.5 million size standard. The contractor must be registered in SAM and have an active ORCA registration.

View the file

Other files

File Type Posted
Updated Drawings_07_29_21.pdf PDF
SF 30_Amd_0001.pdf PDF
Site Visit Attendance.pdf PDF
Attachment D-SubmittalLog.pdf PDF
Attachment B-Specifications.pdf PDF
1442.pdf PDF
Attachment E- Wage Determination.pdf PDF
Attachment C-Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
FOLSOM SUBSTATION RATINGS UPGRADE
CLINWork or MaterialEstimated QuantityUnitUnit PriceAmount
0001Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Sections H and M.)LS$_
0002Motor-operated disconnecting switch, 230-kV, 2,000 amp (Government-furnished)4EA$_$_
0003Outdoor bus system (Government-furnished)LS$_
0004Existing outdoor electrical equipment and materialLS$_
0005Electical testingLS$_

TOTAL $ _

ABBREVIATIONS
CLIN = Contract Line Item Number
EA = each LS = for the lump sum of

Sheet1

PropaneXYZV230kVVGFE Steel (Installed by Western, not the contractor)
Tank(ft)(ft)(ft)(cy)Switch Support SS3(cy)SCE_2600(fio), (x1) - Station Service Support Frame @ 772 Lbs
Stem#11.0002.5005.0000.463Formed0.200SCE_2601(fio), (x1) - Safety Switch Support @ 770 Lbs
Stem#21.0002.5005.0000.463Augered0.600SCE_2602(fio), (x1) - Yard Panel Support DWA @ 830 Lbs
Footing5.00010.0001.3332.469Sum0.800SCE_2927(fio), (x1) - Equipment Cabinet Platform @ 489 Lbs
3.395Quantity6SCE_23021, (x4) - C6x13x3'-0" Equipment Bride Beams @ 39Lbs/Each
4 cy4.800Total GFE Steel3017 Lbs
5 cy
GeneratorXYZVNew Concrete
Building(ft)(ft)(ft)(cy)CB3VQtyFndndwgsdwgsdwgscy/fndntotal cy
Stem#11.33317.5005.0004.321Existing CB & crumbling fndns(cy)12CB423006.46.4
Stem#21.33317.5005.0004.321Formed0.80012SSVT1230155
Footing10.00020.0001.3339.877Quantity612STA1230266
Entry Slab3.5005.0001.5000.9724.80012SSA1230322
19.4915 cy42SS4230428
20 cy22SS5230548
12DP1230622
Panel SlabXYZVSS3V12SA1230733
SSE1(ft)(ft)(ft)(cy)Existing CB & crumbling fndns(cy)Total New Concrete40.4=41cy
Footing4.5006.0001.5001.500Formed0.600
1.500Quantity4
2 cy2.400
3 cy
PrecastXYZV
Cable Trench(ft)(ft)(ft)(cy)
Wall#10.3332.6671.5000.049Total Concrete for Demo = 4+20+2+1+5+5+3=40cy40cyNew Concrete
Wall#10.3332.6671.5000.049Total New Concrete =40.4cyDemo Concrete
Bottom2.6674.0000.3330.132Total GFE Steel Weight=772+770+830+4893017LbsGFE Steel Weight
0.230
1 cy