Attachment 4E Drawings 12KV OH-UG-5.pdf

PDF 9 MB Posted

Attached to
12KV Overhead to Underground Powerline Replacement At DDJC Federal contract opportunity
Solicitation number
SP330023B0001
Issued by
Defense Logistics Agency Distribution

About this file

This solicitation seeks proposals for a 12kV overhead to underground powerline replacement project at the Defense Logistics Agency Distribution (DLA) facility located in Tracy, California. The scope of work includes removing existing overhead 12kV lines, communications equipment, and poles, and installing new underground conduits, duct banks, manholes, lighting poles, transformers, and other accessories to provide a complete underground power distribution system. The northern segment currently runs overhead along First Street between Ennis Drive and B Street, while the southern segment extends south from D Street around the south end of the facility up to 5th Street. Offerors should provide pricing to complete the replacement of both segments and ensure a functioning underground system as described. The solicitation was issued by DLA on behalf of the facility in Tracy, California.

View the file

Other files for this federal contract opportunity

Other files attached to 12KV Overhead to Underground Powerline Replacement At DDJC, newest first.
File Type Posted
Bid Abstract signed 23B0001.pdf PDF
SECTION I - IFB - 12kV PL Revised as of A4.pdf PDF
SP330023B00010004.pdf PDF
12KV OH to UG Site Visit Roster.pdf PDF
SP330023B00010003.pdf PDF
Attachment 3 DDJC Tracy_12 kV OH to UG Specification_J7 Rev2.0.pdf PDF
SP330023B00010002.pdf PDF
SP330023B00010001 change to Site Visit Date .pdf PDF
Attachment 1 23B00010001 Revised SECTION L -IFB - 12kV PL.pdf PDF
Attachment 7 SF25A-Payment Bond AUG16.pdf PDF
Attachment 1 Applicable Wage General Decision Number CA20230018 14APR23.pdf PDF
Attachment 9 Visitor-Contractor Pre_Enrollment.xlsx XLSX spreadsheet
Attachment 8 SF24-Bid Bond AUG16.pdf PDF
Attachment 5 Submittal Register 12KV OH-UG.pdf PDF
Attachment 4F Drawings 12KV OH-UG-6.pdf PDF
Attachment 4D Drawings 12KV OH-UG-4.pdf PDF
Attachment 4B Drawings 12KV OH-UG-2.pdf PDF
Attachment 2 SOW-DDJC Tracy_12 kV OH to UG Specification_J7.pdf PDF
SP330023B0001.pdf PDF
Attachment 4C Drawings 12KV OH-UG-3.pdf PDF
Attachment 4A Drawings 12KV OH-UG-1.pdf PDF
Attachment 6 SF25-Performance Bond AUG16.pdf PDF
Attachment 3 DDJC Tracy_12 kV OH to UG Specification_J7 Rev1.0.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PI: 13+07.02

PI: 14+77.35

W/16

W/15

N37

1S T

ST

R

EE

T

C E

LP

H H

H H

LP

3)

LP

1)

M H

-2

H H

-4 H

H -5

H H

-6 H

H -7

PI: 11+60.84

PI: 13+07.02

PI: 14+77.35

PI: 16+51.15

PI: 17+88.53

PI: 19+44.34

PI

: 2

2+

.4

W/18A

W/18

W/17

W/16

W/15

W/14

W/13

W/12 A/1 A/2

A/3 A/4

N24

N37

N39

N50

1S T

ST

R

EE

T

1S T

ST

R

EE

T

1S T

ST

R

EE

T

A STREET

ST

AT

IO

N

S

TR

EE

T

C C

C

C

E E

E E

LP

E

A/1

H H

H E

H H

H H

H H

H H

H H

H

H

E

LP

3)

LP

1)

M H

-1 M

H -2

M H

-3

M H

-4

M H

-5

M H

-6

H H

-1 H

H -2

H H

-3 H

H -4

H H

-5 H

H -6

H H

-7 H

H -8

H H

-9 H

H -1

H

H -1

1 H H

-1

PS

S1

H

H

H

HH-13

HH-14

HH-15

DL

A

SI

GN

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-102

SI

TE

P

LA

N

ST

AT

IO

N

2+

T O

6+

BA

SE

B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

KEY NOTES:

1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN TWO CONDUITS.

PROVIDE DUCTBANK PER DETAIL 6 SHEET E-503.

2. PROVIDE A 30 KVA, 3-PHASE, 4-WIRE, 12470-480/277V TRANSFORMER. PROVIDE

SECONDARY FEEDERS FROM NEW TRANSFORMERS TO NEW LIGHT POLES. PROVIDE NEW

PAD MOUNTED TRANSFORMER PER DETAIL 1 ON SHEET E-503.

3. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.

4. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS DETAILS 4 AND 5 ON SHEET

E-501. MOUNT NEW LUMINARIES ON LIGHT POLES AT 24 FEET HEIGHT. PROVIDE

HANDHOLE PER DETAIL 3 ON SHEET E-502.

5. PROVIDE 200 PAIR COPPER FROM TO BUILDING 100 USING EXISTING CONDUIT.

6. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING. PROVIDE LIGHTING

DUCTBANK PER DETAIL 4 ON SHEET E-503.

7. PROVIDE A 50 A, 3-PHASE, 4-WIRE, 480/277V PANELBOARD AND LABEL IT LP-1. INSTALL

PANELBOARD ON 30 KVA TRANSFORMER PAD.

8. PROVIDE DUAL LUMINARE TYPE POLES FROM HH-1 TO HH-14.

9. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER. PROVIDE DUCTBANK

PER DETAIL 4 SHEET E-502.

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, 15KV, 133

PERCENT INSULATION, TYPE MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION,

AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER DEMOLITION. POLE NUMBERS

AND POLE LOCATIONS ARE FOR REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND

CABLE.

TYP

TYP

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text E-102

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-101

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-103

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

LOAD (KVA)

AutoCAD SHX Text

CB

AutoCAD SHX Text

VOLTS:

AutoCAD SHX Text

BUS:

AutoCAD SHX Text

MAINS:

AutoCAD SHX Text

PHASE:

AutoCAD SHX Text

MOUNTING:

AutoCAD SHX Text

AIC:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LOAD (KVA)

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

RECEPT.

AutoCAD SHX Text

LIGHTING

AutoCAD SHX Text

LOAD SUMMARY:

AutoCAD SHX Text

PHASE KVA:

AutoCAD SHX Text

OTHER

AutoCAD SHX Text

SPARE:

AutoCAD SHX Text

CB

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text

CONN. (KVA)

AutoCAD SHX Text D.F.

AutoCAD SHX Text

DEMAND (KVA)

AutoCAD SHX Text

DEMAND AMPS:

AutoCAD SHX Text

SCHEDULE OF PANEL

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

LTG.

AutoCAD SHX Text

REC.

AutoCAD SHX Text

OTHER

AutoCAD SHX Text

LTG.

AutoCAD SHX Text

REC.

AutoCAD SHX Text

OTHER

AutoCAD SHX Text 0.84

AutoCAD SHX Text 20A

AutoCAD SHX Text

LTG HH-1 TO HH-6

AutoCAD SHX Text 480/277V

AutoCAD SHX Text

AutoCAD SHX Text 10,000

AutoCAD SHX Text

SURFACE

AutoCAD SHX Text 100A

AutoCAD SHX Text 50A

AutoCAD SHX Text 2.14

AutoCAD SHX Text

AutoCAD SHX Text 2.14

AutoCAD SHX Text 0.84

AutoCAD SHX Text

LTG HH-7 TO HH-14 & ENT LTGS

AutoCAD SHX Text 1.3

AutoCAD SHX Text 20A

AutoCAD SHX Text 1.3

AutoCAD SHX Text 2.14

AutoCAD SHX Text 2.14

AutoCAD SHX Text 7.8

AutoCAD SHX Text

LP-1

PI: 16+51.15

PI: 17+88.53

PI: 19+44.34

W/14

W/13

W/12 A/1

N39

1S T

ST

R

EE

T

C E

A/1

H

H E

H H

H H

H

M H

-3

M H

-4 H

H -8

H H

-9 H

H -1

H

H -1

1 H H

-1

H

H

HH-13

HH-14

PI: 11+60.84

PI: 13+07.02

PI: 14+77.35

PI: 16+51.15

PI: 17+88.53

PI: 19+44.34

PI

: 2

2+

.4

W/18A

W/18

W/17

W/16

W/15

W/14

W/13

W/12 A/1 A/2

A/3 A/4

N24

N37

N39

N50

1S T

ST

R

EE

T

1S T

ST

R

EE

T

1S T

ST

R

EE

T

A STREET

ST

AT

IO

N

S

TR

EE

T

C C

C

C

E E

E E

LP

E

A/1

H H

H E

H H

H H

H H

H H

H H

H

H

E

LP

3)

LP

1)

M H

-1 M

H -2

M H

-3

M H

-4

M H

-5

M H

-6

H H

-1 H

H -2

H H

-3 H

H -4

H H

-5 H

H -6

H H

-7 H

H -8

H H

-9 H

H -1

H

H -1

1 H H

-1

PS

S1

H

H

H

HH-13

HH-14

HH-15

DL

A

SI

GN

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-103

SI

TE

P

LA

N

ST

AT

IO

N

6+

T O

1+

BA

SE

B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

KEY NOTES:

1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN TWO CONDUITS.

PROVIDE DUCTBANK PER DETAIL 6 SHEET E-503.

2. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS 4 AND 5 ON SHEET E-501.

MOUNT NEW LUMINARIES ON LIGHT POLES AT 24 FEET HEIGHT. PROVIDE HANDHOLE PER

DETAIL 3 ON SHEET E-502.

3. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.

4. PROVIDE 200 PAIR COPPER TO BUILDING 100 USING EXISTING CONDUIT.

5. PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMER TO EXISTING GATEHOUSE

PANELBOARD. PROVIDE (3) #4/0 AND (1) #4 G. PROVIDE DUCTBANK PER DETAIL 4 SHEET

E-502. REFER TO SHEET E-104 FOR LOCATION OF NEW PADMOUNTED TRANSFORMER.

6. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING. PROVIDE LIGHTING

DUCTBANK PER DETAIL 4 ON SHEET E-503.

7. PROVIDE DUAL LUMINARE TYPE POLES FROM HH-1 TO HH-14.

8. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR 40A PANELBOARD, LIGHTING AND DLA

SIGN AT 120/208 V IN EXISTING CONDUIT.

9. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR 40A PANELBOARD, LIGHTING AND DLA

SIGN AT 120/208 V. PROVIDE LIGHTING DUCTBANK PER DETAIL 4 ON SHEET E-503.

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, 15KV, 133

PERCENT INSULATION, TYPE MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION,

AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER DEMOLITION. POLE NUMBERS

AND POLE LOCATIONS ARE FOR REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND

CABLE.

TYP

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text E-103

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-102

AutoCAD SHX Text

MATCH TO SHEET

E-104

PI: 19+44.34

PI

: 2

2+

.4

W/12 A/1 A/2

A/3 A/4

A STREET

ST

AT

IO

N

S

TR

EE

T

E E E

A/1

H H

H H

H

M H

-4

M H

-5

M H

-6

H H

-1 1 H

H -1

H

H

H

HH-13

HH-14

HH-15

DL

A

SI

GN

PI: 11+60.84

PI: 13+07.02

PI: 14+77.35

PI: 16+51.15

PI: 17+88.53

PI: 19+44.34

PI

: 2

2+

.4

W/18A

W/18

W/17

W/16

W/15

W/14

W/13

W/12 A/1 A/2

A/3 A/4

N24

N37

N39

N50

1S T

ST

R

EE

T

1S T

ST

R

EE

T

1S T

ST

R

EE

T

A STREET

ST

AT

IO

N

S

TR

EE

T

C C

C

C

E E

E E

LP

E

A/1

H H

H E

H H

H H

H H

H H

H H

H

H

E

LP

3)

LP

1)

M H

-1 M

H -2

M H

-3

M H

-4

M H

-5

M H

-6

H H

-1 H

H -2

H H

-3 H

H -4

H H

-5 H

H -6

H H

-7 H

H -8

H H

-9 H

H -1

H

H -1

1 H H

-1

PS

S1

H

H

H

HH-13

HH-14

HH-15

DL

A

SI

GN

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-104

SI

TE

P

LA

N

ST

AT

IO

N

0+

T O

5+

BA

SE

B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE

CONDUCTOR COPPER, 15KV, 133 PERCENT INSULATION, TYPE

MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION,

AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER

DEMOLITION. POLE NUMBERS AND POLE LOCATIONS ARE FOR

REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH

12KV TO UNDERGROUND CABLE.

KEY NOTES:

1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY

POWER IN TWO CONDUITS. PROVIDE DUCTBANK PER DETAIL 6

SHEET E-503.

2. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS 4

AND 5 ON SHEET E-501. MOUNT NEW LUMINARIES ON LIGHT

POLES AT 24 FEET HEIGHT. PROVIDE HANDHOLE PER DETAIL 3

ON SHEET E-502.

3. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.

4. PROVIDE (2) NEW RISERS PER DETAIL 1 AND 2 ON SHEET E-501

AND DETAIL 3 ON SHEET E-503 FOR THE DOWN GUY.

5. PROVIDE 200 PAIR COPPER TO BUILDING 100 USING EXISTING

CONDUIT.

6. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING.

CONTRACTOR SHALL PROVIDE LIGHTING DUCTBANK PER DETAIL

4 ON SHEET E-503.

7. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR 40A

PANELBOARD, LIGHTING AND DLA SIGN AT 120/208 V IN

EXISTING CONDUIT.

8. PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMER TO

EXISTING GATEHOUSE PANELBOARD. PROVIDE (3) 250 KCMIL

AND (1) #4 G. PROVIDE DUCTBANK PER DETAIL 4 SHEET E-502.

9.

10.

PROVIDE A 100 KVA, 3-PHASE, 4-WIRE, 12470-208/120V

TRANSFORMER. PROVIDE NEW PAD MOUNTED TRANSFORMER

PER DETAIL 1 ON SHEET E-503. PROVIDE 4 BOLLARDS.

PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMERS TO

EXISTING GATEHOUSE SHED PANELBOARD. PROVIDE (3) #1 AND

(1) #6 G. PROVIDE DUCTBANK PER DETAIL 4 SHEET E-502.

11. PROVIDE HANDHOLE NEAR W/12 TO INTERCEPT CONDUITS

CURRENTLY INSTALLED ON POLE W/12 AND FEED THE EXISTING

GATEHOUSE PANEL AND EXISTING 120/208V, 40A PANEL

FEEDING ENTRANCE LIGHTS AND DLA SIGN.

12. RELOCATE EXISTING DISCONNECT AND SPRINKLER TIMER BOX

FROM POLE A/3 TO POLE A/4, INTERCEPT WIRES FEEDING THE

DISCONNECT AT A/4. INSTALL RISERS ON A/4 AND INSTALL NEW

UNDERGROUND CABLE TO NEW HANDHOLE NEAR POLE A/3 TO

FEED EXISTING LOW VOLTAGE SPRINKLER SYSTEM.

13. PROVIDE DUAL LUMINARE TYPE POLES FROM HH-1 TO HH-14.

14. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR 40A

PANELBOARD, LIGHTING AND DLA SIGN AT 120/208 V. PROVIDE

LIGHTING DUCTBANK PER DETAIL 4 ON SHEET E-503.

15. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY

POWER. PROVIDE DUCTBANK PER DETAIL 4 SHEET E-502.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text E-104

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-103

AutoCAD SHX Text

MATCH TO SHEET

E-105

N50

ST

AT

IO

N

S

TR

EE

T

C C

E53

BUILDING 100

PI: 11+60.84

PI: 13+07.02

PI: 14+77.35

PI: 16+51.15

PI: 17+88.53

PI: 19+44.34

PI

: 2

2+

.4

W/18A

W/18

W/17

W/16

W/15

W/14

W/13

W/12 A/1 A/2

A/3 A/4

N24

N37

N39

N50

1S T

ST

R

EE

T

1S T

ST

R

EE

T

1S T

ST

R

EE

T

A STREET

ST

AT

IO

N

S

TR

EE

T

C C

C

C

E E

E E

C

E53

LP

E

A/1

BUILDING 100

H H

H E

H H

H H

H H

H H

H H

H

H

E

LP

3)

LP

1)

M H

-1 M

H -2

M H

-3

M H

-4

M H

-5

M H

-6

H H

-1 H

H -2

H H

-3 H

H -4

H H

-5 H

H -6

H H

-7 H

H -8

H H

-9 H

H -1

H

H -1

1 H H

-1

PS

S1

H

H

H

HH-13

HH-14

HH-15

DL

A

SI

GN

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-105

SI

TE

P

LA

N

ST

AT

IO

N

5+

T O

7+

BA

SE

B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE

CONDUCTOR COPPER, 15KV, 133 PERCENT INSULATION, TYPE

MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION,

AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER

DEMOLITION. POLE NUMBERS AND POLE LOCATIONS ARE FOR

REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH

12KV TO UNDERGROUND CABLE.

KEY NOTES:

1. PROVIDE 200 PAIR COPPER TO BUILDING 100 USING

EXISTING CONDUIT.

2. TERMINATE 200 PAIR COPPER IN TELECOMMUNICATIONS

ROOM IN BUILDING 100.

3. EXISTING 4" CONDUIT INSIDE OF THE BUILDING.

4. EXISTING 4" CONDUIT ON THE ROOF.

5. EXISTING PULLBOX ON THE ROOF.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-104

E-105

W/34

W/34A

W/35

W/36

E

E

PS

H H

H

M H

-7

H H

-1

H H

-1

H H

-1

S2

W/35A

HH

H

-1

W/34

W/34A

W/35

W/36

W/37

W/38

W/39

W/40

W/41

W /4

W/43

W/44

W/45

W/46

EW/2

EW/3

EW/4

EW/5

EW/6

EW/7

EW/8

EW/9

E

E5

E

E

PS

PS

E

E E

LP

W/47

E

E

E

LP

PS

E H

E H

H H

H H

H H

H H

H H

H H

H H

H

LP

3)

LP

1)

LP

1)

E M

H -7

M H

-8 M

H -9

M H

-1

M H

-1

M H

-1

M H

-1

M H

-1

MH-15

H H

-2

H H

-1

H H

-1

H H

-1

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-3

H H

-3

H H

-3

S2

S3 S4

H H

-2

H H

-3

W/35A

HH

H

-1

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-106

SI

TE

P

LA

N

ST

AT

IO

N

3+

T O

0+

O

PT

IO

N B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

KEY NOTES:

1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN TWO CONDUITS.

PROVIDE DUCTBANK PER DETAIL 6 SHEET E-503.

2. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS 4 AND 5 ON SHEET E-501. MOUNT NEW LUMINARIES ON LIGHT POLES AT 24 FEET HEIGHT. PROVIDE HANDHOLE PER DETAIL 3 ON SHEET E-502.

3. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.

4. PROVIDE A 150 KVA, 3-PHASE, 4-WIRE, 12470-480/277V TRANSFORMER. PROVIDE NEW PAD MOUNTED TRANSFORMER PER DETAIL 1 ON SHEET E-503. PROVIDE FOUR BOLLARDS FOR THIS TRANSFORMER.

5. PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMERS TO EXISTING BUILDING PANEL.

PROVIDE (3) #4/0 AND (1) #4 G. CONTRACTOR SHALL PROVIDE DUCTBANK PER DETAIL 4

SHEET E-502.

6. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING. PROVIDE LIGHTING DUCTBANK PER DETAIL 4

ON SHEET E-503.

7. PROVIDE A 150 KVA, 3-PHASE, 4-WIRE, 12470-208/120V TRANSFORMER. PROVIDE NEW PAD MOUNTED TRANSFORMER PER DETAIL 1 ON SHEET E-503. PROVIDE FOUR BOLLARDS FOR THIS TRANSFORMER.

8. PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMERS TO EXISTING BUILDING PANEL. PROVIDE (6) #350 KCMIL AND (1) #1 G IN (2) 5" SURFACE MOUNTED RGS CONDUIT OUTSIDE THE BUILDING. PROVIDE A THIRD RGS CONDUIT WITH PULL ROPE AS A SPARE. INTERCEPT THE CONDUIIT FEEDING THE BUILDING PANEL.

PROVIDE DUCTBANK PER DETAIL 5 SHEET

E-503.

9. PROVIDE 4-WAY 15KV PAD-MOUNTED SWITCH PER DETAIL 2 ON SHEET E-503. FUSE RATING TO BE

COORDINATED WITH DOWNSTREAM LOAD. PROVIDE ENGRAVED LABELS TO DISPLAY INFORMATION

INCLUDING SWITCH #, POWER SOURCE FROM AND TO, FEEDING POWER TO BUILDING #. CONTACT PROJECT

ENGINEER FOR MORE INFORMATION.

10. REUSE EXISTING CONDUCTOR FOR PRIMARY POWER AND EXTEND EACH CIRCUIT TO TERMINATE AT NEW PAD- MOUNTED SWITCH S-2. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN EACH CONDUIT.

PROVIDE DUCTBANK PER DETAIL 5 SHEET

E-503.

11. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER. PROVIDE DUCTBANK PER DETAIL 4 SHEET E-502.

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, 15KV, 133 PERCENT INSULATION, TYPE MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION, AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER DEMOLITION. POLE NUMBERS AND POLE

LOCATIONS ARE FOR REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND CABLE.

6. CLIN 3 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/34 TO POLE W/36. IF ONLY CLIN 3 OPTION IS SELECTED PROVIDE CABLE AND DUCT BANK PER KET NOTE 1 UPTO POLE W/36 AND PROVIDE RISER

ON POLE W/36.

7. CLIN OPTION 4: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/36 TO POLE W/41. IF ONLY CLIN 4 OPTION IS SELECTED PROVIDE A RISER ON POLE W/36 AND W/41 AND CABLES AND DUCTBANK PER KEY NOTE

1 FROM POLE W/36 TO POLE W/41.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text E-106

AutoCAD SHX Text

MATCH TO SHEET

E-107

W/37

W/38

PS

E

H H

H H

H

M H

-8

H H

-1

H H

-2

H H

-2

H H

-2

H H

-2

S3

W/34

W/34A

W/35

W/36

W/37

W/38

W/39

W/40

W/41

W /4

W/43

W/44

W/45

W/46

EW/2

EW/3

EW/4

EW/5

EW/6

EW/7

EW/8

EW/9

E

E5

E

E

PS

PS

E

E E

LP

W/47

E

E

E

LP

PS

E H

E H

H H

H H

H H

H H

H H

H H

H H

H

LP

3)

LP

1)

LP

1)

E M

H -7

M H

-8 M

H -9

M H

-1

M H

-1

M H

-1

M H

-1

M H

-1

MH-15

H H

-2

H H

-1

H H

-1

H H

-1

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-2

H H

-3

H H

-3

H H

-3

S2

S3 S4

H H

-2

H H

-3

W/35A

HH

H

-1

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SP

EC

N O

D

ES

IG

N

F

IL

E N

O

TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA

D D

JC

T

R

AC

Y, C

A

KV

O

VE

R

H

EA

D T

O U

N D

ER

G

R O

U N

D P

O W

ER

L

IN

E

R

EP

LA

C

EM

EN

T

PN

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

FE

BR

U

AR

Y

W

8-

XX

-X

-X

XX

X

W

8-

XX

-X

-X

XX

X

0-

-0

AN

SI

D

E-107

SI

TE

P

LA

N

ST

AT

IO

N

0+

T O

6+

O

PT

IO

N B

ID

R .L

EO

N

R .L

EO

N

D .C

AR

U

LL

I

A.

PA

SC

U

A, P

E

N

KEY NOTES:

1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER. PROVIDE DUCTBANK PER DETAIL 4

SHEET E-502.

2. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS 4 AND 5 ON SHEET E-501. MOUNT NEW LUMINARIES ON LIGHT POLES AT 24 FEET HEIGHT. PROVIDE HANDHOLE PER DETAIL 3 ON SHEET E-502.

3. PROVIDE 4-WAY 15KV PAD-MOUNTED SWITCH PER DETAIL 2 ON SHEET E-503. FUSE RATING TO BE

COORDINATED WITH DOWNSTREAM LOAD. PROVIDE ENGRAVED LABELS TO DISPLAY INFORMATION

INCLUDING SWITCH #, POWER SOURCE FROM AND TO, FEEDING POWER TO BUILDING #. CONTACT

PROJECT ENGINEER FOR MORE INFORMATION.

4. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER, CONNECT NEW FEEDERS TO EXISTING

TRANSFORMER AND USE EXISTING CONDUIT FEED. PROVIDE NEW CONDUIT FROM MANHOLE TO

INTERCEPT EXISTING CONDUIT.

5. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING. PROVIDE LIGHTING DUCTBANK PER

DETAIL 4 ON SHEET E-503.

6. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.

7. PROVIDE SECONDARY FEEDERS FROM NEW TRANSFORMERS TO EXISTING BUILDING PANEL. PROVIDE (6)

#350 KCMIL AND (1) #1 G IN (2) 5" SURFACE MOUNTED RGS CONDUIT OUTSIDE THE BUILDING. PROVIDE A THIRD RGS CONDUIT WITH PULL ROPE AS A SPARE. INTERCEPT THE CONDUIIT FEEDING THE BUILDING

PANEL.

8. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN (3) CONDUITS. PROVIDE DUCTBANK

PER DETAIL 5 SHEET E-503.

#2

GENERAL NOTES:

1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, 15KV, 133 PERCENT INSULATION, TYPE MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION, AND COPPER TAPE SHIELDING.

2. FIELD VERIFY EXISTING CONDITIONS.

3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER DEMOLITION. POLE NUMBERS AND POLE LOCATIONS

ARE FOR REFERENCE ONLY.

4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.

5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND CABLE.

6. CLIN OPTION 4: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/36 TO POLE W/41. IF ONLY CLIN 4 OPTION IS SELECTED PROVIDE A RISER ON POLE W/36 AND W/41 AND CABLES AND DUCTBANK PER KEY NOTE 1 FROM

POLE W/36 TO POLE W/41.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20 ft.

AutoCAD SHX Text E-107

AutoCAD SHX Text

MATCH TO SHEET

AutoCAD SHX Text E-106

AutoCAD SHX Text

MATCH TO SHEET

E-108

File details come from the government source that posted it. Updated .