Attachment 2 SOW-DDJC Tracy_12 kV OH to UG Specification_J7.pdf
PDF 139 KB Posted
- Attached to
- 12KV Overhead to Underground Powerline Replacement At DDJC Federal contract opportunity
- Solicitation number
- SP330023B0001
- Issued by
- Defense Logistics Agency Distribution
About this file
This document includes a Statement of Work for a federal contract opportunity to replace overhead power lines with underground utilities at the Defense Distribution Depot San Joaquin in Tracy, California. The project scope involves removing existing 12kV overhead lines, poles, and auxiliary communications equipment along two segments and installing new underground conduits, duct banks, manholes, transformers, switches, and other infrastructure to establish a functioning underground power distribution system. Key locations and aspects of the work are outlined. The document provides relevant submittal requirements and guidance on locating underground utilities, salvaging materials, and protecting existing infrastructure.
The related federal contract opportunity is solicitation number SP330023B0001 to perform the 12kV Overhead to Underground Powerline Replacement work at the Defense Distribution Depot San Joaquin. The opportunity type is a solicitation issued by the Defense Logistics Agency Distribution. The document summarizes the project description and scope of replacing the overhead power lines with an underground system along the specified segments.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12KV OVERHEAD TO UNDERGROUND POWER LINE REPLACEMENT 2410
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes removal of overhead 12kV lines, auxiliary communications equipment (where installed), and poles and the subsequent installation of new underground conduits, duct banks, manholes, lighting poles, transformers, switches and other accessories to ensure a complete working power distribution system. The northern segment of the existing overhead 12kV is located along First Street between Ennis Drive and B Street, while the southern segment runs south from D Street and wraps around the south end of the facility up to 5th Street. The southern section will be included to the furthest extent possible while staying within the obligated funds for this project and incidental related work. Building 205 switch is located near West Area Z road. Work for Building 205 to be done per Annexure 1
1.2.2 Location
The work is located at the Defense Distribution Depot San Joaquin California (DDJC) Tracy, California, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with
01 11 00 - 2
12KV OVERHEAD TO UNDERGROUND POWER LINE REPLACEMENT 2410
Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.5 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on the installation.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --