Attachment 0001_SOW Attachment 1.7 - Project Schedule_v1.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
Solicitation number
W51EW7-26-R-A002
Issued by

About this file

This is a Project Schedule (Gantt Chart) attachment for a Statement of Work related to the Franklin Commuter Line over East Street Bridge Replacement project under MBTA Contract No. B92PS24, Task Order No. 6. The schedule was created on December 10, 2018, with a beginning date of November 10, 2018, and reflects work planned through June 6, 2019.

The schedule encompasses six major phases totaling approximately 715 days of effort across multiple work packages. Phase 1 (Project Management) runs November 10, 2018 to June 6, 2019 with 209 man-hours and includes Notice to Proceed, Task Specific QA Plan, and Task Specific Project Management Plan. Phase 2 (Analysis of Existing Conditions) spans November 14, 2018 to March 19, 2019 with 125 man-hours, covering research and review of available data, field inspections, MBTA ROW/Safety Training, and preliminary environmental assessments. Phase 3 (Topographic and Property Survey) runs November 14, 2018 to February 12, 2019 with 90 man-hours for field surveys and drawing preparation. Phase 4 (Geotechnical Investigation) covers November 14, 2018 to February 12, 2019 with 90 man-hours, including coordination with Keolis GZA, utility clearance, field drilling, lab testing, and geotechnical reporting. Phase 5 (Bridge Type Study Report) extends from January 2, 2019 to June 6, 2019 with 155 man-hours, encompassing substructure evaluation, superstructure replacement alternatives, construction sequencing concepts, roadway evaluation, clearance mitigation alternatives, detour planning, and MBTA review and finalization. Phase 6 (Value Analysis) runs January 2, 2019 to March 19, 2019 with 76 man-hours for value engineering, constructability analysis, quantity takeoffs, cost analysis, and project scheduling across all project alternatives.

View the file

Other files

File Type Posted
Solicitation Amendment W51EW726RA0020008 SF30.pdf PDF
Solicitation Amendment W51EW726RA0020006 SF30.pdf PDF
Soicitation Amendment W51EW726RA0020005 SF 30.pdf PDF
Attachment 0013 - NCR MATOC SITE VISIT SIGN IN SHEET 23MAR2026.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet- NTE v2.xlsx XLSX spreadsheet
69 - Attachment 0004 SEED PROJ SOW 2020 Title Sheet Alter 1st Flr BTH 085806.pdf PDF
66 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 FDN PLN 041804.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
60 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DRN 041856.pdf PDF
54 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DOM WTR 041859.pdf PDF
53 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC FLR PLN 041826.pdf PDF
50 - Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1ST FLR BTH 085810.pdf PDF
47 - Attachment 0004 SEED PROJ SOW 2014 WTR BFLW DEVICE 079606.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
43 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 MTW DETS 041854.pdf PDF
36 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041836.pdf PDF
31 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN 041877.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
28 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LTG FIX SCHED 041882.pdf PDF
25 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC SIG 041890.pdf PDF
24 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR SIG 041889.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
17 - Attachment 0004 SEED PROJ SOW 2020 Legends Alter 1st FLR BTH 085812.pdf PDF
12 - Attachment 0004 SEED PROJ SOW Attach 1991 EBK VBRJS OG 4 TLT PLNS 041784.pdf PDF
11 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 STAIR PLNS 041783.pdf PDF
9 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 2nd 041798.pdf PDF
3 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 1st FLR PLN 041753.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet - NTE.xlsx XLSX spreadsheet
Attachment 0001_SOW APPENDIX 2.7.8 MYER DPW Excavation Permit.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.7 JBMHH Schematic Outline.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.1 JBMHH Color Map.pdf PDF
Attachment 0001_SOW APPENDIX 2.1.2 APG Environmental Requirements.pdf PDF
Attachment 0001_SOW Attachment 1.6 - Engineering Form 4025.pdf PDF
Attachment 0001_SOW Attachment 1.5 - QCR Submittal Form.pdf PDF
Attachment 0001_SOW Attachment 1.1 - DD1354.pdf PDF
Solicitation W51EW726RA002.pdf PDF
Attachment 0008 - NCR MATOC Section L v4.pdf PDF
68 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SECT DETS 041810.pdf PDF
67 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805.pdf PDF
59 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860.pdf PDF
56 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 TITLE SHT 041709.pdf PDF
51 - Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1st FLR BTH 085811.pdf PDF
44 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PROF SW MTW 041853.pdf PDF
33 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR PLN 041825.pdf PDF
37 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041837.pdf PDF
34 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041828.pdf PDF
35 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041835.pdf PDF
8 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 1st 041797.pdf PDF
5 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 DOOR SCHD 041786.pdf PDF
1 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV 041759 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV01

1.00.043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.043701.043708.043715.043722.043729.043736.0
Time Period
Weekly
Gantt Chart Dates
Beginning Date11/10/18Updated:12/10/18
Today9/15/25By:COR
20182019
(format critical path tasks in red text below)StartEndTaskNovNovNovDecDecDecDecDecJanJanJanJanFebFebFebFebMarMarMarMarMarAprAprAprAprMayMayMayMayJunJunJunJunJunJulJulJulJulAugAugAug
LevelSr. No.TaskResource/MHDateDateDuration (days)101724181522295121926291623291623306132027411182518152229613202731017
1P1Project Management11/10/20186/6/19209
A1.1Notice to Proceed11/10/201811/13/201831.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A1.2Task Specific QA Plan2011/26/201812/14/2018181.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A1.3Task Specific Project Management Plan2011/26/201812/14/2018181.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
0043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
2P2Analysis of Existing Conditions11/14/20183/19/1912543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.1Research & Review Available Data and Plans2211/14/201801/29/2019762.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.2Plan/Coordinate Field Inspection1211/14/201812/30/2018462.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.3Field Inspection & Summary of Findings4601/03/201901/09/201962.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.4MBTA ROW/Safety Training4812/01/201812/19/2018182.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.5Preliminary Assessment - Environmental Checklist for Design1401/02/201903/19/2019762.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A2.6Preliminary Assessment - Project Checklist for Environmental1401/02/201903/19/2019762.643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
2P3Topograhic and Property Survey11/14/20182/12/1990343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A3.1Field Work "Surveys"34012/12/201801/15/2019343.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A3.2Survey Drawing Preparation12001/02/201901/29/2019273.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
3P4Geotechnical Investigation11/14/20182/12/1990443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.1Coordination w/ KeolisGZA11/14/201812/18/2018344.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.2Utility Clearance/access coordination with KeolisGZA11/28/201812/18/2018204.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.3Field DrillingGZA01/06/201901/09/201934.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.4Lab TestingGZA01/09/201901/15/201964.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A4.5Draft geotech ReportGZA01/16/201902/12/2019274.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
5P5Bridge Type Study Report01/2/20196/6/19155543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.1Existing Substructure Evaluation and Assessment4401/30/201902/19/2019205.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.2Superstructure Replacement Alternatives (3 Types)10001/02/201902/19/2019485.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.3Sequence of Construction Concepts4801/23/201902/19/2019275.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.4Exist. Roadway Evaluation and Assessment2401/30/201902/05/201965.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.5Roadway Clearance Mitigation Alternatives (Hor./Vert. 2 Alternates)10602/06/201903/05/2019275.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.6Preparation of Conceptual Detour Plan2203/06/201903/12/201965.643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.7Evaluation and Prepare Draft Report8802/20/201903/19/2019275.743414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
QA Review803/26/201904/01/2019643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
QA Updates2404/02/201904/08/2019643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
5.8Submit Type Study Report004/09/201904/09/2019043414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.9MBTA ReviewMBTA04/10/201905/08/2019285.943414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A5.1Finalize Report Upon MBTA Review2405/09/201906/06/2019285.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
P6Value Analysis01/2/20193/19/1976643414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.1Value Engineering4401/02/201902/19/2019486.143414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.2Constructability5201/30/201902/20/2019216.243414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.3Preliminary Quantity Take-Off (All Alternates)5802/20/201903/05/2019136.343414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.4Cost Analysis / Project Estimates (All Alternates)6603/06/201903/19/2019136.443414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0
A6.5Project Schedule4003/06/201903/19/2019136.543414.043421.043428.043435.043442.043449.043456.043463.043470.043477.043484.043491.043498.043505.043512.043519.043526.043533.043540.043547.043554.043561.043568.043575.043582.043589.043596.043603.043610.043617.043624.043631.043638.043645.043652.043659.043666.043673.043680.043687.043694.0

&D &T MBTA Contract No. B92PS24 - Task Order No. 6 Franklin Commuter Line over East Street Bridge Replacement Work Flow Management &P of &N