Attachment 1 - SMCM Landers Library Spec - CD 251218.pdf
PDF 9 MB Posted
- Attached to
- Landers Library Renovation
- Solicitation number
- BPM055065
- Issued by
- Maryland
About this file
This is a Construction Documents Specifications file for the Landers Library Renovation project at St. Mary's College of Maryland, located in St. Mary's City, Maryland. The project consists of a full gut interior renovation of approximately 20,000 square feet within the existing Landers Library building, including comprehensive work across multiple divisions such as general requirements, demolition, wood and composites, openings, finishes, mechanical systems, plumbing, electrical, fire suppression, and communications. The project will proceed while the Owner continues to occupy portions of the facility, requiring coordination to minimize conflicts with ongoing college operations. The renovation encompasses structural and finishes work, mechanical/electrical/plumbing (MEP) systems managed by Mueller Associates, audiovisual and IT infrastructure through Convergent Technologies Design Group, with architectural services provided by Quinn Evans and cost estimating by Rider Levett Bucknall. The specifications establish detailed requirements for submittals, scheduling, quality control, administrative procedures, and construction methodologies, with the Contractor required to submit a preliminary construction schedule within 10 working days of the Agreement date and a complete schedule within 15 working days thereafter, with updates required with each Application for Payment.
The contract requires comprehensive administrative compliance including electronic document submittal via PROCORE, preconstruction and site mobilization meetings, bi-monthly progress meetings, daily construction reports using the Raken application, and progress photographs with each payment application. Pricing procedures utilize AIA G702 and G703 forms with a Schedule of Values subject to Owner approval, change order documentation with 14-day quotation requirements for Architect-requested changes, and detailed cost substantiation requirements. The project emphasizes sustainability and indoor air quality with restrictions on volatile organic compounds (VOCs), requirements for low-emitting products compliant with California Department of Public Health standards, environmental product declarations, and composite wood emissions standards. Contractor must provide quality control plans, maintain project record documents, implement waste management and recycling procedures per Section 017419, and supply maintenance materials including spare parts. The Owner will provide electrical power, water supply connections, and temporary sanitary facilities, while the Contractor is responsible for telecommunications services, barriers, interior enclosures, security coordination, and waste removal, with all costs incorporated into the Contract Sum.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 N CHARLES ST, 14TH FL, BALTIMORE, MD 21201 410.576.0440 | WWW.QUINNEVANS.COM
WASHINGTON, DC | ANN ARBOR, MI | BALTIMORE, MD | DETROIT, MI | MADISON, WI | RICHMOND, VA
CONSTRUCTION DOCUMENTS SPECIFICATIONS
APRIL 30, 2025
LANDERS LIBRARY RENOVATION
ST. MARY’S COLLEGE OF MARYLAND
ST. MARY’S CITY, MD 20686
OWNER
ST. MARY’S COLLEGE OF MARYLAND
18952 E. FISHER ROAD
ST. MARY’S CITY, MD 20686-3001
ARCHITECT
QUINN EVANS
100 N. CHARLES STREET, 14TH FLOOR
BALTIMORE, MD 21201
410-576-0440
MEP ENGINEERS
MUELLER ASSOCIATES, INC
