Attachment 1 - APLs.docx
DOCX document 20 KB Posted
- Attached to
- Afghanistan Excess Property Management
- Solicitation number
- SP451020R0001
- Issued by
-
Defense Logistics Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_SP451020R00010004.pdf | ||
| SF30_SP451020R00010003.pdf | ||
| Attachment 2 Bid Schedule_Revised_ Amendment 3.xlsx | XLSX spreadsheet | |
| SF30_SP451020R00010002.pdf | ||
| SF30_SP451020R00010001.pdf | ||
| Attachment 2 Bid Schedule_Revised_ Amendment 1.xlsx | XLSX spreadsheet | |
| Attachment 5 - Contractor Instructions.pdf | ||
| Attachment 4 CAC Turn-In Receipt.pdf | ||
| Attachment 2 Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 3 CENTCOM.doc | DOC document | |
| SF1449_SP451020R0001.pdf | ||
| Attachment 6 Past Performance Questionairre.doc | DOC document | |
| Attachment 7 Equipment.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
Acceptable Performance Levels
DELIVERABLE
STANDARD
MEASUREMENT
UNIVERSE
PARAGRAPH
ACCEPTABLE
PERFORMANCE
METRIC
METHOD
OF
SURVEILLANCE
REDUCTION
FOR FAILED
APL
| Performance of DEMIL in Acceptable Manner |
| DEMIL is accomplished in accordance with |
DOD 4160.28
| All DEMIL-required property |
| 6.1 |
| Rejection of fewer than 20 items for improper Demilitarization per month. |
| COR Observations |
| 5 – 20% consideration of the value of the task order and past performance annotated |
| Pulling of Correct Property for Requisitions and Adequate Preparation of Requisitioned Property for Transportation |
| Accomplished in accordance with oSOP 4160.21-016 |
| All property issue actions |
| 6.5 |
| No more than 1 reportable incidents per month |
| COR Observations |
| 5 – 20% consideration of the value of the task order and past performance annotated |
Storage of Property in Correct Location Assigned for Property
| Property has an assigned location, is in the proper location and is properly stored/labeled. |
| Current inventory at DLA Disposition Services Afghanistan site. |
| 6.2 |
| No more than 5 reportable incidents per month |
| COR Observations |
| 5 – 20% consideration of the value of the task order and past performance annotated |
Perform Daily Preventative Maintenance Checks for MHE Operated Equipment
| Daily inspection and completion of log. |
| All Government-furnished MHE for utilization under the contract |
| 6.9 |
| 100% All equipment has records updated prior to the use of equipment |
| perodic |
COR review of contractor log 5 – 20% consideration of the value of the task order and past performance annotated
Loading, Unloading and Operation of MHE in Safe and Acceptable Manner
| Safe operation of MHE on a daily basis in accordance with DRMS 4160.21. |
| All incoming and outgoing shipments and movement of property utilizing MHE. All MHE Operations. |
| 6.9 |
| No more than 5 reportable incidents per month and/or more than 1 incidents requiring DLA Disposition Services Afghanistan site personnel to stop activity or provide verbal warnings/ directions to cease unsafe activities. |
| COR Observations |
| 5 – 20% consideration of the value of the task order and past performance annotated |
| Documentation Filed in Appropriate Location |
| Documentation filed in appropriate location within 15 calendar days of receipt in accordance with DRMS-I 4160.21 |
| All documentation received during period being inspected. |
| 6.12 |
| No more than 5 reportable incidents per month with 100% accountability of records |
| COR Observations |
| 5 – 20% consideration of the value of the task order and past performance annotated |
DELIVERABLE
STANDARD
MEASUREMENT
UNIVERSE
PARAGRAPH
ACCEPTABLE
PERFORMANCE
LEVEL
METHOD OF
SURVEILLANCE
REDUCTION
FOR FAILED
APL
| Timely and Complete Preventive Maintenance |
| Preventive Maintenance of All Items on Attachment 1 |
| Completion within three weeks deadline |
| 7.1 |
| No more than 3 items maintained late. Failure to meet APL allowed once during entire contract performance, including options |
| COR Observations |
| 5 – 100% consideration of the value of maintenance and past performance annotated. |
| Unscheduled Maintenance and Repairs |
| MHE Operational in Timely Manner |
| Completion of all equipment in Attachment 6 |
| 7.0 |
| No more than 3 items requiring maintenance or repair exceeding the timeframe per period of performance. Failure to meet APL allowed once per contract annual period of performance. |
| COR Observations |
| 5 – 100% consideration of the value of the unscheduled maintenance or repairs and past performance annotated. |
Ordering of parts and tracking orders
Place order and track delivery of order
| Timeliness of order deliveries. |
| 7.0 |
| No more than 40 late call order part deliveries per contract period. |
| COR Observations |
| 5 – 100% consideration of the value of the orders placed and tracked. Past performance annotated. |
| Scale Calibration |
| Scale is calibrated yearly and in accordance with DLA SOP 4160.01-002 |
| All scales to include surge equipment are calibrated and certificates provided within 10 days of completion |
| 7.9.1 |
| 100% of scales are calibrated annually |
| 100% inspection |
| 5 – 100% consideration of the value of the orders placed and tracked. Past performance annotated. |
| Work area is clean and maintained |
| Work area clean and well maintained. Excess debris and clutter taken to proper areas and end of each day |
| Works areas should be organized and kept clean daily |
| 6.6 |
| No more than 5 reportable incidents per month |
| Random Inspection |
| 5 – 20% consideration of the value of the orders placed and tracked. Past performance annotated. |