ASBUILT_WL-00-03.pdf
PDF 3 MB Posted
- Solicitation number
- S-C01510-00012593
- Issued by
- Lake County, Oregon
About this file
This is a set of engineering construction drawings from the City of Albany Public Works Department for the Goldfish Farm Road Water Line project (WL-00-03). The drawings detail the installation of a new 24" water line along Goldfish Farm Road, including fire hydrant assemblies, water service connections, and associated infrastructure. The project includes multiple construction phases with detailed station points, elevations, and pipe grades throughout the alignment. Key components include water valve installations, ditch crossings, culvert work, and traffic control measures during construction.
The technical specifications show requirements for materials including ductile iron pipe, butterfly valves, air/vacuum release valves, and corporation stops. Construction details include standard drawings for hydrant installations, valve box details, pipe bedding, and water meter connections. Traffic control plans indicate a maximum 300-foot moving road closure will be required during construction, with signage directing traffic to use Price Road/Timber Street as an alternate route. The drawings specify that all construction must conform to City of Albany 1998 Standard Specifications and special provisions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .