Attachment 1 - SOW HAAW179035_162100 25 Mar 2020.docx

DOCX document 20 KB Posted

Attached to
Squadron Operations Center Build / Upgrade Federal contract opportunity
Solicitation number
W50S8N20B0001
Issued by
Department of the Army National Guard

About this file

This statement of work and solicitation are for two construction projects at the 174th Attack Wing of the New York Air National Guard. Project HAAW179035 involves constructing a new 3,365 square foot addition to Building 643 to support Reaper flight operations. Project HAAW162100 involves renovating and upgrading the existing Squadron Operations Facility in Building 643. The work includes construction, site work, and utilities work. The performance period for Project HAAW179035 is 330 days and 300 days for Project HAAW162100. The solicitation is identified as a total small business set-aside with a NAICS code of 236220 and size standard of $39.5 million average annual revenue. The project value is between $1 million to $5 million. The solicitation is posted on SAM.gov and instructions for plans are in Section 00100. Funds are currently unavailable for CLIN 0003 but are expected to be available by 30 September 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Squadron Operations Center Build / Upgrade, newest first.
File Type Posted
Bid Abstract.pdf PDF
Bid Opening Sign In.pdf PDF
Questions and Answers 29 May 2020.docx DOCX document
W50S8N20B00010004 Amendment.pdf PDF
Questions and Answers 27 May 2020.docx DOCX document
W50S8N20B00010004 Amendment.pdf PDF
W50S8N20B00010003 Amendment.pdf PDF
Questions and Answers 20 May 2020.docx DOCX document
HAAW179035-Addendum 02 - Dwg_R-A-601.pdf PDF
HAAW162100-Addendum 02 - Dwg_S-A-601.pdf PDF
Tax Form NY ST120_1_fill_in.pdf PDF
HAAW179035-Addendum 02 - Spec_08 14 00.pdf PDF
HAAW179035-Addendum 02 - Spec_23 11 25.pdf PDF
HAAW162100-Addendum 02 - Spec_08 14 00.pdf PDF
W50S8N20B00010002 Amendment.pdf PDF
Questions and Answers 18 May 2020.docx DOCX document
HAAW162100-Addendum 02 - Spec_09 29 00.pdf PDF
W50S8N20B00010001 Amendment.pdf PDF
HAAW179035-Addendum 02 - Spec_09 29 00.pdf PDF
W50S8N20B00010001 Amendment.pdf PDF
HAAW179035_Fire Alarm_ADDENDUM-001.pdf PDF
HAAW179035_Arch_ADDENDUM-001.pdf PDF
HAAW179035_Elec_Comm_ADDENDUM-001.pdf PDF
Pre-bid Slides HAAW179035-HAAW162100.pptx PPTX presentation
B643 Pre-Bid Sign In Sheet.pdf PDF
Attachment 7 - HAAW162100 Drawings.pdf PDF
Attachment 6 - HAAW179035 Drawings.pdf PDF
Attachment 3 - HAAW179035 Vol 2.pdf PDF
W50S8N20B0001 IFB Add_Alter B643.pdf PDF
Attachment 5 - HAAW162100 Vol 2.pdf PDF
Attachment 4 - HAAW162100 Vol 1.pdf PDF
Attachment 2 - HAAW179035 Vol 1.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

HAAW179035 Construct Reaper Operations Center & HAAW162100 Repair Squadron Operations Center B643

174th Attack Wing

Hancock Field ANG Base 6001 East Molloy Road Syracuse, New York 13211

25 March 2020

Table of contents

1. SCOPE OF WORK

2. AREA OF WORK

3. DESCRIPTION OF WORK

4. PERIOD OF PERFORMANCE

5. MATERIALS

6. MATERIAL SUBMITTALS

7. GENERAL CONDITIONS

8. GOVERNMENT WORKING HOURS

9. DIFFERING SITE CONDITIONS

10. UTILITIES

11. DISPOSAL OF MATERIALS AND CLEANUP

12. MATERIAL & EQUIPMENT ACCOUNTABILITY

13. FIRE & SECURITY

14. ESCORTS

1. SCOPE OF WORK:

For HAAW179035 Construct Reaper Operations Center, The work includes the construction of a new 3,365 square foot, one-story addition to existing Building 643 to support the upgrades to the Reaper flight operations mission. The Project scope also includes associated Site Work and utilities to support the new addition. Renovations and upgrades to the existing Squadron Operations Facility will be accomplished under Project HAAW162100, Repair Squadron Operations Center Building 643. Work on HAAW162100 will start concurrent with construction on HAAW179035. Work will be limited to the east SCIF boundary rooms. The remainder of the work for HAAW162100 will pause for completion of the accreditation of the new SCIF constructed on HAAW179035 and movement of operations from the current SCIF to the new addition. Pause duration is estimated at 6-12 months. Work for HAAW162100 includes renovations of existing Building 643 to support the upgrades to the Reaper flight operations mission. The Project scope also includes associated Site Work and utilities to support the new addition. The building will be occupied during performance of work under these contracts. Contractors will be badged in and out of the job site daily. Occupancy notifications will be posted in a prominent location in the work area (non SCIF). All work in the active SCIF will require escorts by SCIF personnel.

2. AREA OF WORK:

Contractor shall work only in the areas designated by Contracting Officer Representative (COR).

3. DESCRIPTION OF WORK:

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. Details for the construction and renovation work are provided in the drawings and specifications for each project.

4. PERIOD OF PERFORMANCE:

4.1. HAAW179035 – 330 days

4.2. HAAW162100 – 300 days

5. MATERIALS:

See plans & specifications.

6. MATERIAL SUBMITTALS:

See plans & specifications.

7. GENERAL CONDITIONS:

See plans & specifications.

8. DIFFERING SITE CONDITIONS:

See plans & specifications.

9. GOVERNMENT WORKING HOURS:

See specifications.

10. UTILITIES:

See plans & specifications.

11. DISPOSAL OF MATERIALS AND CLEANUP:

See plans & specifications.

12. MATERIAL & EQUIPMENT ACCOUNTABILITY:

See plans & specifications.

13. FIRE & SECURITY:

Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

See plans & specifications for additional information.

14. ESCORTS:

Required for work completed in the active SCIF. See plans & specifications.