Attachment 4D Drawings 12KV OH-UG-4.pdf
PDF 9 MB Posted
- Attached to
- 12KV Overhead to Underground Powerline Replacement At DDJC Federal contract opportunity
- Solicitation number
- SP330023B0001
- Issued by
- Defense Logistics Agency Distribution
About this file
This solicitation is for a 12kV Overhead to Underground Powerline Replacement project at the Defense Distribution Depot in Tracy, California. The scope of work includes demolishing existing overhead 12kV power lines and poles, and installing new underground conduits, ductbanks, manholes, lighting poles, transformers and other equipment to provide a fully functioning underground power distribution system. The northern segment currently runs along First Street, while the southern segment extends from D Street along the south end of the facility up to 5th Street. The Defense Logistics Agency Distribution is the contracting agency. Offerors should provide pricing to complete the full scope of work, including removal of overhead infrastructure and installation of the new underground system. The anticipated award date is not specified.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W/34
W/34A
W/35
W/36
HANDHOLE
W/35A
E
GUARDSHACK
W/34
W/34A
W/35
W/36
W/37
W/38
W/39
W/40
W/41
W/42
W/43
W/44
W/45
W/46
EW/2
EW/3
EW/4
EW/5
EW/6
EW/7
EW/8
EW/9
E
E5
HANDHOLE
E
W/35A
E
GUARDSHACK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL DEMO SHEETS 6_2_2021.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
ED105
SI
TE
P
LA
N D
EM
O
ST
AT
IO
N
3+
T
O
0+
O
PT
IO
N
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. FIELD VERIFY EXISTING CONDITIONS.
2. DEMOLISH ALL EQUIPMENT ON POLES.
3. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
4. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND
CABLE.
5. CLIN 3 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/34 TO POLE W/36.
A,B
HA,B
KEY NOTES:
1. DEMOLISH SWITCH ON POLE W/35A.
2. DEMOLISH CONDUITS/DUCTBANKS UP TO EXISTING MANHOLE.
3. PULL BACK CONDUCTORS TO MANHOLE SO THAT IT CAN BE REUSED.
4. REMOVE ALL DATA AND POWER CABLES ON W/34 AND ALL WEATHER HEADS, CONDUITS
OUTSIDE AND INSIDE BUILDING 110 AND GUARD SHACK UP TO THE EXISTING POWER
PANEL.
F
G
ED105
F
H
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text
MATCH TO SHEET
AutoCAD SHX Text
ED106
W/37
W/38
W/34
W/34A
W/35
W/36
W/37
W/38
W/39
W/40
W/41
W/42
W/43
W/44
W/45
W/46
EW/2
EW/3
EW/4
EW/5
EW/6
EW/7
EW/8
EW/9
E
E5
HANDHOLE
E
W/35A
E
GUARDSHACK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL DEMO SHEETS 6_2_2021.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
ED106
SI
TE
P
LA
N D
EM
O
ST
AT
IO
N
0+
T
O
6+
O
PT
IO
N
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. FIELD VERIFY EXISTING CONDITIONS.
2. DEMOLISH ALL EQUIPMENT ON POLES.
3. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
4. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND
CABLE.
5. CLIN 4 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/36 TO POLE W/41.
KEY NOTES:
1. REMOVE CONDUCTORS FROM EXISTING RISER TO EXISTING TRANSFORMER.
HA,B
F
ED106
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text
MATCH TO SHEET
AutoCAD SHX Text
ED105
AutoCAD SHX Text
MATCH TO SHEET
ED107
W/39
W/40
W/34
W/34A
W/35
W/36
W/37
W/38
W/39
W/40
W/41
W/42
W/43
W/44
W/45
W/46
EW/2
EW/3
EW/4
EW/5
EW/6
EW/7
EW/8
EW/9
E
E5
HANDHOLE
E
W/35A
E
GUARDSHACK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL DEMO SHEETS 6_2_2021.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
ED107
SI
TE
P
LA
N D
EM
O
ST
AT
IO
N
6+
T
O
2+
O
PT
IO
N
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. FIELD VERIFY EXISTING CONDITIONS.
2. DEMOLISH ALL EQUIPMENT ON POLES.
3. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
4. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND
CABLE.
5. CLIN 4 OPTION THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/36 TO POLE
W/41.
KEY NOTES:
1. REMOVE CONDUCTORS FROM EXISTING RISER TO EXISTING TRANSFORMER.
HA,B
F
ED107
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text
MATCH TO SHEET
AutoCAD SHX Text
ED106
AutoCAD SHX Text
MATCH TO SHEET
ED108
W/41
W/42
W/34
W/34A
W/35
W/36
W/37
W/38
W/39
W/40
W/41
W/42
W/43
W/44
W/45
W/46
EW/2
EW/3
EW/4
EW/5
EW/6
EW/7
EW/8
EW/9
E
E5
HANDHOLE
E
W/35A
E
GUARDSHACK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL DEMO SHEETS 6_2_2021.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
ED108
SI
TE
P
LA
N D
EM
O
ST
AT
IO
N
2+
T
O
8+
O
PT
IO
N
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. FIELD VERIFY EXISTING CONDITIONS.
2. DEMOLISH ALL EQUIPMENT ON POLES.
3. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
4. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND CABLE.
5. CLIN 4 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/36 TO POLE W/41.
6. CLIN 5 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/41 TO POLE W/47 AND TO POLE EW/2.
KEY NOTES:
1. REMOVE CONDUCTORS AND CONDUIT FROM EXISTING RISER (POLE W/41) TO
EXISTING RISER (POLE W/42).
2. DEMOLISH SWITCH ON POLE W/41.
A,B
A
A,B E
ED108
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text
MATCH TO SHEET
AutoCAD SHX Text
ED107
AutoCAD SHX Text
MATCH TO SHEET
ED109
W/43
W/44
W/45
W/46
EW/2
W/34
W/34A
W/35
W/36
W/37
W/38
W/39
W/40
W/41
W/42
W/43
W/44
W/45
W/46
EW/2
EW/3
EW/4
EW/5
EW/6
EW/7
EW/8
EW/9
E
E5
HANDHOLE
E
W/35A
E
GUARDSHACK
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL DEMO SHEETS 6_2_2021.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
ED109
SI
TE
P
LA
N D
EM
O
ST
AT
IO
N
8+
T
O
3+
O
PT
IO
N
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. FIELD VERIFY EXISTING CONDITIONS.
2. DEMOLISH ALL EQUIPMENT ON POLES.
3. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
4. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND
CABLE.
5. CLIN 5 OPTION: THIS OPTION SHALL INCLUDE THE WORK FROM POLE W/41 TO POLE W/47
AND TO POLE EW/2.
KEY NOTES:
1. REMOVE CONDUCTORS, CAP CONDUITS AND ABANDON IN PLACE.
A,B
A,B
A
F
ED109
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text
MATCH TO SHEET
AutoCAD SHX Text
ED108
AutoCAD SHX Text
MATCH TO SHEET
ED110
PI: 11+60.84
W/18A
W/18
W/17
N24
1S T
ST
R
EE
T
C E
H H
H
M H
-1
H H
-1 H
H -2
H H
-3
PS
S1
PI: 11+60.84
PI: 13+07.02
PI: 14+77.35
PI: 16+51.15
PI: 17+88.53
PI: 19+44.34
PI
: 2
2+
.4
W/18A
W/18
W/17
W/16
W/15
W/14
W/13
W/12 A/1 A/2
A/3 A/4
N24
N37
N39
N50
1S T
ST
R
EE
T
1S T
ST
R
EE
T
1S T
ST
R
EE
T
A STREET
ST
AT
IO
N
S
TR
EE
T
C C
C
C
E E
E E
LP
E
A/1
H H
H E
H H
H H
H H
H H
H H
H
H
E
LP
3)
LP
1)
M H
-1 M
H -2
M H
-3
M H
-4
M H
-5
M H
-6
H H
-1 H
H -2
H H
-3 H
H -4
H H
-5 H
H -6
H H
-7 H
H -8
H H
-9 H
H -1
H
H -1
1 H H
-1
PS
S1
H
H
H
HH-13
HH-14
HH-15
DL
A
SI
GN
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
TRACY OH BURIAL_ELECTRICAL SHEETS UPDATED ROUTE For Reliability.dwg RTA
D D
JC
T
R
AC
Y, C
A
KV
O
VE
R
H
EA
D T
O U
N D
ER
G
R O
U N
D P
O W
ER
L
IN
E
R
EP
LA
C
EM
EN
T
PN
IN
-H
O U
SE
D
ES
IG
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
FE
BR
U
AR
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
0-
-0
AN
SI
D
E-101
SI
TE
P
LA
N
ST
AT
IO
N
0+
T O
2+
BA
SE
B
ID
R .L
EO
N
R .L
EO
N
D .C
AR
U
LL
I
A.
