Attachment 2 - SMCM Landers Library Drawings, R2. 260123.1.pdf
PDF 38 MB Posted
- Attached to
- Landers Library Renovation
- Solicitation number
- BPM055065
- Issued by
- Maryland
About this file
This is a set of construction documents for the Landers Library Renovation project at St. Mary's College of Maryland located in St. Mary's City, Maryland. The project encompasses a comprehensive renovation of an approximately 60,641-gross-square-foot library facility across three floors, with work occurring at the college's primary campus location. The construction documents include architectural plans, demolition drawings, reflected ceiling plans, interior elevations, finish schedules, furniture plans, and detailed specifications for mechanical, electrical, and telecommunications systems. The project is organized into three construction phases to maintain library operations during renovation, with phasing diagrams indicating sequential work areas across Levels 1, 2, and 3. The renovation includes new partition construction, acoustic treatments, flooring and finish upgrades, lighting modifications, casework installation, and comprehensive AV/IT infrastructure improvements. Construction documents are dated April 30, 2025, with revision notes indicating updates through January 23, 2026, and the project team includes Quinn Evans Architects as the lead designer, Mueller Associates as MEP engineer, Convergent Technologies Design Group as AV/IT consultant, and Rider Levett Bucknall as cost estimating consultant.
The renovation project maintains the existing building classification as Type IIIB construction with Business (B) occupancy designation, with total allowable building area of 199,500 square feet accommodating a maximum occupant load of 667 persons across the three floors. The project includes automatic sprinkler system protection and compliance with 2021 IBC, 2021 IPC, 2020 NEC, 2021 IMC, 2012 IGCC, and 2018 NFPA 101 codes. Specific work scope includes demolition of existing partitions, casework, and finishes; installation of new sound-isolating partitions with STC ratings ranging from 49 to 59; new ceiling systems including acoustic panel and gypsum board options; new flooring with carpet tile and luxury vinyl tile; painting throughout with specified Benjamin Moore colors; new lighting fixtures and electrical distribution; and telecommunications infrastructure upgrades including MDF and telecom closet work. Three construction alternates are identified, including acoustic treatment at the stairwell using felt panels and configuration options for classrooms 222 and 225. The library will remain open to the public throughout construction, requiring coordination between contractor and public access; contractor staging is proposed at Mill Field Drive with field office space within the existing library facility.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING INDEX
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
100 N. CHARLES STREET
14TH FLOOR
BALTIMORE, MD 21201
v 410.576.0440
VICINITY MAPS
QUINN EVANS
100 N. CHARLES STREET
14TH FLOOR
BALTIMORE, MD 21201
v 410.576.0440
PROJECT TEAM
MUELLER ASSOCIATES, INC.
MEP ENGINEER
1306 CONCOURSE DR
SUITE 100
LITHICUM, MD 21090
CONVERGENT TECHNOLOGIES
DESIGN GROUP, INC.
AV / IT / SECURITY CONSULTANT
6501 YORK RD
BALTIMORE, MD 21212
RIDER LEVETT BUCKNALL
COST ESTIMATING CONSULTANT
9881 BROKEN LAND PARKWAY
SUITE 304
COLUMBIA, MD 21046
ARCHITECTS
G001
COVER SHEET
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
ST. MARY'S COLLEGE OF MARYLAND
LANDERS LIBRARY RENOVATION
ST. MARY'S CITY, MD 20686
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
GENERAL
G001 COVER SHEET
G006 CONSTRUCTION TYPES
G014 CODE
G015 CODE
G020 PHASING DIAGRAMS
ARCHITECTURAL DEMO
AD101 DEMO PLAN - FIRST FLOOR
AD103 DEMO PLAN - SECOND FLOOR WEST
AD104 DEMO PLAN - SECOND FLOOR EAST
AD105 DEMO PLAN - THIRD FLOOR
AD121 DEMO RCP - FIRST FLOOR
AD123 DEMO RCP - SECOND FLOOR WEST
AD124 DEMO RCP - SECOND FLOOR EAST
AD125 DEMO RCP - THIRD FLOOR
ARCHITECTURAL
A001 LEGENDS, SMYBOLS, ABBREVIATIONS
A101 PLAN - FIRST FLOOR
A103 PLAN - SECOND FLOOR WEST
A104 PLAN - SECOND FLOOR EAST
A105 PLAN - THIRD FLOOR
A106 ROOF PLAN
A110 ALTERNATES
A111 ALTERNATE - ACOUSTIC TREATMENT AT STAIR
A115 ENLARGED PLANS
A121 RCP - FIRST FLOOR
A123 RCP - SECOND FLOOR WEST
A124 RCP - SECOND FLOOR EAST
A125 RCP - THIRD FLOOR
A131 FINISH PLAN - L1
A134 FINISH PLAN - L2 EAST
A135 FINISH PLAN - L3
A136 CARPET TILE AND LVT PLAN - LEVEL 1
A137 CARPET TILE AND LVT PLAN - LEVEL 2
A138 CARPET TILE AND LVT PLAN - LEVEL 3
A431 INTERIOR ELEVATIONS
A432 INTERIOR ELEVATIONS
A433 INTERIOR ELEVATIONS
A434 INTERIOR ELEVATIONS
A501 ROOF DETAILS
A511 DETAILS
A512 DETAILS
A513 DETAILS
A521 INTERIOR STORERONT TYPES
A601 DOOR TYPES & SCHEDULES
A631 FINISH SCHEDULE
A701E EXISTING FURNITURE PLAN - L1
A703E EXISTING FURNITURE PLAN - L2 WEST
A704E EXISTING FURNITURE PLAN - L2 EAST
A705E EXISTING FURNITURE PLAN - L3
A701 FURNITURE & EQUIPMENT PLAN - L1
A703 FURNITURE & EQUIPMENT PLAN - L2 WEST
A704 FURNITURE & EQUIPMENT PLAN - L2 EAST
A705 FURNITURE & EQUIPMENT PLAN - L3
A706 FURNITURE PLANS - ENLARGED
A801 CASEWORK
A802 CASEWORK
A803 CASEWORK
A804 CASEWORK
SIGNAGE
SN001 SIGNAGE FAMILIES
SN101 SIGNAGE PLAN - FIRST FLOOR
SN103 SIGNAGE PLAN - SECOND FLOOR WEST
SN104 SIGNAGE PLAN - SECOND FLOOR EAST
SN105 SIGNAGE PLAN - THIRD FLOOR
MECHANICAL
M001 MECHANICAL LEGEND
MD101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
WEST
MD102 MECHANICAL DEMOLITION PLAN - SECOND FLOOR
MD103 MECHANICAL DEMOLITION PLAN - THIRD FLOOR
MD401A MECHANICAL DEMOLITION PLAN - ALTERNATES
M101 MECHANICAL PLAN - FIRST FLOOR WEST
M102 MECHANICAL PLAN - SECOND FLOOR WEST
M103 MECHANICAL PLAN - SECOND FLOOR EAST
M104 MECHANICAL PLAN - THIRD FLOOR
M105 MECHANICAL PLAN - ROOF
M401A MECHANICAL PART PLANS AND ALTERNATES
M601 MECHANICAL DETAILS & SCHEMATICS
M901 MECHANICAL SCHEDULES
ELECTRICAL
E001 ELECTRICAL LEGEND
ED101 POWER DEMOLITION PLAN - FIRST FLOOR
ED103 POWER DEMOLITION PLAN - SECOND FLOOR
WEST
ED104 POWER DEMOLITION PLAN - SECOND FLOOR EAST
ED105 POWER DEMOLITION PLAN - THIRD FLOOR
ED201 LIGHTING AND FIRE ALARM DEMOLITION PLAN -
FIRST FLOOR
ED204 LIGHTING AND FIRE ALARM DEMOLITION PLAN -
SECOND FLOOR EAST
ED205 LIGHTING AND FIRE ALARM DEMOLITION PLAN -
THIRD FLOOR
ELECTRICAL
E101 POWER NEW WORK PLAN - FIRST FLOOR
E103 POWER NEW WORK PLAN - SECOND FLOOR WEST
E104 POWER NEW WORK PLAN - SECOND FLOOR EAST
E105 POWER NEW WORK PLAN - THIRD FLOOR
E106 POWER NEW WORK PLAN - ROOF
E201 LIGHTING AND FIRE ALARM NEW WORK PLAN -
FIRST FLOOR
E204 LIGHTING AND FIRE ALARM NEW WORK PLAN -
SECOND FLOOR EAST
E205 LIGHTING AND FIRE ALARM NEW WORK PLAN -
THIRD FLOOR
E401 ELECTRICAL PART PLANS
E402 ELECTRICAL PART PLANS
E501 ELECTRICAL DETAILS
E601 ELECTRICAL ONE-LINE DIAGRAM
E900 ELECTRICAL SCHEDULES
E901 PANELBOARD SCHEDULES
E902 PANELBOARD SCHEDULES
TELECOMMUNICATIONS / AUDIOVISUAL
TA001 LOW VOLTAGE SYSTEMS TITLESHEET
TA010 TELECOM GROUNDING DETAILS & RISER
DIAGRAM
TA101 LOW VOLTAGE FIRST FLOOR PLAN
TA103 LOW VOLTAGE SECOND FLOOR PLAN EAST
TA104 LOW VOLTAGE SECOND FLOOR PLAN WEST
TA105 LOW VOLTAGE THIRD FLOOR PLAN
TA121 LOW VOLTAGE RCP - FIRST FLOOR
TA123 LOW VOLTAGE RCP - SECOND FLOOR EAST
TA124 LOW VOLTAGE RCP - SECOND FLOOR WEST
TA125 LOW VOLTAGE RCP - THIRD FLOOR
TA200 MDF 135 ENLARGED DETAILS
TA201 TELECOM 110 ENLARGED DETAILS
TA202 TELECOM 226 ENLARGED DETAILS
TA203 TELECOM 325 ENLARGED DETAILS
TA400 DISPLAY WALL ELEVATIONS
TA500 LOW VOLTAGE SYSTEMS INFRASTRUCTURE
DETAILS (1 OF 3)
TA501 LOW VOLTAGE SYSTEMS INFRASTRUCTURE
DETAILS (2 OF 3)
TA502 LOW VOLTAGE SYSTEMS INFRASTRUCTURE
DETAILS (3 OF 3)
TA510 ELECTRONIC ACCESS CONTROL DOOR DETAILS
TA511 ELECTRONIC ACCESS CONTROL DOORS DOUBLE
DOORS
TA512 ELECTRONIC ACCESS CONTROL DOOR SCHEDULE
TA700 TYPICAL CONFERENCE ROOM, STUDY ROOM &
PRIVATE OFFICE AV SIGNAL FLOW
TA701 CAREER STUDIO 115 & DIGITAL SIGNAGE AV
SIGNAL FLOWS
TA702 BOARDROOM 222 AV SIGNAL FLOW
TA703 CITL SEMINAR CLASSROOM 311 AV SIGNAL FLOW
TA704 CLASSROOM 312 AV SIGNAL FLOW
TA705 FACULTY/STAFF TRAINING LAB 317 AV SIGNAL
FLOW
TA706 LECTURE 321 AV SIGNAL FLOW
TA707 SEMINAR 225 AV SIGNAL FLOW
No. Date Description
1 18 DEC 2025 REV 1
5/8" GYPSUM WALL BOARD
METAL STUD
SIZE AS SCHEDULED
ACOUSTIC BATT INSULATION
METAL STUD
SIZE AS SCHEDULED
5/8" GYPSUM WALL
BOARD
FACE OF
SUBSTRATE
TWO LAYERS 5/8" GYPSUM WALL BOARD
METAL STUD
SIZE AS SCHEDULED; 20 ga
2" X 1/2" DEEP RESILIENT CHANNEL (RC-1 RPO)
@ 24" OC
3" MINERAL FIBER SOUND
ATTENUATED FIRE BLANKET (SAFB)
5/8" GYPSUM WALL BOARD
4"
STC 60
ACOUSTIC TEST USG-760405
3/4" PLYWOOD
9 1/2" 16 ga STEEL JOISTS @ 24" OC
3" MINERAL FIBER SOUND
ATTENUATED FIRE BLANKET
(SAFB)
TWO LAYERS 1/2" GYP BD
SUSPENDED ACOUSTIC PANEL
CEILING
1/4" ACOUSTIC RUBBER UNDERLAYMENT
3/4" PLYWOOD SUBFLOOR - FLASH PATCH
AS REQUIRED FOR FLATNESS
SCHEDULED FINISH FLOOR
5/8" GYPSUM WALL BOARD
METAL STUD
SIZE AS SCHEDULED
GLASS FIBER INSULATION
2 LAYERS 5/8" GYPSUM WALL
BOARD TYP ROOM SIDE
EXISTING WALL CONSTRUCTION
5/8" GYPSUM WALL BOARD ON
EXISTING WALL ASSEMBLY
1. ALL PARTITION CORE STRUCTURE & SHEATHING LAYERS TO EXTEND TO STRUCTURE OR DECK ABOVE.
A. SEE PLANS AND PLAN ENLARGEMENTS FOR PARTITION MARK DESIGNATIONS.
B. SEE LIFE SAFETY PLANS FOR LEGEND & FIRE RATED PARTITION LOCATIONS
2. UTILIZE MOISTURE RESISTANT GYPSUM BOARD AT PARTITIONS (OTHER THAN PLUMBING PARTITIONS) IN THE
FOLLOWING SPACE TYPES UNLESS NOTED OTHERWISE:
A. TOILET ROOMS AND RESTROOMS
B. JANITOR’S CLOSETS
3. UTILIZE CEMENTITIOUS TILE BACKER BOARD AT PLUMBING PARTITIONS (WET WALLS) UNLESS NOTED
OTHERWISE.
A. COORDINATE EXTENT OF BACKER BOARD WITH EXTENT OF TILE FINISH
B. TRANSITION TO MOISTURE RESISTANT GYPSUM BOARD AT AREAS NOT DESIGNATED TO RECEIVE TILE
4. PARTITION TYPES DO NOT DEPICT ADDITIONAL FINISH LAYERS TYPICALLY
A. SEE FINISH SCHEDULE AND INTERIOR ELEVATIONS FOR EXTENT OF FINISHES
B. SEE SPECIFIC PARTITION TYPES INCORPORATING FINISH AND BACKUP
6. SOUND ISOLATING FRAMED PARTITIONS (STC RATING IDENTIFIED IN SCHEDULE) ARE TO INCLUDE:
A. PERIMETER ACOUSTIC SEALANT BEAD FULL DEPTH OF SHEATHING LAYER ADJACENT TO FRAMING EA SIDE:
1. BASE: SEAL BETWEEN BOTTOM OF SHEATHING TO STRUCTURAL DECK
2. TOP: SEAL BETWEEN TOP OF SHEATHING TO STRUCTURAL DECK OR RATED CEILING SHEATHING WHERE
APPLICABLE
B. FULL FRAMING DEPTH SOUND ATTENUATION BATT FOR FULL HEIGHT OF PARTITION
GENERAL PARTITION NOTES:
S1A-1
NOMINAL WIDTH OF CORE STRUCTURE
WALL CORE (STRUCTURE) KEY:
S M C F
STUD: LIGHT GA. METAL FRAMING OR COLD FORM STEEL
MASONRY
SHAFTWALL: CH STUD
FURRING
WALL STRUCTURE
MODIFIER
FIRE RATING IF APPLICABLE
NUMBER DENOTES RATING REQUIREMENT
PARTITION TYPE MARK:
METAL TRACK
GWB, HOLD 3/8" ABOVE
DECK WITH CONTINUOUS,
FULL DEPTH PERIMETER
SEALANT EA SIDE
SCHEDULED FLOOR
FINISH AND WALL BASE
PARTITION TYPE AS
SCHEDULED
# OF GYPBD
LAYERS AS
SCHEDULED
BASE OF PARTITION - B2
CONTINUOUS, PERIMETER
FIRE STOP SEALANT EA
SIDE
METAL TRACK (SLOTTED
TRACK OPTIONAL)
DECK/SLAB
ACOUSTIC TOP - T3F
CUT GYPSUM BOARD
PANELS TO FIT DECK
CONFIGURATION
SEE SCHEDULE FOR RATINGS AND UL DESIGN REFERENCES
COORDINATE FINAL ASSEMBLIES WITH UL PUBLISHED DESIGNS
NON-LOAD BEARING
FRAMING, EXTEND TO
STRUCTURE ABOVE
CONTINUOUS, PERIMETER
SEALANT EA SIDE
DEFLECTION TRACK
DECK/SLAB
TOP OF PARTITION - T2F
PARTITION TYPE AS
SCHEDULED
CEILING, SEE RCP FOR
TYPE AND HEIGHT
METAL STUD
SIZE AS SCHEDULED
2 LAYERS OF 5/8"
GYPSUM WALL BOARD
FACE OF
SUBSTRATE
3/4" PLYWOOD SHEATHING
METAL STUD
SIZE AS SCHEDULED
5/8" GYPSUM WALL BOARD
FACE OF
SUBSTRATE
3/4" PLYWOOD
METAL STUD
SIZE AS SCHEDULED
5/8" GYPSUM WALL
BOARD
FACE OF
SUBSTRATE
3/4" PLYWOOD SHEATHING
METAL STUD
SIZE AS SCHEDULED
GLASS FIBER INSULATION
2 LAYERS 5/8" GYPSUM WALL
BOARD BOTH SIDES
METAL STUD
SIZE AS SCHEDULED
5/8" GYPSUM WALL
BOARD
5/8" GYPSUM WALL
BOARD
3/4" PLYWOOD SHEATHING
TWO LAYERS 5/8" GYPSUM WALL BOARD
6" METAL STUD; 20 ga
2" X 1/2" DEEP RESILIENT CHANNEL
(RC-1 RPO) @ 24" OC
3" MINERAL FIBER SOUND
ATTENUATED FIRE BLANKET (SAFB)
5/8" GYPSUM WALL BOARD
4" C-H STUD
1" GAP
1" LINER PANEL
1' - 1"
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:5
PM
G006
CONSTRUCTION
TYPES
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
PARTITION - S1
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S1C 3 5/8" 0' - 4 7/8" 49 EST
PARTITION - S2
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S2A 1 5/8" 0' - 2 1/4" S2C 3 5/8" 0' - 4 1/4"
PARTITION - SA1
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
ACOUSTICAL
TEST
DETAILS
TOP BOTTOM
SA1 6" 0' - 8" 59 <varies>
1 1/2" = 1'-0"G006
C3 CEILING TYPE C3 - ACOUSTIC
1 1/2" = 1'-0"G006
F1 FLOOR TYPE 1 - ACOUSTIC
1 1/2" = 1'-0"G006
6 09 - PART-BASE-B2
1 1/2" = 1'-0"G006
10 09 - PART-TOP-T4
1 1/2" = 1'-0"G006
13 09 - PART-TOP-T2 FULL HGT
PARTITION - S4
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S4C 3 5/8" 0' - 5 1/2" 52
PARTITION - S5
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S5 N/A 0' - 0 5/8"
PARTITION - S6
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S6C 3 5/8" 0' - 5 5/8"
PARTITION - S3
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S3C 3 5/8" 0' - 5"
PARTITION - S7
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S7A 1 5/8" 0' - 3" S7C 3 5/8" 0' - 5" 49
EST
PARTITION - S8
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S8C 3 5/8" 0' - 6 1/8" 49
EST
PARTITION - S9
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST STC
DETAILS
TOP BOTTOM
S9C 3 5/8" 0' - 5 5/8" 49
EST
No. Date Description
PARTITION - SA2
TYPE
CORE
SIZE
ACTUAL
WIDTH
UL
FIRE
TEST
DETAILS
TOP BOTTOM
SA2 6" 1' - 1"
EGRESS ROOM TAG
EGRESS PATH AND LENGTH
LEGEND
Room name
OCC
ROOM NUMBER
ROOM OCCUPANCY
XX'
1 HR RATED WALL
2 HR RATED WALL
MECHANICAL
MECHANICAL ROOM 134 REQUIRES ONLY
ONE MEANS OF EGRESS. EXTERIOR DOOR
134B SATISFIES THIS REQUIREMENT.
134B
134A
DOOR 134A IS NOT AN EXIT
DUE TO LIMITED HEADROOM TO ACCESS DOOR 134B, SMCM IS
REQUIRED TO CONFORM TO 29 CFR Part 1926 OF OSHA.
https://www.osha.gov/confined-spaces-construction/faq
OIT
6 OCC
STUDENT DIGITAL
MEDIA LAB
54" WIDE STAIR @ .3
INCH/OCC = 180
CAPACITY
CAREER STUDIO
CCPD
11 OCC
DIGITAL MEDIA
SECIALIST
OFFICE
121B
VIDEO EDITING
RM
121A
READING ROOM
44 OCC
STACKS
7 OCC
W&SC
4 OCC
LIBRARY SERVICES
19 OCC
EXIT CAPACITY = 350
EXIT CAPACITY = 170
EXIT CAPACITY THIS FLOOR = 520
OCCUPANT LOAD THIS FLOOR = 213
161' - 7"
CONFERENCE
OIE MEETING
ROOM
122A
COLLAB
MAX OCCUPANCY AT CCPD
SUITE = 49 PERSONS
AUDIO
RECORDING
STUDIO
CIRCULATION
SERVICES SUITE
6 OCC
STACKS
40 OCC
MARYLAND
ROOM
STACKS
78 OCC
READING ROOM
31 OCC
STUDY RM
STUDY RM - LG
STUDY RM - LG
STUDY RM - LG
MD ROOM
ARTIFACTS
DIRECTOR
OFFICE
ADMIN OFFICE
EXIT CAPACITY = 170
EXIT CAPACITY = 170
EXIT CAPACITY = 170
EXIT CAPACITY THIS FLOOR = 510
OCCUPANT LOAD THIS FLOOR = 271
193' - 5"
SEMINAR ROOM
CLASSROOM
STUDY RM
PODS
TELECOM
GEN STOR
CITL
7 OCC
CITL SEMINAR/
CLASSROOM
CLASSROOM
FACULTY / STAFF
TRAINING LAB
LECTURE ROOM
SUPPORT
27 OCC
54" WIDE STAIR @ .3
INCH/OCC = 180
CAPACITY
54" WIDE STAIR @ .3
INCH/OCC = 180
CAPACITY
EXIT CAPACITY THIS FLOOR = 340
OCCUPANT LOAD THIS FLOOR = 183
EXIT CAPACITY = 170
EXIT CAPACITY = 170
BUSINESS OCCUPANCY
OCCUPANCY TYPE LEGEND
LIBRARY READING ROOM
LIBRARY STACKS
REFER TO OCCUPANCY
SCHUDULE ON G015
PROJECT
NORTH
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:1
PM
G014
CODE
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
CODE ANALYSIS
1.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
1.
1.
1.
1.
2.
3.
A.
B.
4.
5.
6.
7.
8.
9.
10.
1.
1.
A AUTHROITIES HAVING JURISDICTION
ST MARY'S COLLEGE OF MARYLAND
B APPLICABLE CODES
IBC / 2021
IPC / 2021
NEC (NFPA 70) / 2020
IMC / 2021
IGCC / 2012
NFPA 101 / 2018
C USE GROUP/OCCUPANCY AND CONSTRUCTION TYPE
CONSTRUCTION TYPES: ANALYZED AS IIIB
USE GROUP/OCCUPANCY: B
ACCESSORY GROUPS WITH SEPARATION REQUIREMENT: NON-SEPARATED MIXED USE
BUILDING HEIGHT LIMITATION: 75'
5. ACTUAL HEIGHT: 36.62'
BUILDING AREA ALLOWABLE AREA FACTOR (PER TABLE 506.2) At: 57,000 SF
NS = 19,000 SF
FRONTAGE INCREASE FACTOR (PER TABLE 506.3.3) FOR 50-75% OPEN SPACE GREATER THAN 30 FT = If = .50 Aa = At + (NS x If) Aa = 57,000 + (19,000 x .50) = 66,500 SF PER STORY
TOTAL ALLOWABLE BUILDING AREA: 199,500 SF
7. ACTUAL BUILDING AREAS:
FIRST FLOOR EAST (NO ARCHITECTURAL SCOPE): 9,631 GSF
FIRST FLOOR WEST: 16,659 GSF
SECOND FLOOR: 24,828 GSF
THIRD FLOOR: 9,523 GSF
TOTAL BUILDING GSF: 60,641 GSF
D FIRE PROTECTION SYSTEMS
AUTOMATIC SPRINKLER SYSTEM
E FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS
IBC TABLE 601: TYPE IIIB CONSTRUCTION
0 HR STRUCTURAL FRAME
2 HR EXTERIOR BEARING WALLS
0 HR EXTERIOR NON-BEARING WALLS
0 HR INTERIOR BEARING WALLS
0 HR INTERIOR NON-BEARING WALLS
0 HR FLOOR CONSTRUCTION
0 HR ROOF CONSTRUCTION
2 HR SHAFTS AND VERTICAL EXIT ENCLOSURES
YES AUTOMATIC SPRINKLER SYSTEM
F MEANS OF EGRESS ANALYSIS
STAIRWAYS EGRESS WITH PER OCC: 44" STAIR WIDTH / .3 PER NFPA 101 = 133
EGRESS WIDTH PROVIDED AT STAIRWAYS:
DOOR EGRESS WITH PER OCC: . 2 PER NFPA 101
(1) 36" DOOR = 170 OCCUPANT CAPACITY
(2) 36" DOORS = 350 OCCUPANT CAPACITY
CORRIDOR EGRESS WIDTH MIN.: 44" WHERE SERVING LESS THAN 100 PEOPLE
CORRIDOR EGRESS WIDTH MIN.: 72" WHERE SERVING 100 PEOPLE OR MORE
CORRIDOR FIRE RESISTANCE RATING:
FIRE RESISTANCE RATING PROVIDED AT CORRIDORS: 0 HR
LENGTH OF TRAVEL MAXIMUM: 200 PER NFPA 15.2.6.3
MAXIMUM COMMON PATH OF TRAVEL: 100 FT PER NFPA 15.2.5.3.1
DEAD END CORRIDOR MAXIMUM: 20 FT PER NFPA 15.2.5.2
H SPECIAL REQUIREMENTS
REFER TO NOTES ON PLANS RELATED TO EGRESS FROM MECHANICAL ROOM 134
LIST ANY SPECIAL REQUIREMENTS
1/16" = 1'-0"G014
1 CODE REVIEW - FIRST FLOOR
1/16" = 1'-0"G014
2 CODE REVIEW - SECOND FLOOR
1/16" = 1'-0"G014
3 CODE REVIEW - THIRD FLOOR
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:1
PM
G015
CODE
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
LIFE SAFETY - NET AREA SCHEDULE - LEVEL 1
Number Name Area Occupancy Occupant Load Factor Occupant Count
112 CONFERENCE 269 SF COLLAB 30 SF 9
115 CAREER STUDIO 630 SF CLASSROOM 20 SF 21
118 STUDENT DIGITAL MEDIA LAB 545 SF CLASSROOM 20 SF 28
119 AUDIO RECORDING STUDIO 264 SF CLASSROOM 20 SF 14
121A VIDEO EDITING RM 119 SF OFFICE 150 SF 2
121B DIGITAL MEDIA SECIALIST OFFICE 118 SF OFFICE 150 SF 2
122A OIE MEETING ROOM 211 SF COLLAB 30 SF 8
133 COLLAB 1,108 SF COLLAB 30 SF 37
134 MECHANICAL 940 SF SERVICE 1
LIFE SAFETY - GROSS AREA OCCUPANCY - LEVEL 1
Name Area Program Area Type Occupant Load Factor Occupant Count
OIT 867 SF BUSINESS 150 SF 6
CCPD 1,607 SF BUSINESS 150 SF 11
READING ROOM 2,184 SF LIBRARY READING ROOM 50 SF 44
STACKS 618 SF LIBRARY STACKS 100 SF 7
W&SC 563 SF BUSINESS 150 SF 4
LIBRARY SERVICES 2,366 SF BUSINESS 150 SF 19
8,207 SF 91
LIFE SAFETY - GROSS AREA OCCUPANCY - LEVEL 2
Name Area Program Area Type Occupant Load Factor Occupant Count
CIRCULATION SERVICES SUITE 814 SF BUSINESS 150 SF 6
STACKS 3,944 SF LIBRARY STACKS 100 SF 40
STACKS 7,724 SF LIBRARY STACKS 100 SF 78
