This is a concept plan attachment for the Cuthbert site development project involving infrastructure improvements and site redesign. The plan outlines a comprehensive site reconfiguration that includes the realignment of the existing parking lot, creation of a new entry plaza, installation of a new ticket booth, and the addition of new paved pathways throughout the facility. The project incorporates multiple functional elements including a pull-through bus staging area designed to replace parking as needed, potential stormwater management infrastructure, and improved connectivity to adjacent amenities such as the Cuthbert Amphitheater, Science Center, and Community Garden. The parking capacity is designed to accommodate 53 total stalls, consisting of 30 standard stalls and 23 ADA-compliant stalls, representing a significant consideration in the site's operational capacity and accessibility standards.

The concept plan demonstrates a multi-use approach to site development that balances operational needs with environmental management and accessibility requirements. The integration of stormwater facilities, new paved pathways, and the bus staging area indicates a focus on sustainable infrastructure and improved visitor circulation. The plan's emphasis on ADA stalls comprising approximately 43 percent of total parking capacity reflects a commitment to accessibility compliance. This conceptual framework provides the baseline for the detailed design and bidding process that will follow for the actual construction and implementation of the Cuthbert site improvements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUTHBERT PARKING LOT

REALIGNED PRE’S TRAIL

DR

OP

OFF

NEW ENTRY

PLAZA POTENTIAL

STORMWATER

PULL-THROUGH BUS

STAGING AREA TO

REPLACE PARKING

AS NEEDED

NEW TICKET

BOOTH LOCATION

NEW PAVED

PATH

NEW PAVED

PATH

CANOE CANAL

CUTHBERT

AMPHITHEATER

SCIENCE

CENTER

COMMUNITY

GARDEN

DAY ISLAND ROAD

GOAL 5

PARKING COUNTS

STANDARD STALLS 30 STALLS

ADA STALLS 23 STALLS

53 TOTALS STALLS