This document is an attachment to a state and local contract opportunity issued by the Illinois Department of Natural Resources (IDNR) for the replacement of wooden docks with aluminum docks at Beaver Dam State Park.

The scope of work includes the provision and installation of a floating dock system with structural metal frames, flotation, wood decking, bridges, and anchorage. The contractor must submit detailed design calculations, construction drawings, and shop drawings sealed by a Registered Professional Engineer. The dock system must meet specific design load conditions and performance requirements. The document provides a list of approved dock manufacturers. Pricing, funding sources, and other commercial terms are not included in this technical specification.

View the file

Other files

File Type Posted
Beaver Dam QUESTIONS AND ANSWERS.docx DOCX document
Dock B.pdf PDF
B-24764 Addendum 1.docx DOCX document
Forms B 1~36.docx DOCX document
Dock D.pdf PDF
1Standard Terms and Conditions1~43.pdf PDF
B-24764 Notice of Award Form~1.pdf PDF
Attachment C - Site map.pdf PDF
Attachment B - 01 33 23 Shop Drawings_Product Data_Samples.pdf PDF
Dock A.pdf PDF
Beaver Dam Dock Replacement - IFB Updated.docx DOCX document
Forms A Section V.18.1~85.doc DOC document
Dock C.pdf PDF
Attachment - Notice of Electronic Submission Only~51.pdf PDF
Attachment D - Gabion Sketch.pdf PDF
Pictures~3.docx DOCX document
1Standard CertificationsV.18.1~2.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDNR File# 1-15-014 1 July 12, 2018

DIVISION 35 – WATERWAY & MARINE CONSTRUCTION

35 51 00 – Courtesy Boat Docks

1. GENERAL

1.01 SECTION INCLUDES

A. Base Bid General Contractor provide:

1. Floating dock system.

2. Walkway ramps & bridges.

1.02 RELATED WORK

A. Specified Elsewhere:

1. 01 33 23 – Shop Drawings, Product Data & Samples.

1.03 SUBMITTALS

A. Design Submittal: The Contractor shall submit detailed design calculations and construction drawings in accordance to Section 01 33 23.

B. Shop Drawings:

1. Layout plan drawing of dock.

2. Detail and sectional drawing of all components of the dock system, including, but not limited to, walkway ramps, pipe anchors, cleats, etc.

3. All Drawings shall be sealed by a Registered Professional Engineer licensed to practice in Illinois.

1.04 QUALITY ASSURANCE

A. Workmanship:

1. The floating dock system shall be completely prefabricated by the manufacturer and delivered ready for field assembly and installation. All finished metallic structural members shall be free from twists, bends, distortions, and open joints. All exposed parts shall be free of sharp edges and burns. Ends and edges to be rounded or beveled. All welding shall conform with the requirements of the American Welding Society. Openings between deck and adjacent modules shall not exceed ½ inch.

B. Experience:

1. The system shall be the standard commercial product of a marina manufacturer having no less than five (5) years’ experience in the design, manufacture, and

IDNR File# 1-15-014 2 July 12, 2018 installation of floating marina structures. Special circumstances will be considered by IDNR on a case-by-case basis.

1.05 WARRANTY

A. General contractors warranty of one year from the date of substantial completion and in accord with general requirements.

B. All treated wood decking shall have a warranty of one year from the date of substantial completion.

C. All structural frames and flotation devices shall have a warranty of eight (8) years from the date of substantial completion. The float and its flotation material shall be 100% warranted against stinking, becoming waterlogged, cracking, peeling, fragmenting, or losing beads.

1.06 DESIGN LOAD CONDITIONS

A. Dead loads shall consist of the entire weight of the floating structure including all accessories and appurtenances.

B. Deck surface and structural frame live load shall be equal to 30 PSF (pounds per square foot), applied to the full surface area of the deck. Concentrated 300 pounds plus 33% impact (total 400 pounds) applied over an area 12 inches x 12 inches.

C. Loads applied to flotation units shall include all bridge and walkway loads.

D. Horizontal Loads:

1. 20 PSF horizontal wind load on all projected surfaces.

2. Impact load, 10,000 lb. craft, with a velocity of three (3) feet per second striking the end of a finger dock at 10 degrees to the centerline of that dock.

3. The bridge/gangway shall be designed for 100 PSF load applied to the full surface area. Bridge handrails shall be designed for a 250-pound load applied in any direction and at any point along the handrail.

4. Under dead load conditions, the freeboard (top of deck) shall be 16-20 inches. In addition, the structural frame shall not float less than two (2) inches above the water.

The lower freeboard (16”) is desired for most installations.

5. Under full uniform live load (30 PSF), the minimum freeboard shall be six (6) inches. At those locations with significant wave action, the live load freeboard should be increased so as to prevent the dock from getting wet.

6. Slope and Height Differences under Dead Load:

a. For main or header docks, the slope shall be no more than ½ inch per 6 feet length in any direction. For finger docks, the outer end of the dock shall not be more than 2 inches higher than where it attaches to the center dock. In

IDNR File# 1-15-014 3 July 12, 2018 addition, finger docks shall not have across slope greater than ½ inch per 3 feet width.

b. The height difference between two (2) adjacent dock units shall not be greater than 1/8 inch.

7. In order to prevent torsion, racking, and twisting, sufficient built-in torsional resistance shall be installed such that no more than three (3) inches variation in normal freeboard per 100 feet of length, as measured in any direction, under any possible combination of specified loads, excluding wave action loads.

8. Where bridges/gangways/ramps attach to the floating structure, there shall be floats attached either under the bridge or under the end of the structure, so that the structure remains level under dead load conditions, and that there is no excessive deflection under live load conditions.

9. Structures are to be factory assembled in the largest possible shippable units.

Modular structures must be designed for quick and easy assembly and disassembly, with a minimum of bolts and connections.

2. PRODUCTS

2.01. FLOATING DOCKS

The following manufacturers have confirmed that they can produce a floating dock which meets or exceeds current Illinois Department of Natural Resources Boat Specifications. These manufacturers are listed in alphabetical order.

1. Meeco Sullivan Inc.

1501 E. Electric Ave.

McAlester, Oklahoma 74501 800/627-4621 Attn: Ralph Morley www.meecosullivan.com

2. Floating Docks Manufacturing Co.

3010 W. Morris Street Indianapolis, Indiana 46241 800/969-3625 Attn: Christopher Gaughan www.floatingdocks.com

3. Holtz Engineering, LTD 1124 North State Street Monticello, Illinois 61856 217/762-4097 Attn: Mike Holtz

4. Marine Development, Inc.

HC 62 Box B1 501 Industrial Dr.

Eufaula, Oklahoma 74432 Attn: Roger Otis http://www.meecosullivan.com/ http://www.floatingdocks.com/

IDNR File# 1-15-014 4 July 12, 2018

5. VW Docks 3050 16th Street P. O. Box 343 Spirit Lake, Iowa 51360 800/893-6257 Attn: Scott Chambers www.vwdocks.com

6. Tiger Docks Waterfront Products 1613 E. Terra Lane

O'Fallon, MO 63367 636/272-4300 Attn: Clark Gould www.tigerdocks.com

2.02. MATERIALS & EQUIPMENT

A. Structural frame and other structural parts:

All floating units shall have a structural metal frame to which the flotation, decking, connectors and anchorage shall be attached.

1. Structural frames for bridges, ramps, and floating units shall be of all welded construction. Welding shall conform to the requirements of the latest edition of the American Welding Society (AWS) Specifications. Welds must be performed by qualified Code Welders.

2. Structural frame and other structural members shall be 3/16” minimum thickness steel or aluminum alloy. Steel members shall be rolled structural shapes with ASTM A- 36 material and galvanized in accordance with ASTM A-123 requirements. All welds over galvanized steel material shall be thoroughly cleaned and coated with two coats of cold galvanized compound. All aluminum frames shall comprise of alloy 6061-T6, and be shop welded into full size units without bolting being necessary. Stainless steel fasteners must be used on aluminum frames.

3. The sub-structural steel or aluminum frames shall all be welded truss design made from angles, structural shapes or rounds, and straps, of sufficient strength to withstand the required design stresses. All members shall not be less than 1-1/2” x 1- 1/2” x 3/16” angle after fabrication.

B. Flotation:

1. Flotation units shall be positively fastened to the structural frame and shall be capable of easy removal and field replacement. The units shall be of such size and quantity to maintain the freeboard listed in these specifications.

2. The flotations shall be 1.1 pounds per cubic foot (PCF) polystyrene with a thick wall polyethylene float shell conforming to the following specifications:

Nominal Thickness 0.1875 in.

Color Black http://www.vwdocks.com/ http://www.tigerdocks.com/

IDNR File# 1-15-014 5 July 12, 2018

Density 58 Lbs. ASTM 1505 Environmental Stress Cracking F50 1000 Hr. ASTM D-1693 Ultimate Tensile Strength 2600 PSI ASTM D-638 Vicat Softening Temperature 240° F. ASTM D-1525 Brittleness Temperature -180° F. ASTM D-746 Flexure Modules 100,000 PSI ASTM D-790

C. Wood Deck:

1. Wood planks shall be nominal 2” x 6” Southern Yellow Pine, Grade 1, K.D. and grade stamped in accordance with the current grading rules of the Regional Lumber Association for the species, with stamp shown.

2. All lumber and deck timbers shall be given preservative treatment ACQ. A minimum of

0.4 pounds per cubic foot of preservative shall be retained after treatment.

3. Planks shall be fastened to the structural frame with bolts or screws. There shall be at least two fasteners at every structural cross support. Fasteners shall be flush with the deck surface and shall be of stainless or galvanized steel which is compatible with the material in the structural frame.

D. Bridges:

1. Bridges shall be four wide (4 ft.) with attachments to shore. The bridge frame shall be constructed of galvanized steel or aluminum alloy members of sufficient size to meet design loads as specified herein. The decking material shall be the same as the floating dock in paragraph C above. Handrails shall be designed in accordance with the ADA Accessibility Codes.

E. Anchorage:

1. Anchorage of the floating structure shall consist of telescoping pipes arranged with the larger pipes adequately braced to the dock unit with structural steel (hot-dipped galvanized after welding), or aluminum all alloy. The inner section shall be firmly imbedded into the lake bottom. The telescoping spuds shall be sized for typical water surface elevation and a maximum fluctuation, with the bottom sections equipped with an auger welded to the ends. In some instances, where the water fluctuation or water depths will allow, non-telescoping poles may be used. In those instances, the top of the poles shall all be cut to the same elevation and a cap supplied by the manufacturer shall be provided on the top of the pole.

F. Wood Rubrail:

1. The floating unit shall have a wood rubrail around the entire perimeter and shall be nominal 2” x 12” Southern Yellow Pine, Grade 1, K.D., and grade stamped in accordance with current grading rules of the Regional Lumber Association for the species, with stamp shown.

2. Wood shall receive the same preservative treatment as specified for the deck.

IDNR File# 1-15-014 6 July 12, 2018

3. The wood rubrail shall be attached to the structural frame with non-protruding thru-bolts on maximum centers of 4 feet. Bolting materials shall be compatible with the base frame material and galvanized to protect against corrosion. The attaching method shall allow for easy replacement in the event of damage.

G. Vinyl Bumpers:

1. Vinyl bumpers shall be located around the perimeter of the floating unit and attached to the wood rubrail with galvanized, non-protruding fasteners. The bumpers shall run continuously around the perimeter and shall be extruded vinyl with Durometer hardness approximately 86 Shore “A” (ASTM D-2240); specific gravity of 1.30; 10% modulus strength of 1150 PSI (ASTM D-638) and brittle temperature of 15 degrees F.

(ASTM D-746). The overall compression section shall be approximately 2-3/4” high attaching flange shall be 1-1/4” and bottom flange at least 7/8”. Material thickness shall be 1/8”.

3. EXECUTION

3.01 ASSEMBLY AND INSTALLATION:

A. Structure dock/bridge components shall be unloaded, assembled, and floated at the site.

Contractor shall maintain and protect all components during the installation process. All structural Install in accord with the manufacturer’s instructions and specifications.

B. Pipe spud depth, length and location shall be verified by the contractor and indicated on layout plans submitted with the shop drawings for IDNR review and approval.

END 35 51 00