READING ROOM 1,514 SF LIBRARY READING ROOM 50 SF 31
13,997 SF 155
LIFE SAFETY - NET AREA SCHEDULE - LEVEL 2
Number Name Area Occupancy Occupant Load Factor Occupant Count
205 STUDY RM 92 SF COLLAB 15 SF 7
206 STUDY RM 179 SF COLLAB 15 SF 12
214 STUDY RM - LG 185 SF COLLAB 15 SF 13
215 STUDY RM - LG 151 SF COLLAB 15 SF 11
216 STUDY RM - LG 187 SF COLLAB 15 SF 13
220 MARYLAND ROOM 540 SF STORAGE 300 SF 1
221 MD ROOM ARTIFACTS 259 SF STORAGE 300 SF 1
222 BOARDROOM 732 SF CLASSROOM 20 SF 37
226 TELECOM 91 SF SERVICE 1
228 STORAGE 95 SF STORAGE 1
232 PODS 235 SF COLLAB 15 SF 16
235 ADMIN OFFICE 149 SF OFFICE 150 SF 1
236 DIRECTOR OFFICE 209 SF OFFICE 150 SF 2
LIFE SAFETY - NET AREA SCHEDULE - LEVEL 3
Number Name Area Occupancy Occupant Load Factor Occupant Count
311 CITL SEMINAR/ CLASSROOM 656 SF CLASSROOM 20 SF 33
312 CLASSROOM 793 SF CLASSROOM 20 SF 40
317 FACULTY / STAFF TRAINING LAB 680 SF CLASSROOM 20 SF 34
321 LECTURE ROOM 824 SF LECTURE HALL 20 SF 42
LIFE SAFETY - GROSS AREA OCCUPANCY - LEVEL 3
Name Area Program Area Type Occupant Load Factor Occupant Count
CITL 901 SF BUSINESS 150 SF 7
SUPPORT 4,045 SF BUSINESS 150 SF 27
4,946 SF 34
TOTAL LEVEL 1 OCCUPANTS: 213
TOTAL LEVEL 2 OCCUPANTS: 271
TOTAL LEVEL 2 OCCUPANTS: 183
COORDINATE PLACEMENT OF
TEMPORARY SERVICE DESK
WITH OWNER
MILL
FIELD
D
RIVE
CONSTRUCTION STAIR
NO ARCHITECTURAL
SCOPE AT EAST PORTION
OF FIRST FLOOR
CONSTRUCTION STAIR
MAINTAIN ACCESS TO
STAIR FOR PUBLIC EGRESS
DOOR NOT USED BY CONTRACTORS
DURING CONSTRUCTION
IF APPROVED BY OWNER,
THIS WORK MAY BE ABLE
TO BE PERFORMED DURING
PHASE 1
SHEET NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THESE DIAGRAMS ARE A PROPOSAL
FOR HOW WORK IS TO BE SEQUENCED
AND ARE NOT INTENDED TO DEFINE
SCOPE OF WORK. REFER TO PLANS
WITHIN FOR CONSTRUCTION SCOPE.
LIBRARY IS TO BE OPEN TO THE PUBLIC
FOR THE DURATION OF
CONSTRUCTION
TEMPORARY DOORS IN TEMPORARY
WALL ARE NOT SHOWN. CONTRACTOR
TO INSTALL DOORS TO ACCESS WORK
AREAS AS REQUIRED TO PERFORM
WORK
IT IS ANTICIPATED THE ELEVATORS
WILL NOT BE AVAILABLE FOR
CONTRACTOR USE. OWNER TO
CONFIRM.
OWNER TO APPROVE USE OF STAIR
INDICATED AS A CONSTRUCITON STAIR.
STAIR(S) THAT ARE USED DURING
CONSTRUCTION ARE TO BE
PROTECTED DURING USE AND
RETURNED TO OWNER IN THE SAME
CONDITION THAT IT WAS FOUND IN.
MAINTAIN CODE COMPLIANT ACCESS
TO EGRESS STAIRS DURING
CONSTRUCTION - TYP ALL PHASES
IF APPROVED BY THE OWNER,
VARIATIONS TO THESE PROPOSED
PHASES ARE POSSIBLE.
CONTRACTOR TO SUBMIT PHASING
PLANS COORDINATED WITH
DEMOLITION AND CONSTRUCTION
WORK AND CORRESPONDING
CONSTRUCTION SCHEDULE TO OWNER
AND DESIGN TEAM FOR REVIEW AND
APPROVAL.
OWNER TO REVIEW AND APPROVE
PROPOSAL TO USE MILL FIELD DRIVE
FOR PRIMARY CONSTRUCTION ACCESS
AND STAGING AREA.
IT IS ANTICIPATED THAT THE OWNER
WILL APPROVE USE OF EXISITNG
LIBRARY SPACE FOR THE
CONSTRUCTION FIELD OFFICE.
LOCATION IS TO BE DETERMINED
EXTERIOR ROOF WORK NOT
INDICATED ON THESE PLANS
PHASE LEGEND
WORK AREA PER PHASE
NO OR LIMITED WORK AREA IN
PHASE INDICATED
TEMPORARY WALL WITH DOORS
FOR CONSTRUCTION ACCESS AS
REQUIRED
NO ARCHITECTURAL
SCOPE AT EAST PORTION
OF FIRST FLOOR
CONTRACTOR AND PUBLIC TO SHARE
BUILDING ACCESS - WORK TO BE
PERFORMED IN A MANNER THAT
ACCOMODATE CONTINUOUS PUBLIC
ACCESS DURING ALL HOURS THAT
LIBRARY IS OPEN
NEWLY CONSTRUCTION
SERVICE DESK IS TO BE
FUNCTIONAL DURING
THIS PHASE
CLOSE ACCESS TO STAIR
WHILE LEVEL 3 WORK IS
BEING PERFORMED
CONSTRUCTION STAIR
IF APPROVED BY OWNER,
LEVEL 3 IT MAY BE
ACCEPTABLE FOR LEVEL 3
WORK TO EXTEND INTO
PHASE 2
MILL
FIELD
D
RIVE
CONSTRUCTION STAIR
NO ARCHITECTURAL
SCOPE AT EAST PORTION
OF FIRST FLOOR
CLOSE OFF STAIR TO PUBLIC ACCESS TO
PERFORM ADD ALTERNATE 3 WORK IF
ACCEPTED
WORK COMPLETE AT THIS
LEVEL DURING PHASE 3
PROJECT
NORTH
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:2
PM
G020
PHASING DIAGRAMS
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/32" = 1'-0"G020
1.2 PHASE 2 - FIRST FLOOR PLAN
1/32" = 1'-0"G020
2.2 PHASE 2 - SECOND FLOOR PLAN
1/32" = 1'-0"G020
3.1 PHASE 1 - THIRD FLOOR PLAN
1/32" = 1'-0"G020
1.3 PHASE 3 - FIRST FLOOR PLAN
1/32" = 1'-0"G020
2.1 PHASE 1 - SECOND FLOOR PLAN
1/32" = 1'-0"G020
3.2 PHASE 2 - THIRD FLOOR PLAN
1/32" = 1'-0"G020
1.1 PHASE 1 - FIRST FLOOR PLAN
1/32" = 1'-0"G020
2.3 PHASE 3 - SECOND FLOOR PLAN
1/32" = 1'-0"G020
3.3 PHASE 2 - THIRD FLOOR PLAN
1 28 JUN 2024 SD COST DRIVEN REVISIONS
DEMOLITION LEGEND
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING DOOR
TO REMAIN
EXISTING CONSTRUCTION
TO REMAIN
DOOR TO BE REMOVED,
SALVAGED OR
REINSTALLED
D27.1
D27.2
D06.1
D06.1
D06.2
D06.2
TYP OF 10
THIS FLOOR
D09.1
D09.2
D09.2
D27.5
D08.3
D08.3 D06.4
D06.4
D10.2 D10.1
D10.4 D10.3 D27.6
D10.5
D06.3
D06.6
D06.6
D27.7
LINE OF WALL
ABOVE - TYP
SHEET NOTES
1. COORDINATE DEMOLITION WITH NEW
WORK.
2. PROTECT ALL EXISTING FURNITURE
AND EQUIPMENT FOR REINSTALLATION
OR RETURN TO OWNER - REFER TO
DEMO FURNITURE PLANS.
3. UNO WHEREEVER NEW FLOOR
FINISHES ARE SCHEDULED, REMOVE
EXISTING FLOOR FINISH, REMOVE
EXISTING BASE & PREP SUBSTRATE
FOR NEW FLOOR FINISH. REFER TO
FINISH PLANS FOR AREAS TO RECEIVE
NEW FINISHES.
