This document is a Certified Test, Adjust and Balance (TAB) Report prepared by Systems Service Mechanical, Inc. for the Community Living Center Phase I project located at 2615 East Clinton Ave, Fresno, CA 93793, dated July 18, 2018. The report certifies that air distribution and hydronic distribution systems have been tested, adjusted, and balanced in accordance with NEBB (National Environmental Balancing Bureau) Procedural Standards and project specifications. The TAB work was performed by NEBB Certified Professional Steve Santos (Registration No. 2938, expiration date 3/31/2019) and submitted by Systems Service Mechanical, Inc., located at 39215 Skyline Dr, Oakhurst, CA 93644. The architect is Polytech Associates, Inc., and the engineer is Mazzetti & Associates. The HVAC contractor was New England Sheet Metal.

The report documents comprehensive testing of systems including AHU-1 (Huntair 20-ton unit), two exhaust/return fans (EF-2 and RF-1), 27 VAV boxes serving various zones, multiple pumps for primary and secondary heating circuits, and associated balance valves and control systems. Final measured flows achieved approximately 98-101% of design specifications across most zones, with VAV cooling design flows ranging from 45 CFM to 1,025 CFM per zone. Primary heating pumps (PHWP-1 and PHWP-2) delivered 56 GPM at 9.25 feet of head; secondary heating pumps (SHWP-1 and SHWP-2) delivered 54 GPM at 30 feet of head operating at 36 Hz. The report includes detailed instrument calibration records with calibration dates through 2019, shop drawings, performance curves, and general notes addressing VAV calibration procedures, ductwork balancing, and seasonal limitations affecting heating system testing.

View the file

Other files

File Type Posted
Amendment 0002 - Attachment 3.pdf PDF
Amendment 0002 - Attachment 1.pdf PDF
36C26126Q0321 0002.docx DOCX document
Questions and Answers Document .docx DOCX document
36C26126Q0321 0001.docx DOCX document
ATTACHMENT 2 - Room Schedule Air Test Adjust and Balance.pdf PDF
36C26126Q0321.docx DOCX document
ATTACHMENT 1 - Quality Assurance Surveillance Plan.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFIED TEST, ADJUST AND

BALANCE REPORT

DATE 7/18/2018

PROJECT Community Living Center Phase I ADDRESS 2615 East Clinton Ave

Fresno, CA. 93793

ARCHITECT Polytech Associates, Inc ADDRESS 235 Pne Street, 17th Floor

San Francisco, CA 94104

PHONE 415 397 3117 FAX 415 397 1517

ENGINEER Mazzetti & Associates ADDRESS 220 Montgomeery Street, Suite 650

San Francisco, CA 94104

PHONE 415 632 3266 FAX

HVAC

CONTRACTOR New England Sheet Metal

ADDRESS 2731 South Cherry Ave.

Fresno, CA 93706

PHONE 559 268 7375 FAX

NEBB TAB FIRM Systems Service Mechanical, Inc.

ADDRESS 39215 Skyline Dr.

Oakhurst, CA. 93644 (559) 779-2634

TAB CERT. NO. 2938

E-MAIL steve@ssmechtab.com mailto:steve.ssmech@sti.net

TABLE of CONTENT

COVER PAGE 1

TOC 2

CERTIFCATION 3

GENERAL NOTES 4

SHOP DRAWING 5-6

AIR APPARATUS REPORT 7

FAN TEST REPORT 8

VAV INOUT REPORT 9-11

INOUT REPORT 12

PUMP TEST & BALANCE REPORT 13-18

INSTRUMENT CERTIFICATION 19-21

ABBREVIATION PAGE 22

Systems Service Mechanical CERTIFICATION PROJECT Community Living Center Phase I ADDRESS 2615 East Clinton Ave

Fresno, CA. 93793

THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENT AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST-ADJUST-BALANCE

REPORT PROJECT SUMMARY.

THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS

HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING,

ADJUSTING BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.

NEBB TAB FIRM

REG. NO. 2938 CERTIFIED BY Steve Santos DATE 7/18/2018

(Air Tab Supervisor)

THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING

BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.

NEBB TAB FIRM

REG. NO. 2938 CERTIFIED BY Steve Santos DATE 7/18/2018

(Hydronic Tab Supervisor)

SUBMITTED & CERTIFIED BY:

NEBB TAB FIRM Systems Service Mechanical, Inc.

TAB SUPERVISOR Steve Santos

REG. NO. 2938 SIGNATURE DATE 7/18/2018

EXP. DATE 3/31/2019

FORM 2 /12.98 PAGE 3

SYSTEMS SERVICE MECHANICAL, INC.

HVAC Test, Adjust and Balancing

39215 Skyline Drive., Oakhurst, CA. 93644 CCL# 669679 Ph (559) 779-2634 Fax (559) 683-6426

NEBB Certified Professional # 2938 steve.ssmech@sti.net

GENERAL NOTES

All VAV boxes were calibrated via EMS program for their maximum / minimum setpoints, distribution after the box was proportionally balanced. Once all boxes calibrated they were forced to cooling max and AH fan speed adjusted to satisfy all zones cooling setpoint, with only two or three boxes damper at 100% open. Duct static pressure set to control VFD.

Outside air damper opened to allow Phase I minimum OSA and ductwork above unit was measured via pitot tube traverse. Return fan tracking speed set when supply fan at operating speed. Return duct distribution proportionally balanced. Supply air and return air totals derived from flowhood tabulation, OSA will not typically equal exactly the difference between SA & RA & OSA reading

EF 2 serving general exhaust was ran and ductwork balanced to the required flows.

Heating pumps serving boilers were reduced down to the design flows from the triple duty valve at inlet to boiler. VFD operating speed remained at 60hz.

Secondary heating pumps were tested per NEBB procedures at full speed and throttling valve was used to verify pumps requirement. Throttling reopen and VFD ran to deliver the required flows to phase I requirement, 36hz

Reheat coils balancing valves were proportionally balanced. Due to seasonal condition boiler was not ran and no heating water and heating air temperatures available.

::::::::::::::::: :: .. ·.·.·.·.··o·····.·.

r•••· ::::/::/:::. :�W}:/

LOOBY

FIREPLACE

FLUE

8"x8"

�V>ti/BOILER "iC..,,lJ ROOM

@fil Bl r:::=:J

----. 12·x12•

---30"x30"

ELECTRICAL

ROON

[illjJ i

D]

CHILLERYARO i I 1 ·' I ' I J I . I• · ·• I I :�i I I .�R I I I I I I I I L __________ _i

Al

S9

S10

S1

S2

S3

S4

S5

S6

S7

S8

S11

S12

S13

S14 S15

S16

S17

S18

S19S20

S21

S23

NA

S24

S25 S26

S27 S28

S29

S30

S31

S33

S32

R34

R35

R36

R37

R39

R40

R41

R42

R43

R44

R45

R46

R47

R48

R49 E50

E51

E52

R43

E54

E55

E56

E57

E58

E59

E60

Systems Service Mechanical, Inc. AIR APPARATUS

REPORT

PROJECT VA Community Living Center SYSTEM / UNIT AHU 1

LOCATION Fresno, CA

UNIT DATA MOTOR DATA

Make / Model No. Huntair / 30461 001 Make / Frame Toshiba / 184t

Type / Size CW/HW / 20 tons H.P. / RPM 4) 6.5 / 1740

Serial Number NA Volts / Phase / Hertz 460 / 3 / 60

Arr. / Class 4) BI SWSI / I F.L. Amps / S.F. 8.9 / 1.15

Discharge Plenum Make Sheave Direct Drive

Make Sheave Direct Drive Sheave Diam. / Bore Direct Drive

Sheave Diam. / Bore Direct Drive Sheave Center Distance Direct Drive

No. Belts / Make / Size Direct Drive

No. Filters / Type / Size 12 / MERV8 / 24x24x2

12 / MERV14 / 24x24x12

FAN DESIGN DESIGN ACTUAL

Total CFM 8000 8046 External Discharge S.P. NA 1.67

Total S.P. NA 2.49 External Suction S.P. NA 0.63

Fan RPM 1740 1145 Fan Discharge S.P. NA 1.67

External S.P. NA 2.3 Fan Suction S.P. NA 0.82

Motor Volts 460 467/467/468 Reheat Coil Delta S.P. NA NA

Motor Amps 8.9 6.9 / 6.9 / 6.8 Cooling Coil & PHC Delta S.P. NA 0.59

Outside Air CFM ( Min ) 2535 2610 Filters Delta S.P. NA 0.13

Return Air CFM 7460 7212 VFD Hertz 60 39.5

Outside Air Damper Position NA 35% open

Ambient Temp. 105 79 / 60

Entering Air DB / WB 80 / 64 74 / 61

Leaving Air DB / WB NA 55 / 53

EWT / LWT (F) 45 / 55 43 / 58

REMARKS:

TEST DATE 7/18/2018 READINGS BY Steve Santos

FORM 5 / 12.98 PAGE 7

TEST DATA TEST DATAOUTLET

TOTAL

Systems Service Mechanical, Inc. FAN TEST

PROJECT VA Community Living Center Phase 1, Fresno, CA

FAN DATA FAN NO. EF - 2 FAN NO. RF - 1 FAN NO.

Location

Service

Manufacturer

Model Number

Serial Number

Type / Class

Motor Make / Style

Motor HP/RPM/Frame

Volts/Phase/Hertz

F.L. Amps/S.F.

Motor Sheave Make

Motor Sheave Diam./Bore

Fan Sheave Make

Fan Sheave Diam./Bore

No. Belts/Make/Size

Sheave Center Distance

TEST DATA FAN DESIGN INLET TOTAL FAN DESIGN INLET TOTAL FAN DESIGN INLET TOTAL

CFM 880 873 7330 7212

Fan RPM 2100 2070 1750 704

S.P. In/Out NA .67 / .0 NA .6 / .03

Total S.P. 1 0.67 NA 0.63

Voltage 460 469/470/469 460 471/471/470

Amperage 1.1 1.0 / 1.1 / 1.0 4) 4.0 5.9

VFD Speed NA NA 60 24

REMARKS

TEST DATE 7/3/2018 READINGS BY Steve Santos

FORM 6 / 12.98 PAGE 8

Mechanical Room

Direct Drive

Direct Drive

Direct Drive

Direct Drive

Direct Drive

Direct Drive

460 / 3 / 60

AH 1

Huntair

30476 001

NA

4) BI SWSI / I

Toshiba / ODP

5.0 / 1760 / 182T

1VP36 / 5/8"

Power Drive

AK30 / 3/4"

1 / Carlisle / 4L210

4) 4.0 / 1.15

6.5"

Power Drive

Roof

General Exhaust

Marathon / ODP

3/4 / 1750 / 56

460 / 3 / 60

1.1 / 1.15

Greenheck

CUBE 101 HP 5X

15445494

BI SWSI / I

Systems Service Mechanical VAV IN OUT

PROJECT VA Community Living Center Phase 1, Fresno, CA

AREA NO. KIND SIZE AK COOLING

DESIGN PRELIM COOLING

FINAL

PERCENT

OF DESIGN

Htg. MAX.

DESIGN

Htg. MAX

FINAL

AHU 1

SAV 1-12

Lobby S1 CD 8 x 8 1.00 255 121 241 95 140 Lobby S2 CD 8 x 8 1.00 260 191 270 104 146 Lobby S3 SWG 12 x 10 1.00 255 407 265 104 148 Lobby S4 SWG 12 x 10 1.00 255 429 251 98 141

Total 1025 1148 1027 100 562 575

SAV 1-13

Stair Well S5 CD 18 x 8 1.00 450 440 460 102 460 Storage 1E20 S6 SWG 6 x 6 1.00 45 200 80 178 80 Utility 1E15 S7 CD 8" Dia. 1.00 175 50 179 102 179

Total 670 690 719 107 670 719

SAV 1-14

Electrical Rm 1E21 S8 SWG 22 x 22 1.00 740 680 739 100 739

Total 740 680 739 100 740

SAV 1-15

Resident Bed 1D01 S9 CD 10" Dia. 1.00 290 289 100 141

Total 290 0 289 100 145 141

SAV 1-16

Resident Bed 1D02 S10 CD 10" Dia. 1.00 290 278 292 101 142

Total 290 278 292 101 145 142

SAV 1-17

Kitchen 1D03A S11 SWG 16 x 8 1.00 390 59 382 98 206 Kitchen 1D03A S12 SWG 18 x 10 1.00 520 810 534 103 255

Total 910 869 916 101 455 461

REMARKS

TEST DATE READINGS BY Steve Santos

FORM 2 / 12.98 PAGE 9

7/3/2018

PROJECT VA Community Living Center Phase 1, Fresno, CA

AREA NO. KIND SIZE AK COOLING

DESIGN PRELIM COOLING

FINAL

PERCENT

OF DESIGN

Htg. MAX.

DESIGN

Htg. MAX

FINAL

AHU 1

SAV 1-18

Resident Bed 1D04 S13 CD 10" Dia. 1.00 290 288 99 146

Total 290 0 288 99 145 146

SAV 1-19

Resident Bed 1D05 S14 CD 10" Dia. 1.00 290 279 96 144

Total 290 0 279 96 145 144

SAV 1-20

Corridor 1D-1 S15 CD 10" Dia. 1.00 310 279 308 99 132 Storage 1D13 S16 CD 6" Dia. 1.00 25 85 26 104 0 Nurse Station 1D14 S17 CD 6" Dia. 1.00 75 101 74 99 36 Corridor 1D-1 S18 CD 10" Dia. 1.00 310 248 302 97 136

Total 720 713 710 99 310 328

SAV 1-21

Medication 1D10 S19 CD 8" Dia. 1.00 150 114 152 101 69 Clean Linen 1D11A S20 CD 6" Dia. 1.00 75 59 78 104 37 Corridor 1D01 S21 CD 6" Dia. 1.00 25 85 27 108 0

Total 250 258 257 103 100 106

SAV 1-22

Nurses Break 1D15 S22 CD 10" Dia. 1.00 315 305 309 98 162

Total 315 305 309 98 160 162

FORM 2 / 12.98 PAGE 10

PROJECT VA Community Living Center Phase 1, Fresno, CA

AREA NO. KIND SIZE AK COOLING

DESIGN PRELIM COOLING

FINAL

PERCENT

OF DESIGN

Htg. MAX.

DESIGN

Htg. MAX

FINAL

AHU 1

SAV 1-23

Living Room 1D16 S24 Lin 8" Dia. 1.00 125 111 130 104 74 Living Room 1D16 S25 Lin 8" Dia. 1.00 125 105 122 98 70 Living Room 1D16 S26 Lin 8" Dia. 1.00 125 99 125 100 76 Living Room 1D16 S27 Lin 8" Dia. 1.00 125 88 120 96 71 Living Room 1D16 S28 SWG 16 x 8 1.00 250 454 260 104 140 Living Room 1D16 S29 SWG 16 x 8 1.00 250 395 252 101 135

Total 1000 1252 1009 101 555 566

SAV 1-24

Resident Bed 1D17 S30 CD 10" Dia. 1.00 290 287 99 150

Total 290 0 287 99 145 150

SAV 1-25

Resident Bed 1D18 S31 CD 10" Dia. 1.00 290 290 100 144

Total 290 0 290 100 145 144

SAV 1-26

Data Rm 1E17 S32 CD 12" Dia. 1.00 500 477 505 101 256

Total 500 477 505 101 250 256

SAV 1-27

Laundry Rm 1E18 S33 CD 8" Dia. 1.00 130 143 130 100 66

Total 130 143 130 100 65 66

FORM 2 / 12.98 PAGE 11

Systems Service Mechanical, Inc. IN OUT

PROJECT VA Community Living Center Phase 1, Fresno, CA

AREA NO. KIND SIZE AK DESIGN PRELIM FINAL COMMENTS

AHU 1 Returns Lobby R34 SWR 30 x10 1.50 1115 960 1092 98 Mech Rm R35 SWR 18 x 10 1.00 450 1100 434 96 Electrical Rm 1E21 R36 SWR 16 x 16 1.56 740 1205 760 103 Data Rm 1E17 R37 CR 14" Dia. 0.78 500 400 496 99 Resident Bed 1D01 R38 CR 8" Dia. 1.00 215 220 203 94 Resident Bed 1D02 R39 CR 8" Dia. 1.00 215 135 203 94 Dining Room 1D03 R40 SWR 30 x 12 1.00 910 955 908 100 Resident Bed 1D04 R41 CR 8" Dia. 1.00 215 127 211 98 Resident Bed 1D05 R42 CR 8" Dia. 1.00 215 197 221 103 Nurses Break 1D15 R43 CR 8" Dia. 1.00 215 202 219 102 Living Room 1D16 R44 SWR 30 x 12 1.00 1100 900 1056 96 Resident Bed 1D17 R45 CR 8" Dia. 1.00 215 202 203 94 Resident Bed 1D18 R46 CR 8" Dia. 1.00 215 168 211 98 Corridor 1D-1 R47 CR 12" Dia. 1.00 510 428 496 97 Corridor 1D-1 R48 CR 12" Dia. 1.00 500 469 499 100

Total 7330 7668 7212 98

EF -2

Resident Bed 1D01a E49 CR 6" Dia. 1.00 75 73 76 101 Resident Bed 1D02a E50 CR 6" Dia. 1.00 75 53 70 93 Resident Bed 1D04a E51 CR 6" Dia. 1.00 75 93 81 108 Resident Bed 1D05a E52 CR 6" Dia. 1.00 75 71 78 104 Soiled Utility 1D11b E53 CR 6" Dia. 1.00 75 71 73 97 Staff Toilet 1D11c E54 CR 6" Dia. 1.00 75 96 73 97 House Keeping 1D11d E55 CR 6" Dia. 1.00 75 85 70 93 Toilet E56 CR 6" Dia. 1.00 75 88 76 101 Resident Bed 1D17a E57 CR 6" Dia. 1.00 75 118 77 103 Resident Bed 1D18a E58 CR 6" Dia. 1.00 75 131 78 104 Laundry 1E18 E59 CR 6" Dia. 1.00 130 68 121 93

Totsl 880 947 873 99

REMARKS

TEST DATE READINGS BY Steve Santos

FORM 2 / 12.98 PAGE 12

PERCENT

of DESIGN

Systems Service Mechanical PUMP TEST

PROJECT VA Community Living Center Phase 1, Fresno, CA

PUMP DATA PUMP NO. PHWP - 1 PUMP NO. PHWP - 2 PUMP NO.

Location

Service

Manufacturer

Model Number

Serial Number

GPM / Ft.Hd.

Req. NPSH

Pump RPM

Impeller Diam.

Motor Mfr. / Frame

Motor HP / RPM

Volts / Phase / Hertz

F.L. Amps / S.F.

Seal Type

Pump Off Pressure

Valve Shut Diff.

Actual Impeller Diam.

Valve Open Diff.

Valve Open GPM

Final Discharge Press.

Final Suction Press.

Final Delta P

Final GPM

Voltage

Amperage

VFD Speed

REMARKS

TEST DATE 7/18/2018 READINGS BY Steve Santos

FORM 8 / 8.99 PAGE 13

3.5"

3.5'

50.75'

41.5'

9.25'

0.64

41.5'

0.64

.8 / 1.15

CeramicCeramic

9.25'

3.5"

3.5'

18 psi

13'

18 psi

13'

50.75'

.8 / 1.15

NA

3.5"

Baldor / 56C

3.5"

Baldor / 56C

1/2 / 1725

460 / 3 / 60

1/2 / 1725

460 / 3 / 60

NA

Mechanical Room

Primary / Boilers

Bell & Gossett

60 3x5.25 3.5" BF

PH018592 A

54 / 10'

PH018592 B

54 / 10'

Mechanical Room

Primary / Boilers

Bell & Gossett

60 3x5.25 3.5" BF

Systems Service Mechanical PUMP TEST

PROJECT VA Community Living Center Phase 1, Fresno, CA

PUMP DATA PUMP NO. SHWP - 1 PUMP NO. SHWP - 2 PUMP NO.

Location

Service

Manufacturer

Model Number

Serial Number

GPM / Ft.Hd.

Req. NPSH

Pump RPM

Impeller Diam.

Motor Mfr. / Frame

Motor HP / RPM

Volts / Phase / Hertz

F.L. Amps / S.F.

Seal Type

Pump Off Pressure

Valve Shut Diff.

Actual Impeller Diam.

Valve Open Diff.

Valve Open GPM

Final Discharge Press.

Final Suction Press.

Final Delta P

Final GPM

Voltage

Amperage

VFD test speed

PH I operating Spd

REMARKS

TEST DATE 7/18/2018 READINGS BY Steve Santos

FORM 8 / 8.99 PAGE 14

36hz 36hz

1.3 1.5

60hz 60hz

54 54

456 457

46' 48'

30' 30'

70 70

76' 78'

5.75" 5.75"

20.9' 20.9'

NA NA

37' 37'

1.6 / 1.15 1.6 / 1.15

Ceramic Ceramic

1.0 / 1760 1.0 / 1760

460 / 3 / 60 460 / 3 / 60

5.75" 5.75"

Baldor / 143t Baldor / 143t

4' 4'

1760 1760

PH018594 A PH018594 B

54 / 30' 54 / 30'

Bell & Gossett Bell & Gossett e1510 1.25 AD e1510 1.25 AD

Mechanical Room Mechanical Room

Reheat Coils Reheat Coils

B-160L x

SERIES e-1510 1800 RPM SYNCHRONOUS SPEED

Series e-1510

Series e-1510 x

Systems Service Mechanical BALANCE VALVE/FLOW

METER TEST REPORT

PROJECT VA Community Living Center Phase 1, Fresno, CA

AREA SIZE MODEL DESIGN ACTUAL ACTUAL ACTUAL NOTES

GPM VALVE VALVE GPM

SETPOINT P.D.

AHU -1

Cooling Coil CB4F B&G 94 15.00 6.8' 95

Heating Water

PHC - 1 CV 3.8 Griswold 4 100% 38" 3

SAV 1-12 CV 1.9 Griswold 2.1 50% 22" 2

SAV 1-13 CV 1.9 Griswold 1.2 20% 10" 1.3

SAV 1-15 CV 1.9 Griswold 0.7 50% 11" 0.8

SAV 1-16 CV 1.9 Griswold 0.6 60% 25" 0.7

SAV 1-17 CV 1.9 Griswold 1.6 50% 10" 1.6

SAV 1-18 CV 1.9 Griswold 0.6 50% 11" 0.7

SAV 1-19 CV 1.9 Griswold 0.6 50% 18" 0.7

SAV 1-20 CV 1.9 Griswold 1 50% 11" 1.1

SAV 1-21 CV 1.9 Griswold 0.5 50% 12" 0.6

SAV 1-22 CV 1.9 Griswold 1 50% 20" 1.1

SAV 1-23 CV 1.9 Griswold 1.9 100% 40" 1.8

SAV 1-24 CV 1.9 Griswold 0.6 30% 11" 0.7

SAV 1-25 CV 1.9 Griswold 0.6 30% 10" 0.7

SAV 1-27 CV 1.9 Griswold 0.5 10% 10" 0.7

REMARKS

TEST DATE READINGS BY Steve Santos

FORM 2 / 12.98 PAGE 17

7/18/2018

Systems Service Mechanical, Inc.

Table 1. Required Instrumentsation for Air & Hydronic Certification

FUNCTION

RANGE

MINIMUM

ACCURACY &

RESOLUTION

CALIBRATION

DATE

(Requirement)

Name/ Type (12 Months)

1% +/- RPM Manufact. & Model Serial No. H.250132 2/8/2019

(12 Months)

Name/ Type

Manufact. & Model Serial No. 6070691 2/8/2019

Name/ Type (12 Months)

Manufact. & Model Serial No. 6070691 2/8/2019

Name/ Type

Manufact. & Model Serial No. 6070691 2/8/2019

Electrical Measurement

Name/ Type (6 Months)

Manufact. & Model Serial No. 73953486 2/8/2019

Name/ Type

Manufact. & Model Serial No. 73953486 2/8/2019

Clamp Meter

Clamp Meter

2% +/- reading &

0.1 Ampere

Fluke 52

INSTRUMENT INFORMATION

Digital Tachometer

2% +/- READING

minus40 to 240 deg

Extech Instruments 461995

1% of Reading & 0.2 deg.F.

1% of Reading & 0.2 deg.F.

1% of Reading & 0.2 deg.F.

minus40 to 240 deg minus40 to 240 deg

Digital Thermometer / with probes

Fluke 52

Rotating Measuring

Digital Thermometer / with probes

0 to 100 AmpsAmpere

AIR

Immersion

Contact

Volts

Fluke 52

0 to 600 VAC

Temperature Measurement

0 to 5000 RPM

Fluke #36

Digital Thermometer / with thermo

2% +/- reading & 1 volt Fluke #36

Systems Service Mechnical, Inc.

Table 2. Required Instrumentsation for Air & Hydronic Certification

FUNCTION RANGE

MINIMUM

ACCURACY &

RESOLUSION

CALIBRATION

DATE

(Requirement)

5% +/- in w.g. Name/ Type (12 Months)

Manufact. & Model Serial No. M92163 2/8/2019

Name/ Type

Air Pressure 0 to 10.00 in. w.g. Manufact. & Model Serial No. M92163 2/8/2019 Measurememt

Name/ Type

Manufact. & Model Serial No. M92163 2/8/2019

Name/ Type

Manufact. & Model Serial No. M92163 2/8/2019

18 in. NA Name/ Type

Manufact. & Model Serial No. NA NA Pitot Tube

(2 Required ) 36 in. NA Name/ Type

Manufact. & Model Serial No. NA NA

Name/ Type (12 Months)

Measuring 50 to 2500 FPM 20 fpm Manufact. & Model Serial No. CP237357 10/27/2017

Name/ Type (12 Months)

10 to 90% RH 3% RH Range Manufact. & Model Serial No. 11118499 2/8/2019 1% Resolusion

Name/ Type (12 Months)

Digital 5 CFM Manufact. & Model Serial No. M92163 2/8/2019

PAG 20E

INSTRUMENT INFORMATION

Micromanometer

Shortridge ADM 870

Micromanometer

Dwyer

Micromanometer

Shortridge ADM 870

Micromanometer

Shortridge ADM 870

Shortridge ADM 870

Dwyer / 18"

Dwyer

Dwyer / 36"

Shortridge ADM 870

Alnor Anemometer

RVA 801

Precision Psychrometer

Extech RH 390

Shortridge Flow Hood

0.01 in w.g. < 1 in w.g.

0.1 in w.g. > 1 in w.g.

5% +/- reading &

Air Volume Measurememt

(Direct Readings Hood)

Minimum Range 100 to 2000 CFM

5% +/- Reading

Air Velocity Minimum Range

Humidity Measurememt

Systems Service Mechanical, Inc.

Table 3. Required Instrumentation for Hydronic Certification

FUNCTION RANGE

MINIMUM

ACCURACY &

RESOLUSION

CALIBRATION

DATE

(Requirement)

Name/ Type (12 Months)

Manufact. & Model Serial No. W12128 3/20/2018

Name/ Type

Manufact. & Model Serial No. W12128 3/20/2018

Name/ Type

Manufact. & Model Serial No. W12128 3/20/2018

Name/ Type

Manufact. & Model Serial No. W12128 3/20/2018

Name/ Type

Manufact. & Model Serial No. W12128 3/20/2018

INSTRUMENT INFORMATION

Hydro Data Digital Micromanometer

Shortridge 250

Hydro Data Digital Micromanometer

Shortridge 250

Hydro Data Digital Micromanometer

Shortridge 250

Hydro Data Digital Micromanometer 0 to 100ft

Shortridge 250

Hydro Data Digital Micromanometer

Shortridge 250

2% of Reading &

1.0 psi.

2% of Reading &

2.5 psi.

2% of Reading & 1.0ft w.g.

Hydronic Drfferential Pressure

Measurenent

2% of Reading & 1.0 in w.g

Hydronic Pressure

Measuremet

2% of Reading &

0.5 psi.

30 HG to 60

Psi.

0 TO 100 PSI.

0 to 100 in w.g.

0 TO 200 PSI.

ABBREVIATION

AFF ABOVE FINISH FLOOR LWT LEAVING WATER TEMPERATURE

AMB AMBIENT LIN LINEAR DIFFUSER

BDD BACKDRAFT DAMPER MAX MAXIMUM

BHP BRAKE HORSEPOWER MBH THOUSAND BTU PER HOUR

BTUH BTU PER HOUR MIN MINIMUM

CD CEILING DIFFUSER NC NORMALLY CLOSED

CG CEILING GRILL NA NOT AVAILABLE

CR CEILING REGISTER OSA OUTSIDE AIR

CFM CUBIC FEET PRE HOUR OD OUTSIDE DIAMETER

DIA DIAMETER OV OUTLET VELOCITY

DL DRUM LOUVER PRV PRESSURE REDUCING VALVE

DWDI DOUBLE WIDE DOUBLE INLET

E EXHAUST AIR GRILL PSI POUNDS PER SQUARE INCH

EAT ENTER AIR TEMPERATURE PSIG PSI GAUGE

EDB ENTER DRY BULB QTY QUANTITY

EER ENERGY EFFICIENCY RATIO R RETURN AIR DIFFUSER/GRILL

EFF EFFICIENCY RH RELATIVE HUMIDITY

ENT ENTERING S SUPPLY AIR DIFFUSER/GRILL

ESP EXTERNAL STATIC PRESSURE SS STAINLESS STEEL

EWB ENTERING WET BULB SWG SIDE WALL GRILL

EWT ENTERING WATER TEMPERATURE SWSI SINGLE WIDE SINGLE INLET FAN

(E) EXISTING TG TRANSFER GRILL

FA FREE AREA TSP TOTAL STATIC PRESSURE

FC FORWARD CURVE FAN TYP TYPICAL

FT FEET TW THROW AWAY FILTERS

FG FLOOR GRILL UNO UNLESS NOTED OTHERWISE

FF FINISHED FLOOR V/PH/HZ VOLTS / PHASE / HERTZ

FLA FULL LOAD AMPERES VD VOLUME DAMPER

FPM FEET PER MINUTE VTR VENT THROUGH ROOF

FV FACE VELOCITY W WIDTH

GPM GALLONS PER MINUTE W/ WITH

HP HORSEPOWER WB WET BULB

HX HEAT EXCHANGER WG WATER GAUGE

ID INSIDE DIAMETER WPH WATER PRESSURE DROP

IN INCHES

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LDB LEAVING WET BULB TEMPERATURE

SSM cover
Sheet1
TABLE OF CONTENT
SSM certifi
Sheet1
SSM general notes
Floor Plan
SSM appara
Sheet1
SSM fan
Sheet1
SSM VAVinout
Sheet1
Sheet1 (2)
Sheet1 (3)
SSM new Inout
Sheet1
SSM flowmeter
Sheet1
Balance Valve
SSM Calibration
Table 1
Table 2
Table 3
TAB ABBREVIATIONS
Sheet1
SSM pumps.pdf
Sheet1
Sheet1 (2)

File details come from the government source that posted it. Updated .