1306 CONCOURSE DR, SUITE 100
LNTHICUM, MD 21090
410-646-4500
AV/ IT CONSULTANT
CONVERGENT TECHNOLOGIES DESIGN GROUP, INC
6501 YORK ROAD
BALTIMORE, MD 21212
410-532-2395
COST ESTIMATOR
RIDER LEVETT BUCKNALL
9881 BROKEN LAND PARKWAY, SUITE 304
COLUMBIA, MD 21046
410-740-1671
St. Mary's College of Maryland
Landers Library Renovation
April 30, 2025
QE Project # 42137280
TABLE OF CONTENTS TOC - 1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 ....... SUMMARY
01 2000 ....... PRICE AND PAYMENT PROCEDURES
01 2200 ....... UNIT PRICES
01 2300 ....... ALTERNATES
01 2500 ....... SUBSTITUTION PROCEDURES
01 3000 ....... ADMINISTRATIVE REQUIREMENTS
01 3216 ....... CONSTRUCTION PROGRESS SCHEDULE
01 4000 ....... QUALITY REQUIREMENTS
01 4216 ....... DEFINITIONS
01 5000 ....... TEMPORARY FACILITIES AND CONTROLS
01 6000 ....... PRODUCT REQUIREMENTS
01 6116 ....... VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01 7000 ....... EXECUTION AND CLOSEOUT REQUIREMENTS
01 7419 ....... CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 7800 ....... CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 4100 ....... DEMOLITION
DIVISION 03 – DIVISION 05
NOT USED
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1053 ....... MISCELLANEOUS ROUGH CARPENTRY
06 4100 ....... ARCHITECTURAL WOOD CASEWORK
DIVISION 07
NOT USED
DIVISION 08 - OPENINGS
08 1113 ....... HOLLOW METAL DOORS AND FRAMES
08 1416 ....... FLUSH WOOD DOORS
08 3473 ....... SOUND CONTROL DOOR ASSEMBLIES
TABLE OF CONTENTS TOC - 2
08 4126 ....... ALL-GLASS ENTRANCES AND STOREFRONTS
08 4313 ....... ALUMINUM-FRAMED STOREFRONTS
08 7100 ....... DOOR HARDWARE
08 8000 ....... GLAZING
DIVISION 09 - FINISHES
09 0561 ....... COMMON WORK RESULTS FOR FLOORING PREPARATION
09 2116 ....... GYPSUM BOARD ASSEMBLIES
09 3000 ....... TILING
09 5100 ....... ACOUSTICAL CEILINGS
09 6500 ....... RESILIENT FLOORING
09 6813 ....... TILE CARPETING
09 8430 ....... SOUND-ABSORBING WALL AND CEILING UNITS
09 9123 ....... INTERIOR PAINTING
DIVISION 10 – SPECIALTIES
10 1419 ....... DIMMENSIONAL LETTER SIGNAGE
DIVISION 11
11 3013 ....... RESIDENTIAL APPLIANCES
11 5213 ...... PROJECTION SCREENS ELECTRIC
DIVISION 12
12 2400 ....... WINDOW SHADES
12 3600 ....... COUNTERTOPS
DIVISION 13
NOT USED
DIVISION 21
210500 ....... COMMON WORK RESULTS FOR FIRE SUPPRESSION
211313 ....... FIRE-SUPPRESSION SYSTEMS
DIVISION 22 - PLUMBING
22 0500 ....... COMMON WORK RESULTS FOR PLUMBING
22 1116 ....... DOMESTIC WATER PIPING
TABLE OF CONTENTS TOC - 3
22 1316 ....... SANITARY WASTE & VENT PIPING
22 4100 ....... PLUMBING SPECIALTIES
22 4216.16 .. COMMERCIAL SINKS
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
23 0500 ....... COMMON WORK RESULTS FOR MECHANICAL
23 0523 ....... GENERAL DUTY VALVES FOR MECHANICAL PIPING
23 0529 ....... HANGERS AND SUPPORTS FOR MECHANICAL PIPING AND EQUIPMENT
23 0548 ....... MECHANICAL VIBRATION CONTROL
23 0553 ....... IDENTIFICATION FOR MECHANICAL
23 0593 ....... TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0700 ....... MECHANICAL INSULATION
23 0900 ....... INSTRUMENTATION AND CONTROL FOR HVAC
23 0993 ....... SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23 2113 ....... HYDRONIC PIPING
23 2116 ....... HYDRONIC PIPING SPECIALTIES
23 2300 ....... REFRIGERANT PIPING
23 3113 ....... METAL DUCTS
23 3300 ....... AIR DUCT ACCESSORIES
23 3346 ....... FLEXIBLE DUCTS
23 3600 ....... AIR TERMINAL UNITS
23 3713 ....... DIFFUSERS, REGISTERS AND GRILLES
23 8126 ....... SPLIT SYSTEM AIR CONDITIONERS
DIVISION 26 – ELECTRICAL
26 0505 ....... SELECTIVE DEMOLITION FOR ELECTRICAL
26 0519 ....... LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS
26 0526 ....... GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0529 ....... HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 0533.13 .. CONDUIT FOR ELECTRICAL SYSTEMS
26 0533.16 .. BOXES FOR ELECTRICAL SYSTEMS
26 0553 ....... IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 0923 ....... LIGHTING CONTROL DEVICES
26 0936 ....... MODULAR DIMMING CONTROLS
26 2200 ....... LOW-VOLTAGE TRANSFORMERS
26 2416 ....... PANELBOARDS
TABLE OF CONTENTS TOC - 4
26 2726 ....... WIRING DEVICES
26 4300 ....... SURGE PROTECTIVE DEVICES
26 5100 ....... INTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 0526 ....... GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 0528 ....... CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 0528.45 .. TELECOMMUNICATIONS FLUSH POKE THRU
27 0528.48 .. MULTIMEDIA CONNECTION WALL BOX
27 1000 ....... TELECOMMUNICATIONS STRUCTURED CABLING
27 4100 ....... AUDIOVISUAL SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY & SECURITY
28 13 00 ...... ELECTRONIC ACCESS CONTROL
28 23 00 ...... VIDEO SURVEILLANCE SYSTEMS
28 46 00 ...... FIRE DETECTION AND ALARM
APPENDICES
AUDIO VISUAL COST ESTIMATE
April 30, 2025 QE Project # 42137280
011000 Summary - 1
SECTION 011000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: SMCM Hilda C Landers Library Renovation B. The Project consists of the full gut interior renovation of approximately 20,000 within the existing Landers Library. Refer to the contract drawings and specs for renovation scope outside those areas of intense renovation that includes, but is not limited to AV/IT and technology infrastructure..
1.02 CONTRACT DESCRIPTION
1.03 OWNER OCCUPANCY
A. Owner intends to occupy the project during the entire construction period.
B. Owner intends to occupy the Project upon Substantial Completion.
C. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
D. Schedule the Work to accommodate Owner occupancy.
END OF SECTION
April 30, 2025 QE Project # 42137280
012000 Price and Payment Procedures - 1
SECTION 012000
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation of changes in Contract Sum and Contract Time.
C. Change procedures.
1.02 RELATED REQUIREMENTS
A. Section 012100 - Allowances: Payment procedures relating to allowances.
B. Section 017800 - Closeout Submittals: Project record documents.
1.03 SCHEDULE OF VALUES
A. Use Schedule of Values Form: As approved by Owner.
B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Owner and Architect for approval.
C. Forms filled out by hand will not be accepted.
1.04 APPLICATIONS FOR PROGRESS PAYMENTS
A. Payment Period: Submit at intervals stipulated in the Agreement.
B. Use Form AIA G702 and Form AIA G703, edition stipulated in the Agreement.
C. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.
D. Forms filled out by hand will not be accepted.
E. For each item, provide a column for listing each of the following:
1. Item Number.
2. Description of work.
3. Scheduled Values.
4. Previous Applications.
5. Work in Place and Stored Materials under this Application.
6. Authorized Change Orders.
7. Total Completed and Stored to Date of Application.
8. Percentage of Completion.
9. Balance to Finish.
10. Retainage.
F. Execute certification by signature of authorized officer.
G. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products.
H. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.
I. Submit one electronic and three hard-copies of each Application for Payment.
J. Include the following with the application:
1. Transmittal letter as specified for submittals in Section 013000.
2. Construction progress schedule, revised and current as specified in Section 013000.
3. Current construction photographs specified in Section 013000.
4. Partial release of liens from major subcontractors and vendors.
5. Affidavits attesting to off-site stored products.
April 30, 2025 QE Project # 42137280
012000 Price and Payment Procedures - 2
K. When Architect requires substantiating information, submit data justifying dollar amounts in question.
1.05 MODIFICATION PROCEDURES
A. Submit name of the individual authorized to receive change documents and who will be responsible for informing others in Contractor's employ or subcontractors of changes to Contract Documents.
B. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect will issue instructions directly to Contractor.
C. For other required changes, Architect will issue a document signed by Owner instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order.
1. The document will describe the required changes and will designate method of determining any change in Contract Sum or Contract Time.
2. Promptly execute the change.
D. For changes for which advance pricing is desired, Architect will issue a document that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit a fixed price quotation within 14 calendar days.
E. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation.
Document any requested substitutions in accordance with Section 016000.
F. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.
1. For change requested by Architect for work falling under a fixed price contract, the amount will be based on Contractor's price quotation.
2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Architect.
3. For change ordered by Architect without a quotation from Contractor, the amount will be determined by Architect based on the Contractor's substantiation of costs as specified for Time and Material work.
G. Substantiation of Costs: Provide full information required for evaluation.
1. On request, provide the following data:
a. Quantities of products, labor, and equipment.
b. Taxes, insurance, and bonds.
c. Overhead and profit.
d. Justification for any change in Contract Time.
e. Credit for deletions from Contract, similarly documented.
2. Support each claim for additional costs with additional information:
a. Origin and date of claim.
b. Dates and times work was performed, and by whom.
c. Time records and wage rates paid.
d. Invoices and receipts for products, equipment, and subcontracts, similarly documented.
3. For Time and Material work, submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract.
H. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
April 30, 2025 QE Project # 42137280
012000 Price and Payment Procedures - 3
I. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum.
J. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.
K. Promptly enter changes in Project Record Documents.
1.06 APPLICATION FOR FINAL PAYMENT
A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.
B. Application for Final Payment will not be considered until the following have been accomplished:
1. All closeout procedures specified in Section 017000.
April 30, 2025 QE Project # 42137280
012200 Unit Prices - 1
SECTION 012200
UNIT PRICES
PART 1 GENERAL
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
DEC 18, 2025
012300 Alternates - 1
SECTION 012300
ALTERNATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Alternates.
1.02 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Accepted Alternates will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.
1.03 SCHEDULE OF ALTERNATES
A. Alternate No. 1 – Seminar Room 225, Associate Director Office 212, Storage 213, and CSS Open Work Area 210 :
1. Reference: Drawing A1, A2, A3, B1, & C1 on Sheet A110; 1/AD124
B. Alternate No. 2 - Classroom 222:
1. Reference: Drawing C2, C3, D1, D2, D3 on Sheet A110; 2/AD124
C. Alternate No. 3 - Acoustic Treatment at Stair 4:
1. Reference: Drawing A2 & B4 on A111
PART 2 PRODUCTS - NOT USED
April 30, 2025 QE Project # 42137280
012500 Substitution Procedures - 1
SECTION 012500
SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 RELATED REQUIREMENTS
A. Section 012300 - Alternates, for product alternatives affecting this section.
B. Section 016000 - Product Requirements: Fundamental product requirements, product options, delivery, storage, and handling.
1.03 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
a. Substitution requests offering advantages solely to the Contractor will not be considered.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
6. Agrees to reimburse Owner and Architect for review or redesign services associated with re-approval by authorities.
B. A Substitution Request for specified installer constitutes a representation that the submitter:
1. Has acted in good faith to obtain services of specified installer, but was unable to come to commercial, or other terms.
C. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
D. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. No specific form is required. Contractor's Substitution Request documentation must include the following:
a. Project Information:
April 30, 2025 QE Project # 42137280
012500 Substitution Procedures - 2
1) Official project name and number, and any additional required identifiers established in Contract Documents.
2) Owner's, Architect's, and Contractor's names.
b. Substitution Request Information:
1) Discrete and consecutive Substitution Request number, and descriptive subject/title.
2) Indication of whether the substitution is for cause or convenience.
3) Issue date.
4) Reference to particular Contract Document(s) specification section number, title, and article/paragraph(s).
5) Description of Substitution.
6) Reason why the specified item cannot be provided.
7) Differences between proposed substitution and specified item.
8) Description of how proposed substitution affects other parts of work.
c. Attached Comparative Data: Provide point-by-point, side-by-side comparison addressing essential attributes specified, as appropriate and relevant for the item:
1) Physical characteristics.
2) In-service performance.
3) Expected durability.
4) Visual effect.
5) Sustainable design features.
6) Warranties.
7) Other salient features and requirements.
8) Include, as appropriate or requested, the following types of documentation:
(a) Product Data:
(b) Samples.
(c) Certificates, test, reports or similar qualification data.
(d) Drawings, when required to show impact on adjacent construction elements.
d. Impact of Substitution:
1) Savings to Owner for accepting substitution.
2) Change to Contract Time due to accepting substitution.
E. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Submittal Time Restrictions:
1. Instructions to Bidders specifies time restrictions and the documents required for submitting substitution requests during the bidding period.
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Architect will consider requests for substitutions only within 30 days after date of Agreement.
B. Submit request for Substitution for Cause within 14 days of discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
C. Submit request for Substitution for Convenience within 14 days of discovery of its potential advantage to the project, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
1. In addition to meeting general documentation requirements, document how the requested substitution benefits the Owner through cost savings, time savings, greater energy conservation, or in other specific ways.
April 30, 2025 QE Project # 42137280
012500 Substitution Procedures - 3
2. Document means of coordinating of substitution item with other portions of the work, including work by affected subcontractors.
3. Bear the costs engendered by proposed substitution of:
a. Owner's compensation to the Architect for any required redesign, time spent processing and evaluating the request.
b. Other construction by Owner.
c. Other unanticipated project considerations.
D. Substitutions will not be considered under one or more of the following circumstances:
1. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
2. Without a separate written request.
3.04 RESOLUTION
A. Architect may request additional information and documentation prior to rendering a decision.
Provide this data in an expeditious manner.
B. Architect will notify Contractor in writing of decision to accept or reject request.
1. Architect's decision following review of proposed substitution will be noted on the submitted form.
3.05 ACCEPTANCE
A. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. See Section 017800 - Closeout Submittals, for closeout submittals.
B. Include completed Substitution Request Forms as part of the Project record. Include both approved and rejected Requests.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 1
SECTION 013000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Electronic document submittal service.
C. Preconstruction meeting.
D. Site mobilization meeting.
E. Progress meetings.
F. Construction progress schedule.
G. Contractor's daily reports.
H. Progress photographs.
I. Submittals for review, information, and project closeout.
J. Number of copies of submittals.
K. Requests for Interpretation (RFI) procedures.
L. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 013216 - Construction Progress Schedule: Form, content, and administration of schedules.
B. Section 017000 - Execution and Closeout Requirements: Additional coordination requirements.
C. Section 017800 - Closeout Submittals: Project record documents; operation and maintenance data; warranties and bonds.
1.03 REFERENCE STANDARDS
1.04 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 017000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Architect:
1. Requests for Interpretation (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL SERVICE
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF, MS Word, or MS Excel) format, as appropriate to the document, and transmitted via PROCORE, an Internet-based submittal service that receives, logs and stores documents, April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 2 provides electronic stamping and signatures, and notifies addressees via email.
1. Besides submittals for review, information, and closeout, this procedure applies to
Requests for Interpretation (RFIs), progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, Contractor's correction punchlist, and any other document any participant wishes to make part of the project record.
2. Contractor and Architect are required to use this service.
3. It is Contractor's responsibility to submit documents in allowable format.
4. Subcontractors, suppliers, and Architect's consultants are to be permitted to use the service at no extra charge.
5. Users of the service need an email address, internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com), unless such software capability is provided by the service provider.
6. Paper document transmittals will not be reviewed; emailed electronic documents will not be reviewed.
7. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
B. Cost: The cost of the service is to be paid by Contractor; include the cost of the service in the Contract Sum.
C. Training: One, one-hour, web-based training session will be arranged for all participants, with representatives of Architect and Contractor participating; further training is the responsibility of the user of the service.
D. Project Closeout: Architect will determine when to terminate the service for the project and is responsible for obtaining archive copies of files for Owner.
3.02 PRECONSTRUCTION MEETING
A. Schedule meeting after Notice of Award.
B. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
4. Major subcontractors.
5. ________.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Submission of initial Submittal schedule.
6. Designation of personnel representing the parties to Contract, ________ and Architect.
7. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
8. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.03 SITE MOBILIZATION MEETING
A. Schedule meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 3
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
C. Agenda:
1. Use of premises by Owner and Contractor.
2. Owner's requirements.
3. Construction facilities and controls provided by Owner.
4. Temporary utilities provided by Owner.
5. Survey and building layout.
6. Security and housekeeping procedures.
7. Schedules.
8. Application for payment procedures.
9. Procedures for testing.
10. Procedures for maintaining record documents.
11. Requirements for start-up of equipment.
12. Inspection and acceptance of equipment put into service during construction period.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.04 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Review of off-site fabrication and delivery schedules.
8. Maintenance of progress schedule.
9. Corrective measures to regain projected schedules.
10. Planned progress during succeeding work period.
11. Coordination of projected progress.
12. Maintenance of quality and work standards.
13. Effect of proposed changes on progress schedule and coordination.
14. Other business relating to work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 4
3.05 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 working days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 working days.
C. Within 15 working days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 working days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.06 DAILY CONSTRUCTION REPORTS
A. Include only factual information. Do not include personal remarks or opinions regarding operations and/or personnel.
B. Use the App Raken to prepare, track, and store daily construction report data.
1. Archive daily reports in .pdf format for record whenever called upon by owner or architect.
C. Prepare a daily construction report recording the following information concerning events at
Project site and project progress:
1. Date.
2. High and low temperatures, and general weather conditions.
3. List of subcontractors at Project site.
4. List of separate contractors at Project site.
5. Approximate count of personnel at Project site.
a. Include a breakdown for supervisors and laborers.
6. Major equipment at Project site.
7. Material deliveries.
8. Safety, environmental, or industrial relations incidents.
9. Meetings and significant decisions.
10. Unusual events (submit a separate special report).
11. Stoppages, delays, shortages, and losses. Include comparison between scheduled work activities (in Contractor's most recently updated and published schedule) and actual activities. Explain differences, if any. Note days or periods when no work was in progress and explain the reasons why.
12. Meter readings and similar recordings.
13. Emergency procedures.
14. Directives and requests of Authority(s) Having Jurisdiction (AHJ).
15. Change Orders received and implemented.
16. Testing and/or inspections performed.
17. List of verbal instruction given by Owner and/or Architect.
18. Signature of Contractor's authorized representative.
3.07 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Photography Type: Digital; electronic files.
C. Provide photographs of site and construction throughout progress of work produced by an experienced photographer, acceptable to Architect.
D. Views:
1. Consult with Architect for instructions on views required.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 5
2. Provide factual presentation.
3. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
E. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via email.
2. File Naming: Include project identification, date and time of view, and view identification.
3. PDF File: Assemble all photos into printable pages in PDF format, with 2 to 3 photos per page, each photo labeled with file name; one PDF file per submittal.
3.08 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract
Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.
C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of
Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to Owner.
3. Prepare using software provided by the Electronic Document Submittal Service.
4. Combine RFI and its attachments into a single electronic file. PDF format is preferred.
D. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Include in each request Contractor's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.
2. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
c. Different methods of performing work than those indicated in the Contract Drawings and Specifications (comply with provisions of the Conditions of the Contract).
3. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.
4. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
E. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in
Contract Documents.
2. Owner's, Architect's, and Contractor's names.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 6
3. Discrete and consecutive RFI number, and descriptive subject/title.
4. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
5. Annotations: Field dimensions and/or description of conditions which have engendered the request.
6. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example;
routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
F. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
G. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
2. Note dates of when each request is made, and when a response is received.
3. Highlight items requiring priority or expedited response.
4. Highlight items for which a timely response has not been received to date.
H. Review Time: Architect will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
I. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith.
Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3. Upon receipt of a response, promptly review and distribute it to all affected parties, and update the RFI Log.
4. Notify Architect within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.09 SUBMITTAL SCHEDULE
A. Submit to Architect for review a schedule for submittals in tabular format.
1. Submit at the same time as the preliminary schedule specified in Section - 013216 - Construction Progress Schedule.
2. Coordinate with Contractor's construction schedule and schedule of values.
3. Format schedule to allow tracking of status of submittals throughout duration of construction.
4. Arrange information to include scheduled date for initial submittal, specification number and title, submittal category (for review or for information), description of item of work covered, and role and name of subcontractor.
5. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
a. For assemblies, equipment, systems comprised of multiple components and/or requiring detailed coordination with other work, allow for additional time to make
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 7 corrections or revisions to initial submittals, and time for their review.
3.10 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 017800 - Closeout Submittals.
3.11 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Architect's knowledge as contract administrator or for Owner.
3.12 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 017800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.13 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Extra Copies at Project Closeout: See Section 017800.
C. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.14 SUBMITTAL PROCEDURES
A. General Requirements:
1. Use a separate transmittal for each item.
2. Submit separate packages of submittals for review and submittals for information, when included in the same specification section.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 8
3. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
4. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy.
5. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.
6. Deliver each submittal on date noted in submittal schedule, unless an earlier date has been agreed to by all affected parties, and is of the benefit to the project.
a. Send submittals in electronic format via email to Architect.
7. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 15 calendardays excluding delivery time to and from the Contractor.
b. For sequential reviews involving Architect's consultants, Owner, or another affected party, allow an additional 7 calendar days.
8. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
9. Provide space for Contractor and Architect review stamps.
10. When revised for resubmission, identify all changes made since previous submission.
11. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
12. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
13. Submittals not requested will be recognized, and will be returned "Not Reviewed", B. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Do not submit product data sheets or catalogs that include products not intended for use unless such products are clearly identified as excluded from review.
3. Collect required information into a single submittal.
4. Do not submit (Material) Safety Data Sheets for materials or products. Contractor's safety officer shall Maintain access to (Material) Safety Data Sheets on project site and make available to Owner, Architect, and subcontractors upon request.
C. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting
Contract Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
D. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
3. Include with transmittal high-resolution image files of samples to facilitate electronic review and approval. Provide separate submittal page for each item image.
3.15 SUBMITTAL REVIEW
A. Submittals for Review: Architect will review each submittal, and approve, or take other appropriate action.
April 30, 2025 QE Project # 42137280
013000 Administrative Requirements - 9
B. Submittals for Information: Architect will acknowledge receipt and review. See below for actions to be taken.
C. Architect's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
1. Notations may be made directly on submitted items and/or listed on appended Submittal
Review cover sheet.
D. Architect's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Approved", or language with same legal meaning.
b. "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
2) Non-responsive resubmittals may be rejected.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Architect's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
April 30, 2025 QE Project # 42137280
013216 Construction Progress Schedule - 1
SECTION 013216
CONSTRUCTION PROGRESS SCHEDULE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preliminary schedule.
B. Construction progress schedule, bar chart type.
1.02 RELATED SECTIONS
A. Section 011000 - Summary: Work sequence.
1.03 SUBMITTALS
A. Within 10 working days after date of Agreement, submit preliminary schedule.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 working days.