NOT IN
SCOPE
M
AI
N
EN
TR
Y
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:2
PM
AD101
DEMO PLAN - FIRST
FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD101
A1 PARTIAL FIRST FLOOR DEMO PLAN - WEST
KEYNOTES
D06.1 REMOVE COUNTER AND WALL
SUPPORT BRACKETS
D06.2 REMOVE WOOD CHAIR RAIL AND
BASE AT FREESTANDING
COLUMNS - TYP
D06.3 REMOVE EXISTING MILLWORK
D06.4 REMOVE CASEWORK
D06.6 REMOVE CHAIR RAIL AND WOOD
BASE AT ELEVATOR LOBBY - TYP
D08.3 REMOVE ACCORDION DOOR
D09.1 WALL REMOVAL FOR
INSTALLATION OF NEW INTERIOR
WINDOW - COORDINATE WITH
NEW WORK
D09.2 REMOVE THINSET QUARRY TILE
IN AREA INDICATED
D10.1 REMOVE SIGNAGE
D10.2 REMOVE BULLETIN BOARD
D10.3 REMOVE HAND SANITIZER
STATION
D10.4 REMOVE PHI BETA KAPPA SIGN
AND RETURN TO OWNER -
OWNER TO CONFIRM DEMO IS
ACCEPTABLE
D10.5 REMOVE DIRECTORY
D27.1 REMOVE EXISTING WALL WHILE
PROTECTING EXISTING DATA
CABLE RUN VERTICALLY
THROUGH IT
D27.2 REMOVE POTS LINES RUN IN
WALL
D27.5 PRIOR TO ANY DEMOLITION IN
THIS AREA, MEET WITH SMCM OIT
DEPARTMENT AND THEIR SUB
CONTRACTOR(S) TO CONFIRM
WHAT INFRASTRUCTURE TO
REMOVE AND THE TIMING OF ANY
INFRASTRUCTURE REMOVAL
D27.6 RELOCATE EXISTING HAND
TELEPHONE - REFER TO
CONSTRUCTION PLANS FOR NEW
LOCATION
D27.7 REMOVE DIGITAL DISPLAY
SCREEN, MOUNT, BACKBOX AND
ASSOCIATED WIRING - RETURN
TO OWNER
6.3
27.3
6.3
27.3
6.3
27.3
6.3
6.3
ROOF
SHEET NOTES
1. COORDINATE DEMOLITION WITH NEW
WORK.
2. PROTECT ALL EXISTING FURNITURE
AND EQUIPMENT FOR REINSTALLATION
OR RETURN TO OWNER - REFER TO
DEMO FURNITURE PLANS.
3. UNO WHEREEVER NEW FLOOR
FINISHES ARE SCHEDULED, REMOVE
EXISTING FLOOR FINISH, REMOVE
EXISTING BASE & PREP SUBSTRATE
FOR NEW FLOOR FINISH. REFER TO
FINISH PLANS FOR AREAS TO RECEIVE
NEW FINISHES.
DEMOLITION LEGEND
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING DOOR
TO REMAIN
EXISTING CONSTRUCTION
TO REMAIN
DOOR TO BE REMOVED,
SALVAGED OR
REINSTALLED
6.3 REMOVE CHAIR RAIL THIS ROOM
SPECIFIC DEMO NOTES
27.3 REMOVE ALL AV FROM THIS ROOM
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:2
PM
AD103
DEMO PLAN -
SECOND FLOOR
WEST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD103
A1 PARTIAL SECOND FLOOR DEMO PLAN - WEST
KEYNOTES
A110 A1
ALTERNATE
A110 D1
ALTERNATE
9.2
6.3
27.3
SHEET NOTES
1. COORDINATE DEMOLITION WITH NEW
WORK.
2. PROTECT ALL EXISTING FURNITURE
AND EQUIPMENT FOR REINSTALLATION
OR RETURN TO OWNER - REFER TO
DEMO FURNITURE PLANS.
3. UNO WHEREEVER NEW FLOOR
FINISHES ARE SCHEDULED, REMOVE
EXISTING FLOOR FINISH, REMOVE
EXISTING BASE & PREP SUBSTRATE
FOR NEW FLOOR FINISH. REFER TO
FINISH PLANS FOR AREAS TO RECEIVE
NEW FINISHES.
DEMOLITION LEGEND
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING DOOR
TO REMAIN
EXISTING CONSTRUCTION
TO REMAIN
DOOR TO BE REMOVED,
SALVAGED OR
REINSTALLED
6.1 REMOVE RAISED FLOOR SYSTEM AND RAMP
SPECIFIC DEMO NOTES
6.2 REMOVE STAIR, ELEVATED WALKWAY, SUPPORT
STRUCTURE AND RAILINGS
27.1
REMOVE TELECOM CLOSET, EQUIPMENT AND
ASSOCIATED WIRING AND ELECTRICAL -
COORDIANATE REMOVAL WITH NEW WORK SO
THAT SERVICE TO SPACES IN USE IS NOT
DISRUPTED
27.2 REMOVE MOTORIZED PROJECTION SCREEN
CONTROL SWITCH
11.1
COORDINATE TEMPORARY STORAGE OF
EQUIPMENT LOCATED IN THESE ROOMS.
RELOCATION INTO NEWLY CONSTRUCTED
STORAGE ROOMS
11.2
REMOVE ALL EQUIPMENT TO STORAGE AREA AS
DIRECTED BY OWNER. MOVE TO ROOM 119 AFTER
IT IS CONSTRUCTED.
9.1 REMOVE EXISTING GYP BD BULKHEAD
9.2 REMOVE EXISTING VCT FLOORING
9.3 REMOVE EXISTING VCT FLOORING AT FULL
EXTENT OF ROOM
9.4 REMOVE EXISTING LVT FLOORING
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:2
PM
AD104
DEMO PLAN -
SECOND FLOOR EAST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD104
A1 PARTIAL SECOND FLOOR DEMO PLAN - EAST
D08.2
6.1
6.2
27.1
D08.2
D08.2
D08.2
27.2
11.1
11.1
11.1
11.2
D02.2
D06.7
D08.2
DOOR TO
MECHANICAL
SPACE
SHEET NOTES
1. COORDINATE DEMOLITION WITH NEW
WORK.
2. PROTECT ALL EXISTING FURNITURE
AND EQUIPMENT FOR REINSTALLATION
OR RETURN TO OWNER - REFER TO
DEMO FURNITURE PLANS.
3. UNO WHEREEVER NEW FLOOR
FINISHES ARE SCHEDULED, REMOVE
EXISTING FLOOR FINISH, REMOVE
EXISTING BASE & PREP SUBSTRATE
FOR NEW FLOOR FINISH. REFER TO
FINISH PLANS FOR AREAS TO RECEIVE
NEW FINISHES.
6.1 REMOVE RAISED FLOOR SYSTEM AND RAMP
SPECIFIC DEMO NOTES
6.2 REMOVE STAIR, ELEVATED WALKWAY, SUPPORT
STRUCTURE AND RAILINGS
27.1
REMOVE TELECOM CLOSET, EQUIPMENT AND
ASSOCIATED WIRING AND ELECTRICAL -
COORDIANATE REMOVAL WITH NEW WORK SO
THAT SERVICE TO SPACES IN USE IS NOT
DISRUPTED
27.2 REMOVE MOTORIZED PROJECTION SCREEN
CONTROL SWITCH
11.1
COORDINATE TEMPORARY STORAGE OF
EQUIPMENT LOCATED IN THESE ROOMS.
RELOCATION INTO NEWLY CONSTRUCTED
STORAGE ROOMS
11.2
REMOVE ALL EQUIPMENT TO STORAGE AREA AS
DIRECTED BY OWNER. MOVE TO ROOM 119 AFTER
IT IS CONSTRUCTED.
9.1 REMOVE EXISTING GYP BD BULKHEAD
9.2 REMOVE EXISTING VCT FLOORING
9.3 REMOVE EXISTING VCT FLOORING AT FULL
EXTENT OF ROOM
9.4 REMOVE EXISTING LVT FLOORING
DEMOLITION LEGEND
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING DOOR
TO REMAIN
EXISTING CONSTRUCTION
TO REMAIN
DOOR TO BE REMOVED,
SALVAGED OR
REINSTALLED
ROOF
BELOW
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:3
PM
AD105
DEMO PLAN - THIRD
FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD105
A1 THIRD FLOOR DEMO PLAN
KEYNOTES
D02.2 EXISTING STAIR WITH WOOD
TREADS AND RISERS TO REMAIN
D06.7 REMOVE BASE AND UPPER
CABINETS , SINK, COUNTER, AND
BACKSPLASH
D08.2 REMOVE INTERIOR WINDOW
L
K
J
I
H
G
1110987
654321 5.5
I.5
NO CEILING
OPEN TO
ABOVE
NO CEILING
NO CEILING
NO CEILING
OPEN TO
ABOVE
OPEN TO
ABOVE
9.1 9.1
9.1 9.1
9.1
9.1
9.1
9.1
REMOVE BULKHEAD
D27.7
EXTERIOR
SOFFITOPEN TO THE
SKY ABOVE
ACOUSTIC PANEL CEILING
- EXISTING TO REMAIN
REMOVE SUSPENDED
ACOUSTIC CEILING UNO
GYP CEILING OR BULKHEAD
- EXISTING TO REMAIN
DEMO RCP LEGEND
REMOVE CEILING PANELS -
PROTECT GRID FOR REUSE
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING CONSTRUCTION
TO REMAIN
SHEET NOTES
1. COORDINATE CEILING REMOVAL
WITH NEW WORK
2. ALL CEILINGS TO BE REMOVED ARE
ACOUSTIC PANEL CEILINGS UNO
3. EXIT SIGNS ARE TO BE REPLACED AT
THIS FLOOR, TYP
9.1 REMOVE EXISTING GYP BD BULKHEAD
SPECIFIC DEMO NOTES
Y
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:3
PM
AD121
DEMO RCP - FIRST
FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD121
A1 PARTIAL FIRST FLOOR DEMO RCP - WEST
KEYNOTES
D27.7 REMOVE DIGITAL DISPLAY
SCREEN, MOUNT, BACKBOX AND
ASSOCIATED WIRING - RETURN
TO OWNER
K
J
I
H
G
F
F.2
1110987
654321 5.5
I.5
A703 A3
ACOUSTIC PANEL CEILING
- EXISTING TO REMAIN
REMOVE SUSPENDED
ACOUSTIC CEILING UNO
GYP CEILING OR BULKHEAD
- EXISTING TO REMAIN
DEMO RCP LEGEND
REMOVE CEILING PANELS -
PROTECT GRID FOR REUSE
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING CONSTRUCTION
TO REMAIN
SHEET NOTES
1. COORDINATE CEILING REMOVAL
WITH NEW WORK
2. ALL CEILINGS TO BE REMOVED ARE
ACOUSTIC PANEL CEILINGS UNO
3. EXIT SIGNS ARE TO BE REPLACED AT
THIS FLOOR, TYP
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:3
PM
AD123
DEMO RCP - SECOND
FLOOR WEST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD123
A1 PARTIAL SECOND FLOOR DEMO RCP - WEST
F
F.2
E
D
C
B
A
87654321 5.5
NO CEILING
NO CEILING
OPEN TO
ABOVE
AD124
AD124
ALTERNATE ALTERNATE
ACOUSTIC PANEL CEILING
- EXISTING TO REMAIN
REMOVE SUSPENDED
ACOUSTIC CEILING UNO
GYP CEILING OR BULKHEAD
- EXISTING TO REMAIN
DEMO RCP LEGEND
REMOVE CEILING PANELS -
PROTECT GRID FOR REUSE
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING CONSTRUCTION
TO REMAIN
SHEET NOTES
1. COORDINATE CEILING REMOVAL
WITH NEW WORK
2. ALL CEILINGS TO BE REMOVED ARE
ACOUSTIC PANEL CEILINGS UNO
3. EXIT SIGNS ARE TO BE REPLACED AT
THIS FLOOR, TYP
E
D
C
B
65 5.5
C
B
D26.1
D26.1
D27.4
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:3
PM
AD124
DEMO RCP - SECOND
FLOOR EAST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD124
A1 PARTIAL SECOND FLOOR DEMO RCP - EAST
KEYNOTES
D26.1 REMOVE EXISTING SUSPENDED
LIGHTING FIXTURE.
D27.4 REMOVE CEILING MOUNTED
PROJECTOR, SCREEN, AND
ASSOCIATED MOUNT AND
WIRING.
1/8" = 1'-0"AD124
1 DEMO RCP - ALT - CLASSROOM 225 & CSS
1/8" = 1'-0"AD124
2 DEMO RCP - ALT CLASSROOM 222
E
D
C
B
A
7654321 5.5
NO CEILING
D27.4
D27.5
ACOUSTIC PANEL CEILING
- EXISTING TO REMAIN
REMOVE SUSPENDED
ACOUSTIC CEILING UNO
GYP CEILING OR BULKHEAD
- EXISTING TO REMAIN
DEMO RCP LEGEND
REMOVE CEILING PANELS -
PROTECT GRID FOR REUSE
ITEM / CONSTRUCTION
TO BE REMOVED,
SALVAGED OR
REINSTALLED
EXISTING CONSTRUCTION
TO REMAIN
SHEET NOTES
1. COORDINATE CEILING REMOVAL
WITH NEW WORK
2. ALL CEILINGS TO BE REMOVED ARE
ACOUSTIC PANEL CEILINGS UNO
3. EXIT SIGNS ARE TO BE REPLACED AT
THIS FLOOR, TYP
ROOF
BELOW
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:3
PM
AD125
DEMO RCP - THIRD
FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"AD125
A1 THIRD FLOOR DEMO RCP
KEYNOTES
D27.4 REMOVE CEILING MOUNTED
PROJECTOR, SCREEN, AND
ASSOCIATED MOUNT AND
WIRING.
D27.5 PRIOR TO ANY DEMOLITION IN
THIS AREA, MEET WITH SMCM OIT
DEPARTMENT AND THEIR SUB
CONTRACTOR(S) TO CONFIRM
WHAT INFRASTRUCTURE TO
REMOVE AND THE TIMING OF ANY
INFRASTRUCTURE REMOVAL
DETAIL / PLAN BLDG SECTION CUT
DRAWING REFERENCE
SHEET REFERENCE
DRAWING REFERENCE
SHEET REFERENCE
INTERIOR ELEVATION DETAIL CUT
DRAWING REFERENCE
SHEET REFERENCE
DRAWING REFERENCE
SHEET REFERENCE
A101
SIM
A101
SIM
A101
SIM
A101
SIM
WALL SECTION CUT
DRAWING REFERENCE
SHEET REFERENCE
A101
SIM
A101
SIM
DRAWING REFERENCE
SHEET REFERENCE
EXTERIOR ELEVATION
A101
SIM
XX
XX
ROOM NUMBER
FINISH TYPE
DOOR NUMBER
WALL TYPES
WINDOW NUMBER
DIMENSIONAL LUMBER
(SIZE AS INDICATED)
STEEL
DISCONTINUOUS LUMBER
(SIZE AS INDICATED)
MATERIAL LEGEND
CEILING TAG
NEW ELEVATION
EXISTING ELEVATION
BATT INSULATION
Room name
101 KEYNOTE
ALUMINUM
WOOD
PLYWOOD
XX-XX
MATERIAL DESIGNATION
(REFER TO MATERIALS
SCHED. ).
XX
SYMBOLS
XX LOUVER TAG
REVISION CLOUD
AND INDICATOR
XX CONSTRUCTION
ASSEMBLY
MATCHLINE
A EXISTING COLUMN
LINE
A NEW COLUMN LINE
X/SHEET #
X/SHEET #
SHIM
2 4
GYPSUM BOARD / PLASTER
SEALANT & BACKER ROD
(SIZE AS INDICATED)
METAL STUD
METAL TRACK
2 4
ACOUSTICAL CEILING
CARPET
3/8"
1i 1' - 0"
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:4
PM
A001
LEGENDS, SMYBOLS,
ABBREVIATIONS
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
A/C AIR CONDITIONING
A/E ARCHITECT / ENGINEER
ABV ABOVE
ACCESS ACCESSIBLE
ACP ACOUSTICAL CEILING PANEL
ACST ACOUSTIC
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADD'L ADDITIONAL
ADJ ADJACENT/ADJUST
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGG AGGREGATE
ALT ALTERNATE
ALUM ALUMINIUM
APPROX APPROXIMATE(LY)
ARCH ARCHITECT(URAL, URE)
ASPH ASPHALT(IC)
ASSOC ASSOCIATED
AUTO AUTOMATIC
AVG AVERAGE
AWP ACOUSTICAL WALL PANEL
BBT BIO-BASED TILE
BC BRICK COURSE
BD BOARD
BIT BITUMINOUS, BITUMEN
BLDG BUILDING
BLKG BLOCKING
BLKHD BULKHEAD
BLW BELOW
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
BR BRASS OR BRONZE
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
C-C CENTER TO CENTER
CAB CABINET
CEM CEMENT
CFS COLD FORMED STEEL
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMUNICATIONS
CONC CONCRETE
COND CONDITION
CONFIG(S) CONFIGURATION(S)
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CORR CORRIDOR
CPT CARPET(ED)
CT CERAMIC TILE
CTR CENTER
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DETER DETERIORATING,
DETERIORATED
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM(S) DIMENSION(S)
DIV DIVIDE
DN DOWN
DR DOOR, DRAIN
DS DOWNSPOUT
DTL DETAIL
DWG(S) DRAWING(S)
DWR DRAWER
E EAST
E-P EPOXY PAINT
EA EACH
EJ EXPANSION JOINT
EL ELEVATION (TOPO)
ELEC ELECTRICAL
ELEV ELEVATION (ARCH),
ELEVATOR
EMER EMERGENCY
ENCL ENCLOS(E,URE)
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EPS EXPANDED POLYSTYRENE
BOARD
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE(D)
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXHB EXHIBIT
EXIST EXISTING
EXP EXPOSED, EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAS FASTEN(ER)
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH(ED) FACE
FF&E FURNITURE, FIXTURES &
EQUIPMENT
FH FIRE HOSE, FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN(S) FINISH(ES)
FIXT FIXTURE
FL FLOOR(ING)
FLAM FLAMMABLE
FLUOR FLUORESCENT
FO FINISHED OPENING
FOS FACE OF STUDS
FP FIRE PROTECTION
FR FRAME(D,ING), FIRE RATING,
FIRE RESISTANT
FT FEET
FTG FOOTING
FUR FURR(ED,ING)
FWC FABRIC WALL COVERING
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEN GENERATOR
GF GLASS FILM
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
POLYESTER,
GLASS-FIBER-REINFORCED
PLASTIC
GL GLASS, GLAZING
GLU LAM GLUE LAMINATED WOOD
GOVT GOVERNMENT
GT GROUT
GWB GYPSUM WALLBOARD
H HIGH
HAZ MAT HAZARDOUS MATERIAL
HB HOSE BIBB
HC HOLLOW CORE, HOSE
CABINET
HCWD HOLLOW CORE WOOD DOOR
HD HEAVY DUTY
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL(LY)
HP HIGH POINT
HSS HOLLOW STRUCTURAL
SECTION
HT HEIGHT(S)
HT HEIGHT
HVAC HEATING, VENTILATION & AIR
CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH(ES)
INCAN INCANDESCENT
INCL INCLUDE(S,D,ING)
INFO INFORMATION
INSUL INSULATION, INSULATED
INT INTERIOR
INV INVERT
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
J-BOX JUNCTION BOX
JAN JANITOR
JT(S) JOINT(S)
KIT KITCHEN
KO KNOCK OUT
L ANGLE
LAM LAMINATE(D)
LAV LAVATORY
LBL LABEL
LH LEFT HAND
LHR LEFTHAND REVERSE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LT GA LIGHT GAUGE
LTG LIGHTING
LV LOW VOLTAGE
LVT LUXURY VINYL TILE
LW LIGHT WEIGHT
MAS MASONRY
MATL MATERIAL(S)
MAX MAXIMUM
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD BIT MODIFIED BITUMEN
MR MLISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NC NOISE CRITERIA, NORMALLY
CLOSED
NIC NOT IN CONTRACT, NOISE
ISOLATION CLASS
NO('S) NUMBER(S), NORMALLY
OPEN
NOM NOMINAL
NRC NOISE REDUCTION
COEFFICIENT
NTS NOT TO SCALE
O-O OUT TO OUT
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED /
CONTRACTOR INSTALLED
OFC OFFICE
OH OPPOSITE HAND, OVERHEAD
OPNG OPENING(S)
ORIG ORIGINAL
PA PUBLIC ADDRESS
PAR PARALLEL
PART PARTITION(S), PARTIAL
PC PRECAST
PERF PERFORATE(D)
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLWD PLYWOOD
PNL PANEL(ED)
POL POLISHED
POLY POLYETHYLENE
PR PAIR
PREP PREPARE (SURFACE)
PROV PROVIDE(D)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POST-TENSIONED,
PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PWR POWER
QT QUARRY TILE
QTY QUANTITY
QUAD QUADRANT
QZ QUARTZ
QZT QUARTZ TILE
R RADIUS, RISER, THERMAL
RESISTANCE
RB RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
REF REFERENCE
REG REGISTER, REGULATION
REINF REINFORCED
REPL REPLACE
REQ REQUIRED
RES RESILIENT
RET RETAINING, RETURN
REV REVISION(S) / REVISE(D)
RFG ROOFING
RFG ROOFING
RH RIGHT HAND, RELATIVE
HUMIDITY
RHR RIGHT HAND REVERSE
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
RS RESILIENT SHEET
RTF RUBBER TILE FLOOR
RTU ROOF TOP UNIT
RV ROOF VENTILATOR
S SOUTH, SEAL
SAB SOUND ATTENUATION BATT
SALV SALVAGE
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SDT STANDARD DISSIPATIVE TILE
SEC SECURE, SECURITY
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SLD SEALED
SLL SOUND / LIGHT LOCK
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
ST STONE
STD STANDARD
STL STEEL
STN STAIN
STO STORAGE
STRUC STRUCTURAL
SUB SUBSTITUTION
SUSP SUSPENDED
SYS SYSTEM
T THICK, TREAD, TOILET
T&G TONGUE AND GROOVE
T.O. TOP OF
TBB TILE BACKER BOARD
TECH TECHNOLOGY
TEL TELEPHONE
TEMP TEMPORARY, TEMPERED
THRS THRESHOLD
THRU THROUGH
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOJ TOP OF JOIST
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSPARENT
TRZ TERAZZO
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UH UNIT HEATER
UIO UNLESS INDICATED
OTHERWISE
UL UNDERWRITER'S
LABORATORY
UNFIN UNFINISHED
UR URINAL
VAR VARIES
VAT VINYL ASBESTOS TILE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUHG ROOF
VU VENTILATION UNIT
VWC VINYL WALLCOVERING
W WEST, WIDE, WIDE FLANGE
W-W WALL TO WALL
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HEATER
WP WATERPROOFING, WORK
POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
X BRACE CROSS BRACING
XFER TRANSFER
YD YARD, YARD DRAIN
# NUMBER, POUND
& AND
@ AT
± PLUS / MINUS
ABBREVIATION LIST REFERENCE SYMBOLS
UP
UP
EXISTING CONSTRUCTION
TO REMAIN
WALL / PARTITION
EXISTING DOOR TO
REMAIN
DOOR
LEGEND
EXISTING WATER
FOUNTAIN TO REMAIN
CASEWORK
SHEET NOTES
1.
2.
A.
B.
C.
3.
DIMENSION ARE TO FINISH FACE UNLESS
INDICATED OTHERWISE.
INTERIOR PARTITIONS TO BE:
TYPE XX UNLESS INDICATED
OTHERWISE.
CENTERED ON GRIDLINE WHERE
SHOWN.
ALIGNED WITH ADJACENT
CONSTRUCTION WHERE SHOWN.
DOORS TO BE 4" FROM CORNER TO
OUTSIDE OF FRAME UNLESS INDICATED
OTHERWISE.
M
L
K
J
I
H
G
F
F.2
1110987
654321 5.5
VESTIBULE
STUDENT DIGITAL
MEDIA LAB
REFERENCE
COLLECTION
130A
PCS
130B
COLLAB
W&SC CORR
131A
WOMENS TOILET
MENS TOILET
940 SF
MECHANICAL
LOBBY
LIBRARIAN
OFFICE
LIBRARIAN
OFFICE
LIBRARIAN
OFFICE
I.5
ELEC
SUPERVISOR
OFFICE
124B
PRE-SHELVING
125B
AUDIO
RECORDING
STUDIO
GEN STORAGE
CIRCULATION
SERVICES
124A
DIGITAL MEDIA
SECIALIST
OFFICE
121B
VIDEO EDITING
RM
121A
OIE MEETING
ROOM
122A
OIE OFFICE
122B
OIE DIR OFFICE
123C
OIE ADVISOR
OFFICE
123B
OIE LOBBY
123A
A431
A3
EXEC. 1
EXEC. 2
CAREER STUDIO
COORD. OFFICE
114B
COORD. OFFICE
114A
CONFERENCE
EXEC. 3
FLEX INTERVIEW
LOBBY/WAITING
HOLDS /
SHIPPING & REC
125A
ELEV EQUIP
JC
ELEV LOBBY
COFFEE
114C
OFFICE
131C
OFFICE
131B
OFFICE
131E
OFFICE
131D
STAIR NO 5
STAIR NO 6
09.0108.01A
A432C3
EX AHU 1
A115 B1
ATM
BOOK
DROP
TRASH /
RECYCLE
A2
A111
A431 B1
A431A1
27.1
27.1
MDF
CORR
MDF
RACK
4A
4B
195B 195A
1C
1A
1B
122A
2B
1B13
1C
1D
1E
4A
114B
123B
123C
4B
123A
ELEV
S1C
C2
22' - 8" 22' - 8" 22' - 9"
27.3
A433
B3
A432
09.05
S1C
S1C
S1C
S1C
S1C
S1C
S1C
S1C
S1C
S1C
S1C
SA1 SA1 SA1
SA2
S3C
S2C
S2C
S2C
S1C
S2C
S2C
S4C S4C
S4C
S4C
S4C
S1C
S4C
S1C
S4C
S1C
S9C
S2C
S2C
S2C
A433 C3
B2
A433
B1
A432B1
A432
B2
A2
A432
B3
A115 A1
A801
D2
27.1
27.1 27.1
27.1
2' - 1 7/8"
A804 D3
B4
C2
A431
D1
A431
C3
A431D3 D2
1B
1A
SF02SF03
SF06
SF04
SF05
C1
A512
27.1
C1
27.5
27.6
9.2
9.2
9.2
9.2
SIM
S6C
S2A S7C
S7A
4'
0"
4' - 0"
TELECOM
LINE OF WALL
ABOVE - TYP
1/ 2"
/2
5'
0"
EQ EQ
CL
10' - 0"
/2
10.08
10.08
SERVICE DESK
10' - 5 1/2" 19' - 1"
5' - 1 5/8"
5 5/8" 7' - 8"
S4C
AL
IG
N
AL
IG
N
1 3/8"
ALIGN
EQ
EQ
CL
PTN
5' - 10 5/8"
6.1
12' - 6"
A513 B3
A513 B3
A513 B3
A513 B3
A513 B3
A513 B3
2' - 4 3/4" 15' - 1" 3' - 7 1/4"
EQ EQEQ EQ
5'
5"EQ EQ
EQ EQ
EQ
EQ
EQ
EQ
2' - 6"
6.1
LOCATE PARTITION SUCH THAT GYP BD OF PTN
ADJACENT IS LAMINATE TO EXISTING FURRING
HERE
SPECIFIC NOTES
9.2
CUT AND PATCH EXISTING GWB FURRING TO
INSTALL NEW CONCEALED CONDUIT FOR
ELECTRICAL AND DATA
Y
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:4
PM
A101
PLAN - FIRST FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"A101
A1 PARTIAL FIRST FLOOR PLAN - WEST
KEYNOTES
08.01A HM SIDELITE
09.01 ACOUSTIC WD SLAT WALL
CLADDING - REFER TO A1/A801
09.05 PATCH COLUMNS AT AREA OF
REMOVED CHAIR RAIL - TYP.
REFER TO DEMO DRAWINGS FOR
LOCATIONS
10.08 CANTILEVERED WOOD DISPLAY
SHELVES
27.1 DISPLAY SCREEN - COORD
POWER AND DATA RECEPTACLE
LOCATIONS WITH WALL BRACKET
TO BE CONCEALED BEHIND
SCREEN - REFER TO TA
DRAWINGS AND SPECS
27.3 REROUTE EXISTING DATA CABLE
THROUGH KNEE WALL TO NEW
DATA PANEL - REFER TO AV/IT
27.5 LOCATION FOR RELOCATED
TELEPHONE. CONFIRM LOCATION
WITH SMCM
27.6 SLIM AV CABINET - BOD: 2 BAY,
32" TALL C3 SERIES BY MIDDLE
ATLANTIC - REFER TO AV -
FURNISH AND INSTALL BY
CONTRACTOR
DN
DN
SHEET NOTES
1.
2.
A.
B.
C.
3.
DIMENSION ARE TO FINISH FACE UNLESS
INDICATED OTHERWISE.
INTERIOR PARTITIONS TO BE:
TYPE XX UNLESS INDICATED
OTHERWISE.
CENTERED ON GRIDLINE WHERE
SHOWN.
ALIGNED WITH ADJACENT
CONSTRUCTION WHERE SHOWN.
DOORS TO BE 4" FROM CORNER TO
OUTSIDE OF FRAME UNLESS INDICATED
OTHERWISE.
M
L
K
J
I
H
G
F
F.2
1110987
654321 5.5
STUDY RM - LG
STUDY RM - LG
GENERAL
COLLECTION -
CENTER
208B
GENERAL
COLLECTION -
SOUTH
208C
QUIET READING
WOMENS TOILET
MENS TOILET
STUDY RM
GENERAL
COLLECTION -
NORTH
208A
I.5
22' - 8" 22' - 8" 22' - 9"
EXIST. BENCH
JANITOR
STAIR NO 5
CORRIDOR
233 CORRIDOR
STAIR NO 4
STUDY RM - LG
A2
A111
STUDY RM
ELEV
A433
D3
27.1
27.1
27.1
A433
D3
A433
D3
A433D2
PODS
12.02
12.02
ROOF
OPEN TO EXT BELOW
9.3
EQ
EQ
EQ EQ
EQ EQ
EXISTING CONSTRUCTION
TO REMAIN
WALL / PARTITION
EXISTING DOOR TO
REMAIN
DOOR
LEGEND
EXISTING WATER
FOUNTAIN TO REMAIN
CASEWORK
KEYPLAN
SPECIFIC NOTES
9.3 CUT AND PATCH EXISTING GWB FURRING TO
INSTALL NEW REFRIGERANT PIPING TO ROOF
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:4
PM
A103
PLAN - SECOND
FLOOR WEST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"A103
A1 PARTIAL SECOND FLOOR PLAN - WEST
KEYNOTES
12.02 FURNITURE POD - REFER TO
FURNITURE PACKAGE
27.1 DISPLAY SCREEN - COORD
POWER AND DATA RECEPTACLE
LOCATIONS WITH WALL BRACKET
TO BE CONCEALED BEHIND
SCREEN - REFER TO TA
DRAWINGS AND SPECS
SHEET NOTES
1.
2.
A.
B.
C.
3.
DIMENSION ARE TO FINISH FACE UNLESS
INDICATED OTHERWISE.
INTERIOR PARTITIONS TO BE:
TYPE XX UNLESS INDICATED
OTHERWISE.
CENTERED ON GRIDLINE WHERE
SHOWN.
ALIGNED WITH ADJACENT
CONSTRUCTION WHERE SHOWN.
DOORS TO BE 4" FROM CORNER TO
OUTSIDE OF FRAME UNLESS INDICATED
OTHERWISE.
F
F.2
E
D
C
B
A
87654321 5.5
STUDY RM - LG
MARYLAND
ROOM
DIRECTOR
OFFICE
GENERAL
COLLECTIONS
ADMIN OFFICE
BOARDROOM
MD ROOM
ARTIFACTS
STAIR NO 2
CORRIDOR
STAIR NO 3
STAIR NO 1
ELEV LOBBY
CORR
218 21
6 235
ELEV
S1C
A110 A2
ALTERNATE
TELECOM
CSS OPEN WORK
AREA
ASSOCIATE
DIRECTOR
OFFICE
STORAGE
A110 D2
ALTERNATE
1A
1B
27.1
S1C
AL
IG
N
EQ EQ
EXISTING CONSTRUCTION
TO REMAIN
WALL / PARTITION
EXISTING DOOR TO
REMAIN
DOOR
LEGEND
EXISTING WATER
FOUNTAIN TO REMAIN
CASEWORK
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:5
PM
A104
PLAN - SECOND
FLOOR EAST
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"A104
A1 PARTIAL SECOND FLOOR PLAN - EAST
KEYNOTES
27.1 DISPLAY SCREEN - COORD
POWER AND DATA RECEPTACLE
LOCATIONS WITH WALL BRACKET
TO BE CONCEALED BEHIND
SCREEN - REFER TO TA
DRAWINGS AND SPECS
2.
A.
B.
C.
3.
DIMENSION ARE TO FINISH FACE UNLESS
INDICATED OTHERWISE.
INTERIOR PARTITIONS TO BE:
TYPE XX UNLESS INDICATED
OTHERWISE.
CENTERED ON GRIDLINE WHERE
SHOWN.
ALIGNED WITH ADJACENT
CONSTRUCTION WHERE SHOWN.
DOORS TO BE 4" FROM CORNER TO
OUTSIDE OF FRAME UNLESS INDICATED
OTHERWISE.
F
E
D
C
B
A
7654321 5.5
CLASSROOM
CITL SEMINAR/
CLASSROOM
LOANER EQUIP
RM
FACULTY / STAFF
TRAINING LAB
CITL BREAKOUT
SPACE
DIRECTOR
OFFICE
ADMIN
KITCHENETTE
STAFF
BREAKROOM /
LOUNGE
TELECOM
STORAGE
CITL FRIDGE
SHARED FRIDGE
OIT OFFICE
STAFF
WORKROOM
STAIR NO 1
EVENT &
CLASSROOM
EQUIP RM
INFRASTRUCTURE
WORKROOM &
INVENTORY
ROOM
STAIR NO 2
LECTURE ROOM
MEN
WOMEN
JC
STAIR NO 3
CORRIDOR
11.02A
A434
C1
C3
C2
A433
A2
A1
321B
321A
3A434B2
A434
B3
S1C
S4C
S1C S1C
S1C S1C
S1C S8C
S8C
S4C
S4C
S4C
S1C
S1C
A3
A434A2
A1
8.1
8.1
8.1
8.1 9.1
S1C
S4C
S8CS5
27.1
27.1
27.1
27.1
27.1
27.1
27.1
A434
B1
SF09
SF08
SF10
Generic - 12"
A706 B1
3.1
09.11
09.11
09.11
S1C
S1C
S1C
S1C
EQ
EQ
5'
0"
2"
NOTIFY ARCH IS OFF MORE THAN 3"
36' - 10 7/8"+/- VIF
7'
0" EQ
EQ
EQ
EQ
ALIGN 11
/8
/-6'
0"
6'
3/
4"
10' - 10"
5'
0"
AL
IG
N
A513 B3
A513 B3
A513 B3
27.1
27.7
27.7
27.7
EQ EQ
17' - 0"
EQ
EQ
RA2
RA1
RA1
DOOR TO
MECHANICAL
SPACE
SF11
4"
CL
DISPLAY
SCREEN EQ
EQ
EQ EQ
EXISTING CONSTRUCTION
TO REMAIN
WALL / PARTITION
EXISTING DOOR TO
REMAIN
DOOR
LEGEND
EXISTING WATER
FOUNTAIN TO REMAIN
CASEWORK
SPECIFIC NOTES
8.1 PARTITION INFILL AT REMOVED WINDOW
9.1 PATCH AND PAINT WALL AT REMOVED PROJECTION
SCREEN CONTROL SWITCH
3.1 INFILL SLAB AT REMOVED POKE THROUGH -
REFER TO 1/ED105
ROOF
BELOW
KEYPLAN
PROJECT
NORTH
0'
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
2' 8' 16'4'
Au to de sk
D oc s:
//S t M ar ys C ol le ge o f M ar yl an d Li br ar y R ev /S
M C
M L ib ra ry R en ov at io n_
.rv t 4/
/2
4:
:5
PM
A105
PLAN - THIRD FLOOR
AuthorChecker
QEA No.42137280
ST. MARY'S CITY, MD 20686
APRIL 30, 2025
CONSTRUCTION DOCUMENTS
LANDERS LIBRARY
RENOVATION
ST. MARY'S COLLEGE OF
MARYLAND
1/8" = 1'-0"A105
A1 THIRD FLOOR PLAN
KEYNOTES
09.11 WALL INFILL CONSTRUCTION TO
MATCH EXISTING ADJACENT - VIF
11.02A PLOTTER
27.1 DISPLAY SCREEN - COORD
POWER AND DATA RECEPTACLE
LOCATIONS WITH WALL BRACKET
TO BE CONCEALED BEHIND
SCREEN - REFER TO TA
DRAWINGS AND SPECS
27.7 HEIGHT ADJUSTABLE AV
TEACHING DESK - REFER TO TA
SERIES. BOD: FORUM BY MIDDLE
ATLANTIC
1 28 JUN 2024 SD COST DRIVEN REVISIONS
K
JJ
II
HH
G
F F.2
E
D
C
B
A
5.5
5.5
I.5I.5
OUTDOOR UNIT -
TELECOM 325
OUTDOOR UNIT -
TELECOM 226
OUTDOOR UNIT -
TELECOM 110
FOOTPRINT OF TELECOM 325
BELOW SHOWN DASHED
FOOTPRINT OF TELECOM 226
BELOW SHOWN DASHED
FOOTPRINT OF TELECOM 110
BELOW SHOWN DASHED
A4
A501
A4
A501
FOOTPRINT OF MDF 135 BELOW
SHOWN DASHED
A4
A501
OUTDOOR UNIT - MDF
COORDINATE LOCATION OF ROOF PENETRATION
WITH ROUTE THROUGH LEVEL 2
A501 A3
A501 A3
A501 A3
A501 A3
SHEET NOTES
1. ALL MECHANICAL PIPING RUN ABOVE
ROOF IS TO BE SUPPORTED ON PIPE
SUPPORT CURB - REFER TO C3/A501
PA
TH
F
IL
EN
AM
E:
PL
O
TT
IN
G D
AT
E
TI
M E:
A
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
2101 L STREET, NW
SUITE 950
WASHINGTON, DC 20037
v 202.298.6700
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
Au to de sk
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .