Summary: VA Fresno Critical Room Recertification 2025 - Test, Adjust, and Balance Report
This document is a Certified Test, Adjust, and Balance (TAB) Report prepared by Equal Air Balance Company (NEBB Certified Firm #2910) for the Department of Veterans Affairs facility in Fresno, California on February 7, 2025. The report provides comprehensive testing, measurement, and certification of HVAC system performance across multiple critical care rooms and operational spaces within the VA Medical Center. Equal Air Balance Company is a NEBB-certified firm operating under License #1006492, with technicians A. Plyavinsh and J. Bueno conducting measurements in accordance with NEBB procedural standards. The work documents static pressures, air change rates (ACH), supply and exhaust CFM flows, and differential pressures for over 60 rooms across multiple floors, including operating rooms, isolation rooms, procedure rooms, emergency department spaces, and support facilities.
Key findings indicate several rooms exceed or fall short of designed air change specifications, with notable issues including: AHU-Surgical experiencing elevated external discharge static pressure of 4.86" (previously 3.61"), suggesting possible air restrictions; multiple sterile supply and observation/treatment rooms demonstrating insufficient supply airflow and inadequate air changes; 3A04A and 3A04B GI procedure rooms with insufficient exhaust flow; and room 3A15A (Housekeeping) with zero exhaust register flow, indicating possible disconnection. Pressure compliance varies significantly across spaces, with some rooms maintaining designed positive or negative pressurization while others deviate. The report includes detailed outlet-by-outlet measurements, calibration certificates for measurement instruments (micromanometer, hygronic manometer, digital strobe, and digital thermometer all calibrated in 2024), and NEBB certification documentation for the supervising professional and firm, valid through December 31, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Attachment 3.pdf | ||
| 36C26126Q0321 0002.docx | DOCX document | |
| Questions and Answers Document .docx | DOCX document | |
| Amendment 0002 - Attachment 2.pdf | ||
| 36C26126Q0321 0001.docx | DOCX document | |
| ATTACHMENT 2 - Room Schedule Air Test Adjust and Balance.pdf | ||
| 36C26126Q0321.docx | DOCX document | |
| ATTACHMENT 1 - Quality Assurance Surveillance Plan.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERTIFIED TEST; ADJUST; BALANCE REPORT
Project Name:
Address:
City:
Architect: N/S
Engineer:
HVAC Contractor:
NEBB Certified TAB Firm: Equal Air Balance Company
Address: 357 East Arrow Highway, Suite 206
City: San Dimas, CA 91773
Certification Number: 2910
License #: 1006492
Date: 2/7/2025
A. Plyavinsh, J. Bueno
VA Fresno Critical Room Recertification
VA Fresno Critical Room Recertification 2025
2615 E. Clinton Avenue
Fresno, CA 93703-2223
N/S
Department of Veterans Affairs
EAB Job #: 25007
Technician:
AIR BALANCE REPORT IS NOT VALID WITHOUT NEBB STAMP ABOVE
accounts Snapshot
Project Name:
Certifying NEBB Qualified
TAB Supervisor:
Firm License Number:
Expiration Date: 8/31/2025
Firm Certification Number:
Expiration Date:
"THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM
MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN
ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL
SYSTEMS . ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB
TOLERANCES, ARE NOTED IN THE TEST - ADJUST - BALANCE REPORT PROJECT
SUMMARY."
357 E. Arrow Hwy. Suite 206
San Dimas, CA 91773
Phone (714) 637-3500
Fax (714) 637-3050
Web: www.equalairbalance.com
Specializing in testing and balancing of environmental systems
1006492
REPORT CERTIFICATION
VA Fresno Critical Room
Recertification 2025
Erik Dlugajczyk
12/31/2025
STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL
Symbol Sheet:
Report Summary: 2nd & 3rd Floors
Test & Balance Sheet:
Air Balance Summary Sheet:
Outlet Sheets:
Report Summary: All Floors
Air Balance Summary Sheet:
Test & Balance Sheet:
Outlet Sheets:
Report Summary Sheet:
Air Balance Summary Sheet:
Outlet Sheets:
Test & Balance Sheet:
Report Summary Sheet:
Test & Balance Sheet:
Certifications:
61 - 62
64 - 81
Table of Contents
VA Fresno Critical Room Recertification 2025
8 - 13
14 - 17
18 - 20
21 - 23
24 - 60
ACU Air Conditioning Unit LAT Leaving Air Temperature
AK Free Area Factor LD Linear Diffuser
ATM Atmosphere LFD Laminar Floor Diffuser
BHP Brake Horse Power LWT Leaving Water Temperature
CAV Constant Air Volume MAT Mixed Air Temperature
CD Ceiling Diffuser MB Mixing Box
CER Ceiling Exhaust Register NA Not Applicable
CFM Cubic Feet per Minute NI Not Installed
CHWR Chilled Water Return NL Not Listed
CHWS Chilled Water Supply NVL No Valid Location
CO Cooling Only NM Not Measured
CRR Ceiling Return Register NR Not Read
CSG Ceiling Supply Grille NS Not Specified
CWR Condenser Water Return OSA Outside Air
CWS Condenser Water Supply R.A Reverse Acting
D.A. Direct Acting RA Return Air
DNA Data Not Available RAG Return Air Grille
DO Duct Opening RAR Return Air Register
DT Duct Traverse RD Round Diffuser
EAG Exhaust Air Grille RH Re-Heat
EAR Exhaust Air Register RPM Revolutions per Minute
EAT Entering Air Temperature SA Supply Air
EF Exhaust Fan SAG Supply Air Grille
EG Exhaust Grille SAR Supply Air Register
ESP External Static Pressure SAV Supply Air Valve
EWT Entering Water Temperature SEF Smoke Evac Fan
EXH Exhaust SP Static Pressure
FC Fan Coil SW Sidewall
FLA Full Load Amps SWG Sidewall Grille
FP Fan Powered TBD To Be Determined
FPM Feet per Minute TSP Total Static Pressure
GEX General Exhaust T-STAT Thermostat
GF Grease Filter UA ULPA Filter
HF Hepa Filter V Volts
HP Horse Power VAV Variable Air Volume
HWR Hot Water Return VP Velocity Pressure
HWS Hot Water Supply WER Wall Exhaust Register
Air Symbol Sheet
(1)
(2)
(3)
(4)
(5)
(6)
PROJECT: VA Fresno Critical Room Recertification 2025
JOB #: 25007
DATE:SYSTEM:
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
REPORT SUMMARY
A.P. / J. B. TECHNICIAN:
Fresno, CA 93703
Existing HVAC
2nd & 3rd Floor
2/7/2025
AREA SERVED:
LOCATION:
Room has 24.18 ACH and is designed for 20 ACH. The room is positively pressurized to the corridor and is designed to be positive.
2A13B Special Procedures (SPL):
2A04F Preparation Assembly and
Room has 24.38 ACH and is designed for 4 ACH. The room is positively pressurized to the corridor and is designed to be positive.
3A15 Decontamination Area:
Room has 25.68 ACH and is designed for 6 ACH. The room is negatively pressurized to the corridor and is designed to be negative.
3A15.1 Scope Processing:
Room has 30.05 ACH and is designed for 10 ACH. The room is negatively pressurized to the corridor and is designed to be negative.
3A15A Housekeeping:
Zero flow reading from exhaust register. Register possibly disconnected from exhaust system.
3A15B Restroom:
Room has 10.78 ACH and is designed for 10 ACH. The door to the restroom has been removed, unable to measure DP.
accounts Image accounts Text Box
CERTIFIED MEMBER - NATIONAL ENVIRONMENTAL BALANCING BUREAU
Date: 2/7/2025
Readings by: Job No.: 25007
REQUIRED ACTUAL
DELTA PRESS. DELTA PRESS. WHERE TAKEN
TO ADJACENT TO ADJACENT COMMENTS
ROOM (INCHES W.C) ROOM (INCHES W.C) AN/OR DATA
2A13B ( + ) 0.001" ( + ) 0.0352"
3A02F ( + ) 0.001" ( + ) 0.0103"
3A15 ( - ) 0.001" ( - ) 0.0127"
3A15.1 ( - ) 0.001" ( - ) 0.0082"
3A15A ( -) 0.001" ( - ) 0.00015" (1)
3A15B ( - ) 0.001" NA (2)
Notes:
(2) Restroom door has been removed. No pressure reading can be taken.
(1) 3A15A Housekeeping: Zero flow reading from exhaust register.
Restroom
Housekeeping
TEST AND BALANCE
VA Fresno Critical Room Recertification 2025
A. Plyavinsh, J. Bueno
ROOM
NO. # NAME
Special Procedures
Prep Assembly
Decontamination Area
Scope Processing accounts Image accounts
Air Balance Summary Job No.:
Date:
Job Name: Technician:
Job Location:
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
RM # ROOM NAME (CU.FT.) REQ. ACT. PLAN ACT. CFM +/- PLAN ACT. CFM +/- PLAN ACT CFM +/- AC/HR AC/HR
2A13B Special Procedures (SPL) 5562 P P NS 2242 NM NS 1235 NM NA NA NA NA 20 24.18
3A02F Preparation, Assembly and Sterilization Area 6826 P P NS 2546 NM NS 0 NM NA NA NA NA 4 22.38
3A15 Decontamination Area 3154 N N NS 660 NM NS 1350 NM NA NA NA NA 6 25.68
3A15.1 Scope Processing 605 N N NS 303 NM NS 245 NM NA NA NA NA 10 30.05
3A15A Housekeeping (2) 155 N N NS NA NM NS 0 NM NA NA NA NA 10 0.00
3A15B Restroom 601 N NA (1) NS 86 NM NS 108 NM NA NA NA NA 10 10.78
Notes:
(1) Restroom door has been removed. No pressure reading can be taken.
(2) Housekeeping area has zero CFM reading from Exhaust Register.
Fresno, CA 93703
AIR CHANGES
ACTUAL
357 East Arrow Highway Suite 206 San Dimas, CA 91773
(714) 637-3500
25007
2/7/2025
A. Plyavinsh, J. BuenoVA Fresno Critical Room Recertification 2025 accounts Image accounts
TEST AND BALANCE REPORT
DIFFUSER AND GRILLE TEST
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2A13B / Special Procedures 1 24" x 24" 1.00 HF NS * 969 *
2A13B / Special Procedures 2 24" x 10" 1.670 HF NS NS 641 384
2A13B / Special Procedures 3 24" x 10" 1.670 HF NS NS 631 378
Total NS 2242
Exhaust 2A13B / Special Procedures E - 1 48" x 10" 3.33 SWG NS * 749 225
2A13B / Special Procedures E - 2 48" x 10" 3.33 SWG NS * 486 146
2A13B / Special Procedures E - 3 14" x 14" 1.00 SWG NS * 0 NS (1)
2A13B / Special Procedures E - 4 14" x 14" 1.00 SWG NS * 0 NS (1)
Total NS 1235
(+) 1007
Notes:
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
DESIGN ACTUAL
NOTES
(1) Zero flow reading from exhaust register. Register is capped accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A02F / Prep Assembly 1 14" x 14" 1.00 CD NS * 222 *
3A02F / Prep Assembly 2 14" x 14" 1.00 CD NS * 35 *
3A02F / Prep Assembly 3 14" x 14" 1.00 CD NS * 34 *
3A02F / Prep Assembly 4 14" x 14" 1.00 CD NS * 170 *
3A02F / Prep Assembly 5 14" x 14" 1.00 CD NS * 135 *
3A02F / Prep Assembly 6 14" x 14" 1.00 CD NS * 168 *
3A02F / Prep Assembly 7 14" x 14" 1.00 CD NS * 115 *
3A02F / Prep Assembly 8 12" x 8" 1.00 SWSG NS * 306 *
3A02F / Prep Assembly 9 12" x 8" 1.00 SWSG NS * 152 *
3A02F / Prep Assembly 10 12" x 8" 1.00 SWSG NS * 136 *
3A02F / Prep Assembly 11 12" x 8" 1.00 SWSG NS * 237 *
3A02F / Prep Assembly 12 12" x 8" 1.00 SWSG NS * 244 *
3A02F / Prep Assembly 13 12" x 8" 1.00 SWSG NS * 303 *
3A02F / Prep Assembly 14 12" x 8" 1.00 SWSG NS * 0 *
3A02F / Prep Assembly 15 11.25" x 7.25" 1.00 SWSG NS * 289 *
Total NS 2546
Return 3A02F / Prep Assembly 1 25.25" x 11.5" 1.00 SWR NS * 0 *
Total NS 0
( + ) 2,546
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A15 / Decontamination Area 1 18" x 18" 1.00 CD NS * 391 *
3A15 / Decontamination Area 2 16" x 16" 1.00 CD NS * 269 *
Total NS 660
Exhaust 3A15 / Decontamination Area E - 1 20" x 20" 1.00 EG NS * 1350 *
Total NS 1350
( - ) 690
Supply 3A15 / Decontamination Area 1 18" DIA 1.00 RG NS * 581 *
3A15 / Decontamination Area 2 18" DIA 1.00 RG NS * 615 *
Total NS 1,196 (1)
Return 3A15 / Decontamination Area R - 1 18" DIA 1.00 RG NS * 582 *
3A15 / Decontamination Area R - 2 18" DIA 1.00 RG NS * 575 *
Total NS 1,157 (1)
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
(1) This unit is a temp unit installed and 100% recirculation. Not included with AC/H calculation.
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A15.1 / Scope Processing 1 12" x 12" 1.00 CD NA * 303 *
Total NS 303
Exhaust 3A15.1 / Scope Processing E - 1 12" x 12" 1.00 EG NS * 245 *
Total NS 245
( + ) 58
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A15A / Housekeeping 1 6" x 4" 1.00 CD NS * 0 *
Total NS 0 (1)
Notes:
(1) Zero flow reading from exhaust grille, possibly disconnected from exhaust system.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL 0
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A15B / Restroom 1 12" x 12" 1.00 CD NS * 86 *
Total NS 86
Exhaust 3A15B / Restroom E - 1 10" x 6" 1.00 EG NS * 108 *
Total NS 108
( - ) 22
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
(1) 2A09C Ultrasound #1:
(2) 3A014 Sterile Supply Room (GI Cabinet):
(3) 3A02E Clean Storage West:
(4) 3A02E Clean Storage East:
(5) 3A04A GI Procedure-1 EDG
(6) 3A04B GI Procedure-2 EDG:
(7) 3A04D Sterile Supply Room GI:
(8) 3A04G GI Procedure Room:
(9) 3B10A OR-1:
(10) 3B10D OR-2:
(11) 3B10I Sterile Supply:
Room has 8.67 ACH and is designed for 4 ACH. Room is positively pressurized to Ultrasound Suite and is designed to be positive.
Actual Room - Restroom. The room has 12.10 ACH and is designed for 4 ACH. The room is negatively pressurized to the corridor and is designed to be positive.
Room has 4.4 ACH and is designed for 4 ACH. Room is negatively pressurized to the corridor and is designed to be positive.
Room has 5.83 ACH and is designed for 4 ACH. Room is positively pressurized to the ramp and is designed to be positive.
Room has 5.12 ACH and is designed for 10 ACH. Room is negatively pressurized to the corridor. and is designed to be negative. Insufficient exhaust flow. Insufficient air changes.
Room has 7.33 ACH and is designed for 10 ACH. Room is positively pressurized to the corridor. and is designed to be negative. Insufficient exhaust flow. Insufficient air changes.
Room has 23.63 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0292"w.c.
Room has 4.66 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 6.8 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 14.16 ACH and is designed for 12 ACH. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 23.07 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0257"w.c.
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
Report Summary
PROJECT: VA Fresno Critical Room Recertification 2025
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025 accounts Image accounts
(12) 3B10J OR Equipment Storage:
(13) 3B10K OR-4:
(14) 3B10M OR-3:
(15) 4A45 Sterile Supply Room:
(16) 4A26 Sterile Supply Room:
(17) 4A27 Sterile Supply Room:
(18) 4B39 Sterile Supply Room:
(19) 4B46L Sterile Supply Room:
(20) 5A28 Isolation Room:
Room has 24.78 ACH and negative ( - ) 0.0917" in relation to the corridor.
Room has 24.54 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0258"w.c.
Room has 11.75 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive. Exhaust register is covered by tape.
Room has 8.25 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 9.04 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 9.52 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 15.29 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 20.17 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0204"w.c.
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
Room has 5.23 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
PROJECT: VA Fresno Critical Room Recertification 2025 accounts Image accounts
(21) 5A29 Ante Room:
(22) 5A30 Isolation Room:
(23) 5B19 Isolation Room:
(24) 5B19.1 Ante Room:
(25) 5B20 Isolation Room:
(26)
(27) B1B04 Gross Specimen Holding Area:
(28) B1B04A Autopsy:
(29) B1B05 Soiled Laundry Receiving and Sorting Room:
(30) B1B16 Laundry Room-Clean Side:
Room has 10. ACH and is designed for 6 ACH. Room is positively pressurized to the corridor (0.0021") and is designed to be negative.
Room has 16.13 ACH and is designed for 4 ACH. Room is positively pressurized to B1B04 and is designed to be positive.
Room has 15.94 ACH and is positive in relation to the isolation room 5A28 (0.0451"); positive in relation to the isolation room 5A30 (0.0201") and negative in relation to the corridor ( - ) 0.0557". Pressure monitor reads: ( - )
0.0219" W.C. Attempted to calibrate. Pressure value on monitor is fluctuating, can not be calibrated.
Room has 27.56 ACH with a design of 12 ACH. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 16.06 ACH with a design of 12 ACH. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 10.23 ACH positive in relation to the isolation room (0.0220") and design of 10 ACH); positive in relation to the isolation room (0.0301") and negative in relation to the corridor ( - )0.0110".
5B20.1 Ante Room:
Room has 10.02 ACH with design of 10 ACH and is positive in relation to the isolation room (0.0290"); positive in relation to the isolation room (0.0301") and negative in relation to the corridor ( - )0.0130".
There are no outlets installed.
Room has 25.73 ACH and is designed for 12 ACH. Room is negatively pressurized to B1B04 and is designed to be negative.
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
The ISO Room has 26.48 ACH and negative ( - ) 0.0743" in relation to the corridor.
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
PROJECT: VA Fresno Critical Room Recertification 2025 accounts Image accounts
(31) B1B16B Clean Laundry Storage Room:
(32) 2C06K Infusion Clinic:
(33) 2C15F Sterile Supply Room:
(34) 3C10W Sterile Supply Room:
(35) S0G8 Isolation Room:
(36)
(37) 2C08E Sterile Supply Room:
With the T-stat at 55 degrees the room is positively pressurized to the corridor and is designed to be negative.
When the T-stat is at 72 degrees the room has insufficient air changes with 5.23 ACH with a design of 6 ACH.
Insufficient exhaust flow. The room is negatively pressurized to the corridor with the T-stat at 72 degrees.
Room has 2.87 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 1.35 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 11.08 ACH and is designed for 4 ACH. Room is negatively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 21.57 ACH and is designed for 12 ACH. At time of TAB: Med Air System at High speed. Room is negatively pressurized to the corridor and is designed to be negative.
S0G9 Isolation Room:
Room has 28.69 ACH and is designed for 12 ACH. At time of TAB: Med Air System at High speed. Room is negatively pressurized to the corridor and is designed to be negative.
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
Room has 14.9 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
PROJECT: VA Fresno Critical Room Recertification 2025 accounts Image accounts
Job Name: Technician:
Job Location:
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
RM # ROOM NAME (CU.FT.) REQ. ACT. PLAN ACT. CFM +/- PLAN ACT. CFM +/- PLAN ACT CFM +/- AC/HR AC/HR
2A09C Ultrasound #1 1357 P P NS 196 NS NS 57 NS NA NA NA NA 4 8.67
3A014 Sterile Supply Room (GI Cabinet) (1) 372 P N NS 75 NS NS 85 NS NA NA NA NA 4 12.10
3A02E Clean Storage (West) 4270 P N NS 313 NS NS 0 NS NA NA NA NA 4 4.40
3A02E Clean storage Equip. Room (East) 5124 P P NS 498 NS NS 0 NS NA NA NA NA 4 5.83
3A04A GI Procedure-1 (EDG) (2) 1827 N N NS 136 NS NS 156 NS NA NA NA NA 10 5.12
3A04B GI Procedure-2 (EDG) (2) 1907 N P NS 349 NS NS 233 NS NA NA NA NA 10 7.33
3A04D Sterile Supply Room (GI) 406 P P NS 46 NS NS 0 NS NA NA NA NA 4 6.80
3A04G GI Procedure-3 (Bronch Room) 1720 N N NS 213 NS NS 406 NS 482 NA NA NA 12 14.16
3B10A OR 1 3937 P P NS 1514 NS NS 859 NS NA NA NA NA 20 23.07
3B10D OR 2 4196 P P NS 1652 NS NS 818 NS NA NA NA NA 20 23.63
3B10I OR Sterile Supply 876 P P NS 68 NS NS 53 NS NA NA NA NA 4 4.66
3B10J OR Equip Storage 3704 P P NS 323 NS NS 180 NS NA NA NA NA 4 5.23
Notes: (1) Actual: Room 3A14 is the restroom. Room is negative to the corridor.
(2) 3A04A and 3A04B GI procedure (EDG): Insufficient exhaust air flow. Insufficient air change rate.
Fresno, CA 93703
AIR CHANGES
ACTUAL
357 East Arrow Highway Suite 206 San Dimas, CA 91773
(714) 637-3500
25007
2/7/2025
A. Plyavinsh, J. BuenoVA Fresno Critical Room Recertification 2025 accounts Image accounts
Job Name: Technician:
Job Location:
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
RM # ROOM NAME (CU.FT.) REQ. ACT. PLAN ACT. CFM +/- PLAN ACT. CFM +/- PLAN ACT CFM +/- AC/HR AC/HR
3B10K OR 4 6851 P P NS 2,304 N/S NS 1,507 NS NA NA NA NA 20 20.17
3B10M OR 3 3574 P P NS 1461 NS NS 1011 NS NA NA NA NA 20 24.54
4A45 Sterile Supply Room (ENT) (1) 480 P P NS 94 NS NS 0 NS NA NA NA NA 4 11.75
4A26 Sterile Supply Room (Urology ambulatory) 1280 P P NS 176 NS NS 0 NS NA NA NA NA 4 8.25
4A27 Sterile Supply Room ( Surgical Clinic) 684 P P NS 103 NS NS 0 NS NA NA NA NA 4 9.04
4B39 Sterile Supply Room (Dermatology) 416 P P NS 66 NS NS 0 NS NA NA NA NA 4 9.52
4B46L Sterile Supply Room (Women's Clinic) 577 P P NS 147 NS NS 66 NS NA NA NA NA 4 15.29
5A28 Isolation Room 1804 N N NS 140 NS NS 580 NS NA NA NA NA 12 19.29
5A29 Ante Room 384 N N NS 102 NS NS 0 NS NA NA NA NA 10 15.94
5A30 Isolation Room 1500 N N NS 287 NS NS 697 NS NA NA NA NA 12 27.88
5B19 Isolation Room 1961 N N NS 246 NS NS 600 NS NA NA NA NA 12 16.06
5B19.1 Ante Room 393 N N NS 67 NS NS NA NS NA NA NA NA 10 10.23
5B20 Isolation Room 1260 N N NS 172 NS NS 579 NS NA NA NA NA 12 27.56
5B20.1 Ante Room 407 N N NS 68 NS NS NA NS NA NA NA NA 10 10.02
B1B04 Gross Specimen Holding Area (2) 1120 N N NS NA NS NS 0 NS NA NA NA NA 6 0.00
B1B04A Autopsy 1728 N N NS 304 NS NS 741 NS NA NA NA NA 12 25.73
(3)
B1B05 Soiled Laundry Receiving and Sorting Room 5413 N P NS 608 NS NS 902 NS NA NA NA NA 6 10.00
B1B16B Clean Laundry Storage Room 1180 P P NS 293 NS NS 0 NS NA NA NA NA 4 14.90
Notes: (1) 4A45 Sterile Supply Room (ENT): Exhaust register is covered by tape. Zero flow reading.
(2) No outlets installed in room.
(3) Insufficient exhaust flow.
Fresno, CA 93703
AIR CHANGES
ACTUAL
357 East Arrow Highway Suite 206 San Dimas, CA 91773
(714) 637-3500
25007
2/7/2025
A. Plyavinsh, J. BuenoVA Fresno Critical Room Recertification 2025 accounts Image accounts
Job Name: Technician:
Job Location:
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
RM # ROOM NAME (CU.FT.) REQ. ACT. PLAN ACT. CFM +/- PLAN ACT. CFM +/- PLAN ACT CFM +/- AC/HR AC/HR
B1B16 Laundry Room-Clean Side 18176 P P NS 4,886 NS NS 2832 NS NA NA NA NA 4 16.13
2C06K Infusion Clinic (1) 5463 N P NS 1,056 NS NS 460 NS NA NA NA NA 6 11.60
2C08E Sterile Supply Room (Cardiology) (2) 648 P P NS 31 NS NS 22 NS NA NA NA NA 4 2.87
2C15F Sterile Supply Room (Eye Clinic) (2) 1020 P P NS 23 NS NS 20 NS NA NA NA NA 4 1.35
3C10W Sterile Supply Room (Dental) 720 P N NS #REF! NS NS #REF! NS NA NA NA NA 4 #REF!
SO-G8 Isolation Room (B1C10) 1146 N N NS 181 NS NS 412 NS NA NA NA NA 12 21.57
SO-G9 Isolation Room (B1C11) 1146 N N NS #REF! NS NS #REF! NS NA NA NA NA 12 #REF!
Notes: (1) Insufficient exhaust flow. Insufficient air change rate. At time of test T-Stat set point is 55F.
(2) Insufficient supply flow. Insufficient air change rate.
Fresno, CA 93703
AIR CHANGES
ACTUAL
357 East Arrow Highway Suite 206 San Dimas, CA 91773
(714) 637-3500
25007
2/7/2025
A. Plyavinsh, J. BuenoVA Fresno Critical Room Recertification 2025 accounts Image accounts
REQUIRED ACTUAL
DELTA PRESS. DELTA PRESS. WHERE TAKEN
TO ADJACENT TO ADJACENT COMMENTS
ROOM (INCHES W.C) ROOM (INCHES W.C) AN/OR DATA
2A09C ( + ) 0.001" ( + ) 0.0031"
3A014 ( + ) 0.001" ( - ) 0.0012" (1)
3A02E(West) ( + ) 0.001" ( - ) 0.0028" (6)
3A02E(East) ( + ) 0.001" ( + ) 0.0179" (2)
3A04A ( - ) 0.001" ( - ) 0.0014" (3)
3A04B ( - ) 0.001" ( + ) 0.0031" (4)
3A04D ( + ) 0.001" ( + ) 0.0026" (5)
3A04G ( - ) 0.001" ( - ) 0.0048"
3B10A ( ++ ) 0.02" ( + ) 0.0257"
3B10D ( ++ ) 0.02" ( + ) 0.0292"
3B10I ( + ) 0.001" ( + ) 0.00136"
3B10J ( + ) 0.001" ( + ) 0.00246"
3B10K ( ++ ) 0.02" (+) 0.0204"
3B10M ( ++ ) 0.02" (+) 0.0258""
4A45 ( + ) 0.001" ( + ) 0.0044"
4A26 ( + ) 0.001" ( + ) 0.0007"
4A27 ( + ) 0.001" ( + ) 0.0001"
Notes:
(2) 3A02E (EAST): Room is positive to the ramp ( + )0.0268"
(3) 3A04A GI Procedure-1 (EDG): Insufficient exhaust air flow.
(4) 3A04B GI procedure-2 (EDG): Insufficient exhaust air flow.
Room is positively pressurized, designed to be negative.
(5) 3A04D Sterile Supply Room (GI): Insufficient (zero flow reading) exhaust air flow.
GI Procedure-2 (EDG)
(1) Actual: Room 3A14 is the restroom. Room is negative to corridor.
OR Equip Storage
OR4
Ultrasound #1
Restroom
Clean Storage Eq. Rm West
Clean Storage East
GI Procedure-1 (EDG)
Sterile Supply Room (GI)
GI Procedure-3 (Brunch Room)
OR1
OR2
OR3
OR Sterile Supply
Sterile Supply Room (ENT)
TEST AND BALANCE
VA Fresno Critical Room Recertification 2025
A. Plyavinsh, J. Bueno
ROOM
NO. # NAME
Sterile Supply Room (Urology ambulatory)
(6) The room is negatively pressurized to the corridor and is designed to be positive.
Ster. Supply Rm (Surg. Clinic) accounts Image accounts
REQUIRED ACTUAL
DELTA PRESS. DELTA PRESS. WHERE TAKEN
TO ADJACENT TO ADJACENT COMMENTS
ROOM (INCHES W.C) ROOM (INCHES W.C) AN/OR DATA
4A55 ( + ) 0.001" ( - ) 0.0032" (7)
4B39 ( + ) 0.001" ( + ) 0.0036"
4B46L ( + ) 0.001" ( + ) 0.0064"
5A28 ( - ) 0.001" ( - ) 0.0917"
5A29 ( - ) 0.001" ( - ) 0.0508" (8)
5A30 ( - ) 0.001" ( - ) 0.0743"
5B19 ( - ) 0.001" ( - ) 0.0248"
5B19.1 ( ) 0.001" ( - ) 0.0110" (9)
5B20 ( -- ) 0.001" ( - ) 0.0373"
5B20.1 ( ) 0.001" ( - ) 0.0130" (10)
B1B04 ( - ) 0.001" ( - ) 0.0040"
B1B04A ( - ) 0.001" ( - ) 0.108"
B1B05 ( - ) 0.001" ( + ) 0.0021" (11)
Notes:
(8) 5A29: The ante room is positive in relation to the isolation room 5A28 (0.0449"); positive in relation to the isolation room 5A30 (0.0276") and negative in relation to the corridor.
(9) 5B19.1: The ante room is positive in relation to the isolation room (0.0220") and negative
(10) 5B20.1: The ante room is positive in relation to the isolation room (0.0290") and negative in relation to the corridor ( - )0.0130".
(11) B1B05 Soiled Laundry: Space is open to laundry. Space is positively pressurized to corridor. Designed to be negative.
(7) 4A55 Sterile supply room: No registers installed. No ductwork above the ceiling.
5A29: Readings on pressure monitor reads is fluctuating, cannot be calibrated.
in relation to the corridor ( - )0.0110".
Soiled Lndr. Receive and Sort Rm
Autopsy
Sterile Supply Room (Podiatry)
Sterile Supply Room (Dermat.)
4B46L Ster. Supply Rm (Wom. Clin.)
Isolation Room
Ante
Isolation Room
Isolation Room
Ante
Isolation Room
Ante
Gross Specimen Holding Area
TEST AND BALANCE
VA Fresno Critical Room Recertification 2025
A. Plyavinsh, J. Bueno
ROOM
NO. # NAME
accounts Image accounts
REQUIRED ACTUAL
DELTA PRESS. DELTA PRESS. WHERE TAKEN
TO ADJACENT TO ADJACENT COMMENTS
ROOM (INCHES W.C) ROOM (INCHES W.C) AN/OR DATA
B1B16 ( + ) 0.001" ( + ) 0.0103"
B1B16B ( + ) 0.001" ( + ) 0.0512"
2C06K ( - ) 0.001" ( + ) 0.0088" (12)
2C08E ( + ) 0.001" ( + ) 0.0005"
2C15F ( + ) 0.001" ( + ) 0.0005"
3C10W ( + ) 0.001" ( - ) 0.0047" (13)
SOG8 ( -- ) 0.001" ( - ) 0.0026"
SOG9 ( -- ) 0.001" ( - ) 0.0542"
Notes:
(12) 2C06K Infusion clinic: Room is positive in relation to the corridor. Insufficient air change rate. Insufficient exhaust air flow. Condition: VAV on auto. Temperature Set Point (70F.)
Room is negative in relation to the corridor ( - )0.0003" W.C.).
(13) 3C10W Sterile Supply Rm(Dental): Room is negatively pressurized to corridor. Designed to be positive.
Isolation Room
Isolation Room
Sterile Supply Rm(Dental)
TEST AND BALANCE
VA Fresno Critical Room Recertification 2025
A. Plyavinsh, J. Bueno
ROOM
NO. # NAME
Laundry Room-Clean Side
Clean Laundry Storage Room
Infusion Clinic
Sterile Supply Rm (Cardiol.)
Sterile Supply Rm(Eye Clinic) accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2A09C / Sterile Supply Room 1 24" x 24" 1.00 CD NS * 196 *
Total NS 196
Exhaust 2A09C / Sterile Supply Room E - 1 24" x 24" 1.00 EG NS * 57 *
Total NS 57
( + ) 139
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A014 / Restroom 1 12" x 12" 1.00 CD NS * 75 *
Total NS 75
Exhaust 3A014 / Restroom E - 1 12" x 12" 1.00 EG NS * 85 *
Total NS 85
( - ) 10
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A02E / Clean Storage (East) 1 5.5" x 9.5" 1.00 SWSG NS * 75 *
2 5.5" x 9.5" 1.00 SWSG NS * 219 *
3 5.5" x 9.5" 1.00 SWSG NS * 204 *
Total NS 498
( + ) 498
Supply 3A02E / Clean Storage 1 5.5" x 19.5" 1.00 SWSG NS * 194 *
Equip. Room (West) 2 5.5" x 19.5" 1.00 SWSG NS * 119 *
Total NS 313
( + ) 313
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A04A / GI Procedure-1 (EDG) 1 24" x 24" 1.00 CD NS * 136 *
Total NS 136
Exhaust 3A04A / GI Procedure-1 (EDG) E - 1 24" x 24" 1.00 EG NS * 156 *
Total NS 156
( - ) 20
Notes:
AIR TYPE ROOM OUTLET SIZE TYPE
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A04B / GI Procedure-1 (EDG) 1 24" x 24" 1.00 CD NS * 349 *
Total NS 349
Exhaust 3A04B / GI Procedure-1 (EDG) E - 1 24" x 24" 1.00 EG NS * 233 *
Total NS 233
( + ) 116
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A04D / Sterile Supply Room (GI) 1 24" x 24" 1.00 CD NS * 46 *
Total NS 46
Exhaust 3A04D / Sterile Supply Room (GI) E - 1 24" x 24" 1.00 EG NS * 0 *
Total NS 0 (1)
( + ) 46
Notes:
(1) As of 1/27/2025: Still Zero flow reading from exhaust register. No access to verify if duct is connected
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3A04G / GI Proced-3 (Bronch Rm) 1 24" x 24" 1.00 CD NS * 213 *
Total NS 213
Exhaust 3A04G / GI Proced-3 (Bronch Rm) E - 1 24" x 24" 1.00 EG NS * 0 *
Total NS 0
E(HEPA) 3A04G / GI Proced-3 (Bronch Rm) E - 2 24" x 48" 1.00 HEPA NS * 406 *
Total NS 406
( - ) 193
Notes:
NOTES
CFM DIFFERENTIAL
DESIGN ACTUAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10A OR1 1 25" x 20" 1.066 HEPA NS * 130 122
3B10A OR1 2 25" x 20" 1.066 HEPA NS * 133 125
3B10A OR1 3 25" x 20" 1.066 HEPA NS * 130 122
3B10A OR1 4 25" x 20" 1.066 HEPA NS * 127 119
3B10A OR1 5 25" x 20" 1.066 HEPA NS * 129 121
3B10A OR1 6 25" x 20" 1.066 HEPA NS * 127 119
3B10A OR1 7 25" x 20" 1.066 HEPA NS * 126 118
3B10A OR1 8 25" x 20" 1.066 HEPA NS * 124 116
3B10A OR1 9 25" x 20" 1.066 HEPA NS * 120 113
3B10A OR1 10 25" x 20" 1.066 HEPA NS * 123 115
3B10A OR1 11 25" x 20" 1.066 HEPA NS * 124 116
3B10A OR1 12 25" x 20" 1.066 HEPA NS * 122 114
Total 1646 1514 92%
Exhaust 3B10A OR1 E - 1 12" x 21.5" 1.00 EG NS * 137 *
3B10A OR1 E - 2 12" x 21.5" 1.00 EG NS * 93 *
3B10A OR1 E - 3 12" x 21.5" 1.00 EG NS * 316 *
3B10A OR1 E - 4 12" x 21.5" 1.00 EG NS * 313 *
Total NS 859
( + ) 655
Notes:
NOTES
CFM DIFFERENTIAL
DESIGN ACTUAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10D OR2 1 25" x 20" 1.066 HEPA NS * 145 136
3B10D OR2 2 25" x 20" 1.066 HEPA NS * 147 138
3B10D OR2 3 25" x 20" 1.066 HEPA NS * 144 135
3B10D OR2 4 25" x 20" 1.066 HEPA NS * 142 133
3B10D OR2 5 25" x 20" 1.066 HEPA NS * 135 127
3B10D OR2 6 25" x 20" 1.066 HEPA NS * 144 135
3B10D OR2 7 25" x 20" 1.066 HEPA NS * 133 125
3B10D OR2 8 25" x 20" 1.066 HEPA NS * 135 127
3B10D OR2 9 25" x 20" 1.066 HEPA NS * 139 130
3B10D OR2 10 25" x 20" 1.066 HEPA NS * 117 110
3B10D OR2 11 25" x 20" 1.066 HEPA NS * 134 126
3B10D OR2 12 25" x 20" 1.066 HEPA NS * 136 128
Total 1608 1652 103%
Exhaust 3B10D OR2 E - 1 12" x 21.5" 1.00 EG NS * 116 *
3B10D OR2 E - 2 12" x 21.5" 1.00 EG NS * 137 *
3B10D OR2 E - 3 12" x 21.5" 1.00 EG NS * 535 *
3B10D OR2 E - 4 12" x 21.5" 1.00 EG NS * 30 *
Total NS 818
( + ) 834
Notes:
NOTES
CFM DIFFERENTIAL
DESIGN ACTUAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10I / OR Sterile Supply 1 8" x 8" 1.00 CD NS * 68 *
Total NS 68
Exhaust 3B10I / OR Sterile Supply E - 1 11" x 11" 1.00 EG NS * 53 *
Total NS 53
( + ) 15
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10J / OR Equip Storage 1 14.5" x 14.5" 1.00 CD NS * 147 *
2 14.5" x 14.5" 1.00 CD NS * 176 *
Total NS 323
Exhaust 3B10J / OR Equip Storage E - 1 14" x 14" 1.00 ER NS * 180 *
Total NS 180
( + ) 143
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10K OR4 1 54.25" x 21.25" 1.066 HEPA NS * 256 240
3B10K OR4 2 54.25" x 21.25" 1.066 HEPA NS * 281 264
3B10K OR4 3 54.25" x 21.25" 1.066 HEPA NS * 365 342
3B10K OR4 4 54.25" x 21.25" 1.066 HEPA NS * 220 206
3B10K OR4 5 54.25" x 21.25" 1.066 HEPA NS * 286 268
3B10K OR4 6 54.25" x 21.25" 1.066 HEPA NS * 272 255
3B10K OR4 7 54.25" x 21.25" 1.066 HEPA NS * 205 192
3B10K OR4 8 54.25" x 21.25" 1.066 HEPA NS * 196 184
3B10K OR4 9 35.25" x 21.25" 1.066 HEPA NS * 81 76
3B10K OR4 10 35.25" x 21.25" 1.066 HEPA NS * 143 134
Total NS 2,304 (1)
Exhaust 3B10K OR4 1 21.25" x 11.25" 1.00 SWEG NS * 359 *
3B10K OR4 2 21.25" x 11.25" 1.00 SWEG NS * 369 *
3B10K OR4 3 21.25" x 11.25" 1.00 SWEG NS * 405 *
3B10K OR4 4 21.25" x 11.25" 1.00 SWEG NS * 374 *
Total NS 1,507
( + ) 797
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3B10M OR3 1 25" x 20" 1.066 HEPA NS * 120 113
3B10M OR3 2 25" x 20" 1.066 HEPA NS * 123 115
3B10M OR3 3 25" x 20" 1.066 HEPA NS * 130 122
3B10M OR3 4 25" x 20" 1.066 HEPA NS * 117 110
3B10M OR3 5 25" x 20" 1.066 HEPA NS * 122 114
3B10M OR3 6 25" x 20" 1.066 HEPA NS * 124 116
3B10M OR3 7 25" x 20" 1.066 HEPA NS * 116 109
3B10M OR3 8 25" x 20" 1.066 HEPA NS * 120 113
3B10M OR3 9 25" x 20" 1.066 HEPA NS * 118 111
3B10M OR3 10 25" x 20" 1.066 HEPA NS * 116 109
3B10M OR3 11 25" x 20" 1.066 HEPA NS * 125 117
3B10M OR3 12 25" x 20" 1.066 HEPA NS * 130 122
Total 1631 1461 90% (1)
Exhaust 3B10M OR3 E - 1 12" x 23" 1.00 EG NS * 131 *
3B10M OR3 E - 2 12" x 23" 1.00 EG NS * 76 *
3B10M OR3 E - 3 12" x 23" 1.00 EG NS * 496 *
3B10M OR3 E - 4 12" x 23" 1.00 EG NS * 308 *
Total NS 1011
( + ) 450
Notes:
(1) Room has 24.54 ACH
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4A26 / Sterile Supply Rm 1 24" x 24" 1.00 CD NS * 176 *
(Urology ambulatory) Total NS 176
Exhaust 4A26 / Sterile Supply Rm (Urol.) E - 1 24" x 24" 1.00 EG NS * 0 *
RET Total NS 0
( + ) 176
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4A27 / Strl Supply Rm (Cl.Sgr.) 1 24" x 24" 1.00 CD NS * 103 *
Total NS 103
Exhaust 4A27 / Strl Supply Rm (Cl.Sgr.) E - 1 24" x 24" 1.00 EG NS * 0 *
RET Total NS 0
( + ) 103
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4A45 / Sterile Supply Room (ENT) 1 7.5" x 7.5" 1.00 CD NS * 94 *
Total NS 94
Exhaust 4A45 / Sterile Supply Room (ENT) E - 1 10" x 10" 1.00 EG NS * 0 *
Total NS 0 (1)
( - ) -94
Notes:
(1) Exhaust register is covered by tape. Zero flow reading.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4A55 / Sterile Supply Rm (Pdtr) 1 NS NS CD NS * 0 *
Total NS 0
Exhaust 4A55 / Sterile Supply Rm (Pdtr) E - 1 NS NS EG NS * 0 *
Total NS 0
(+ - ) 0
Notes:
(1) There are no outlets in the room. Room is negative to corridor.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4B39 Sterile Supply Rm (Derm.) 1 11" x 11" 1.00 CD NS * 66 *
Total NS 66
Exhaust 4B39 Sterile Supply Rm (Derm.) E - 1 8" x 8" 1.00 EG NS * 0 *
Total NS 0
( - ) -66
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 4B46L / Ster. Supply Rm (Wom. Clin.) 1 14" x 14" 1.00 CD NS * 147 *
Total NS 147
Exhaust 4B46L / Ster. Supply Rm (Wom. Clin.) E - 1 8" x 8" 1.00 EG NS * 66 *
Total NS 66
( + ) 81
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5A28 / Isolation Room 1 24" x 24" 1.00 CD NS * 140 *
Total NS 140
Exhaust 5A28 / Isolation Room E - 1 37" x 2.5" 0.44 SWEG NS * 457 1038 (1)
E - 2 13" x 13" 1.00 EG NS * 123 *
Total NS 580
( - ) 440
Notes:
(1) Register is served by negative room pressure system.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5A29 / Ante 1 7.5" x 7.5" 1.00 CD NS * 102 *
Total NS 102
( + ) 102
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5A30 / Isolation Room 1 24" x 24" 1.00 CD NS * 287 *
Total NS 287
Exhaust 5A30 / Isolation Room E - 1 37" x 2.5" 0.44 SWEG NS * 697 1584 (1)
5A30 / Isolation Room E - 2 13" x 13" 1.11 SWEG NS 0 0
Total NS 697
( - ) 410
Notes:
(1) Register is served by negative room pressure system.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5B19 / Isolation Room 1 13.25" x 13.25" 1.00 CD NS * 109 *
2 13.25" x 13.25" 1.00 CD NS * 137 *
Total NS 246
Exhaust 5B20 / Isolation Room E - 1 37" x 2.25" 0.38 SWEG NS * 600 1578
Total NS 600 (1)
( - ) 354
Notes:
(1) Register is served by negative room pressure system
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5B19.1 Ante 1 11.25" x 11.25" 1.00 CD NS * 67 *
Total NS 67
( + ) 67
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5B20 / Isolation Room 1 13.25" X 13.25" 1.00 CD NS * 172 *
2 13.25" X 13.25" 1.00 CD NS * 0 * (1)
Total NS 172
Exhaust 5B20 / Isolation Room E - 1 37" X 2.25" 0.38 SWEG NS * 579 1523 (2)
Total NS 579
( - ) 407
Notes:
(1) Supply register is capped by mechanical contractor. Zero CFM reading.
(2) Register is served by negative room pressure system
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 5B20.1 Ante 1 11.25" x 11.25" 1.00 CD NS * 68 *
Total NS 68
( + ) 68
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Exhaust B1B04 / Gross Specimen Hold. Area 1 NS NS EG NS * NS *
Total NS NS
( +- ) NS
Notes:
(1) Room has no outlets.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply B1B04A / Autopsy 1 9.5" x 9.5" 1.00 SWSG NS * 229 *
2 9.5" x 9.5" 1.00 SWSG NS * 75 *
Total NS 304
Exhaust B1B04A / Autopsy E - 1 10" x 13" 1.00 SWEG NS * 280 *
E - 2 10" x 13" 1.00 SWEG NS * 248 *
E - 3 10" x 13" 1.00 SWEG NS * 213 *
Total NS 741
( - ) 437
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply B1B05 / Soiled Lndr Rcvng and Srtng Rm S - 1 34" x 11" 2.34 SWG NS * 400 171
S - 2 34" x 11" 2.34 CD NS * 208
S - 3 26" x 8" 1.00 SWG NS 0
Total NS 608
Exhaust B1B05 / Soiled Lndr Rcvng and Srtng Rm E - 1 24" x 24" 1.00 SWEG NS * 902
Total NS 902
( - ) 294
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply B1B16 / Laundry Room-Clean Side 1 24" x 24" 1.00 CD NS * 358 *
B1B16 / Laundry Room-Clean Side 2 24" x 24" 1.00 CD NS * 358 *
B1B16 / Laundry Room-Clean Side 3 24" x 24" 1.00 CD NS * 282 *
B1B16 / Laundry Room-Clean Side 4 24" x 24" 1.00 CD NS * 270 *
B1B16 / Laundry Room-Clean Side 5 24" x 24" 1.00 CD NS * 262 *
B1B16 / Laundry Room-Clean Side 6 24" x 24" 1.00 CD NS * 397 *
B1B16 / Laundry Room-Clean Side 7 24" x 24" 1.00 CD NS * 173 *
B1B16 / Laundry Room-Clean Side 8 24" x 24" 1.00 CD NS * 161 *
B1B16 / Laundry Room-Clean Side 9 24" x 24" 1.00 CD NS * 181 *
B1B16 / Laundry Room-Clean Side 10 24" x 24" 1.00 CD NS * 0 * (1)
B1B16 / Laundry Room-Clean Side 11 24" x 24" 1.00 CD NS * 902 *
B1B16 / Laundry Room-Clean Side 12 24" x 24" 1.00 CD NS * 0 * (1)
B1B16 / Laundry Room-Clean Side 13 34" x 24" 1.00 SG NS * 58 *
B1B16 / Laundry Room-Clean Side 14 6"DIA 1.00 SG NS * 544 *
B1B16 / Laundry Room-Clean Side 15 6"DIA 1.00 SG NS * 204 *
B1B16 / Laundry Room-Clean Side 16 6"DIA 1.00 SG NS * 323 *
B1B16 / Laundry Room-Clean Side 17 6"DIA 1.00 SG NS * 275 *
B1B16 / Laundry Room-Clean Side 18 6"DIA 1.00 SG NS * 138 *
Total NS 4,886
Exhaust B1B16 / Laundry Room-Clean Side E - 1 32" x 24" 1.00 EG NS * 921 *
E - 2 32" x 24" 1.00 EG NS * 844 *
E - 3 32" x 24" 1.00 EG NS * 848 *
E - 4 32" x 24" 1.00 EG NS * 503 *
E - 5 32" x 24" 1.00 EG NS * 0 * (1)
Total NS 3,116
( + ) 1,770
Notes:
(1) Register is disconnected from the system.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply B1B16B / Clean Laundry Storage 1 18" x 7" 1.00 SWSG NS * 88 *
B1B16B / Clean Laundry Storage 2 8" x 7" 1.00 SWSG NS * 205 *
Total 293
( + ) 293
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2C06K / Infusion ClB14:B37inic 1 24" x 24" 1.00 CD NS * 33 *
T-STAT 2C06K / Infusion ClB14:B37inic 2 24" x 24" 1.00 CD NS * 60 *
AT 70F. 2C06K / Infusion ClB14:B37inic 3 24" x 24" 1.00 CD NS * 68 *
2C06K / Infusion ClB14:B37inic 4 24" x 24" 1.00 CD NS * 71 *
Total 232
Exhaust 2C06K / Infusion Clinic E - 1 24" x 24" 1.00 EG NS * 125 *
2C06K / Infusion Clinic E - 2 24" x 24" 1.00 EG NS * 68 *
2C06K / Infusion Clinic E - 3 24" x 24" 1.00 EG NS * 135 *
2C06K / Infusion Clinic E - 4 24" x 24" 1.00 EG NS * 148 *
Total 476 (1)
( - ) 244
Supply 2C06K / Infusion Clinic 1 24" x 24" 1.00 CD NS * 137 *
T-STAT 2C06K / Infusion Clinic 2 24" x 24" 1.00 CD NS * 254 *
AT 55F. 2C06K / Infusion Clinic 3 24" x 24" 1.00 CD NS * 303 *
2C06K / Infusion Clinic 4 24" x 24" 1.00 CD NS * 362 *
Total 1,056
Exhaust 2C06K / Infusion Clinic E - 1 24" x 24" 1.00 EG NS * 130 *
2C06K / Infusion Clinic E - 2 24" x 24" 1.00 EG NS * 78 *
2C06K / Infusion Clinic E - 3 24" x 24" 1.00 EG NS * 148 *
2C06K / Infusion Clinic E - 4 24" x 24" 1.00 EG NS * 104 *
Total 460
( + ) 596 (2)
Notes:
(1) Room is serving by VAV. Negative to the corridor: ( - )0.0003".
(2) Room is serving by VAV. Negative to the corridor: ( + )0.0088".
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2C08E / Sterile Supply Rm (Cardiol.) 1 24" x 24" 1.00 CD NS * 31 *
Total NS 31
Exhaust 2C08E / Sterile Supply Rm (Cardiol.) E - 1 24" x 24" 1.00 EG NS * 22 *
Total NS 22
( + ) 9
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2C15F / Sterile Supply Rm(Eye Clinic) 1 24" x 24" 1.00 CD NS * 23 *
Total NS 23
Exhaust 2C15F / Sterile Supply Rm(Eye Clinic) E - 1 7" x 7" 1.00 EG NS * 20 *
Total NS 20
( + ) 3
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 3C10W / Sterile Supply Rm (Dental) 1 24" X 24" 1.00 CD NS * 38 *
Total NS 38
Exhaust 3C10W / Sterile Supply Rm (Dental) E - 1 7" X 7" 1.00 DO NS * 133 * (1)
Total NS 133
( - ) 95
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
(1) Supply diffuser installed instead exhaust grill
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply SOG8 / Isolation Room 1 12" X 12" 1.00 CD NS * 181 *
Total NS 181
Exhaust SOG8 / Isolation Room E - 1 18" X 18" 1.00 EG NS * 412 * (1)
Total NS 412
( - ) 231
Notes:
(1) Register is served by negative room pressure system. At time of TAB: MedAir System at high speed.
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply SOG9 / Isolation Room 1 12" X 12" 1.00 CD NS * 141 *
Total NS 141
Exhaust SOG9 / Isolation Room E - 1 18" X 18" 1.00 EG NS * 548 * (1)
Total NS 548
( - ) 407
Notes:
DESIGN ACTUAL
NOTES
CFM DIFFERENTIAL
(1) Register is served by negative room pressure system. At time of TAB: MedAir System at high speed.
VA Fresno Critical Room Recertification 2025
Job No.: 25007
Date: 2/7/2025
AIR TYPE ROOM OUTLET SIZE TYPE
accounts Image accounts
(1) 3C17G Same Day Procedure Room-2:
(2) 3C17H Same Day Procedure Room-1:
(3) 3C17J PACU Post Surgical Revovery Unit:
(4) B1B-1 Emergency Department Waiting Area:
(5) SOG1A Emergency Department Exam Room SO-G COR 1A:
(6) SOG1B Emergency Department Exam Room SO-G COR 1B:
(7) SO3G Emergency Department Exam Room SO-G 3:
(8) SO3G4 Trauma (Small) B1C06:
(9) SO3G5 Trauma (Large) B1C07:
(10) SO3G7 Oberservation/Treatment B1C09:
(11) Room has 4.45 ACH with a design of 6 ACH. Insufficient supply flow. Insufficient air changes.
Room has 10.12 ACH with a design of 6 ACH. Room is positive to the corridor and is designed to be negative.
Insufficient exhaust flow.
Room has 5.94 ACH with a design of 6 ACH. Insufficient supply flow. Insufficient air changes.
SOG10 Oberservation/Treatment B1C12:
Room has 4.02 ACH with a design of 6 ACH. The room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 4.08 ACH with a design of 12 ACH. The room is negatively pressurized to the ER Entrance and is designed to be negative. Insufficient exhaust flow.
Room has 4.66 ACH with a design of 6 ACH. Insufficient supply flow.
Room has 2.96 ACH with a design of 6 ACH. Insufficient supply flow.
Room has 4.83 ACH with a design of 15 ACH. Insufficient supply flow.
Room has 13.86 ACH with a design of 6 ACH. Room is positive to the corridor and is designed to be negative.
Insufficient exhaust flow.
Room has 7.05 ACH with a design of 15 ACH. The room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
Room has 12.35 ACH with a design of 15 ACH. The room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
357 East Arrow Highway Suite 206
San Dimas, CA 91773
(714) 637-3500
Report Summary
PROJECT: VA Fresno Critical Room Recertification 2025 accounts Image accounts
(12) SOG11 Operation/Treatment B1C13:
(13) SOG12 Operation/Treatment B1C14:
(14) SOG14 Observation/Treatment B1C22:
(15) SOG15 Obersvation/Treatment B1C23:
(16)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .