This is a Questions and Answers document for Amendment 0002 of a VA air testing, adjusting, and balancing (TAB) service solicitation, along with supporting reference TAB reports from 2018 and 2025.
The Q&A clarifies key contract requirements for ongoing TAB services at the VA Fresno facility. The scope includes adjusting HVAC systems to meet VA Design Manual criteria for air exchange rates and pressure differentials, with a separate $40,000 annual funding allocation for repairs only—adjustments are included in base service costs. TAB work must be performed outside normal business hours (M-F 7am-5pm), with special considerations for sensitive clinical areas (Operating Rooms, ICU, PACU, isolation rooms, morgue) where no work may occur during surgical cases. A VA escort will be provided for all work, and infection control standards must be strictly enforced in high-risk areas, including use of personal protective equipment and containment measures. The contractor must engage controls contractors if BAS adjustments are needed. Reports must include formal structure (title page, table of contents, executive summary, deficiency listings, summary tables with minimum and actual values, and technician/equipment certifications). Pricing should be quoted for annual services, though invoicing may be broken into quarterly intervals paid in arrears. Service deficiencies unrelated to physical HVAC system issues (such as unprofessional conduct or workmanship issues) must be resolved the same business day identified. The VA cannot guarantee accuracy of mechanical drawings provided and has no register counts available; contractors should assume systems may be significantly out of balance and require full corrective adjustments. The attached 2018 TAB report (Systems Service Mechanical, NEBB Cert. No. 2938) and 2025 recertification report (Equal Air Balance Company, NEBB Cert. No. 2910) document baseline conditions and current deficiencies across multiple hospital rooms, including insufficient airflow in various clinical spaces, pressure differential issues, and equipment concerns such as capped exhaust registers and disconnected ductwork.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Attachment 3.pdf | ||
| Amendment 0002 - Attachment 1.pdf | ||
| 36C26126Q0321 0002.docx | DOCX document | |
| Amendment 0002 - Attachment 2.pdf | ||
| 36C26126Q0321 0001.docx | DOCX document | |
| ATTACHMENT 2 - Room Schedule Air Test Adjust and Balance.pdf | ||
| 36C26126Q0321.docx | DOCX document | |
| ATTACHMENT 1 - Quality Assurance Surveillance Plan.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – Amendment 0002
1. Baseline System Conditions - Are current airflow, ACH, and pressure readings available for the listed spaces, or should contractors assume systems are significantly out of balance and require full corrective adjustments?
The most recent previous TAB report is attached (Amendment 0002 - Attachments 1, 2, and 3); however, it is not inclusive of all spaces included in the PWS as additional rooms have been added under this requirement. A limited number of additional balance reports, generated at the conclusion of construction for rooms in newer buildings, have also been provided for reference. For spaces not included in the most recent TAB, the government cannot assure the current balance condition.
1. Extent of TAB Responsibilities - Is the contractor’s responsibility limited to testing and reporting, or does the scope require full corrective balancing, including damper adjustments, VAV recalibration, and diffuser modifications where required to meet design criteria?
The scope includes adjusting the air conveyance system as necessary to meet the VA HVAC Design Manual criteria for air exchange rate and pressure criteria. A separate funding line-item allocation of $40,000 per year is included to address repairs that may be required to meet the criteria. Refer to Section 5 of the PWS. This allocation is for repairs only, not adjustments which are to be included in the base service cost.
1. System Deficiencies Outside TAB Control - In cases where deficiencies are related to controls issues, failed actuators, or mechanical limitations beyond TAB scope, should these conditions be documented only, or is corrective action expected under this contract?
A separate funding line-item allocation of $40,000 per year is included to address repairs that may be required to meet the air balancing criteria. Refer to Section 5 of the PWS. This allocation is for repairs only, not adjustments which are to be included in the base service cost.
1. Access, Scheduling, and Infection Control Requirements - For sensitive clinical areas such as Operating Rooms, Isolation Rooms, ICU, PACU, Decontamination Areas, and the Morgue, are there defined work windows (after-hours/weekends), escort requirements, or Infection Control Risk Assessment (ICRA) protocols that contractors must account for?
Per section 8.12 “The services of this contract will be performed outside of normal business hours” Business hours being defined as M-F 7am to 5pm. The Operating Room typically concludes weekday cases prior to 5pm, however emergency cases or extended surgeries may require a deferred start time in the OR specifically if TAB work is attempted during the week. The OR currently does not schedule surgical cases on the weekend. Unplanned emergency cases are occasionally conducted on the weekend. No work may be performed in the OR during a surgical case.
A VA escort will be provided for work being performed in all areas of the hospital. Limited unescorted activity will be permitted when vendor personnel have obtained full background clearance and have been issued an identification badge. Badge information is specified in Section 17 of the PWS.
Infection Control Standards will be strictly enforced in high-risk areas of the hospital such as the OR, PACU, ICU and other clinical or sensitive areas. Infection Control requirements will include but not be limited to use of covered tool carts, personal protective attire (bunny suites, shoe covers, beard covers, hair bonnets, masks, etc), containments (if necessary for repair work), and similar prevention strategies. Refer to sections aa of the PWS.
1. Controls and BAS Coordination - Will Building Automation System (BAS) support be provided by the VA during TAB activities, or is the TAB contractor expected to coordinate and troubleshoot controls-related issues to stabilize systems for testing?
If BAS system adjustments are required as part of the balancing adjustments, the TAB contractor will need to engage a controls contractor as necessary to make system adjustments to meet balancing criteria.
1. Reporting Format and Deliverables - Are there specific VA-required TAB report templates, electronic submission standards, or documentation formats that must be used beyond the general requirement for accurate and complete reporting?
The report must have a formal report structure inclusive of a Title page, Table of Contents, and well-organized data sheets, complete with legends, definitions. The report shall include an executive summary and consolidated listing of any deficiencies identified and associated repairs required. Summary Tables depicting minimum and actual values shall be included. The report shall include the certifications of the contractor and each technician performing services under the contract as well as the active calibration certificates for each piece of equipment used in the TAB service.
1. Service Frequency and Pricing Structure - Should pricing be annualized to account for Quarterly, Semi-Annual, and Annual testing frequencies, and may rooms with differing frequencies be grouped within the same mobilization where feasible?
For the purpose of the quote in response to this solicitation, please complete the prices for annual services. For the purpose of invoicing /billing, payments may be broken down to quarterly intervals, with payment made for work performed in arrears. Yes, rooms may be grouped by frequency and performed in the same mobilization.
1. Acceptance Criteria and Allowable Tolerances - Are there defined numerical tolerances for airflow and pressure compliance, and what constitutes acceptable variance prior to requiring corrective action or re-testing?
The VA HVAC Design Manual specifies minimum and maximum criteria for ACH and pressure differential. These are to be achieved along with the 20% buffer for ACH stated in Section 3.6 of the PWS, when possible.
1. Deficiency Resolution Requirements - The QASP requires discrepancies to be resolved on the same business day. Does this requirement apply solely to TAB-related deficiencies, or does it extend to system issues outside the contractor’s direct control?
The deficiencies noted in the QASP are specific to quality-of-service issues identified, not physical deficiencies found with the HVAC system. Service deficiencies may be professional conduct issues, or workmanship issues. For example, if ceiling tiles or access panels are left open when a technician leaves an area or a technician is unprofessional with a VA staff member. These are considered quality of service deficiencies and are expected to be resolved by the awarded contractor the same business day they are identified.
1. Register count/Mechanical drawings - The schedule lacks register counts and mechanical plans.
The VA does not have a register count. Mechanical drawings have been provided for the offeror’s use, however the VA cannot guarantee the accuracy of these drawings, and they shall be used for general reference only.
230593_Testing,_Adjusting,_&_B_Final_TAB_Report_16315258.pdf
CERTIFIED TEST, ADJUST AND
BALANCE REPORT
DATE 7/18/2018
PROJECT Community Living Center Phase I ADDRESS 2615 East Clinton Ave
Fresno, CA. 93793
ARCHITECT Polytech Associates, Inc ADDRESS 235 Pne Street, 17th Floor
San Francisco, CA 94104
PHONE 415 397 3117 FAX 415 397 1517
ENGINEER Mazzetti & Associates ADDRESS 220 Montgomeery Street, Suite 650
San Francisco, CA 94104
PHONE 415 632 3266 FAX
HVAC
CONTRACTOR New England Sheet Metal
ADDRESS 2731 South Cherry Ave.
Fresno, CA 93706
PHONE 559 268 7375 FAX
NEBB TAB FIRM Systems Service Mechanical, Inc.
ADDRESS 39215 Skyline Dr.
Oakhurst, CA. 93644 (559) 779-2634
TAB CERT. NO. 2938
E-MAIL steve@ssmechtab.com mailto:steve.ssmech@sti.net
TABLE of CONTENT
COVER PAGE 1
TOC 2
CERTIFCATION 3
GENERAL NOTES 4
SHOP DRAWING 5-6
AIR APPARATUS REPORT 7
FAN TEST REPORT 8
VAV INOUT REPORT 9-11
INOUT REPORT 12
PUMP TEST & BALANCE REPORT 13-18
INSTRUMENT CERTIFICATION 19-21
ABBREVIATION PAGE 22
Systems Service Mechanical CERTIFICATION PROJECT Community Living Center Phase I ADDRESS 2615 East Clinton Ave
Fresno, CA. 93793
THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENT AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST-ADJUST-BALANCE
REPORT PROJECT SUMMARY.
THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS
HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING,
ADJUSTING BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.
NEBB TAB FIRM
REG. NO. 2938 CERTIFIED BY Steve Santos DATE 7/18/2018
(Air Tab Supervisor)
THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING
BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.
NEBB TAB FIRM
REG. NO. 2938 CERTIFIED BY Steve Santos DATE 7/18/2018
(Hydronic Tab Supervisor)
SUBMITTED & CERTIFIED BY:
NEBB TAB FIRM Systems Service Mechanical, Inc.
TAB SUPERVISOR Steve Santos
REG. NO. 2938 SIGNATURE DATE 7/18/2018
EXP. DATE 3/31/2019
FORM 2 /12.98 PAGE 3
SYSTEMS SERVICE MECHANICAL, INC.
HVAC Test, Adjust and Balancing
39215 Skyline Drive., Oakhurst, CA. 93644 CCL# 669679 Ph (559) 779-2634 Fax (559) 683-6426
NEBB Certified Professional # 2938 steve.ssmech@sti.net
GENERAL NOTES
All VAV boxes were calibrated via EMS program for their maximum / minimum setpoints, distribution after the box was proportionally balanced. Once all boxes calibrated they were forced to cooling max and AH fan speed adjusted to satisfy all zones cooling setpoint, with only two or three boxes damper at 100% open. Duct static pressure set to control VFD.
Outside air damper opened to allow Phase I minimum OSA and ductwork above unit was measured via pitot tube traverse. Return fan tracking speed set when supply fan at operating speed. Return duct distribution proportionally balanced. Supply air and return air totals derived from flowhood tabulation, OSA will not typically equal exactly the difference between SA & RA & OSA reading
EF 2 serving general exhaust was ran and ductwork balanced to the required flows.
Heating pumps serving boilers were reduced down to the design flows from the triple duty valve at inlet to boiler. VFD operating speed remained at 60hz.
Secondary heating pumps were tested per NEBB procedures at full speed and throttling valve was used to verify pumps requirement. Throttling reopen and VFD ran to deliver the required flows to phase I requirement, 36hz
Reheat coils balancing valves were proportionally balanced. Due to seasonal condition boiler was not ran and no heating water and heating air temperatures available.
::::::::::::::::: :: .. ·.·.·.·.··o·····.·.
r•••· ::::/::/:::. :�W}:/
LOOBY
FIREPLACE
FLUE
8"x8"
�V>ti/BOILER "iC..,,lJ ROOM
@fil Bl r:::=:J
----. 12·x12•
---30"x30"
ELECTRICAL
ROON
[illjJ i
D]
CHILLERYARO i I 1 ·' I ' I J I . I• · ·• I I :�i I I .�R I I I I I I I I L __________ _i
Al
S9
S10
S1
S2
S3
S4
S5
S6
S7
S8
S11
S12
S13
S14 S15
S16
S17
S18
S19S20
S21
S23
NA
S24
S25 S26
S27 S28
S29
S30
S31
S33
S32
R34
R35
R36
R37
R39
R40
R41
R42
R43
R44
R45
R46
R47
R48
R49 E50
E51
E52
R43
E54
E55
E56
E57
E58
E59
E60
Systems Service Mechanical, Inc. AIR APPARATUS
REPORT
PROJECT VA Community Living Center SYSTEM / UNIT AHU 1
LOCATION Fresno, CA
UNIT DATA MOTOR DATA
Make / Model No. Huntair / 30461 001 Make / Frame Toshiba / 184t
Type / Size CW/HW / 20 tons H.P. / RPM 4) 6.5 / 1740
Serial Number NA Volts / Phase / Hertz 460 / 3 / 60
Arr. / Class 4) BI SWSI / I F.L. Amps / S.F. 8.9 / 1.15
Discharge Plenum Make Sheave Direct Drive
Make Sheave Direct Drive Sheave Diam. / Bore Direct Drive
Sheave Diam. / Bore Direct Drive Sheave Center Distance Direct Drive
No. Belts / Make / Size Direct Drive
No. Filters / Type / Size 12 / MERV8 / 24x24x2
12 / MERV14 / 24x24x12
FAN DESIGN DESIGN ACTUAL
Total CFM 8000 8046 External Discharge S.P. NA 1.67
Total S.P. NA 2.49 External Suction S.P. NA 0.63
Fan RPM 1740 1145 Fan Discharge S.P. NA 1.67
External S.P. NA 2.3 Fan Suction S.P. NA 0.82
Motor Volts 460 467/467/468 Reheat Coil Delta S.P. NA NA
Motor Amps 8.9 6.9 / 6.9 / 6.8 Cooling Coil & PHC Delta S.P. NA 0.59
Outside Air CFM ( Min ) 2535 2610 Filters Delta S.P. NA 0.13
Return Air CFM 7460 7212 VFD Hertz 60 39.5
Outside Air Damper Position NA 35% open
Ambient Temp. 105 79 / 60
Entering Air DB / WB 80 / 64 74 / 61
Leaving Air DB / WB NA 55 / 53
EWT / LWT (F) 45 / 55 43 / 58
REMARKS:
TEST DATE 7/18/2018 READINGS BY Steve Santos
FORM 5 / 12.98 PAGE 7
TEST DATA TEST DATAOUTLET
TOTAL
Systems Service Mechanical, Inc. FAN TEST
PROJECT VA Community Living Center Phase 1, Fresno, CA
FAN DATA FAN NO. EF - 2 FAN NO. RF - 1 FAN NO.
Location
Service
Manufacturer
Model Number
Serial Number
Type / Class
Motor Make / Style
Motor HP/RPM/Frame
Volts/Phase/Hertz
F.L. Amps/S.F.
Motor Sheave Make
Motor Sheave Diam./Bore
Fan Sheave Make
Fan Sheave Diam./Bore
No. Belts/Make/Size
Sheave Center Distance
TEST DATA FAN DESIGN INLET TOTAL FAN DESIGN INLET TOTAL FAN DESIGN INLET TOTAL
CFM 880 873 7330 7212
Fan RPM 2100 2070 1750 704
S.P. In/Out NA .67 / .0 NA .6 / .03
Total S.P. 1 0.67 NA 0.63
Voltage 460 469/470/469 460 471/471/470
Amperage 1.1 1.0 / 1.1 / 1.0 4) 4.0 5.9
VFD Speed NA NA 60 24
REMARKS
TEST DATE 7/3/2018 READINGS BY Steve Santos
FORM 6 / 12.98 PAGE 8
Mechanical Room
Direct Drive
460 / 3 / 60
AH 1
Huntair
30476 001
4) BI SWSI / I
Toshiba / ODP
5.0 / 1760 / 182T
1VP36 / 5/8"
Power Drive
AK30 / 3/4"
1 / Carlisle / 4L210
4) 4.0 / 1.15
6.5"
Power Drive
Roof
General Exhaust
Marathon / ODP
3/4 / 1750 / 56
1.1 / 1.15
Greenheck
CUBE 101 HP 5X
15445494
BI SWSI / I
Systems Service Mechanical VAV IN OUT
AREA NO. KIND SIZE AK COOLING
DESIGN PRELIM COOLING
FINAL
PERCENT
OF DESIGN
Htg. MAX.
DESIGN
Htg. MAX
AHU 1
SAV 1-12
Lobby S1 CD 8 x 8 1.00 255 121 241 95 140 Lobby S2 CD 8 x 8 1.00 260 191 270 104 146 Lobby S3 SWG 12 x 10 1.00 255 407 265 104 148 Lobby S4 SWG 12 x 10 1.00 255 429 251 98 141
Total 1025 1148 1027 100 562 575
SAV 1-13
Stair Well S5 CD 18 x 8 1.00 450 440 460 102 460 Storage 1E20 S6 SWG 6 x 6 1.00 45 200 80 178 80 Utility 1E15 S7 CD 8" Dia. 1.00 175 50 179 102 179
Total 670 690 719 107 670 719
SAV 1-14
Electrical Rm 1E21 S8 SWG 22 x 22 1.00 740 680 739 100 739
Total 740 680 739 100 740
SAV 1-15
Resident Bed 1D01 S9 CD 10" Dia. 1.00 290 289 100 141
Total 290 0 289 100 145 141
SAV 1-16
Resident Bed 1D02 S10 CD 10" Dia. 1.00 290 278 292 101 142
Total 290 278 292 101 145 142
SAV 1-17
Kitchen 1D03A S11 SWG 16 x 8 1.00 390 59 382 98 206 Kitchen 1D03A S12 SWG 18 x 10 1.00 520 810 534 103 255
Total 910 869 916 101 455 461
TEST DATE READINGS BY Steve Santos
FORM 2 / 12.98 PAGE 9
7/3/2018
SAV 1-18
Resident Bed 1D04 S13 CD 10" Dia. 1.00 290 288 99 146
Total 290 0 288 99 145 146
SAV 1-19
Resident Bed 1D05 S14 CD 10" Dia. 1.00 290 279 96 144
Total 290 0 279 96 145 144
SAV 1-20
Corridor 1D-1 S15 CD 10" Dia. 1.00 310 279 308 99 132 Storage 1D13 S16 CD 6" Dia. 1.00 25 85 26 104 0 Nurse Station 1D14 S17 CD 6" Dia. 1.00 75 101 74 99 36 Corridor 1D-1 S18 CD 10" Dia. 1.00 310 248 302 97 136
Total 720 713 710 99 310 328
SAV 1-21
Medication 1D10 S19 CD 8" Dia. 1.00 150 114 152 101 69 Clean Linen 1D11A S20 CD 6" Dia. 1.00 75 59 78 104 37 Corridor 1D01 S21 CD 6" Dia. 1.00 25 85 27 108 0
Total 250 258 257 103 100 106
SAV 1-22
Nurses Break 1D15 S22 CD 10" Dia. 1.00 315 305 309 98 162
Total 315 305 309 98 160 162
FORM 2 / 12.98 PAGE 10
SAV 1-23
Living Room 1D16 S24 Lin 8" Dia. 1.00 125 111 130 104 74 Living Room 1D16 S25 Lin 8" Dia. 1.00 125 105 122 98 70 Living Room 1D16 S26 Lin 8" Dia. 1.00 125 99 125 100 76 Living Room 1D16 S27 Lin 8" Dia. 1.00 125 88 120 96 71 Living Room 1D16 S28 SWG 16 x 8 1.00 250 454 260 104 140 Living Room 1D16 S29 SWG 16 x 8 1.00 250 395 252 101 135
Total 1000 1252 1009 101 555 566
SAV 1-24
Resident Bed 1D17 S30 CD 10" Dia. 1.00 290 287 99 150
Total 290 0 287 99 145 150
SAV 1-25
Resident Bed 1D18 S31 CD 10" Dia. 1.00 290 290 100 144
Total 290 0 290 100 145 144
SAV 1-26
Data Rm 1E17 S32 CD 12" Dia. 1.00 500 477 505 101 256
Total 500 477 505 101 250 256
SAV 1-27
Laundry Rm 1E18 S33 CD 8" Dia. 1.00 130 143 130 100 66
Total 130 143 130 100 65 66
FORM 2 / 12.98 PAGE 11
Systems Service Mechanical, Inc. IN OUT
AREA NO. KIND SIZE AK DESIGN PRELIM FINAL COMMENTS
AHU 1 Returns Lobby R34 SWR 30 x10 1.50 1115 960 1092 98 Mech Rm R35 SWR 18 x 10 1.00 450 1100 434 96 Electrical Rm 1E21 R36 SWR 16 x 16 1.56 740 1205 760 103 Data Rm 1E17 R37 CR 14" Dia. 0.78 500 400 496 99 Resident Bed 1D01 R38 CR 8" Dia. 1.00 215 220 203 94 Resident Bed 1D02 R39 CR 8" Dia. 1.00 215 135 203 94 Dining Room 1D03 R40 SWR 30 x 12 1.00 910 955 908 100 Resident Bed 1D04 R41 CR 8" Dia. 1.00 215 127 211 98 Resident Bed 1D05 R42 CR 8" Dia. 1.00 215 197 221 103 Nurses Break 1D15 R43 CR 8" Dia. 1.00 215 202 219 102 Living Room 1D16 R44 SWR 30 x 12 1.00 1100 900 1056 96 Resident Bed 1D17 R45 CR 8" Dia. 1.00 215 202 203 94 Resident Bed 1D18 R46 CR 8" Dia. 1.00 215 168 211 98 Corridor 1D-1 R47 CR 12" Dia. 1.00 510 428 496 97 Corridor 1D-1 R48 CR 12" Dia. 1.00 500 469 499 100
Total 7330 7668 7212 98
EF -2
Resident Bed 1D01a E49 CR 6" Dia. 1.00 75 73 76 101 Resident Bed 1D02a E50 CR 6" Dia. 1.00 75 53 70 93 Resident Bed 1D04a E51 CR 6" Dia. 1.00 75 93 81 108 Resident Bed 1D05a E52 CR 6" Dia. 1.00 75 71 78 104 Soiled Utility 1D11b E53 CR 6" Dia. 1.00 75 71 73 97 Staff Toilet 1D11c E54 CR 6" Dia. 1.00 75 96 73 97 House Keeping 1D11d E55 CR 6" Dia. 1.00 75 85 70 93 Toilet E56 CR 6" Dia. 1.00 75 88 76 101 Resident Bed 1D17a E57 CR 6" Dia. 1.00 75 118 77 103 Resident Bed 1D18a E58 CR 6" Dia. 1.00 75 131 78 104 Laundry 1E18 E59 CR 6" Dia. 1.00 130 68 121 93
Totsl 880 947 873 99
FORM 2 / 12.98 PAGE 12
of DESIGN
Systems Service Mechanical PUMP TEST
PUMP DATA PUMP NO. PHWP - 1 PUMP NO. PHWP - 2 PUMP NO.
GPM / Ft.Hd.
Req. NPSH
Pump RPM
Impeller Diam.
Motor Mfr. / Frame
Motor HP / RPM
Volts / Phase / Hertz
F.L. Amps / S.F.
Seal Type
Pump Off Pressure
Valve Shut Diff.
Actual Impeller Diam.
Valve Open Diff.
Valve Open GPM
Final Discharge Press.
Final Suction Press.
Final Delta P
Final GPM
Voltage
Amperage
VFD Speed
FORM 8 / 8.99 PAGE 13
3.5"
3.5'
50.75'
41.5'
9.25'
0.64
41.5'
0.64
.8 / 1.15
CeramicCeramic
9.25'
3.5'
18 psi
13'
18 psi
13'
50.75'
.8 / 1.15
Baldor / 56C
Baldor / 56C
1/2 / 1725
1/2 / 1725
Primary / Boilers
Bell & Gossett
60 3x5.25 3.5" BF
PH018592 A
54 / 10'
PH018592 B
54 / 10'
Primary / Boilers
Bell & Gossett
60 3x5.25 3.5" BF
Systems Service Mechanical PUMP TEST
PUMP DATA PUMP NO. SHWP - 1 PUMP NO. SHWP - 2 PUMP NO.
GPM / Ft.Hd.
Req. NPSH
Pump RPM
Impeller Diam.
Motor Mfr. / Frame
Motor HP / RPM
Volts / Phase / Hertz
F.L. Amps / S.F.
Seal Type
Pump Off Pressure
Valve Shut Diff.
Actual Impeller Diam.
Valve Open Diff.
Valve Open GPM
Final Discharge Press.
Final Suction Press.
Final Delta P
Final GPM
Voltage
Amperage
VFD test speed
PH I operating Spd
FORM 8 / 8.99 PAGE 14
36hz 36hz
1.3 1.5
60hz 60hz
54 54
456 457
46' 48'
30' 30'
70 70
76' 78'
5.75" 5.75"
20.9' 20.9'
NA NA
37' 37'
1.6 / 1.15 1.6 / 1.15
Ceramic Ceramic
1.0 / 1760 1.0 / 1760
460 / 3 / 60 460 / 3 / 60
5.75" 5.75"
Baldor / 143t Baldor / 143t
4' 4'
1760 1760
PH018594 A PH018594 B
54 / 30' 54 / 30'
Bell & Gossett Bell & Gossett e1510 1.25 AD e1510 1.25 AD
Mechanical Room Mechanical Room
Reheat Coils Reheat Coils
B-160L x
SERIES e-1510 1800 RPM SYNCHRONOUS SPEED
Series e-1510
Series e-1510 x
Systems Service Mechanical BALANCE VALVE/FLOW
METER TEST REPORT
AREA SIZE MODEL DESIGN ACTUAL ACTUAL ACTUAL NOTES
GPM VALVE VALVE GPM
SETPOINT P.D.
AHU -1
Cooling Coil CB4F B&G 94 15.00 6.8' 95
Heating Water
PHC - 1 CV 3.8 Griswold 4 100% 38" 3
SAV 1-12 CV 1.9 Griswold 2.1 50% 22" 2
SAV 1-13 CV 1.9 Griswold 1.2 20% 10" 1.3
SAV 1-15 CV 1.9 Griswold 0.7 50% 11" 0.8
SAV 1-16 CV 1.9 Griswold 0.6 60% 25" 0.7
SAV 1-17 CV 1.9 Griswold 1.6 50% 10" 1.6
SAV 1-18 CV 1.9 Griswold 0.6 50% 11" 0.7
SAV 1-19 CV 1.9 Griswold 0.6 50% 18" 0.7
SAV 1-20 CV 1.9 Griswold 1 50% 11" 1.1
SAV 1-21 CV 1.9 Griswold 0.5 50% 12" 0.6
SAV 1-22 CV 1.9 Griswold 1 50% 20" 1.1
SAV 1-23 CV 1.9 Griswold 1.9 100% 40" 1.8
SAV 1-24 CV 1.9 Griswold 0.6 30% 11" 0.7
SAV 1-25 CV 1.9 Griswold 0.6 30% 10" 0.7
SAV 1-27 CV 1.9 Griswold 0.5 10% 10" 0.7
FORM 2 / 12.98 PAGE 17
7/18/2018
Systems Service Mechanical, Inc.
Table 1. Required Instrumentsation for Air & Hydronic Certification
FUNCTION
RANGE
MINIMUM
ACCURACY &
RESOLUTION
CALIBRATION
DATE
(Requirement)
Name/ Type (12 Months)
1% +/- RPM Manufact. & Model Serial No. H.250132 2/8/2019
(12 Months)
Name/ Type
Manufact. & Model Serial No. 6070691 2/8/2019
Electrical Measurement
Name/ Type (6 Months)
Manufact. & Model Serial No. 73953486 2/8/2019
Manufact. & Model Serial No. 73953486 2/8/2019
Clamp Meter
Clamp Meter
2% +/- reading &
0.1 Ampere
Fluke 52
INSTRUMENT INFORMATION
Digital Tachometer
2% +/- READING
minus40 to 240 deg
Extech Instruments 461995
1% of Reading & 0.2 deg.F.
Digital Thermometer / with probes
Rotating Measuring
Digital Thermometer / with probes
0 to 100 AmpsAmpere
AIR
Immersion
Contact
Volts
0 to 600 VAC
Temperature Measurement
0 to 5000 RPM
Fluke #36
Digital Thermometer / with thermo
2% +/- reading & 1 volt Fluke #36
Systems Service Mechnical, Inc.
Table 2. Required Instrumentsation for Air & Hydronic Certification
FUNCTION RANGE
RESOLUSION
5% +/- in w.g. Name/ Type (12 Months)
Manufact. & Model Serial No. M92163 2/8/2019
Air Pressure 0 to 10.00 in. w.g. Manufact. & Model Serial No. M92163 2/8/2019 Measurememt
18 in. NA Name/ Type
Manufact. & Model Serial No. NA NA Pitot Tube
(2 Required ) 36 in. NA Name/ Type
Manufact. & Model Serial No. NA NA
Measuring 50 to 2500 FPM 20 fpm Manufact. & Model Serial No. CP237357 10/27/2017
10 to 90% RH 3% RH Range Manufact. & Model Serial No. 11118499 2/8/2019 1% Resolusion
Digital 5 CFM Manufact. & Model Serial No. M92163 2/8/2019
PAG 20E
Micromanometer
Shortridge ADM 870
Dwyer
Dwyer / 18"
Dwyer
Dwyer / 36"
Alnor Anemometer
RVA 801
Precision Psychrometer
Extech RH 390
Shortridge Flow Hood
0.01 in w.g. < 1 in w.g.
0.1 in w.g. > 1 in w.g.
5% +/- reading &
Air Volume
(Direct Readings Hood)
Minimum Range 100 to 2000 CFM
5% +/- Reading
Air Velocity Minimum Range
Humidity
Systems Service Mechanical, Inc.
Table 3. Required Instrumentation for Hydronic Certification
FUNCTION RANGE
RESOLUSION
Manufact. & Model Serial No. W12128 3/20/2018
Hydro Data Digital Micromanometer
Shortridge 250
0 to 100ft
2% of Reading &
1.0 psi.
2.5 psi.
1.0ft w.g.
Hydronic Drfferential Pressure
Measurenent
Reading & 1.0 in w.g
Hydronic Pressure
Measuremet
0.5 psi.
30 HG to 60
Psi.
0 TO 100 PSI.
0 to 100 in w.g.
0 TO 200 PSI.
ABBREVIATION
AFF ABOVE FINISH FLOOR LWT LEAVING WATER TEMPERATURE
AMB AMBIENT LIN LINEAR DIFFUSER
BDD BACKDRAFT DAMPER MAX MAXIMUM
BHP BRAKE HORSEPOWER MBH THOUSAND BTU PER HOUR
BTUH BTU PER HOUR MIN MINIMUM
CD CEILING DIFFUSER NC NORMALLY CLOSED
CG CEILING GRILL NA NOT AVAILABLE
CR CEILING REGISTER OSA OUTSIDE AIR
CFM CUBIC FEET PRE HOUR OD OUTSIDE DIAMETER
DIA DIAMETER OV OUTLET VELOCITY
DL DRUM LOUVER PRV PRESSURE REDUCING VALVE
DWDI DOUBLE WIDE DOUBLE INLET
E EXHAUST AIR GRILL PSI POUNDS PER SQUARE INCH
EAT ENTER AIR TEMPERATURE PSIG PSI GAUGE
EDB ENTER DRY BULB QTY QUANTITY
EER ENERGY EFFICIENCY RATIO R RETURN AIR DIFFUSER/GRILL
EFF EFFICIENCY RH RELATIVE HUMIDITY
ENT ENTERING S SUPPLY AIR DIFFUSER/GRILL
ESP EXTERNAL STATIC PRESSURE SS STAINLESS STEEL
EWB ENTERING WET BULB SWG SIDE WALL GRILL
EWT ENTERING WATER TEMPERATURE SWSI SINGLE WIDE SINGLE INLET FAN
(E) EXISTING TG TRANSFER GRILL
FA FREE AREA TSP TOTAL STATIC PRESSURE
FC FORWARD CURVE FAN TYP TYPICAL
FT FEET TW THROW AWAY FILTERS
FG FLOOR GRILL UNO UNLESS NOTED OTHERWISE
FF FINISHED FLOOR V/PH/HZ VOLTS / PHASE / HERTZ
FLA FULL LOAD AMPERES VD VOLUME DAMPER
FPM FEET PER MINUTE VTR VENT THROUGH ROOF
FV FACE VELOCITY W WIDTH
GPM GALLONS PER MINUTE W/ WITH
HP HORSEPOWER WB WET BULB
HX HEAT EXCHANGER WG WATER GAUGE
ID INSIDE DIAMETER WPH WATER PRESSURE DROP
IN INCHES
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LDB LEAVING WET BULB TEMPERATURE
SSM cover
Sheet1
TABLE OF CONTENT
SSM certifi
Sheet1
SSM general notes
Floor Plan
SSM appara
Sheet1
SSM fan
Sheet1
SSM VAVinout
Sheet1
Sheet1 (2)
Sheet1 (3)
SSM new Inout
Sheet1
SSM flowmeter
Sheet1
Balance Valve
SSM Calibration
Table 1
Table 2
Table 3
TAB ABBREVIATIONS
Sheet1
SSM pumps.pdf
Sheet1
Sheet1 (2) image3.emf
VA Preliminary Air Balance Report.pdf image1.emf
25007- VA Fresno Critical Room Recertification 2025 - Final Report - Revised 2-10-2025.pdf
CERTIFIED TEST; ADJUST; BALANCE REPORT
Project Name:
Address:
City:
Architect: N/S
Engineer:
HVAC Contractor:
NEBB Certified TAB Firm: Equal Air Balance Company
Address: 357 East Arrow Highway, Suite 206
City: San Dimas, CA 91773
Certification Number: 2910
License #: 1006492
Date: 2/7/2025
A. Plyavinsh, J. Bueno
VA Fresno Critical Room Recertification
VA Fresno Critical Room Recertification 2025
2615 E. Clinton Avenue
Fresno, CA 93703-2223
N/S
Department of Veterans Affairs
EAB Job #: 25007
Technician:
AIR BALANCE REPORT IS NOT VALID WITHOUT NEBB STAMP ABOVE
accounts
Snapshot
Project Name:
Certifying NEBB Qualified
TAB Supervisor:
Firm License Number:
Expiration Date: 8/31/2025
Firm Certification Number:
Expiration Date:
"THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM
MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN
ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL
SYSTEMS . ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB
TOLERANCES, ARE NOTED IN THE TEST - ADJUST - BALANCE REPORT PROJECT
SUMMARY."
357 E. Arrow Hwy. Suite 206
San Dimas, CA 91773
Phone (714) 637-3500
Fax (714) 637-3050
Web: www.equalairbalance.com
Specializing in testing and balancing of environmental systems
1006492
REPORT CERTIFICATION
VA Fresno Critical Room
Recertification 2025
Erik Dlugajczyk
12/31/2025
STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL
Symbol Sheet:
Report Summary: 2nd & 3rd Floors
Test & Balance Sheet:
Air Balance Summary Sheet:
Outlet Sheets:
Report Summary: All Floors
Report Summary Sheet:
Report Summary Sheet:
Certifications:
61 - 62
64 - 81
Table of Contents
8 - 13
14 - 17
18 - 20
21 - 23
24 - 60
ACU Air Conditioning Unit LAT Leaving Air Temperature
AK Free Area Factor LD Linear Diffuser
ATM Atmosphere LFD Laminar Floor Diffuser
BHP Brake Horse Power LWT Leaving Water Temperature
CAV Constant Air Volume MAT Mixed Air Temperature
CD Ceiling Diffuser MB Mixing Box
CER Ceiling Exhaust Register NA Not Applicable
CFM Cubic Feet per Minute NI Not Installed
CHWR Chilled Water Return NL Not Listed
CHWS Chilled Water Supply NVL No Valid Location
CO Cooling Only NM Not Measured
CRR Ceiling Return Register NR Not Read
CSG Ceiling Supply Grille NS Not Specified
CWR Condenser Water Return OSA Outside Air
CWS Condenser Water Supply R.A Reverse Acting
D.A. Direct Acting RA Return Air
DNA Data Not Available RAG Return Air Grille
DO Duct Opening RAR Return Air Register
DT Duct Traverse RD Round Diffuser
EAG Exhaust Air Grille RH Re-Heat
EAR Exhaust Air Register RPM Revolutions per Minute
EAT Entering Air Temperature SA Supply Air
EF Exhaust Fan SAG Supply Air Grille
EG Exhaust Grille SAR Supply Air Register
ESP External Static Pressure SAV Supply Air Valve
EWT Entering Water Temperature SEF Smoke Evac Fan
EXH Exhaust SP Static Pressure
FC Fan Coil SW Sidewall
FLA Full Load Amps SWG Sidewall Grille
FP Fan Powered TBD To Be Determined
FPM Feet per Minute TSP Total Static Pressure
GEX General Exhaust T-STAT Thermostat
GF Grease Filter UA ULPA Filter
HF Hepa Filter V Volts
HP Horse Power VAV Variable Air Volume
HWR Hot Water Return VP Velocity Pressure
HWS Hot Water Supply WER Wall Exhaust Register
Air Symbol Sheet
(1)
(2)
(3)
(4)
(5)
(6)
PROJECT: VA Fresno Critical Room Recertification 2025
JOB #: 25007
DATE:SYSTEM:
357 East Arrow Highway Suite 206
(714) 637-3500
REPORT SUMMARY
A.P. / J. B. TECHNICIAN:
Fresno, CA 93703
Existing HVAC
2nd & 3rd Floor
2/7/2025
AREA SERVED:
LOCATION:
Room has 24.18 ACH and is designed for 20 ACH. The room is positively pressurized to the corridor and is designed to be positive.
2A13B Special Procedures (SPL):
2A04F Preparation Assembly and
Room has 24.38 ACH and is designed for 4 ACH. The room is positively pressurized to the corridor and is designed to be positive.
3A15 Decontamination Area:
Room has 25.68 ACH and is designed for 6 ACH. The room is negatively pressurized to the corridor and is designed to be negative.
3A15.1 Scope Processing:
Room has 30.05 ACH and is designed for 10 ACH. The room is negatively pressurized to the corridor and is designed to be negative.
3A15A Housekeeping:
Zero flow reading from exhaust register. Register possibly disconnected from exhaust system.
3A15B Restroom:
Room has 10.78 ACH and is designed for 10 ACH. The door to the restroom has been removed, unable to measure DP.
Image
Text Box
CERTIFIED MEMBER - NATIONAL ENVIRONMENTAL BALANCING BUREAU
Readings by: Job No.: 25007
REQUIRED ACTUAL
DELTA PRESS. DELTA PRESS. WHERE TAKEN
TO ADJACENT TO ADJACENT COMMENTS
ROOM (INCHES W.C) ROOM (INCHES W.C) AN/OR DATA
2A13B ( + ) 0.001" ( + ) 0.0352"
3A02F ( + ) 0.001" ( + ) 0.0103"
3A15 ( - ) 0.001" ( - ) 0.0127"
3A15.1 ( - ) 0.001" ( - ) 0.0082"
3A15A ( -) 0.001" ( - ) 0.00015" (1)
3A15B ( - ) 0.001" NA (2)
Notes:
(2) Restroom door has been removed. No pressure reading can be taken.
(1) 3A15A Housekeeping: Zero flow reading from exhaust register.
Restroom
Housekeeping
TEST AND BALANCE
ROOM
NO. # NAME
Special Procedures
Prep Assembly
Decontamination Area
Scope Processing
Air Balance Summary Job No.:
Date:
Job Name: Technician:
Job Location:
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
RM # ROOM NAME (CU.FT.) REQ. ACT. PLAN ACT. CFM +/- PLAN ACT. CFM +/- PLAN ACT CFM +/- AC/HR AC/HR
2A13B Special Procedures (SPL) 5562 P P NS 2242 NM NS 1235 NM NA NA NA NA 20 24.18
3A02F Preparation, Assembly and Sterilization Area 6826 P P NS 2546 NM NS 0 NM NA NA NA NA 4 22.38
3A15 Decontamination Area 3154 N N NS 660 NM NS 1350 NM NA NA NA NA 6 25.68
3A15.1 Scope Processing 605 N N NS 303 NM NS 245 NM NA NA NA NA 10 30.05
3A15A Housekeeping (2) 155 N N NS NA NM NS 0 NM NA NA NA NA 10 0.00
3A15B Restroom 601 N NA (1) NS 86 NM NS 108 NM NA NA NA NA 10 10.78
(1) Restroom door has been removed. No pressure reading can be taken.
(2) Housekeeping area has zero CFM reading from Exhaust Register.
AIR CHANGES
ACTUAL
25007
A. Plyavinsh, J. BuenoVA Fresno Critical Room Recertification 2025
TEST AND BALANCE REPORT
DIFFUSER AND GRILLE TEST
Readings by: A. Plyavinsh, J. Bueno
AK % Of
FACTOR CFM FPM CFM FPM Design
Supply 2A13B / Special Procedures 1 24" x 24" 1.00 HF NS * 969 *
2A13B / Special Procedures 2 24" x 10" 1.670 HF NS NS 641 384
2A13B / Special Procedures 3 24" x 10" 1.670 HF NS NS 631 378
Total NS 2242
Exhaust 2A13B / Special Procedures E - 1 48" x 10" 3.33 SWG NS * 749 225
2A13B / Special Procedures E - 2 48" x 10" 3.33 SWG NS * 486 146
2A13B / Special Procedures E - 3 14" x 14" 1.00 SWG NS * 0 NS (1)
2A13B / Special Procedures E - 4 14" x 14" 1.00 SWG NS * 0 NS (1)
Total NS 1235
(+) 1007
CFM DIFFERENTIAL
Job No.: 25007
AIR TYPE ROOM OUTLET SIZE TYPE
DESIGN ACTUAL
NOTES
(1) Zero flow reading from exhaust register. Register is capped
Supply 3A02F / Prep Assembly 1 14" x 14" 1.00 CD NS * 222 *
3A02F / Prep Assembly 2 14" x 14" 1.00 CD NS * 35 *
3A02F / Prep Assembly 3 14" x 14" 1.00 CD NS * 34 *
3A02F / Prep Assembly 4 14" x 14" 1.00 CD NS * 170 *
3A02F / Prep Assembly 5 14" x 14" 1.00 CD NS * 135 *
3A02F / Prep Assembly 6 14" x 14" 1.00 CD NS * 168 *
3A02F / Prep Assembly 7 14" x 14" 1.00 CD NS * 115 *
3A02F / Prep Assembly 8 12" x 8" 1.00 SWSG NS * 306 *
3A02F / Prep Assembly 9 12" x 8" 1.00 SWSG NS * 152 *
3A02F / Prep Assembly 10 12" x 8" 1.00 SWSG NS * 136 *
3A02F / Prep Assembly 11 12" x 8" 1.00 SWSG NS * 237 *
3A02F / Prep Assembly 12 12" x 8" 1.00 SWSG NS * 244 *
3A02F / Prep Assembly 13 12" x 8" 1.00 SWSG NS * 303 *
3A02F / Prep Assembly 14 12" x 8" 1.00 SWSG NS * 0 *
3A02F / Prep Assembly 15 11.25" x 7.25" 1.00 SWSG NS * 289 *
Total NS 2546
Return 3A02F / Prep Assembly 1 25.25" x 11.5" 1.00 SWR NS * 0 *
Total NS 0
( + ) 2,546
Supply 3A15 / Decontamination Area 1 18" x 18" 1.00 CD NS * 391 *
3A15 / Decontamination Area 2 16" x 16" 1.00 CD NS * 269 *
Total NS 660
Exhaust 3A15 / Decontamination Area E - 1 20" x 20" 1.00 EG NS * 1350 *
Total NS 1350
( - ) 690
Supply 3A15 / Decontamination Area 1 18" DIA 1.00 RG NS * 581 *
3A15 / Decontamination Area 2 18" DIA 1.00 RG NS * 615 *
Total NS 1,196 (1)
Return 3A15 / Decontamination Area R - 1 18" DIA 1.00 RG NS * 582 *
3A15 / Decontamination Area R - 2 18" DIA 1.00 RG NS * 575 *
Total NS 1,157 (1)
(1) This unit is a temp unit installed and 100% recirculation. Not included with AC/H calculation.
Supply 3A15.1 / Scope Processing 1 12" x 12" 1.00 CD NA * 303 *
Total NS 303
Exhaust 3A15.1 / Scope Processing E - 1 12" x 12" 1.00 EG NS * 245 *
Total NS 245
( + ) 58
Supply 3A15A / Housekeeping 1 6" x 4" 1.00 CD NS * 0 *
Total NS 0 (1)
(1) Zero flow reading from exhaust grille, possibly disconnected from exhaust system.
CFM DIFFERENTIAL 0
Supply 3A15B / Restroom 1 12" x 12" 1.00 CD NS * 86 *
Total NS 86
Exhaust 3A15B / Restroom E - 1 10" x 6" 1.00 EG NS * 108 *
Total NS 108
( - ) 22
(1) 2A09C Ultrasound #1:
(2) 3A014 Sterile Supply Room (GI Cabinet):
(3) 3A02E Clean Storage West:
(4) 3A02E Clean Storage East:
(5) 3A04A GI Procedure-1 EDG
(6) 3A04B GI Procedure-2 EDG:
(7) 3A04D Sterile Supply Room GI:
(8) 3A04G GI Procedure Room:
(9) 3B10A OR-1:
(10) 3B10D OR-2:
(11) 3B10I Sterile Supply:
Room has 8.67 ACH and is designed for 4 ACH. Room is positively pressurized to Ultrasound Suite and is designed to be positive.
Actual Room - Restroom. The room has 12.10 ACH and is designed for 4 ACH. The room is negatively pressurized to the corridor and is designed to be positive.
Room has 4.4 ACH and is designed for 4 ACH. Room is negatively pressurized to the corridor and is designed to be positive.
Room has 5.83 ACH and is designed for 4 ACH. Room is positively pressurized to the ramp and is designed to be positive.
Room has 5.12 ACH and is designed for 10 ACH. Room is negatively pressurized to the corridor. and is designed to be negative. Insufficient exhaust flow. Insufficient air changes.
Room has 7.33 ACH and is designed for 10 ACH. Room is positively pressurized to the corridor. and is designed to be negative. Insufficient exhaust flow. Insufficient air changes.
Room has 23.63 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0292"w.c.
Room has 4.66 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 6.8 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 14.16 ACH and is designed for 12 ACH. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 23.07 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0257"w.c.
AREA SERVED: All Floors TECHNICIAN: A.P. / J. B.
Report Summary
LOCATION: Fresno, CA 93703 JOB #: 25007
SYSTEM: Existing HVAC DATE: 2/7/2025
(12) 3B10J OR Equipment Storage:
(13) 3B10K OR-4:
(14) 3B10M OR-3:
(15) 4A45 Sterile Supply Room:
(16) 4A26 Sterile Supply Room:
(17) 4A27 Sterile Supply Room:
(18) 4B39 Sterile Supply Room:
(19) 4B46L Sterile Supply Room:
(20) 5A28 Isolation Room:
Room has 24.78 ACH and negative ( - ) 0.0917" in relation to the corridor.
Room has 24.54 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0258"w.c.
Room has 11.75 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive. Exhaust register is covered by tape.
Room has 8.25 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 9.04 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 9.52 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 15.29 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive.
Room has 20.17 ACH and is designed for 20 ACH. Room is positively pressurized to the corridor and is designed to be positive. Room static set point of (+)0.02"w.c. is maintaining by motorized exhaust dampers. Measured space pressure is 0.0204"w.c.
Room has 5.23 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
(21) 5A29 Ante Room:
(22) 5A30 Isolation Room:
(23) 5B19 Isolation Room:
(24) 5B19.1 Ante Room:
(25) 5B20 Isolation Room:
(26)
(27) B1B04 Gross Specimen Holding Area:
(28) B1B04A Autopsy:
(29) B1B05 Soiled Laundry Receiving and Sorting Room:
(30) B1B16 Laundry Room-Clean Side:
Room has 10. ACH and is designed for 6 ACH. Room is positively pressurized to the corridor (0.0021") and is designed to be negative.
Room has 16.13 ACH and is designed for 4 ACH. Room is positively pressurized to B1B04 and is designed to be positive.
Room has 15.94 ACH and is positive in relation to the isolation room 5A28 (0.0451"); positive in relation to the isolation room 5A30 (0.0201") and negative in relation to the corridor ( - ) 0.0557". Pressure monitor reads: ( - )
0.0219" W.C. Attempted to calibrate. Pressure value on monitor is fluctuating, can not be calibrated.
Room has 27.56 ACH with a design of 12 ACH. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 16.06 ACH with a design of 12 ACH. Room is negatively pressurized to the corridor and is designed to
Room has 10.23 ACH positive in relation to the isolation room (0.0220") and design of 10 ACH); positive in relation to the isolation room (0.0301") and negative in relation to the corridor ( - )0.0110".
5B20.1 Ante Room:
Room has 10.02 ACH with design of 10 ACH and is positive in relation to the isolation room (0.0290"); positive in relation to the isolation room (0.0301") and negative in relation to the corridor ( - )0.0130".
There are no outlets installed.
Room has 25.73 ACH and is designed for 12 ACH. Room is negatively pressurized to B1B04 and is designed to
The ISO Room has 26.48 ACH and negative ( - ) 0.0743" in relation to the corridor.
(31) B1B16B Clean Laundry Storage Room:
(32) 2C06K Infusion Clinic:
(33) 2C15F Sterile Supply Room:
(34) 3C10W Sterile Supply Room:
(35) S0G8 Isolation Room:
(36)
(37) 2C08E Sterile Supply Room:
With the T-stat at 55 degrees the room is positively pressurized to the corridor and is designed to be negative.
When the T-stat is at 72 degrees the room has insufficient air changes with 5.23 ACH with a design of 6 ACH.
Insufficient exhaust flow. The room is negatively pressurized to the corridor with the T-stat at 72 degrees.
Room has 2.87 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 1.35 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
Room has 11.08 ACH and is designed for 4 ACH. Room is negatively pressurized to the corridor and is designed to be positive. Insufficient supply flow.
Room has 21.57 ACH and is designed for 12 ACH. At time of TAB: Med Air System at High speed. Room is negatively pressurized to the corridor and is designed to be negative.
S0G9 Isolation Room:
Room has 28.69 ACH and is designed for 12 ACH. At time of TAB: Med Air System at High speed. Room is negatively pressurized to the corridor and is designed to be negative.
Room has 14.9 ACH and is designed for 4 ACH. Room is positively pressurized to the corridor and is designed to
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
2A09C Ultrasound #1 1357 P P NS 196 NS NS 57 NS NA NA NA NA 4 8.67
3A014 Sterile Supply Room (GI Cabinet) (1) 372 P N NS 75 NS NS 85 NS NA NA NA NA 4 12.10
3A02E Clean Storage (West) 4270 P N NS 313 NS NS 0 NS NA NA NA NA 4 4.40
3A02E Clean storage Equip. Room (East) 5124 P P NS 498 NS NS 0 NS NA NA NA NA 4 5.83
3A04A GI Procedure-1 (EDG) (2) 1827 N N NS 136 NS NS 156 NS NA NA NA NA 10 5.12
3A04B GI Procedure-2 (EDG) (2) 1907 N P NS 349 NS NS 233 NS NA NA NA NA 10 7.33
3A04D Sterile Supply Room (GI) 406 P P NS 46 NS NS 0 NS NA NA NA NA 4 6.80
3A04G GI Procedure-3 (Bronch Room) 1720 N N NS 213 NS NS 406 NS 482 NA NA NA 12 14.16
3B10A OR 1 3937 P P NS 1514 NS NS 859 NS NA NA NA NA 20 23.07
3B10D OR 2 4196 P P NS 1652 NS NS 818 NS NA NA NA NA 20 23.63
3B10I OR Sterile Supply 876 P P NS 68 NS NS 53 NS NA NA NA NA 4 4.66
3B10J OR Equip Storage 3704 P P NS 323 NS NS 180 NS NA NA NA NA 4 5.23
Notes: (1) Actual: Room 3A14 is the restroom. Room is negative to the corridor.
(2) 3A04A and 3A04B GI procedure (EDG): Insufficient exhaust air flow. Insufficient air change rate.
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
3B10K OR 4 6851 P P NS 2,304 N/S NS 1,507 NS NA NA NA NA 20 20.17
3B10M OR 3 3574 P P NS 1461 NS NS 1011 NS NA NA NA NA 20 24.54
4A45 Sterile Supply Room (ENT) (1) 480 P P NS 94 NS NS 0 NS NA NA NA NA 4 11.75
4A26 Sterile Supply Room (Urology ambulatory) 1280 P P NS 176 NS NS 0 NS NA NA NA NA 4 8.25
4A27 Sterile Supply Room ( Surgical Clinic) 684 P P NS 103 NS NS 0 NS NA NA NA NA 4 9.04
4B39 Sterile Supply Room (Dermatology) 416 P P NS 66 NS NS 0 NS NA NA NA NA 4 9.52
4B46L Sterile Supply Room (Women's Clinic) 577 P P NS 147 NS NS 66 NS NA NA NA NA 4 15.29
5A28 Isolation Room 1804 N N NS 140 NS NS 580 NS NA NA NA NA 12 19.29
5A29 Ante Room 384 N N NS 102 NS NS 0 NS NA NA NA NA 10 15.94
5A30 Isolation Room 1500 N N NS 287 NS NS 697 NS NA NA NA NA 12 27.88
5B19 Isolation Room 1961 N N NS 246 NS NS 600 NS NA NA NA NA 12 16.06
5B19.1 Ante Room 393 N N NS 67 NS NS NA NS NA NA NA NA 10 10.23
5B20 Isolation Room 1260 N N NS 172 NS NS 579 NS NA NA NA NA 12 27.56
5B20.1 Ante Room 407 N N NS 68 NS NS NA NS NA NA NA NA 10 10.02
B1B04 Gross Specimen Holding Area (2) 1120 N N NS NA NS NS 0 NS NA NA NA NA 6 0.00
B1B04A Autopsy 1728 N N NS 304 NS NS 741 NS NA NA NA NA 12 25.73
(3)
B1B05 Soiled Laundry Receiving and Sorting Room 5413 N P NS 608 NS NS 902 NS NA NA NA NA 6 10.00
B1B16B Clean Laundry Storage Room 1180 P P NS 293 NS NS 0 NS NA NA NA NA 4 14.90
Notes: (1) 4A45 Sterile Supply Room (ENT): Exhaust register is covered by tape. Zero flow reading.
(2) No outlets installed in room.
(3) Insufficient exhaust flow.
ROOM VOLUME PRESSURE PRESSURE SUPPLY SUPPLY SUPPLY EXH EXH EXH RETURN RETURN RETURN CODE MIN OA CODE MIN TOTAL
B1B16 Laundry Room-Clean Side 18176 P P NS 4,886 NS NS 2832 NS NA NA NA NA 4 16.13
2C06K Infusion Clinic (1) 5463 N P NS 1,056 NS NS 460 NS NA NA NA NA 6 11.60
2C08E Sterile Supply Room (Cardiology) (2) 648 P P NS 31 NS NS 22 NS NA NA NA NA 4 2.87
2C15F Sterile Supply Room (Eye Clinic) (2) 1020 P P NS 23 NS NS 20 NS NA NA NA NA 4 1.35
3C10W Sterile Supply Room (Dental) 720 P N NS #REF! NS NS #REF! NS NA NA NA NA 4 #REF!
SO-G8 Isolation Room (B1C10) 1146 N N NS 181 NS NS 412 NS NA NA NA NA 12 21.57
SO-G9 Isolation Room (B1C11) 1146 N N NS #REF! NS NS #REF! NS NA NA NA NA 12 #REF!
Notes: (1) Insufficient exhaust flow. Insufficient air change rate. At time of test T-Stat set point is 55F.
(2) Insufficient supply flow. Insufficient air change rate.
2A09C ( + ) 0.001" ( + ) 0.0031"
3A014 ( + ) 0.001" ( - ) 0.0012" (1)
3A02E(West) ( + ) 0.001" ( - ) 0.0028" (6)
3A02E(East) ( + ) 0.001" ( + ) 0.0179" (2)
3A04A ( - ) 0.001" ( - ) 0.0014" (3)
3A04B ( - ) 0.001" ( + ) 0.0031" (4)
3A04D ( + ) 0.001" ( + ) 0.0026" (5)
3A04G ( - ) 0.001" ( - ) 0.0048"
3B10A ( ++ ) 0.02" ( + ) 0.0257"
3B10D ( ++ ) 0.02" ( + ) 0.0292"
3B10I ( + ) 0.001" ( + ) 0.00136"
3B10J ( + ) 0.001" ( + ) 0.00246"
3B10K ( ++ ) 0.02" (+) 0.0204"
3B10M ( ++ ) 0.02" (+) 0.0258""
4A45 ( + ) 0.001" ( + ) 0.0044"
4A26 ( + ) 0.001" ( + ) 0.0007"
4A27 ( + ) 0.001" ( + ) 0.0001"
(2) 3A02E (EAST): Room is positive to the ramp ( + )0.0268"
(3) 3A04A GI Procedure-1 (EDG): Insufficient exhaust air flow.
(4) 3A04B GI procedure-2 (EDG): Insufficient exhaust air flow.
Room is positively pressurized, designed to be negative.
(5) 3A04D Sterile Supply Room (GI): Insufficient (zero flow reading) exhaust air flow.
GI Procedure-2 (EDG)
(1) Actual: Room 3A14 is the restroom. Room is negative to corridor.
OR Equip Storage
OR4
Ultrasound #1
Restroom
Clean Storage Eq. Rm West
Clean Storage East
GI Procedure-1 (EDG)
Sterile Supply Room (GI)
GI Procedure-3 (Brunch Room)
OR1
OR2
OR3
OR Sterile Supply
Sterile Supply Room (ENT)
Sterile Supply Room (Urology ambulatory)
(6) The room is negatively pressurized to the corridor and is designed to be positive.
Ster. Supply Rm (Surg. Clinic)
4A55 ( + ) 0.001" ( - ) 0.0032" (7)
4B39 ( + ) 0.001" ( + ) 0.0036"
4B46L ( + ) 0.001" ( + ) 0.0064"
5A28 ( - ) 0.001" ( - ) 0.0917"
5A29 ( - ) 0.001" ( - ) 0.0508" (8)
5A30 ( - ) 0.001" ( - ) 0.0743"
5B19 ( - ) 0.001" ( - ) 0.0248"
5B19.1 ( ) 0.001" ( - ) 0.0110" (9)
5B20 ( -- ) 0.001" ( - ) 0.0373"
5B20.1 ( ) 0.001" ( - ) 0.0130" (10)
B1B04 ( - ) 0.001" ( - ) 0.0040"
B1B04A ( - ) 0.001" ( - ) 0.108"
B1B05 ( - ) 0.001" ( + ) 0.0021" (11)
(8) 5A29: The ante room is positive in relation to the isolation room 5A28 (0.0449"); positive in relation to the isolation room 5A30 (0.0276") and negative in relation to the corridor.
(9) 5B19.1: The ante room is positive in relation to the isolation room (0.0220") and negative
(10) 5B20.1: The ante room is positive in relation to the isolation room (0.0290") and negative in relation to the corridor ( - )0.0130".
(11) B1B05 Soiled Laundry: Space is open to laundry. Space is positively pressurized to corridor. Designed to be negative.
(7) 4A55 Sterile supply room: No registers installed. No ductwork above the ceiling.
5A29: Readings on pressure monitor reads is fluctuating, cannot be calibrated.
in relation to the corridor ( - )0.0110".
Soiled Lndr. Receive and Sort Rm
Autopsy
Sterile Supply Room (Podiatry)
Sterile Supply Room (Dermat.)
4B46L Ster. Supply Rm (Wom. Clin.)
Isolation Room
Ante
Gross Specimen Holding Area
B1B16 ( + ) 0.001" ( + ) 0.0103"
B1B16B ( + ) 0.001" ( + ) 0.0512"
2C06K ( - ) 0.001" ( + ) 0.0088" (12)
2C08E ( + ) 0.001" ( + ) 0.0005"
2C15F ( + ) 0.001" ( + ) 0.0005"
3C10W ( + ) 0.001" ( - ) 0.0047" (13)
SOG8 ( -- ) 0.001" ( - ) 0.0026"
SOG9 ( -- ) 0.001" ( - ) 0.0542"
(12) 2C06K Infusion clinic: Room is positive in relation to the corridor. Insufficient air change rate. Insufficient exhaust air flow. Condition: VAV on auto. Temperature Set Point (70F.)
Room is negative in relation to the corridor ( - )0.0003" W.C.).
(13) 3C10W Sterile Supply Rm(Dental): Room is negatively pressurized to corridor. Designed to be positive.
Sterile Supply Rm(Dental)
Laundry Room-Clean Side
Clean Laundry Storage Room
Infusion Clinic
Sterile Supply Rm (Cardiol.)
Sterile Supply Rm(Eye Clinic)
Supply 2A09C / Sterile Supply Room 1 24" x 24" 1.00 CD NS * 196 *
Total NS 196
Exhaust 2A09C / Sterile Supply Room E - 1 24" x 24" 1.00 EG NS * 57 *
Total NS 57
( + ) 139
Supply 3A014 / Restroom 1 12" x 12" 1.00 CD NS * 75 *
Total NS 75
Exhaust 3A014 / Restroom E - 1 12" x 12" 1.00 EG NS * 85 *
Total NS 85
( - ) 10
Supply 3A02E / Clean Storage (East) 1 5.5" x 9.5" 1.00 SWSG NS * 75 *
2 5.5" x 9.5" 1.00 SWSG NS * 219 *
3 5.5" x 9.5" 1.00 SWSG NS * 204 *
Total NS 498
( + ) 498
Supply 3A02E / Clean Storage 1 5.5" x 19.5" 1.00 SWSG NS * 194 *
Equip. Room (West) 2 5.5" x 19.5" 1.00 SWSG NS * 119 *
Total NS 313
( + ) 313
Supply 3A04A / GI Procedure-1 (EDG) 1 24" x 24" 1.00 CD NS * 136 *
Total NS 136
Exhaust 3A04A / GI Procedure-1 (EDG) E - 1 24" x 24" 1.00 EG NS * 156 *
Total NS 156
( - ) 20
Supply 3A04B / GI Procedure-1 (EDG) 1 24" x 24" 1.00 CD NS * 349 *
Total NS 349
Exhaust 3A04B / GI Procedure-1 (EDG) E - 1 24" x 24" 1.00 EG NS * 233 *
Total NS 233
( + ) 116
Supply 3A04D / Sterile Supply Room (GI) 1 24" x 24" 1.00 CD NS * 46 *
Total NS 46
Exhaust 3A04D / Sterile Supply Room (GI) E - 1 24" x 24" 1.00 EG NS * 0 *
( + ) 46
(1) As of 1/27/2025: Still Zero flow reading from exhaust register. No access to verify if duct is connected
Supply 3A04G / GI Proced-3 (Bronch Rm) 1 24" x 24" 1.00 CD NS * 213 *
Total NS 213
Exhaust 3A04G / GI Proced-3 (Bronch Rm) E - 1 24" x 24" 1.00 EG NS * 0 *
E(HEPA) 3A04G / GI Proced-3 (Bronch Rm) E - 2 24" x 48" 1.00 HEPA NS * 406 *
Total NS 406
( - ) 193
Supply 3B10A OR1 1 25" x 20" 1.066 HEPA NS * 130 122
3B10A OR1 2 25" x 20" 1.066 HEPA NS * 133 125
3B10A OR1 3 25" x 20" 1.066 HEPA NS * 130 122
3B10A OR1 4 25" x 20" 1.066 HEPA NS * 127 119
3B10A OR1 5 25" x 20" 1.066 HEPA NS * 129 121
3B10A OR1 6 25" x 20" 1.066 HEPA NS * 127 119
3B10A OR1 7 25" x 20" 1.066 HEPA NS * 126 118
3B10A OR1 8 25" x 20" 1.066 HEPA NS * 124 116
3B10A OR1 9 25" x 20" 1.066 HEPA NS * 120 113
3B10A OR1 10 25" x 20" 1.066 HEPA NS * 123 115
3B10A OR1 11 25" x 20" 1.066 HEPA NS * 124 116
3B10A OR1 12 25" x 20" 1.066 HEPA NS * 122 114
Total 1646 1514 92%
Exhaust 3B10A OR1 E - 1 12" x 21.5" 1.00 EG NS * 137 *
3B10A OR1 E - 2 12" x 21.5" 1.00 EG NS * 93 *
3B10A OR1 E - 3 12" x 21.5" 1.00 EG NS * 316 *
3B10A OR1 E - 4 12" x 21.5" 1.00 EG NS * 313 *
Total NS 859
( + ) 655
Supply 3B10D OR2 1 25" x 20" 1.066 HEPA NS * 145 136
3B10D OR2 2 25" x 20" 1.066 HEPA NS * 147 138
3B10D OR2 3 25" x 20" 1.066 HEPA NS * 144 135
3B10D OR2 4 25" x 20" 1.066 HEPA NS * 142 133
3B10D OR2 5 25" x 20" 1.066 HEPA NS * 135 127
3B10D OR2 6 25" x 20" 1.066 HEPA NS * 144 135
3B10D OR2 7 25" x 20" 1.066 HEPA NS * 133 125
3B10D OR2 8 25" x 20" 1.066 HEPA NS * 135 127
3B10D OR2 9 25" x 20" 1.066 HEPA NS * 139 130
3B10D OR2 10 25" x 20" 1.066 HEPA NS * 117 110
3B10D OR2 11 25" x 20" 1.066 HEPA NS * 134 126
3B10D OR2 12 25" x 20" 1.066 HEPA NS * 136 128
Total 1608 1652 103%
Exhaust 3B10D OR2 E - 1 12" x 21.5" 1.00 EG NS * 116 *
3B10D OR2 E - 2 12" x 21.5" 1.00 EG NS * 137 *
3B10D OR2 E - 3 12" x 21.5" 1.00 EG NS * 535 *
3B10D OR2 E - 4 12" x 21.5" 1.00 EG NS * 30 *
Total NS 818
( + ) 834
Supply 3B10I / OR Sterile Supply 1 8" x 8" 1.00 CD NS * 68 *
Total NS 68
Exhaust 3B10I / OR Sterile Supply E - 1 11" x 11" 1.00 EG NS * 53 *
Total NS 53
( + ) 15
Supply 3B10J / OR Equip Storage 1 14.5" x 14.5" 1.00 CD NS * 147 *
2 14.5" x 14.5" 1.00 CD NS * 176 *
Total NS 323
Exhaust 3B10J / OR Equip Storage E - 1 14" x 14" 1.00 ER NS * 180 *
Total NS 180
( + ) 143
Sup…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .