This is a Price Schedule template in spreadsheet format for a firm fixed price Job Order under a Master Ship and Repair Agreement (MSRA) with the U.S. Army Corps of Engineers (USACE), Portland District. The solicitation (W9127N26BA029_) seeks contractors to perform overhaul, maintenance, and repair services on the Dredge YAQUINA during fiscal year 2027. All overhaul work must be performed at the contractor's facility, with the Government responsible for vessel delivery and pickup following completion. The contract requires dock and sea trials to be passed prior to final acceptance.
Contractor participation mandates attendance at a mandatory site visit scheduled for July 21, 2026, in Coos Bay, Oregon, or an alternative date arranged with five days' notice. Contractors must provide their own Personal Protective and Safety Equipment (PPE) compliant with EM 385-1-1 standards. Some site locations may require Transportation Worker Identification Certification (TWIC) cards for access. Interested parties should contact Ms. Jaren Bowman at Jaren.L.Bowman@usace.army.mil to schedule site visits. The specific pricing details, line items, and cost breakdowns within this Price Schedule template would establish the firm fixed price for the job order, though the detailed contents of the spreadsheet are not provided in this summary.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection / Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking (Lift Day) | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam / Chilled Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemists Certifications | 5.2.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Shafting & Rudder Clearances | 5.3.2 | 1 | Job | $ - 0 | |
| Machinery - Slops Tanks Annual Maintenance | 5.4.1 | 1 | Job | $ - 0 | |
| Machinery - Pump Room Bilge Cleaning | 5.4.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Bilge Cleaning | 5.4.3 | 1 | Job | $ - 0 | |
| Machinery - Emergency Generator Service | 5.4.4 | 1 | Job | $ - 0 | |
| Machinery - Dock and Sea Trials | 5.4.5 | 1 | Job | $ - 0 | |
| Machinery - CRPP Control Service Inspection | 5.4.6 | 1 | Job | $ - 0 | |
| Hull - Sliding Piece Fit-Up | 5.5.3 | 1 | Job | $ - 0 | |
| Hull - Sluice Valve Replacement | 5.5.4 | 1 | Job | $ - 0 | |
| Hull – Pressure Wash Exterior Hull | 5.5.6 | 1 | Job | $ - 0 | |
| Hopper - Hopper Inspection Staging | 5.6.6 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection Setup | 5.7.1 | 1 | Job | $ - 0 | |
| Bow Thruster – Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | ||
| Bow Thruster - Sleeve Replacement | 5.7.4 | 1 | Job | $ - 0 | |
| Deck - Annual Rescue Boat Davit Maintenance | 5.8.3 | 1 | Job | $ - 0 | |
| Deck - Chain Locker Cleaning | 5.8.4 | 1 | Job | $ - 0 | |
| Deck - Launch Davit Annual Maintenance | 5.8.5 | 1 | Job | ||
| Deck - Lift Raft Annual Service | 5.8.6 | 1 | Job | $ - 0 | |
| Deck - Navigation, Communication, and GMDSS Maintenance | 5.8.7 | 1 | Job | $ - 0 | |
| House - Clean and Inspect Galley Exhaust Ducting | 5.9.1 | 1 | Job | $ - 0 | |
| House - Fire Suppression Services | 5.9.2 | 1 | Job | $ - 0 | |
| Inspection - ABS Inspection Services | 5.10.1 | 1 | Job | $ - 0 | |
| Inspection - Audio Gauging Services | 5.10.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Removal and Reinstallation | 5.11.1 | 1 | Job | ||
| Machinery Reduction Gear Overhaul | 5.11.2 | 1 | Job | ||
| Machinery - Keel Cooler Gasket Change Out | 5.11.3 | 1 | Job | ||
| Hull - Engine room Double Bottom Paint | 5.11.4 | 1 | Job | ||
| Hopper - New Hopper Door Seal Hinges | 5.11.5 | 1 | Job | ||
| Hopper - Hopper Door Seal Upgrade | 5.11.6 | 1 | Job | ||
| Deck - Paint Forward Doghouses | 5.11.7 | 1 | Job | ||
| House - Bridge Window Replacement | 5.11.8 | 1 | Job | ||
| House - Jackstaff Varnish Renewal | 5.11.9 | 1 | Job | ||
| House - Bridge Paint Renewal | 5.11.10 | 1 | Job | ||
| House - Laundry Room Cabinet Removal | 5.11.11 | 1 | Job | ||
| Hull - AMR Double Bottom Paint | 5.11.12 | 1 | Job | ||
| Bridge - Auto Pilot installation | 5.11.13 | 1 | Job | ||
| Deck - Capstan Repair | 5.11.14 | 1 | Job | ||
| Deck - Crane Inspection | 5.11.15 | 1 | Job | ||
| House - Watertight Door Replacement | 5.11.16 | 1 | Job | ||
| Hopper - Irathane Coating Renewal | 5.11.17 | 1 | Job | ||
| House - Stateroom Window Gasket Renewal | 5.11.18 | 1 | Job | ||
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services | 5.1.2 | 1 | each | $ - 0 | |
| Main Propulsion - Propeller Blade Repairs | 5.3.1 | 1 | Job | ||
| Hull - Coating of Hull Below Waterline | 5.5.1 | 3000 | SqFt | $ - 0 | |
| Hull - Hull Anode Renewal | 5.5.2 | 1 | Job | $ - 0 | |
| Hull - Suction Inlet Hull Rings and Pipe Liners Replacement | 5.5.5 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Bearing Support Channel Overhaul | 5.6.1 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Hinge Bushing Renewal | 5.6.2 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Operating Rod Replacement | 5.6.3 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Retaining Bar Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper - Hopper I Beam Inspection | 5.6.5 | 1 | Job | $ - 0 | |
| Bow Thruster - Pod Preservation | 5.7.3 | 1 | Job | $ - 0 | |
| Deck - 20-inch Pipe Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Deck - Anchor and Anchor Chain Reconditioning | 5.8.2 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work Over & Above Work tc={EABF1FC3-EC0E-4093-A392-6EB2AC67D34C}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Where do I get these numbers from?
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 500,000.00 | $ 500,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $500,000.00 |