Attachment 2-Price Schedule-HEALY DS.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Dock-side Repairs: USCGC HEALY FY24 DS
- Solicitation number
- 70Z08523RLREP0121
About this file
This document contains a price schedule attachment for solicitation number 70Z08523RLREP0121 to perform dock-side repairs on the USCGC HEALY for fiscal year 2024. The attachment includes 51 contract line items for services such as inspecting and repairing cranes, conducting annual maintenance on boilers, overhauling purifiers, cleaning and inspecting tanks, renewing insulation, preserving decks, and maintaining hydraulic hatches. A composite labor rate of $________ per hour is also requested to cover additional work orders. The total evaluated price will be determined based on the quantities and unit prices provided. The solicitation was issued by the Department of Homeland Security United States Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 00004 - CGC HEALY DS.doc | DOC document | |
| Amendment 00003 - CGC HEALY DS.doc | DOC document | |
| Amendment 00002 - CGC HEALY DS.doc | DOC document | |
| Amendment 00001 - CGC HEALY DS.doc | DOC document | |
| Attachment 1-Specification-HEALY DS.pdf | ||
| Attachment 4-GFP Report-HEALY DS.docx | DOCX document | |
| Attachment 3-Clarification Request-HEALY DS.docx | DOCX document | |
| Solicitation-HEALY DS-to post 17Aug2023.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| ATTACHMENT 2: Price Schedule | ||||||
| USCGC HEALY DOCKSIDE FY24 | ||||||
| SOLICITATION NUMBER: 70Z08523RLREP0121 | ||||||
| Contract Line Item (CLIN) | Funding Code4 | Title | Unit Price | Unit of Issue | Quantity | Extended Price |
| 001 | SO | Anchor Windlass, Inspect and Repair | Job | 1 | $0.00 | |
| 002 | SO | 04 Deck Cranes (Port and Starboard), TB 100-55, Biennial Inspect and Repair | Job | 1 | $0.00 | |
| 003 | SO | Aft Crane (Port), K15-45, Biennial Inspect and Repair | Job | 1 | $0.00 | |
| 004 | SO | Aft Crane (Starboard), K40-55, Biennial Inspect and Repair | Job | 1 | $0.00 | |
| 005 | SO | Bow Crane, Biennial Inspect and Repair | Job | 1 | $0.00 | |
| 006 | SO | Port & Starboard Miranda Davit, Biennial Inspect and Repair | Job | 1 | $0.00 | |
| 007 | SO | A-Frames, Annual Inspection | Job | 1 | $0.00 | |
| 008 | SO | Boiler, Annual Maintenance | Job | 1 | $0.00 | |
| 009 | SO | Internal Hoists, Annual Inspect and Test | Job | 1 | $0.00 | |
| 010 | SO | Pad Eyes, NDT Inspection | Job | 1 | $0.00 | |
| 011 | SO | Ship Service Air Compressor, Overhaul | Job | 1 | $0.00 | |
| 012 | SO | Miscellaneous System Relief Valves, 5 Year Certification | Job | 1 | $0.00 | |
| 013 | SO | Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | Job | 1 | $0.00 | |
| 014 | SO | Main Propulsion Motor L/O Service Pumps, Overhaul | Job | 1 | $0.00 | |
| 015 | SO | Main Propulsion Motor Air Cooler, Clean & Inspect | Job | 1 | $0.00 | |
| 016 | SO | Sewage Holding Tanks, Clean and Inspect | Job | 1 | $0.00 | |
| 017 | SO | Sewage Piping, Clean And Flush | Job | 1 | $0.00 | |
| 018 | SO | Damage Control and Firefighting Systems, PMS | Job | 1 | $0.00 | |
| 019 | SO | Fuel Oil Purifier (FOP) Overhaul | Job | 1 | $0.00 | |
| 020 | SO | Lube Oil Purifier (LOP) Overhaul | Job | 1 | $0.00 | |
| 021 | SO | Potable Water Hydro- Pneumatic Tank(s), Clean and Inspect | Job | 1 | $0.00 | |
| 022 | SO | Oceanographic Winch, Inspect and Test | Job | 1 | $0.00 | |
| 023 | SO | Trawl / Core Winch, Inspect and Test | Job | 1 | $0.00 | |
| 024 | SO | Trawl / Core Winch Gear Box, Overhaul | Job | 1 | $0.00 | |
| 025 | SO | Hull Plating, U/W Body, Diver’s Inspection, Perform | Job | 1 | $0.00 | |
| 026 | SO | Temporary Services, Provide - Cutter | Job | 1 | $0.00 | |
| 027 | SO | Boiler Exhaust Stack Uptakes, Commercial Clean | Job | 1 | $0.00 | |
| 028 | SO | Main Diesel Engine (MDE) and Auxiliary Diesel Generator Engine (ADGE) Exhaust Stack Uptakes, Clean and Inspect | Job | 1 | $0.00 | |
| 029 | SO | Tanks (MP Fuel Service), Clean And Inspect | Job | 1 | $0.00 | |
| 030 | SO | Steam Coil Pre-Heaters, Clean and Repair | Job | 1 | $0.00 | |
| 031 | SO | Aft Warping Capstan, Inspect and Test | Job | 1 | $0.00 | |
| 032 | SO | Bilge Pocket Surfaces, Preserve | Job | 1 | $0.00 | |
| 033 | SO | Electrical Matting, Renew | Job | 1 | $0.00 | |
| 034 | SO | Insulation, Renew | Job | 1 | $0.00 | |
| 035 | SO | Deck Covering (High Build Epoxy), Renew | Job | 1 | $0.00 | |
| 036 | SO | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | Job | 1 | $0.00 | |
| 037 | SO | Deck Socket, Repair | Job | 1 | $0.00 | |
| 038 | SO | Leslie Pressure Regulating Valves, Overhaul | Job | 1 | $0.00 | |
| 039 | SO | Electrical Cable, Groom | Job | 1 | $0.00 | |
| 040 | SO | Hydraulic Hatches, Maintain | Job | 1 | $0.00 | |
| 041 | SO | Deck Drains, Repair | Job | 1 | $0.00 | |
| 042 | SO | Ventilation Ducting, Clean and Inspect | Job | 1 | $0.00 | |
| 043 | SO | Valves, Overhaul or Renew | Job | 1 | $0.00 | |
| 044 | SO | Heat Trace System, Inspect | Job | 1 | $0.00 | |
| 045 | SO | Centrifugal Fan, Overhaul | Job | 1 | $0.00 | |
| 046 | SO | Instrumented Science Winch Sheaves, Inspect | Job | 1 | $0.00 | |
| 047 | SO | Geislinger Coupling, 40,000-hour Service | Job | 1 | $0.00 | |
| 048 | SO | Flex Hose Assemblies, Renew | Job | 1 | $0.00 | |
| 049 | SO | Steam Isolation Valves, Install | Job | 1 | $0.00 | |
| 050 | SO | Fire Prevention, Provide | Job | 1 | $0.00 | |
| 051 | SO | Additional Work - |
Composite Labor Rate:
Composite Labor Hourly Rate: $_________ ; Quantity: 19,0003 ; Unit of Issue: Hour ; Extended Price: [19,0003 X hourly rate quoted]: _______________ .
| The above rate will be incorporated into the contract and used on task order/s for change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer. | Lump Sum | 1 | $ - 0 | |
| Contract Total Evaluated Price | $0.00 | |||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||
| 2 Weekend day is Saturday and Sunday | ||||
| 3 Estimated Quantity. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||
| 4 Funding code correlates to original CLIN work is to be performed under. |