C. Within 15 working days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 working days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
F. Submit in PDF format.
1.04 QUALITY ASSURANCE
A. Scheduler: Contractor's personnel or specialist Consultant specializing in CPM scheduling with one years minimum experience in scheduling construction work of a complexity comparable to this Project, and having use of computer facilities capable of delivering a detailed graphic printout within 48 hours of request.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRELIMINARY SCHEDULE
A. Prepare preliminary schedule in the form of a horizontal bar chart.
3.02 CONTENT
A. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction.
B. Identify each item by specification section number.
C. Identify work of separate stages and other logically grouped activities.
D. Provide sub-schedules to define critical portions of the entire schedule.
E. Include conferences and meetings in schedule.
F. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each month.
G. Provide separate schedule of submittal dates for shop drawings, product data, and samples, and dates reviewed submittals will be required from Architect. Indicate decision dates for selection of finishes.
H. Coordinate content with schedule of values specified in Section 012000 - Price and Payment Procedures.
I. Provide legend for symbols and abbreviations used.
April 30, 2025 QE Project # 42137280
013216 Construction Progress Schedule - 2
3.03 BAR CHARTS
A. Include a separate bar for each major portion of Work or operation.
B. Identify the first work day of each week.
3.04 NETWORK ANALYSIS
A. Prepare network analysis diagrams and supporting mathematical analyses using the Critical
Path Method.
B. Illustrate order and interdependence of activities and sequence of work; how start of a given activity depends on completion of preceding activities, and how completion of the activity may restrain start of subsequent activities.
C. Mathematical Analysis: Tabulate each activity of detailed network diagrams, using calendar dates, and identify for each activity:
1. Preceding and following event numbers.
2. Activity description.
3. Estimated duration of activity, in maximum 15 day intervals.
4. Earliest start date.
5. Earliest finish date.
6. Actual start date.
7. Actual finish date.
8. Latest start date.
9. Latest finish date.
10. Total and free float; float time shall accrue to Owner and to Owner's benefit.
11. Monetary value of activity, keyed to Schedule of Values.
12. Percentage of activity completed.
13. Responsibility.
D. Analysis Program: Capable of compiling monetary value of completed and partially completed activities, accepting revised completion dates, and recomputation of all dates and float.
E. Required Reports: List activities in sorts or groups:
1. By preceding work item or event number from lowest to highest.
2. By amount of float, then in order of early start.
3. By responsibility in order of earliest possible start date.
4. In order of latest allowable start dates.
5. In order of latest allowable finish dates.
3.05 UPDATING SCHEDULE
A. Maintain schedules to record actual start and finish dates of completed activities.
B. Indicate progress of each activity to date of revision, with projected completion date of each activity.
C. Annotate diagrams to graphically depict current status of Work.
D. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes.
E. Indicate changes required to maintain Date of Substantial Completion.
F. Submit reports required to support recommended changes.
G. Provide narrative report to define problem areas, anticipated delays, and impact on the schedule. Report corrective action taken or proposed and its effect.
3.06 DISTRIBUTION OF SCHEDULE
A. Distribute copies of updated schedules to Contractor's project site file, to subcontractors, suppliers, Architect, Owner, and other concerned parties.
April 30, 2025 QE Project # 42137280
013216 Construction Progress Schedule - 3
B. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in schedules.
April 30, 2025 QE Project # 42137280
014000 Quality Requirements - 1
SECTION 014000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Control of installation.
E. Mock-ups.
F. Tolerances.
G. Defect Assessment.
1.02 RELATED REQUIREMENTS
A. Section 013000 - Administrative Requirements: Submittal procedures.
B. Section 014216 - Definitions.
C. Section 016000 - Product Requirements: Requirements for material and product quality.
1.03 DEFINITIONS
A. Contractor's Quality Control Plan: Contractor's management plan for executing the Contract for
Construction.
1.04 SUBMITTALS
A.…