Attachment 4 Subcontractor Percentage Worksheet.pdf
PDF 81 KB Posted
- Attached to
- RIDGWAY RESERVOIR SPILLWAY FISH SCREEN
- Solicitation number
- 140R4020R0018
About this file
This document contains a subcontracting percentage worksheet template for use on federal contracts. The worksheet requires contractors to input direct labor costs, fringe benefits, and general and administrative overhead rates for both the prime contractor and any subcontractors. These figures are used to calculate the subcontracting labor cost percentage to ensure compliance with limitations on subcontracting under FAR Clause 52.219-14.
The related federal contract opportunity is solicitation number 140R4020R0018 for construction of a fish screen at the spillway of Ridgway Reservoir. The soliciting agency is the Bureau of Reclamation within the Department of the Interior. The solicitation seeks offers for this construction work at the reservoir.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR: ____ ___ SOURCE: ___ ___
SUBCONTRACTOR: _____ SOURCE: _____ _
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUBTOTAL (A) $ (B) $
LABOR G&A** @ % $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Attachment 4 - Subcontractor Worksheet
Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = _______ %
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31 .205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
File details come from the government source that posted it. Updated .