PA
SC
U
A, P
E
N
GENERAL NOTES:
1. THE PRIMARY PHASE CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, 15KV, 133
PERCENT INSULATION, TYPE MV105, WITH A SEMI CONDUCTING SCREEN, EPR INSULATION,
AND COPPER TAPE SHIELDING.
2. FIELD VERIFY EXISTING CONDITIONS.
3. POLE NUMBERS AND POLES SHALL NO LONGER EXIST AFTER DEMOLITION. POLE NUMBERS
AND POLE LOCATIONS ARE FOR REFERENCE ONLY.
4. REFER TO SHEET E-001 FOR LEGEND AND ABBREVIATIONS.
5. CHECK PHASE ROTATION BEFORE AND AFTER SWITCHING OH 12KV TO UNDERGROUND
CABLE.
KEY NOTES:
1. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN TWO CONDUITS.
PROVIDE DUCTBANK PER DETAIL 6 SHEET E-503.
2. PROVIDE ELECTRICAL MANHOLE PER DETAIL 1 SHEET E-502.
3. PROVIDE NEW LIGHT POLES AND LUMINARIES PER DETAILS 4 AND 5 ON SHEET E-501.
MOUNT NEW LUMINARIES ON LIGHT POLES AT 24 FEET HEIGHT. PROVIDE HANDHOLE PER
DETAIL 3 ON SHEET E-502.
4. PROVIDE A SPLICE IN MANHOLE N24 TO CONTINUE NEW TELECOMMUNICATION TO
BUILDING 100. PROVIDE A WATERPROOF COPPER SPLICE CLOSURE TO SPLICE NEW OSP 200
PAIR COPPER CABLE AND PULL IN EXISTING SPARE CONDUIT INTO EXISTING
COMMUNICATIONS ROOM IN BLDG. 100. PROVIDE A NEW PROTECTED ENTRANCE
TERMINAL, PER TC-I3A, TO TERMINATE THE 200 PAIR COPPER.
5. EXTEND EXISTING CONDUIT AND CONDUCTOR TO NEW MANHOLE MH-1 AND THEN TO PAD
MOUNTED SWITCH S1. NEW (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER.
6. PROVIDE (2) # 4 AND (1) #12 G , COPPER CABLE FOR LIGHTING. PROVIDE LIGHTING DUCTBANK PER DETAIL 4 ON SHEET E-503.
7. PROVIDE 4-WAY 15KV PAD-MOUNTED SWITCH PER DETAIL 2 ON SHEET E-503. FUSE RATING TO BE COORDINATED WITH
DOWNSTREAM LOAD. PROVIDE ENGRAVED LABELS TO DISPLAY INFORMATION INCLUDING SWITCH #, POWER SOURCE FROM AND TO, FEEDING POWER TO BUILDING #. CONTACT PROJECT ENGINEER FOR MORE INFORMATION.
8. PROVIDE DUAL LUMINARE TYPE POLES FROM HH-1 TO HH-14.
9. PROVIDE (3) # 4/0 15KV EPR, COPPER CABLE FOR PRIMARY POWER IN EACH CONDUIT. PROVIDE DUCTBANK PER DETAIL 5
SHEET E-503.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 20 ft.
AutoCAD SHX Text E-101
AutoCAD SHX Text
MATCH TO SHEET
E-102
File details come from the government source that posted it. Updated .