Attachment 4-GFP Report-HEALY DS.docx
DOCX document 18 KB Posted
- Attached to
- Dock-side Repairs: USCGC HEALY FY24 DS
- Solicitation number
- 70Z08523RLREP0121
About this file
This document is a Government Property Report template to be completed by a contractor performing dock-side repairs on the USCGC HEALY under Solicitation Number 70Z08523RLREP0121 issued by the Department of Homeland Security's United States Coast Guard. The contractor is required to account for all government property received for use in the contract, including its description, manufacturer's part number, and serial number. For each item, the contractor must record its current location, installation or consumption date, and disposition instructions for unused, serviceable, salvage, or scrap property. The contractor and government property administrator must sign and date the form upon completion of property disposition to confirm all items have been accounted for. The completed report must accompany the contractor's final invoice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 00004 - CGC HEALY DS.doc | DOC document | |
| Amendment 00003 - CGC HEALY DS.doc | DOC document | |
| Amendment 00002 - CGC HEALY DS.doc | DOC document | |
| Amendment 00001 - CGC HEALY DS.doc | DOC document | |
| Attachment 2-Price Schedule-HEALY DS.xlsx | XLSX spreadsheet | |
| Attachment 1-Specification-HEALY DS.pdf | ||
| Attachment 3-Clarification Request-HEALY DS.docx | DOCX document | |
| Solicitation-HEALY DS-to post 17Aug2023.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4
Solicitation No.: 70Z08523RLREP0121
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
| CONTRACT NUMBER: 70Z08523............ |
| VESSEL: CGC HEALY |
CONTRACTOR POINT OF CONTACT:
TELEPHONE NUMBER:
CONTRACTOR’S ADDRESS:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| TYPE OF PROPERTY RECEIVED (INCLUDE NAME, DESCRIPTION , NSN AND SERIAL #) |
| VALUE OF |
PROPERTY
| DATE RECEIVED |
| DATE INSTALLED/ CONSUMED |
USE THIS BLOCK TO RECORD :
1.CURRENT LOCATION OF PROPERTY IN THE POSSESSION OF THE CONTRACTOR FOR USE DURING THE AVAILABILITY OR OTHERWISE BEING TEMPORARILY HELD UNTIL BEING RETURNED TO/REINSTALLED ON CUTTER.
2. DISPOSITION INSTRUCTIONSFOR UNUSED, SERVICEABLE, SALVAGE OR SCRAP PROPERTY. STATE WHICH APPLY.
DATE
DISPOSITION
CARRIED OUT
| DESCRIPTION |
| NSN\SERIAL\P/N |
*Definitions (all property defined below will require disposition instructions):Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.Scrap – defined as property having no value except for it basic material content.
The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
_____________________________________ ____________ PROPERTY ADMINISTRATOR DATE
(Sign at time disposition instructions are given) __________________________________ ___________ CONTRACTOR SIGNATURE DATE (sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)
File details come from the government source that posted it. Updated .