20252031_A1_Attachment A_Cuthbert Concept Plan.pdf
PDF 7 MB Posted
- Solicitation number
- S-C01510-00012593
- Issued by
- Lake County, Oregon
About this file
This is a concept plan attachment for the Cuthbert site development project involving infrastructure improvements and site redesign. The plan outlines a comprehensive site reconfiguration that includes the realignment of the existing parking lot, creation of a new entry plaza, installation of a new ticket booth, and the addition of new paved pathways throughout the facility. The project incorporates multiple functional elements including a pull-through bus staging area designed to replace parking as needed, potential stormwater management infrastructure, and improved connectivity to adjacent amenities such as the Cuthbert Amphitheater, Science Center, and Community Garden. The parking capacity is designed to accommodate 53 total stalls, consisting of 30 standard stalls and 23 ADA-compliant stalls, representing a significant consideration in the site's operational capacity and accessibility standards.
The concept plan demonstrates a multi-use approach to site development that balances operational needs with environmental management and accessibility requirements. The integration of stormwater facilities, new paved pathways, and the bus staging area indicates a focus on sustainable infrastructure and improved visitor circulation. The plan's emphasis on ADA stalls comprising approximately 43 percent of total parking capacity reflects a commitment to accessibility compliance. This conceptual framework provides the baseline for the detailed design and bidding process that will follow for the actual construction and implementation of the Cuthbert site improvements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUTHBERT PARKING LOT
REALIGNED PRE’S TRAIL
DR
OP
OFF
NEW ENTRY
PLAZA POTENTIAL
STORMWATER
PULL-THROUGH BUS
STAGING AREA TO
REPLACE PARKING
AS NEEDED
NEW TICKET
BOOTH LOCATION
NEW PAVED
PATH
NEW PAVED
PATH
CANOE CANAL
CUTHBERT
AMPHITHEATER
SCIENCE
CENTER
COMMUNITY
GARDEN
DAY ISLAND ROAD
GOAL 5
PARKING COUNTS
STANDARD STALLS 30 STALLS
ADA STALLS 23 STALLS
53 TOTALS STALLS
ATTACHMENT A
File details come from the government source that posted it. Updated .