Attachment 9 Project CMS.pdf
PDF 425 KB Posted
- Attached to
- Test Engineering and Analysis Services (TEAS) Federal contract opportunity
- Solicitation number
- W9115124R0030
- Issued by
- Department of the Army
About this file
This document appears to be an attachment that describes the financial tracking system elements to be considered for a federal contract opportunity. It outlines the approval chain, purchasing and travel request processes, and financial tracking capabilities required for the contract.
The key details include requirements for tracking purchase requests, travel, overtime, and funding, as well as the ability to create and manage individual and group task orders. The system must have capabilities to approve, reroute, reject, and postpone requests, as well as search, archive, and generate various reports. It must also interface with other systems to ensure accurate and timely data. The document does not provide details on the specific products or services required under the contract opportunity.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Financial Tracking System Elements to be Considered Approval Chain
Purchases • Purchase Request Number
• Requestor
• Request Date
• Required by Date
• Delivery Instructions
• Hand Receipt/Property Accountability
• Justification for Contractor use/purchase
• Requirements (test, support area, etc.)
• Charge Codes: PSC/WAC
• Part No.
• Item Description
Quantity
Unit Price
Burdens, Fees, Taxes
Total
Comment Area
• Task Leader and/or
Alternate (depending on contractor hierarchical structure)
• Group Manager and/or
Alternate (depending on contractor hierarchical structure)
• PSC Test Officer and/or
Alternate
• PSC Division Chief and/ or Alternate
• COR
• PSC Purchasing Team
• Special Staff (as required): Safety, IMO, TDAP, Spectrum, Director, etc.
Capability:
Approve
Reroute to alternate approver
Reject (w/comment) – send back to requestor
Postpone (w/comment) – ask requestor for information or additional data entry required
Search capability
Archive capability
Reports
Travel • Travel Request Number
• Traveler Name/Contact Info
• Request Date
• Travel Date(s) – Depart/Return
• Company Name (prime/sub)
• TDY Work Location
• Requirements (test, support area, etc.)
• Charge Codes: PSC/WAC
• Travel Cost Specifics:
JTR Per Diem
Lodging
M&IE
Airfare
Rental Car
Fuel
POV (mileage)
Parking
Hotel Taxes
Baggage Fees
Other Cost (w/description)
Burdens, Fees, Taxes
Totals
• Comment Area
• Task Leader and/or
Alternate (depending on contractor hierarchical structure)
• Group Manager and/or
Alternate (depending on contractor hierarchical structure)
• PSC Test Officer and/or
Alternate
• PSC Division Chief and/ or Alternate
• COR
Capability:
Approve
Reroute to alternate approver
Reject (w/comment) – send back to requestor
Postpone (w/comment) – ask requestor for information or additional data entry required
Search capability
Archive capability
Reports
MSC Tracking • Ability to create Group PSCs:
Group Name
Scope of Work Description
Start Date
End Date
Division Chief w/contact information
Attachment (Word document)
• Ability to create, manage, and manipulate Individual PSCs:
PSC Name
PSC Number/Id
Group PSC
Applicable FY
ADSS (Cost Tracking Id)
Type of Project (based on categorical selection – determines EPG rates)
Status (Open/Closed)
Start Date
End Date
Director/Directorate
Division Chief/Test Officer w/contact information
Contract POC assignments
WACs
Ability to add/subtract
Start/End
WAC Extension
POCs
Allotment Amount
Status
(Open/Closed)
Milestones
Deliverable Requirements w/ suspense dates
Attachments (Scope of work description, references, etc.)
Approval History
• Group PSCs
Division Chief
COR
KO
• Individual PSCs
Division Chief
COR
Capability:
• Approve
• Reroute to alternate approver
• Each contract year separate and distinct
• Ability to request closure
• Ability to roll forward to a new FY
• COR has primary capability to manage, manipulate, and oversee PSC Tracking System
• Create reports using data maintained within the system
• Feed Financial Display
Capability Automatically
Overtime • OT Request Number
• Charge Codes: PSC/WAC
• Date Start/End
• PSC Test Officer and/or Alternate
Capability:
• Approve
• Reroute to alternate approver
• Reject (w/comment) – send back to requestor
• Postpone (w/comment) – ask requestor for information or additional data entry required
• Capability to display estimated or approved versus actual hours worked by PSC/
WAC
Total Hours
Total Number Personnel
Contractor Names
Purpose/Justification for the OT requirement
Ability to document with attachment
(i.e., Excel spreadsheet for hours per pay period, per person)
• PSC Division Chief and/or Alternate
• COR (IAW KO
established Not-to-Exceed)
Funding • Funding Request Number
• PSC, ADSS, Type of Project
• PSC Name
• Financial Summary
Allocation
Actual
Billed
Available
Cost Estimate
Gov Funding Requestor
Gov Budget Analyst
Funding Amount
Increase/Decrease
Obligation Amount
Allocation Amount
Gov Functional Area
Gov Fund
Gov WBS
Gov Budget Approval
Gov COR Approval
Gov Budget Analyst
COR
Capability:
Approve
Automatically update the allocation in the financial display capability
Feed file for submission of contractor data into CIMS
Financial Tracking Site • FY
• Ability to query by Status, Gov POCs, Contractor POCs, Group PSCs
• PSC Search
Access for ALL Gov/Ctr personnel
Capability:
Interface with other systems to ensure accuracy and timeliness.
Interface with contractor financial system without compromising proprietary information.
Real-time project status, accuracy of prime and subcontractor data, level of detail and drill down capability, query ability are all essential.
Capability to provide various maintained in the system.
ODC Billed
• ADSS Search
• Project Details:
Demographic Details as noted in PSC Tracking
System
Start/End/Status
POCs w/contact information
• Cost Details:
Cost as a Percentage of
Allocation
Allocation
Labor Actuals ($ and Hours)
Labor Billed ($ and Hours)
ODC Actuals
• Travel Actuals
Travel Billed
Commitments
Totals
Drill down capability:
Contractor Name
Contractor Hours
Purchase Details
Travel Details
Billed by Period
Same detail at WAC level
• Reports/Views:
PSC List Sorted by PSC or
ADSS by FY
PSC List w/Allocation and
Actuals by PSC or ADSS by
FY
PSC List w/Allocation and
Billed by PSC or ADSS by FY
PSC List Sorted by Start or
End Dates
PSC List w/Monthly Actuals
Sorted by PSC
PSC List w/Invoiced
Amounts
PSC Burn Rates
PSCs Over 100%
PSCs 90-99%
PSCs 75-89%
WAC List Sorted by WAC
WAC List w/Actuals Sorted by WAC
FY Commitments
Personnel Coverage Reports:
By Employee
By PSC
• Custom Reports:
Actuals vs Billed by PSC and
FY with POC
Contractor Monthly Strength
Contractor Labor by Month and/or by PSC Type
Labor Details by Selected
Period ($ and/or Hours)
Labor Category Hours by
Date Range
Labor Utilization by PSC
Type – Overhead % versus
Reimbursable %
******************End of Document******************
File details come from the government source that posted it. Updated .