ATTACHMENT 2 - Room Schedule Air Test Adjust and Balance.pdf
PDF 544 KB Posted
- Attached to
- H241--AIR TEST/BALANCE (TAB) SERVICE
- Solicitation number
- 36C26126Q0321
About this file
This document is an Air Testing Adjusting and Balancing (TAB) Room Schedule for the VA Central California Healthcare System, dated November 19, 2025. The comprehensive schedule details air quality and ventilation requirements for 106 rooms across multiple buildings, including the main building, OPC building, Building 28, Building 31, and Building 34. Each room entry specifies critical parameters such as building, floor, room name, local identifier, air handler, minimum and desired air changes per hour (ACH), differential pressure, and testing frequency (quarterly, semi-annual, or annual).
The document provides detailed technical specifications for various healthcare spaces, including sterile supply rooms, procedure rooms, clean and soiled utility rooms, operating rooms, isolation rooms, emergency departments, and clinical areas. Each room is assigned a specific air handling unit (AHU) with varying characteristics, such as variable or constant speed, water-cooled or direct expansion systems, and installation dates ranging from 1947 to 2009. The schedule includes specific notes about pressure relationships between rooms, such as ensuring that scope processing rooms are positive relative to decontamination rooms and that endoscopy rooms remain neutral or negative to corridors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Attachment 3.pdf | ||
| Amendment 0002 - Attachment 1.pdf | ||
| 36C26126Q0321 0002.docx | DOCX document | |
| Questions and Answers Document .docx | DOCX document | |
| Amendment 0002 - Attachment 2.pdf | ||
| 36C26126Q0321 0001.docx | DOCX document | |
| 36C26126Q0321.docx | DOCX document | |
| ATTACHMENT 1 - Quality Assurance Surveillance Plan.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Central California Healthcare System Air Testing Adjusting and Balancing (TAB) Room Schedule
November 19, 2025
Line Item Building Floor Room Local Identifier Type (VAV /
CV)
Air Handler Min ACH Desired
ACH
Differential Pressure
Frequency
1 1 2 2A09A Sterile Supply Room (Imaging) VAV AHU-9 4 5 (+) S 2 1 2 2A13B Special Procedures (SPL) VAV AHU-SPL 20 24 (++) Q 3 1 2 2B13 Anatomic Pathology VAV AHU-9 6 7 (-) S 4 1 2 2B24B Microbiology VAV Fan Coil 6 7 (-) S 5 1 2 2B24A.1 Microbiology Hood Room VAV Fan Coil 6 7 (-) S 6 1 3 3A04D Sterile Supply Room (GI Cabinet) CA AHU-9 4 5 (+) S 7 1 3 3A02E Clean Storage East CV AHU-9 4 5 (+) S 8 1 3 3A02E Clean Storage West CV AHU-9 4 5 (+) S 9 1 3 3A02F/3A02G SPS Preparation, Assembly and Sterilization Area CV AHU-9 4 5 (++) Q
10 1 3 3A04A GI Procedure-1 (Endoscopy) CV AHU-9 10 12 Note 1 S 11 1 3 3A04B GI Procedure-2 (Endoscopy) CV AHU-9 10 12 Note 1 S 12 1 3 3A04D Sterile Supply Room (GI) CA AHU-9 4 5 (+) S 13 1 3 3A04G GI Procedure-3 (Bronch Room) CV AHU-9 12 14 (-) S 14 1 3 3A15 SPS Decontamination Area CV AHU-9 6 7 (--) Q 15 1 3 3A15B SPS Scope Processing CV AHU-9 10 12 Note 2 Q 16 1 3 3A15A Housekeeping CV AHU-9 10 12 (--) Q 17 1 3 3B01A Sterile Supply Room CV AHU-9 4 5 (+) S 18 1 3 3B09C Sterile Supply Room CV AHU-OR 4 5 (+) S
19 1 3 3B10A OR 1 CV AHU-OR 20 24 (++) S
20 1 3 3B10D OR 2 CV AHU-OR 20 24 (++) S
21 1 3 3B10F OR Sterile Supply CV AHU-OR 4 5 (+) S 22 1 3 3B10G OR Sterile Supply CV AHU-OR 4 5 (+) S 23 1 3 3B10H OR Sterile Supply CV AHU-OR 4 5 (+) S 24 1 3 3B10J OR Equip Storage CV AHU-OR 4 5 (+) S
25 1 3 3B10K OR 4 CV AHU-OR 20 24 (++) S
26 1 3 3B10M OR 3 CV AHU-OR 20 24 (++) S
27 1 4 4A22 Sterile Supply Room (ENT) VAV 4E AHU 4 5 (+) S 28 1 4 4A24 Soiled Utility Room VAV 4E AHU 10 12 (--) S 29 1 4 4A48 Soiled Utility Room VAV 4E AHU 10 12 (--) S 30 1 4 4A45 Sterile Supply Room (Podiatry) VAV 4E AHU 4 5 (+) S 31 1 4 4A55 Sterile Supply Room (Podiatry) VAV 4E AHU 4 5 (+) S 32 1 4 4B39 Sterile Supply Room (Dermatology) VAV 4W AHU 4 5 (+) S 33 1 4 4B46L Sterile Supply Room (Womens Clinic) VAV 4W AHU 4 5 (+) S 34 1 4 4B46M Soiled Utility Room (Womans Clinic) VAV 4W AHU 10 12 (--) S 35 1 5 5A27 Clean Supply Room CV AHU-10 4 5 (+) S 36 1 5 5A28 Isolation Room CV AHU-10 12 14 (--) S 37 1 5 5A29 Ante Room CV AHU-10 10 12 Note-3 S
November 19, 2025
Line Item Building Floor Room Local Identifier Type (VAV /
CV)
Air Handler Min ACH Desired
ACH
Differential Pressure
Frequency
38 1 5 5A30 Isolation Room CV AHU-10 12 14 (--) S 39 1 5 5A38 Soiled Utility Room CV AHU-10 10 12 (--) S 40 1 5 5A39 Soiled Utility Room CV AHU-10 10 12 (--) S 41 1 5 5A41 Clean Supply Room CV AHU-10 4 5 (+) S 42 1 5 5A45 Clean Supply Room CV AHU-10 4 5 (+) S 43 1 5 5A46 Clean Supply Room CV AHU-10 4 5 (+) S 44 1 5 5B17 Clean Supply Room CV AHU-ICU 4 5 (+) S 45 1 5 5B19 Isolation Room CV AHU-ICU 12 14 (--) S 46 1 5 5B19.1 Ante Room CV AHU-ICU 10 12 Note-1 S 47 1 5 5B20 Isolation Room CV AHU-ICU 12 14 (--) S 48 1 5 5B20.1 Ante Room CV AHU-ICU 10 12 Note-1 S 49 1 5 5B39 Clean Supply Room CV AHU-ICU 4 5 (+) S 50 1 5 5B32 Clean Supply Room CV AHU-ICU 4 5 (+) S 51 1 5 5B47 Clean Supply Room CV AHU-ICU 4 5 (+) S 52 1 5 5B48 Soiled Utility Room CV AHU-ICU 10 12 (--) S 53 1 6 6A29 Clean Supply Room CV AHU-10 4 5 (+) S 54 1 6 6A40 Clean Linen Room CV AHU-10 4 5 (+) S 55 1 6 6A41 Soiled Utility Room CV AHU-10 10 12 (--) S 56 1 7 7A01G Clean Supply Room CV LG Split Unit 4 5 (+) S 57 1 B B1B04 Gross Specimen Holding Area CV AHU-Morgue 6 7 (-) S 58 1 B B1B04A Autopsy CV AHU-Morgue 12 14 (-) S 59 1 B B1B16G.2 Soiled Laundry Receiving and Sorting Room CV AHU-8 6 7 (-) S 60 1 B B1B16 Clean Laundry Storage Room CV AHU-8 4 5 (+) S 61 1 B B1B16C Laundry Room-Clean Side CV AHU-8 4 5 (+) S 62 OPC 1 1C06 Clean Supply Room VAV OPC AHU-4 4 5 (+) A 63 OPC 1 1C50 Soiled Utility Room VAV OPC AHU-4 10 12 (--) S 64 OPC 1 1C53 Clean Supply Room VAV OPC AHU-4 4 5 (+) A 65 OPC 2 2C06J Clean Supply Room (Infusion) VAV OPC AHU-1 4 5 (+) A 66 OPC 2 2C06K Infusion Clinic VAV OPC AHU-1 6 7 (+) A 67 OPC 2 2C08E Sterile Supply Room (Cardiology) VAV OPC-AHU-1 4 5 (+) A 68 OPC 2 2C15R Sterile Supply Room (Eye Clinic) VAV AHU-9 4 5 (+) A 69 OPC 3 3C10R Sterile Supply Room (Dental) VAV OPC-AHU-2 4 5 (+) A 70 OPC 3 3C10W Sterile Supply Room (Dental) VAV OPC-AHU-2 4 5 (+) A 71 OPC 3 3C10U Soiled Utility Room VAV OPC-AHU-2 10 12 (--) A 72 OPC 3 3C11 Clean Supply Room VAV OPC-AHU-2 4 5 (+) A 73 OPC 3 3C17C Clean Supply Room VAV OPC-AHU-2 4 5 (+) A 74 OPC 3 3C17F Same Day Procedure Room VAV OPC-AHU-2 15 18 (+) A 75 OPC 3 3C17G Same Day Procedure Room VAV OPC-AHU-2 15 18 (+) A
November 19, 2025
Line Item Building Floor Room Local Identifier Type (VAV /
CV)
Air Handler Min ACH Desired
ACH
Differential Pressure
Frequency
76 OPC 3 3C17H Same Day Procedure Room VAV OPC-AHU-2 15 18 (+) A 77 OPC 3 3C17J PACU (Post Surgical Recovery Unit) VAV OPC-AHU-2 6 7 (+) A 78 OPC 3 3C17J.1 Soiled Utility Room VAV OPC-AHU-2 10 12 (--) S 79 OPC B B1C-1 Emergency Department Waiting Area VAV OPC-AHU-3 12 14 (-) A 80 OPC B B1C03 Emergency Department Exam Room VAV OPC-AHU-3 6 7 (-) A 81 OPC B B1C04 Emergency Department Exam Room VAV OPC-AHU-3 6 7 (-) A 82 OPC B B1C05 Emergency Department Procedure Room VAV OPC-AHU-3 6 7 (-) A 83 OPC B B1C06 Trauma (Small) VAV OPC-AHU-3 15 17 (+) A 84 OPC B B1C07 Trauma (Large) VAV OPC-AHU-3 15 17 (+) A 85 OPC B B1C09 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 86 OPC B B1C10 Isolation Room CV OPC-AHU-3 12 14 (--) S 87 OPC B B1C11 Isolation Room CV OPC-AHU-3 12 14 (--) S 88 OPC B B1C12 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 89 OPC B B1C13 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 90 OPC B B1C14 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 91 OPC B B1C21 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 92 OPC B B1C23 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 93 OPC B B1C24 Observation / Treatment VAV OPC-AHU-3 6 7 (-) A 94 OPC B B1C25 Clean Supply Room VAV OPC-AHU-3 4 5 (+) A 95 OPC B B1C34 Observation / Treatment Open Bay Area VAV OPC-AHU-3 6 7 (-) A 96 OPC B B1C52 Clean Supply Room VAV OPC-AHU-3 4 5 (+) A 97 OPC B B1C53 Soiled Utility Room VAV OPC-AHU-3 10 12 (--) S 98 28 1 1D11B Soiled Utility Room VAV B28-AHU-1 10 12 (--) S 99 28 1 1D11A Clean Supply Room VAV B28-AHU-1 4 5 (+) A
100 28 1 1E08C Soiled Utility Room VAV B28-AHU-1 10 12 (--) S 101 28 1 1E08D Clean Supply Room VAV B28-AHU-1 4 5 (+) A 102 28 1 1.00E+15 Clean Supply Room VAV B28-AHU-1 4 5 (+) A 103 31 1 1A02 Clean Supply Room (Boon) VAV AHU-31-1 4 5 (+) A 104 31 1 1B02 Clean Supply Room (Boon) VAV AHU-31-2 4 5 (+) A 105 31 1 1C05 Clean Supply Room (Cedar) VAV AHU-31-2 4 5 (+) A 106 34 1 118 Clean Supply Room VAV AHU-34-1 4 5 (+) A
Note-2: The Scope Processing Room is positive with respect to the decontaimination room and positive with respect to the corridor.
Note-1: The Endoscopy room should be neutral or negative to the corridor
Note-3: The Ante Room is positive with respect to the isolation room and negative with respect to the corridor.
Frequency: Q = Quarterly / S = Semi-Annual / A = Annual
November 19, 2025
OPC AHU-2: Variable speed, water cooled, supplies 3rd floor of OPC Bldg., Circa 1985 OPC AHU-3: Variable speed, water cooled, supplies Basement of OPC Bldg., Circa 2000
AHU-Surgical: Variable speed, direct expansion / chilled water, supports all Circa 2009 AHU-10: Constant speed, water cooled, supplies 5E and 6 of Bldg.1, Circa 1947 AHU-ICU: Constant speed, water cooled, dedicated to 5 West (ICU / SDU / RT), Circa 1985 AHU-Morgue: Constant speed, direct expansion, dedicated to Morgue, Circa 1975 AHU-8: Constant speed, direct expansion, supplies SB, B, 1 and portion of 2nd floor Laboratory of Bldg.1, Circa 1947
(--) Supply air volume is 30% less than the return and/or exhaust volumes (-) Supply air volume is 15% less than the return and/or exhaust volumes Air Handler:
AHU-SPL: Constant speed, direct expanision, dedicated to the Special Procedures Suite, Circa-2008 AHU-9: Constant speed, water cooled, supplies floors 2 and 3 of Bldg. 1, Circa 1947
Differential Pressure:
(++) Supply air volume exceeds the return and/or exhaust air volumes by 30% (+) Supply air volume exceeds the return and/or exhaust air volumes by 15%
OPC AHU-1: Variable speed, water cooled, supplies 2nd floor of OPC Bldg., Circa 1985
File details come from the government source that posted it. Updated .