ASBUILT_NWN_20240905.pdf
PDF 2 MB Posted
- Solicitation number
- S-C01510-00012593
- Issued by
- Lake County, Oregon
About this file
This document appears to be an as-built construction drawing from NW Natural showing utility infrastructure details along Christopher Avenue SE. The drawing includes cross-sections of utility locations, with specific instructions to contact Corossion Tech representative Jered Thomas at 971-808-7634 at the start of the job. The drawing details multiple utility crossings, pipe sizes, and infrastructure components along the roadway.
The technical drawing contains specific measurements, coordinates, and utility markings in both plan and profile views. The document appears to be part of a larger bridge replacement project at Cox Creek and Goldfish Farm Road, though the drawing focuses specifically on the utility infrastructure documentation. The drawing includes a compass rose for orientation and detailed annotations of existing utility locations and specifications. A highlighted note in yellow indicates "2' deep under patch below," suggesting specific depth requirements for utility work in that area.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
daineal.malone Highlight daineal.malone Highlight daineal.malone Highlight daineal.malone Highlight
File details come from the government source that posted it. Updated .