Appendix F - Supplemental MVSS Drawings.pdf

PDF 10 MB Posted

Attached to
RFP 118-26 MVSS Bus Maintenance Contract
Solicitation number
BD-27-1206-40000-40000-132987
Issued by
Suffolk County, Massachusetts

About this file

This file consists of supplemental Mobile Video Surveillance System (MVSS) Phase 2 design drawings submitted by the Massachusetts Bay Transportation Authority (MBTA) for the replacement of Network Video Recorders (NVRs), antennas, and cellular routers across the agency's transit fleet. The project encompasses detailed technical specifications and installation procedures for multiple bus series (1400-Series, 2000-Series, 2100-Series, 3100-Series, 0800-Series, 0900-Series, Green Line Type 9 vehicles, and ferry vessels) as well as installation guidance for Axiomtek and Nuvo NVR replacement configurations. The drawings indicate this is a 100% design submission dated March 2024 under MBTA Contract No. 24-XX and provide comprehensive mounting details, existing and proposed wiring diagrams, and equipment specifications for contractor implementation. Key installation requirements include removal and disposal of existing sheet metal enclosures, installation of new cellular routers and antennas, rerouting of ethernet and power cables, replacement of fuse blocks, and programming of 15-minute shutdown delays for NVR and router equipment upon loss of ignition power.

The documentation establishes strict general notes and electrical specifications requiring contractors to comply with multiple reference standards including ANSI, ASTM, NEC, IEEE, and Massachusetts Building Code requirements. Contractors are responsible for all permits, inspections, approvals, and associated fees, with certificates of completion required before final payment. The scope mandates field verification of cable routes and equipment locations, coordination of access with the MBTA project office at least five days in advance, and protection of existing structures and finishes from damage during installation. Contractor obligations include deletion of all data from removed equipment prior to disposal, recycling of network video recorders and metals, patching of finishes where equipment is removed without replacement, and maintenance of continuous operations of existing facilities through necessary temporary connections between new and existing work. The project requires adherence to temporary pathway requirements for construction activities, with minimum 36-inch-wide unobstructed paths maintained during work execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

MARCH 2024

AutoCAD SHX Text

APPROVALS:

AutoCAD SHX Text

SHEET: G-001 PLAN NO: 176876

AutoCAD SHX Text

VOLUME 2 OF 2

AutoCAD SHX Text Plan No.'s 176876 - 176887

AutoCAD SHX Text

DANIEL F. LAURICH

AutoCAD SHX Text Date

AutoCAD SHX Text

%%UMBTA CONTRACT NO. 24-XX

AutoCAD SHX Text Director of Security and Emergency Management

AutoCAD SHX Text

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

AutoCAD SHX Text Tel: 617-242-9222

AutoCAD SHX Text 120 St. James Avenue

AutoCAD SHX Text Boston, MA 02116

AutoCAD SHX Text Fax: 617-242-9824

AutoCAD SHX Text MOBILE VIDEO SURVEILLANCE SYSTEM (MVSS) PHASE 2 NETWORK VIDEO RECORDER (NVR), ANTENNA AND CELLULAR ROUTER REPLACEMENT PROJECT

AutoCAD SHX Text

100% DESIGN SUBMISSION

burnsc3 Rectangle burnsc3 Rectangle burnsc3 Text Box

CURRENT

DRAWN

BY

SHEET

PLAN NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

DESIGN

BY

CHECK

BY

DATE:

SCALE:

MBTA CONTRACT NO. 24-XX

MOBILE VIDEO SURVEILLANCE SYSTEM (MVSS) PHASE 2

NETWORK VIDEO RECORDER (NVR), ANTENNA AND

CELLULAR ROUTER REPLACEMENT PROJECT

BY CHK'D APPISSUE DATE

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITYmassDOT

Massachusetts Department of Transportation

MARCH 2024DESCRIPTION

PROJECT MANAGER DATE

100% DESIGN SUBMISSION

100% PROGRESS

SUBMITTAL

INDEX

PP PJT KGS G-002

N/A 176877

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text G-001

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text G-002

AutoCAD SHX Text

INDEX

AutoCAD SHX Text G-003

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

SC-001

AutoCAD SHX Text

SC-002

AutoCAD SHX Text

SC-003

AutoCAD SHX Text

SC-004

AutoCAD SHX Text

SC-005

AutoCAD SHX Text

AXIOMTEK REPLACEMENT EQUIPMENT MOUNTING DETAILS

AutoCAD SHX Text

PLAN #

AutoCAD SHX Text

OFFICE: 617-242-9222

AutoCAD SHX Text

FAX: 617-242-9824

AutoCAD SHX Text

120 ST. JAMES AVE.

AutoCAD SHX Text

BOSTON, MA 02116

AutoCAD SHX Text THIS SUBMITTAL IS INTENDED FOR REVIEW PURPOSES ONLY. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

AXIOMTEK REPLACEMENT EXISTING WIRING DIAGRAM

AutoCAD SHX Text

TYPICAL ENCLOSURE ELEVATION

AutoCAD SHX Text

NUVO REPLACEMENT EXISTING WIRING DIAGRAM

AutoCAD SHX Text

SC-006

AutoCAD SHX Text

NUVO REPLACEMENT EQUIPMENT MOUNTING DETAILS

AutoCAD SHX Text

AXIOMTEK REPLACEMENT PROPOSED WIRING DIAGRAM

AutoCAD SHX Text

NUVO REPLACEMENT PROPOSED WIRING DIAGRAM

AutoCAD SHX Text

SC-007

AutoCAD SHX Text

GL9 NUVO REPLACEMENT EXISTING WIRING DIAGRAM

AutoCAD SHX Text

SC-008

AutoCAD SHX Text

GL9 NUVO REPLACEMENT PROPOSED WIRING DIAGRAM

AutoCAD SHX Text

SC-009

AutoCAD SHX Text 176876

AutoCAD SHX Text 176877

AutoCAD SHX Text 176878

AutoCAD SHX Text 176879

AutoCAD SHX Text 176880

AutoCAD SHX Text 176881

AutoCAD SHX Text 176882

AutoCAD SHX Text 176883

AutoCAD SHX Text 176884

AutoCAD SHX Text 176885

AutoCAD SHX Text 176886

AutoCAD SHX Text 176887 burnsc3 Rectangle burnsc3

DRAWN

BY

SHEET

PLAN NO.

ISSUE

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

DESIGN

BY

CHECK

BY

DATE:

SCALE:

MBTA CONTRACT NO. 24-XX

MOBILE VIDEO SURVEILLANCE SYSTEM (MVSS) PHASE 2

NETWORK VIDEO RECORDER (NVR), ANTENNA AND

CELLULAR ROUTER REPLACEMENT PROJECT

BY CHK'D APPISSUE DATE

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITYmassDOT

Massachusetts Department of Transportation

MARCH 2024DESCRIPTION

PROJECT MANAGER DATE

100% DESIGN SUBMISSION

100% PROGRESS

SUBMITTAL

GENERAL NOTES

PP PJT KGS G-003

N/A 176878

AutoCAD SHX Text

OFFICE: 617-242-9222

AutoCAD SHX Text

FAX: 617-242-9824

AutoCAD SHX Text

120 ST. JAMES AVE.

AutoCAD SHX Text

BOSTON, MA 02116

AutoCAD SHX Text THIS SUBMITTAL IS INTENDED FOR REVIEW PURPOSES ONLY. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

%%UABBREVAITIONS

AutoCAD SHX Text

%%UGENERAL NOTES

AutoCAD SHX Text

12. NESC - NATIONAL ELECTRIC SAFETY CODE. NESC - NATIONAL ELECTRIC SAFETY CODE. 13. NEMA - NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION. NEMA - NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION. 14. NFPA - NATIONAL FIRE PROTECTION ASSOCIATION. NFPA - NATIONAL FIRE PROTECTION ASSOCIATION. 15. OSHA - OCCUPATIONAL SAFETY AND HEALTH ACT. OSHA - OCCUPATIONAL SAFETY AND HEALTH ACT. 16. TIA - TELECOMMUNICATIONS INDUSTRY ASSOCIATION. TIA - TELECOMMUNICATIONS INDUSTRY ASSOCIATION. 17. MBC - MASS BUILDING CODE 9TH EDITION. MBC - MASS BUILDING CODE 9TH EDITION. 18. UL - UNDERWRITERS' LABORATORIES, INC. UL - UNDERWRITERS' LABORATORIES, INC. 19. NATIONAL, STATE AND LOCAL CODES OF ALL AUTHORITIES HAVING JURISDICTION. NATIONAL, STATE AND LOCAL CODES OF ALL AUTHORITIES HAVING JURISDICTION. 20. ADA - AMERICANS WITH DISABILITIES ACT ADA - AMERICANS WITH DISABILITIES ACT

AutoCAD SHX Text B. IN ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH IN ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH IN ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH OTHER LEGAL REQUIREMENTS, COMPLY WITH OTHER LEGAL REQUIREMENTS, COMPLY WITH LEGAL REQUIREMENTS, COMPLY WITH LEGAL REQUIREMENTS, COMPLY WITH REQUIREMENTS, COMPLY WITH REQUIREMENTS, COMPLY WITH COMPLY WITH COMPLY WITH WITH WITH CURRENT PROVISIONS OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE PROVISIONS OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE PROVISIONS OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE CODES AND REGULATIONS IN EFFECT DURING THE CODES AND REGULATIONS IN EFFECT DURING THE AND REGULATIONS IN EFFECT DURING THE AND REGULATIONS IN EFFECT DURING THE REGULATIONS IN EFFECT DURING THE REGULATIONS IN EFFECT DURING THE IN EFFECT DURING THE IN EFFECT DURING THE EFFECT DURING THE EFFECT DURING THE DURING THE DURING THE THE THE PROGRESS OF THE WORK, AND THE FOLLOWING:

AutoCAD SHX Text CCTV CLOSED CIRCUIT TELEVISION CLOSED CIRCUIT TELEVISION GL GREEN LINE GREEN LINE IP INTERNET PROTOCOL INTERNET PROTOCOL N/C NOT CONNECTED NOT CONNECTED NVR NETWORK VIDEO RECORDER NETWORK VIDEO RECORDER NTS NOT TO SCALE NOT TO SCALE N/A NOT APPLICABLENOT APPLICABLE

AutoCAD SHX Text ALL REQUIREMENTS DESCRIBED HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO REQUIREMENTS DESCRIBED HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO REQUIREMENTS DESCRIBED HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO DESCRIBED HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO DESCRIBED HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO HEREIN SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO SHALL BE INCLUDED IN THE CONTRACTOR'S BID. NO BE INCLUDED IN THE CONTRACTOR'S BID. NO BE INCLUDED IN THE CONTRACTOR'S BID. NO INCLUDED IN THE CONTRACTOR'S BID. NO INCLUDED IN THE CONTRACTOR'S BID. NO IN THE CONTRACTOR'S BID. NO IN THE CONTRACTOR'S BID. NO THE CONTRACTOR'S BID. NO THE CONTRACTOR'S BID. NO CONTRACTOR'S BID. NO CONTRACTOR'S BID. NO BID. NO BID. NO NO NO ADDITIONAL COMPENSATION SHALL BE MADE TO THE CONTRACTOR FOR THE FOLLOWING:

AutoCAD SHX Text

1. DRAWINGS AND SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY DRAWINGS AND SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY AND SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY AND SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY REQUIREMENTS SHALL GOVERN WHERE THEY REQUIREMENTS SHALL GOVERN WHERE THEY SHALL GOVERN WHERE THEY SHALL GOVERN WHERE THEY GOVERN WHERE THEY GOVERN WHERE THEY WHERE THEY WHERE THEY THEY THEY EXCEED CODE AND REGULATIONS REQUIREMENTS. 2. WHERE REQUIREMENTS BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE WHERE REQUIREMENTS BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE REQUIREMENTS BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE REQUIREMENTS BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE GOVERNING CODES AND REGULATIONS VARY, THE GOVERNING CODES AND REGULATIONS VARY, THE CODES AND REGULATIONS VARY, THE CODES AND REGULATIONS VARY, THE AND REGULATIONS VARY, THE AND REGULATIONS VARY, THE REGULATIONS VARY, THE REGULATIONS VARY, THE VARY, THE VARY, THE THE THE MORE STRINGENT SHALL APPLY. 3. NOTHING CONTAINED IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS NOTHING CONTAINED IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS CONTAINED IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS CONTAINED IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS CONTRACT DOCUMENTS SHALL BE CONSTRUED AS CONTRACT DOCUMENTS SHALL BE CONSTRUED AS DOCUMENTS SHALL BE CONSTRUED AS DOCUMENTS SHALL BE CONSTRUED AS SHALL BE CONSTRUED AS SHALL BE CONSTRUED AS BE CONSTRUED AS BE CONSTRUED AS CONSTRUED AS CONSTRUED AS AS AS AUTHORITY OR PERMISSION TO DISREGARD OR VIOLATE LEGAL OR CODE OR PERMISSION TO DISREGARD OR VIOLATE LEGAL OR CODE OR PERMISSION TO DISREGARD OR VIOLATE LEGAL OR CODE PERMISSION TO DISREGARD OR VIOLATE LEGAL OR CODE PERMISSION TO DISREGARD OR VIOLATE LEGAL OR CODE TO DISREGARD OR VIOLATE LEGAL OR CODE TO DISREGARD OR VIOLATE LEGAL OR CODE DISREGARD OR VIOLATE LEGAL OR CODE DISREGARD OR VIOLATE LEGAL OR CODE OR VIOLATE LEGAL OR CODE OR VIOLATE LEGAL OR CODE VIOLATE LEGAL OR CODE VIOLATE LEGAL OR CODE LEGAL OR CODE LEGAL OR CODE OR CODE OR CODE CODE CODE REQUIREMENTS. THE CONTRACTOR SHALL IMMEDIATELY DRAW TO THE ATTENTION THE CONTRACTOR SHALL IMMEDIATELY DRAW TO THE ATTENTION THE CONTRACTOR SHALL IMMEDIATELY DRAW TO THE ATTENTION CONTRACTOR SHALL IMMEDIATELY DRAW TO THE ATTENTION CONTRACTOR SHALL IMMEDIATELY DRAW TO THE ATTENTION SHALL IMMEDIATELY DRAW TO THE ATTENTION SHALL IMMEDIATELY DRAW TO THE ATTENTION IMMEDIATELY DRAW TO THE ATTENTION IMMEDIATELY DRAW TO THE ATTENTION DRAW TO THE ATTENTION DRAW TO THE ATTENTION TO THE ATTENTION TO THE ATTENTION THE ATTENTION THE ATTENTION ATTENTION ATTENTION OF THE ENGINEER ANY SUCH CONFLICTS NOTED IN THE CONTRACT DOCUMENTS.

AutoCAD SHX Text

%%UDEMOLITION NOTES

AutoCAD SHX Text

1. ALL MATERIALS TO BE REMOVED AND DISPOSED SHALL BE DISPOSED OF BY LEGAL ALL MATERIALS TO BE REMOVED AND DISPOSED SHALL BE DISPOSED OF BY LEGAL MEANS BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE MBTA. ITEMS SUCH AS NETWORK VIDEO RECORDERS, CELLULAR MODEMS, METALS, AND CABLE SHALL BE RECYCLED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION CONTRACTOR SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION CONTRACTOR SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION SHALL BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION BE RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION RESPONSIBLE FOR DELETING ALL DATA AND INFORMATION FOR DELETING ALL DATA AND INFORMATION FOR DELETING ALL DATA AND INFORMATION DELETING ALL DATA AND INFORMATION DELETING ALL DATA AND INFORMATION ALL DATA AND INFORMATION ALL DATA AND INFORMATION DATA AND INFORMATION DATA AND INFORMATION AND INFORMATION AND INFORMATION INFORMATION INFORMATION FROM ALL EQUIPMENT REMOVED PRIOR TO DISPOSAL. 3. WHERE EQUIPMENT IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE WHERE EQUIPMENT IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE EQUIPMENT IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE EQUIPMENT IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE IS TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE TO BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE BE REMOVED AND NO NEW EQUIPMENT INSTALLED THE REMOVED AND NO NEW EQUIPMENT INSTALLED THE REMOVED AND NO NEW EQUIPMENT INSTALLED THE AND NO NEW EQUIPMENT INSTALLED THE AND NO NEW EQUIPMENT INSTALLED THE NO NEW EQUIPMENT INSTALLED THE NO NEW EQUIPMENT INSTALLED THE NEW EQUIPMENT INSTALLED THE NEW EQUIPMENT INSTALLED THE EQUIPMENT INSTALLED THE EQUIPMENT INSTALLED THE INSTALLED THE INSTALLED THE THE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING EXISTING FINISHES. 4. SHOULD EXISTING STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE SHOULD EXISTING STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE EXISTING STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE EXISTING STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE STRUCTURES OR FINISHES BE DAMAGED DURING ANY PART OF THE OR FINISHES BE DAMAGED DURING ANY PART OF THE OR FINISHES BE DAMAGED DURING ANY PART OF THE FINISHES BE DAMAGED DURING ANY PART OF THE FINISHES BE DAMAGED DURING ANY PART OF THE BE DAMAGED DURING ANY PART OF THE BE DAMAGED DURING ANY PART OF THE DAMAGED DURING ANY PART OF THE DAMAGED DURING ANY PART OF THE DURING ANY PART OF THE DURING ANY PART OF THE ANY PART OF THE ANY PART OF THE PART OF THE PART OF THE OF THE OF THE THE THE DEMOLITION OR INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING INSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING SHALL BE RESPONSIBLE FOR REPAIRING SHALL BE RESPONSIBLE FOR REPAIRING BE RESPONSIBLE FOR REPAIRING BE RESPONSIBLE FOR REPAIRING RESPONSIBLE FOR REPAIRING RESPONSIBLE FOR REPAIRING FOR REPAIRING FOR REPAIRING REPAIRING REPAIRING DAMAGED STRUCTURES OR FINISHES.

AutoCAD SHX Text

1. CABLE ROUTES, DISTANCES, AND EQUIPMENT LOCATIONS SHALL BE FIELD VERIFIED. CABLE ROUTES, DISTANCES, AND EQUIPMENT LOCATIONS SHALL BE FIELD VERIFIED. 2. UNLESS OTHERWISE NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED UNLESS OTHERWISE NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED OTHERWISE NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED OTHERWISE NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED NOTED, WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED WHEREVER A NORMAL PATH OF TRAVEL IS SCHEDULED A NORMAL PATH OF TRAVEL IS SCHEDULED A NORMAL PATH OF TRAVEL IS SCHEDULED NORMAL PATH OF TRAVEL IS SCHEDULED NORMAL PATH OF TRAVEL IS SCHEDULED PATH OF TRAVEL IS SCHEDULED PATH OF TRAVEL IS SCHEDULED OF TRAVEL IS SCHEDULED OF TRAVEL IS SCHEDULED TRAVEL IS SCHEDULED TRAVEL IS SCHEDULED IS SCHEDULED IS SCHEDULED SCHEDULED SCHEDULED TO BE TEMPORARILY BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BE TEMPORARILY BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BE TEMPORARILY BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF TEMPORARILY BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF TEMPORARILY BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BLOCKED BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF BY CONSTRUCTION, PROVIDE A TEMPORARY PATH OF CONSTRUCTION, PROVIDE A TEMPORARY PATH OF CONSTRUCTION, PROVIDE A TEMPORARY PATH OF PROVIDE A TEMPORARY PATH OF PROVIDE A TEMPORARY PATH OF A TEMPORARY PATH OF A TEMPORARY PATH OF TEMPORARY PATH OF TEMPORARY PATH OF PATH OF PATH OF OF OF TRAVEL. SUBMIT THE PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR SUBMIT THE PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR SUBMIT THE PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR THE PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR THE PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR PROPOSED PATH AND TIME PERIOD FOR DIVERSION FOR PATH AND TIME PERIOD FOR DIVERSION FOR PATH AND TIME PERIOD FOR DIVERSION FOR AND TIME PERIOD FOR DIVERSION FOR AND TIME PERIOD FOR DIVERSION FOR TIME PERIOD FOR DIVERSION FOR TIME PERIOD FOR DIVERSION FOR PERIOD FOR DIVERSION FOR PERIOD FOR DIVERSION FOR FOR DIVERSION FOR FOR DIVERSION FOR DIVERSION FOR DIVERSION FOR FOR FOR APPROVAL BY THE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE BY THE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE BY THE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE THE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE THE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE ENGINEER. THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE THIS PATH SHALL BE A MINIMUM OF 36 INCHES WIDE PATH SHALL BE A MINIMUM OF 36 INCHES WIDE PATH SHALL BE A MINIMUM OF 36 INCHES WIDE SHALL BE A MINIMUM OF 36 INCHES WIDE SHALL BE A MINIMUM OF 36 INCHES WIDE BE A MINIMUM OF 36 INCHES WIDE BE A MINIMUM OF 36 INCHES WIDE A MINIMUM OF 36 INCHES WIDE A MINIMUM OF 36 INCHES WIDE MINIMUM OF 36 INCHES WIDE MINIMUM OF 36 INCHES WIDE OF 36 INCHES WIDE OF 36 INCHES WIDE 36 INCHES WIDE 36 INCHES WIDE INCHES WIDE INCHES WIDE WIDE WIDE WITH NO OBSTRUCTIONS AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL NO OBSTRUCTIONS AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL NO OBSTRUCTIONS AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL OBSTRUCTIONS AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL OBSTRUCTIONS AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL AND REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL REMAIN IN PLACE UNTIL THE NORMAL PATH OF TRAVEL IN PLACE UNTIL THE NORMAL PATH OF TRAVEL IN PLACE UNTIL THE NORMAL PATH OF TRAVEL PLACE UNTIL THE NORMAL PATH OF TRAVEL PLACE UNTIL THE NORMAL PATH OF TRAVEL UNTIL THE NORMAL PATH OF TRAVEL UNTIL THE NORMAL PATH OF TRAVEL THE NORMAL PATH OF TRAVEL THE NORMAL PATH OF TRAVEL NORMAL PATH OF TRAVEL NORMAL PATH OF TRAVEL PATH OF TRAVEL PATH OF TRAVEL OF TRAVEL OF TRAVEL TRAVEL TRAVEL IS RESTORED. IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER RESTORED. IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER RESTORED. IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER IN ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER ADDITION, SET BARRICADES, WARNING LIGHTS, AND OTHER SET BARRICADES, WARNING LIGHTS, AND OTHER SET BARRICADES, WARNING LIGHTS, AND OTHER BARRICADES, WARNING LIGHTS, AND OTHER BARRICADES, WARNING LIGHTS, AND OTHER WARNING LIGHTS, AND OTHER WARNING LIGHTS, AND OTHER LIGHTS, AND OTHER LIGHTS, AND OTHER AND OTHER AND OTHER OTHER OTHER PROTECTIVE DEVICES THAT ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, DEVICES THAT ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, DEVICES THAT ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, THAT ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, THAT ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, ARE NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, NECESSARY, IN THE JUDGEMENT OF THE ENGINEER, IN THE JUDGEMENT OF THE ENGINEER, IN THE JUDGEMENT OF THE ENGINEER, THE JUDGEMENT OF THE ENGINEER, THE JUDGEMENT OF THE ENGINEER, JUDGEMENT OF THE ENGINEER, JUDGEMENT OF THE ENGINEER, OF THE ENGINEER, OF THE ENGINEER, THE ENGINEER, THE ENGINEER, ENGINEER, ENGINEER, FOR THE PROTECTION OF THE PUBLIC AND MBTA EMPLOYEES. 3. VERIFY ALL EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD VERIFY ALL EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD ALL EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD ALL EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD EXISTING DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD DIMENSIONS, GRADES, AND MEASUREMENTS IN THE FIELD GRADES, AND MEASUREMENTS IN THE FIELD GRADES, AND MEASUREMENTS IN THE FIELD AND MEASUREMENTS IN THE FIELD AND MEASUREMENTS IN THE FIELD MEASUREMENTS IN THE FIELD MEASUREMENTS IN THE FIELD IN THE FIELD IN THE FIELD THE FIELD THE FIELD FIELD FIELD BEFORE COMMENCING WORK AND PROMPTLY NOTIFY THE ENGINEER OF ANY COMMENCING WORK AND PROMPTLY NOTIFY THE ENGINEER OF ANY COMMENCING WORK AND PROMPTLY NOTIFY THE ENGINEER OF ANY WORK AND PROMPTLY NOTIFY THE ENGINEER OF ANY WORK AND PROMPTLY NOTIFY THE ENGINEER OF ANY AND PROMPTLY NOTIFY THE ENGINEER OF ANY AND PROMPTLY NOTIFY THE ENGINEER OF ANY PROMPTLY NOTIFY THE ENGINEER OF ANY PROMPTLY NOTIFY THE ENGINEER OF ANY NOTIFY THE ENGINEER OF ANY NOTIFY THE ENGINEER OF ANY THE ENGINEER OF ANY THE ENGINEER OF ANY ENGINEER OF ANY ENGINEER OF ANY OF ANY OF ANY ANY ANY DISCREPANCIES. WHERE THE CLEAR INTENT OF THE NEW WORK IS TO MATCH WHERE THE CLEAR INTENT OF THE NEW WORK IS TO MATCH WHERE THE CLEAR INTENT OF THE NEW WORK IS TO MATCH WHERE THE CLEAR INTENT OF THE NEW WORK IS TO MATCH THE CLEAR INTENT OF THE NEW WORK IS TO MATCH THE CLEAR INTENT OF THE NEW WORK IS TO MATCH CLEAR INTENT OF THE NEW WORK IS TO MATCH CLEAR INTENT OF THE NEW WORK IS TO MATCH INTENT OF THE NEW WORK IS TO MATCH INTENT OF THE NEW WORK IS TO MATCH OF THE NEW WORK IS TO MATCH OF THE NEW WORK IS TO MATCH THE NEW WORK IS TO MATCH THE NEW WORK IS TO MATCH NEW WORK IS TO MATCH NEW WORK IS TO MATCH WORK IS TO MATCH WORK IS TO MATCH IS TO MATCH IS TO MATCH TO MATCH TO MATCH MATCH MATCH EXISTING CONDITIONS, THE FIELD CONDITIONS SHALL GOVERN. 4. ALL APPLICABLE LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR ALL APPLICABLE LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR APPLICABLE LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR APPLICABLE LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR LICENSE, INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR INSURANCE, AND PERMITS NEED TO BE SUBMITTED PRIOR AND PERMITS NEED TO BE SUBMITTED PRIOR AND PERMITS NEED TO BE SUBMITTED PRIOR PERMITS NEED TO BE SUBMITTED PRIOR PERMITS NEED TO BE SUBMITTED PRIOR NEED TO BE SUBMITTED PRIOR NEED TO BE SUBMITTED PRIOR TO BE SUBMITTED PRIOR TO BE SUBMITTED PRIOR BE SUBMITTED PRIOR BE SUBMITTED PRIOR SUBMITTED PRIOR SUBMITTED PRIOR PRIOR PRIOR TO THE WORK. 5. SCOPE OF WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND SCOPE OF WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND OF WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND OF WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND REQUIRED LABOR, MATERIALS, EQUIPMENT AND REQUIRED LABOR, MATERIALS, EQUIPMENT AND LABOR, MATERIALS, EQUIPMENT AND LABOR, MATERIALS, EQUIPMENT AND MATERIALS, EQUIPMENT AND MATERIALS, EQUIPMENT AND EQUIPMENT AND EQUIPMENT AND AND AND SERVICES NECESSARY TO COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY NECESSARY TO COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY NECESSARY TO COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY TO COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY TO COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY COMPLETE AND SAFELY INSTALL THE WORK IN CONFORMITY AND SAFELY INSTALL THE WORK IN CONFORMITY AND SAFELY INSTALL THE WORK IN CONFORMITY SAFELY INSTALL THE WORK IN CONFORMITY SAFELY INSTALL THE WORK IN CONFORMITY INSTALL THE WORK IN CONFORMITY INSTALL THE WORK IN CONFORMITY THE WORK IN CONFORMITY THE WORK IN CONFORMITY WORK IN CONFORMITY WORK IN CONFORMITY IN CONFORMITY IN CONFORMITY CONFORMITY CONFORMITY WITH REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION. 6. SITE CLEANLINESS: KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH SITE CLEANLINESS: KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH CLEANLINESS: KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH CLEANLINESS: KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH KEEP SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH SITE FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH FREE FROM SURPLUS MATERIAL, TOOLS AND RUBBISH FROM SURPLUS MATERIAL, TOOLS AND RUBBISH FROM SURPLUS MATERIAL, TOOLS AND RUBBISH SURPLUS MATERIAL, TOOLS AND RUBBISH SURPLUS MATERIAL, TOOLS AND RUBBISH MATERIAL, TOOLS AND RUBBISH MATERIAL, TOOLS AND RUBBISH TOOLS AND RUBBISH TOOLS AND RUBBISH AND RUBBISH AND RUBBISH RUBBISH RUBBISH AT ALL TIMES DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN ALL TIMES DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN ALL TIMES DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN TIMES DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN TIMES DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN DURING CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN CONSTRUCTION PERIOD AND UPON COMPLETION, LEAVE SITE IN PERIOD AND UPON COMPLETION, LEAVE SITE IN PERIOD AND UPON COMPLETION, LEAVE SITE IN AND UPON COMPLETION, LEAVE SITE IN AND UPON COMPLETION, LEAVE SITE IN UPON COMPLETION, LEAVE SITE IN UPON COMPLETION, LEAVE SITE IN COMPLETION, LEAVE SITE IN COMPLETION, LEAVE SITE IN LEAVE SITE IN LEAVE SITE IN SITE IN SITE IN IN IN A CLEAN CONDITION. 7. SITE SECURITY: PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO SITE SECURITY: PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO SECURITY: PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO SECURITY: PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO PROTECT MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO MATERIALS AND EQUIPMENT FROM ALL DAMAGES DUE TO AND EQUIPMENT FROM ALL DAMAGES DUE TO AND EQUIPMENT FROM ALL DAMAGES DUE TO EQUIPMENT FROM ALL DAMAGES DUE TO EQUIPMENT FROM ALL DAMAGES DUE TO FROM ALL DAMAGES DUE TO FROM ALL DAMAGES DUE TO ALL DAMAGES DUE TO ALL DAMAGES DUE TO DAMAGES DUE TO DAMAGES DUE TO DUE TO DUE TO TO TO FIRE, THEFT, VANDALISM, ETC. 8. DAMAGE TO OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE DAMAGE TO OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE TO OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE TO OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE OTHER WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE WORK: REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE REPAIR ANY DAMAGE TO OTHER AREAS CAUSED BY THE ANY DAMAGE TO OTHER AREAS CAUSED BY THE ANY DAMAGE TO OTHER AREAS CAUSED BY THE DAMAGE TO OTHER AREAS CAUSED BY THE DAMAGE TO OTHER AREAS CAUSED BY THE TO OTHER AREAS CAUSED BY THE TO OTHER AREAS CAUSED BY THE OTHER AREAS CAUSED BY THE OTHER AREAS CAUSED BY THE AREAS CAUSED BY THE AREAS CAUSED BY THE CAUSED BY THE CAUSED BY THE BY THE BY THE THE THE CONTRACTOR. 9. SITE SAFETY: CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR SITE SAFETY: CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR SAFETY: CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR SAFETY: CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR CONTRACTOR COVENANTS AND AGREES THAT THEY AND THEIR COVENANTS AND AGREES THAT THEY AND THEIR COVENANTS AND AGREES THAT THEY AND THEIR AND AGREES THAT THEY AND THEIR AND AGREES THAT THEY AND THEIR AGREES THAT THEY AND THEIR AGREES THAT THEY AND THEIR THAT THEY AND THEIR THAT THEY AND THEIR THEY AND THEIR THEY AND THEIR AND THEIR AND THEIR THEIR THEIR SUBCONTRACTORS AND EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO AND EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO AND EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO WILL PROVIDE AND MAINTAIN A SAFE PLACE TO WILL PROVIDE AND MAINTAIN A SAFE PLACE TO PROVIDE AND MAINTAIN A SAFE PLACE TO PROVIDE AND MAINTAIN A SAFE PLACE TO AND MAINTAIN A SAFE PLACE TO AND MAINTAIN A SAFE PLACE TO MAINTAIN A SAFE PLACE TO MAINTAIN A SAFE PLACE TO A SAFE PLACE TO A SAFE PLACE TO SAFE PLACE TO SAFE PLACE TO PLACE TO PLACE TO TO TO WORK AND THAT THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY AND THAT THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY AND THAT THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY THAT THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY THAT THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY COMPLY WITH ALL LAWS AND REGULATIONS OF ANY COMPLY WITH ALL LAWS AND REGULATIONS OF ANY WITH ALL LAWS AND REGULATIONS OF ANY WITH ALL LAWS AND REGULATIONS OF ANY ALL LAWS AND REGULATIONS OF ANY ALL LAWS AND REGULATIONS OF ANY LAWS AND REGULATIONS OF ANY LAWS AND REGULATIONS OF ANY AND REGULATIONS OF ANY AND REGULATIONS OF ANY REGULATIONS OF ANY REGULATIONS OF ANY OF ANY OF ANY ANY ANY ANY GOVERNMENTAL AUTHORITY HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES AUTHORITY HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES AUTHORITY HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES JURISDICTION THEREOF, AND CONTRACTOR AGREES JURISDICTION THEREOF, AND CONTRACTOR AGREES THEREOF, AND CONTRACTOR AGREES THEREOF, AND CONTRACTOR AGREES AND CONTRACTOR AGREES AND CONTRACTOR AGREES CONTRACTOR AGREES CONTRACTOR AGREES AGREES AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS INDEMNIFY, DEFEND AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS INDEMNIFY, DEFEND AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS DEFEND AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS DEFEND AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS AND HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS HOLD HARMLESS THE ENGINEER, OWNER AND OTHERS HARMLESS THE ENGINEER, OWNER AND OTHERS HARMLESS THE ENGINEER, OWNER AND OTHERS THE ENGINEER, OWNER AND OTHERS THE ENGINEER, OWNER AND OTHERS ENGINEER, OWNER AND OTHERS ENGINEER, OWNER AND OTHERS OWNER AND OTHERS OWNER AND OTHERS AND OTHERS AND OTHERS OTHERS OTHERS FROM AND AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING AND AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING AND AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING LOSS, DAMAGE OR EXPENSE, INCLUDING LOSS, DAMAGE OR EXPENSE, INCLUDING DAMAGE OR EXPENSE, INCLUDING DAMAGE OR EXPENSE, INCLUDING OR EXPENSE, INCLUDING OR EXPENSE, INCLUDING EXPENSE, INCLUDING EXPENSE, INCLUDING INCLUDING INCLUDING ATTORNEY'S FEES, ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF FEES, ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF FEES, ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF A FAILURE OR ALLEGED FAILURE ON THE PART OF A FAILURE OR ALLEGED FAILURE ON THE PART OF FAILURE OR ALLEGED FAILURE ON THE PART OF FAILURE OR ALLEGED FAILURE ON THE PART OF OR ALLEGED FAILURE ON THE PART OF OR ALLEGED FAILURE ON THE PART OF ALLEGED FAILURE ON THE PART OF ALLEGED FAILURE ON THE PART OF FAILURE ON THE PART OF FAILURE ON THE PART OF ON THE PART OF ON THE PART OF THE PART OF THE PART OF PART OF PART OF OF OF THE CONTRACTOR, THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO CONTRACTOR, THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO CONTRACTOR, THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES TO AND THEIR AGENTS AND EMPLOYEES TO AND THEIR AGENTS AND EMPLOYEES TO THEIR AGENTS AND EMPLOYEES TO THEIR AGENTS AND EMPLOYEES TO AGENTS AND EMPLOYEES TO AGENTS AND EMPLOYEES TO AND EMPLOYEES TO AND EMPLOYEES TO EMPLOYEES TO EMPLOYEES TO TO TO PROVIDE AND MAINTAIN A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS AND MAINTAIN A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS AND MAINTAIN A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS MAINTAIN A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS MAINTAIN A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS A SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS SAFE PLACE TO WORK AND TO COMPLY WITH ALL LAWS PLACE TO WORK AND TO COMPLY WITH ALL LAWS PLACE TO WORK AND TO COMPLY WITH ALL LAWS TO WORK AND TO COMPLY WITH ALL LAWS TO WORK AND TO COMPLY WITH ALL LAWS WORK AND TO COMPLY WITH ALL LAWS WORK AND TO COMPLY WITH ALL LAWS AND TO COMPLY WITH ALL LAWS AND TO COMPLY WITH ALL LAWS TO COMPLY WITH ALL LAWS TO COMPLY WITH ALL LAWS COMPLY WITH ALL LAWS COMPLY WITH ALL LAWS WITH ALL LAWS WITH ALL LAWS ALL LAWS ALL LAWS LAWS LAWS AND REGULATIONS OF ANY GOVERNMENTAL AUTHORITY HAVING JURISDICTION THEREOF. 10. PASSAGE OF EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO PASSAGE OF EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO OF EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO OF EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO DIMENSIONAL REQUIREMENTS OF EQUIPMENT TO REQUIREMENTS OF EQUIPMENT TO REQUIREMENTS OF EQUIPMENT TO OF EQUIPMENT TO OF EQUIPMENT TO EQUIPMENT TO EQUIPMENT TO TO TO ENSURE THAT SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO THAT SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO THAT SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO CAN PASS THROUGH THE NECESSARY AREAS TO CAN PASS THROUGH THE NECESSARY AREAS TO PASS THROUGH THE NECESSARY AREAS TO PASS THROUGH THE NECESSARY AREAS TO THROUGH THE NECESSARY AREAS TO THROUGH THE NECESSARY AREAS TO THE NECESSARY AREAS TO THE NECESSARY AREAS TO NECESSARY AREAS TO NECESSARY AREAS TO AREAS TO AREAS TO TO TO REACH ITS ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK ITS ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK ITS ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK INSTALLED LOCATION. INCLUDE IN BID COST ALL WORK LOCATION. INCLUDE IN BID COST ALL WORK LOCATION. INCLUDE IN BID COST ALL WORK INCLUDE IN BID COST ALL WORK INCLUDE IN BID COST ALL WORK INCLUDE IN BID COST ALL WORK IN BID COST ALL WORK IN BID COST ALL WORK BID COST ALL WORK BID COST ALL WORK COST ALL WORK COST ALL WORK ALL WORK ALL WORK WORK WORK REQUIRED TO MOVE EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING TO MOVE EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING TO MOVE EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING MOVE EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING MOVE EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING EQUIPMENT THROUGH THE SITE OF EACH LOCATION, INCLUDING THROUGH THE SITE OF EACH LOCATION, INCLUDING THROUGH THE SITE OF EACH LOCATION, INCLUDING THE SITE OF EACH LOCATION, INCLUDING THE SITE OF EACH LOCATION, INCLUDING SITE OF EACH LOCATION, INCLUDING SITE OF EACH LOCATION, INCLUDING OF EACH LOCATION, INCLUDING OF EACH LOCATION, INCLUDING EACH LOCATION, INCLUDING EACH LOCATION, INCLUDING LOCATION, INCLUDING LOCATION, INCLUDING INCLUDING INCLUDING ANY DISMANTLING. 11. POTENTIAL DELIVERY PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN POTENTIAL DELIVERY PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN DELIVERY PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN DELIVERY PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN PROBLEMS: THE CONTRACTOR SHALL NOTIFY ENGINEER IN THE CONTRACTOR SHALL NOTIFY ENGINEER IN THE CONTRACTOR SHALL NOTIFY ENGINEER IN CONTRACTOR SHALL NOTIFY ENGINEER IN CONTRACTOR SHALL NOTIFY ENGINEER IN SHALL NOTIFY ENGINEER IN SHALL NOTIFY ENGINEER IN NOTIFY ENGINEER IN NOTIFY ENGINEER IN ENGINEER IN ENGINEER IN IN IN WRITING, WITHIN FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY WITHIN FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY WITHIN FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY AWARD OF CONTRACT, OF THE PROPOSED DELIVERY AWARD OF CONTRACT, OF THE PROPOSED DELIVERY OF CONTRACT, OF THE PROPOSED DELIVERY OF CONTRACT, OF THE PROPOSED DELIVERY CONTRACT, OF THE PROPOSED DELIVERY CONTRACT, OF THE PROPOSED DELIVERY OF THE PROPOSED DELIVERY OF THE PROPOSED DELIVERY THE PROPOSED DELIVERY THE PROPOSED DELIVERY PROPOSED DELIVERY PROPOSED DELIVERY DELIVERY DELIVERY SCHEDULE OF ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION OF ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION OF ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION OR MATERIAL THAT MAY PREVENT THE INSTALLATION OR MATERIAL THAT MAY PREVENT THE INSTALLATION MATERIAL THAT MAY PREVENT THE INSTALLATION MATERIAL THAT MAY PREVENT THE INSTALLATION THAT MAY PREVENT THE INSTALLATION THAT MAY PREVENT THE INSTALLATION MAY PREVENT THE INSTALLATION MAY PREVENT THE INSTALLATION PREVENT THE INSTALLATION PREVENT THE INSTALLATION THE INSTALLATION THE INSTALLATION INSTALLATION INSTALLATION FROM BEING COMPLETED WITHIN THE PROJECT COMPLETION MILESTONE. 12. PERMITS AND INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL AND INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL AND INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INSPECTIONS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHALL BE RESPONSIBLE FOR ALL SHALL BE RESPONSIBLE FOR ALL BE RESPONSIBLE FOR ALL BE RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL FOR ALL FOR ALL ALL ALL APPROVALS AND PAY ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE AND PAY ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE AND PAY ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE PAY ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE PAY ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE ALL FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE FEES FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE FOR ALL WORK INSTALLED, CERTIFICATE SHALL BE ALL WORK INSTALLED, CERTIFICATE SHALL BE ALL WORK INSTALLED, CERTIFICATE SHALL BE WORK INSTALLED, CERTIFICATE SHALL BE WORK INSTALLED, CERTIFICATE SHALL BE INSTALLED, CERTIFICATE SHALL BE INSTALLED, CERTIFICATE SHALL BE CERTIFICATE SHALL BE CERTIFICATE SHALL BE SHALL BE SHALL BE BE BE DELIVERED TO MBTA BEFORE FINAL PAYMENT SHALL BE MADE. 13. WORK WITH MBTA SO THAT WORK DOES NOT INTERFERE WITH NORMAL OPERATIONS. WORK WITH MBTA SO THAT WORK DOES NOT INTERFERE WITH NORMAL OPERATIONS. 14. ACCESS TO THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT ACCESS TO THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT TO THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT TO THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT THE PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT PROPERTY SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT SHALL BE COORDINATED WITH MBTA PROJECT OFFICE, AT BE COORDINATED WITH MBTA PROJECT OFFICE, AT BE COORDINATED WITH MBTA PROJECT OFFICE, AT COORDINATED WITH MBTA PROJECT OFFICE, AT COORDINATED WITH MBTA PROJECT OFFICE, AT WITH MBTA PROJECT OFFICE, AT WITH MBTA PROJECT OFFICE, AT MBTA PROJECT OFFICE, AT MBTA PROJECT OFFICE, AT PROJECT OFFICE, AT PROJECT OFFICE, AT OFFICE, AT OFFICE, AT AT AT LEAST 5 DAYS IN ADVANCE OF ACTIVITIES. 15. LOCATIONS OF ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL LOCATIONS OF ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL OF ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL OF ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL ALL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL EQUIPMENT SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL SHOWN ARE APPROXIMATE; FIELD COORDINATE FINAL ARE APPROXIMATE; FIELD COORDINATE FINAL ARE APPROXIMATE; FIELD COORDINATE FINAL APPROXIMATE; FIELD COORDINATE FINAL APPROXIMATE; FIELD COORDINATE FINAL FIELD COORDINATE FINAL FIELD COORDINATE FINAL COORDINATE FINAL COORDINATE FINAL FINAL FINAL POSITIONS WITH THE MBTA AND ENGINEER PRIOR TO INSTALLATION.

AutoCAD SHX Text

%%UELECTRICAL SPECIFICATIONS

AutoCAD SHX Text REFERENCE STANDARDS A. PUBLISHED CODES, SPECIFICATIONS, STANDARDS, TESTS OR RECOMMENDED METHODS OF TRADE, INDUSTRY OR GOVERNMENTAL ORGANIZATIONS, OR LOCAL UTILITIES APPLY TO WORK IN THIS DIVISION.

AutoCAD SHX Text

1. ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE. ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE. 2. ASTM - AMERICAN SOCIETY OF TESTING AND MATERIALS. ASTM - AMERICAN SOCIETY OF TESTING AND MATERIALS. 3. CBM - CERTIFIED BALLAST MANUFACTURES. CBM - CERTIFIED BALLAST MANUFACTURES. 4. ETL - ELECTRICAL TESTING LABORATORIES. ETL - ELECTRICAL TESTING LABORATORIES. 5. FCC - FEDERAL COMMUNICATIONS COMMISSION. FCC - FEDERAL COMMUNICATIONS COMMISSION. 6. FM - FACTORY MUTUAL. FM - FACTORY MUTUAL. 7. ICEA - INSULATED CABLE ENGINEERS ASSOCIATION. ICEA - INSULATED CABLE ENGINEERS ASSOCIATION. 8. IEEE - INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS. IEEE - INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS. 9. IES - ILLUMINATING ENGINEERING SOCIETY. IES - ILLUMINATING ENGINEERING SOCIETY. 10. MEC - MASSACHUSETTS ELECTRICAL CODE. MEC - MASSACHUSETTS ELECTRICAL CODE. 11. NEC - NATIONAL ELECTRIC CODE. NEC - NATIONAL ELECTRIC CODE.

AutoCAD SHX Text

%%UINSTALLATION OF NEW WORK

AutoCAD SHX Text

%%UCONNECTIONS TO EXISTING WORK

AutoCAD SHX Text THE CONTRACT DRAWINGS INDICATE THE GENERAL ARRANGEMENT FOR THE NEW CONTRACT DRAWINGS INDICATE THE GENERAL ARRANGEMENT FOR THE NEW CONTRACT DRAWINGS INDICATE THE GENERAL ARRANGEMENT FOR THE NEW DRAWINGS INDICATE THE GENERAL ARRANGEMENT FOR THE NEW DRAWINGS INDICATE THE GENERAL ARRANGEMENT FOR THE NEW INDICATE THE GENERAL ARRANGEMENT FOR THE NEW INDICATE THE GENERAL ARRANGEMENT FOR THE NEW THE GENERAL ARRANGEMENT FOR THE NEW THE GENERAL ARRANGEMENT FOR THE NEW GENERAL ARRANGEMENT FOR THE NEW GENERAL ARRANGEMENT FOR THE NEW ARRANGEMENT FOR THE NEW ARRANGEMENT FOR THE NEW FOR THE NEW FOR THE NEW THE NEW THE NEW NEW NEW EQUIPMENT.

AutoCAD SHX Text DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE NECESSARY OFFSETS, ARE DIAGRAMMATIC AND DO NOT INDICATE NECESSARY OFFSETS, ARE DIAGRAMMATIC AND DO NOT INDICATE NECESSARY OFFSETS, DIAGRAMMATIC AND DO NOT INDICATE NECESSARY OFFSETS, DIAGRAMMATIC AND DO NOT INDICATE NECESSARY OFFSETS, AND DO NOT INDICATE NECESSARY OFFSETS, AND DO NOT INDICATE NECESSARY OFFSETS, DO NOT INDICATE NECESSARY OFFSETS, DO NOT INDICATE NECESSARY OFFSETS, NOT INDICATE NECESSARY OFFSETS, NOT INDICATE NECESSARY OFFSETS, INDICATE NECESSARY OFFSETS, INDICATE NECESSARY OFFSETS, NECESSARY OFFSETS, NECESSARY OFFSETS, OFFSETS, OFFSETS, OBSTRUCTIONS OR STRUCTURAL CONDITIONS.

AutoCAD SHX Text 1.

AutoCAD SHX Text INSTALL NEW WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO NEW WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO NEW WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO TO EXISTING WORK WITH MINIMUM INTERFERENCE TO TO EXISTING WORK WITH MINIMUM INTERFERENCE TO EXISTING WORK WITH MINIMUM INTERFERENCE TO EXISTING WORK WITH MINIMUM INTERFERENCE TO WORK WITH MINIMUM INTERFERENCE TO WORK WITH MINIMUM INTERFERENCE TO WITH MINIMUM INTERFERENCE TO WITH MINIMUM INTERFERENCE TO MINIMUM INTERFERENCE TO MINIMUM INTERFERENCE TO INTERFERENCE TO INTERFERENCE TO TO TO EXISTING EQUIPMENT.

AutoCAD SHX Text

COORDINATE THE WORK IN AMPLE TIME FOR PROPER INSTALLATION AND CONNECTION.

AutoCAD SHX Text PREPARE DRAWINGS, ATTEND MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL DRAWINGS, ATTEND MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL DRAWINGS, ATTEND MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL ATTEND MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL ATTEND MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL MEETINGS, OBTAIN ALL APPROVALS REQUIRED BY ALL OBTAIN ALL APPROVALS REQUIRED BY ALL OBTAIN ALL APPROVALS REQUIRED BY ALL ALL APPROVALS REQUIRED BY ALL ALL APPROVALS REQUIRED BY ALL APPROVALS REQUIRED BY ALL APPROVALS REQUIRED BY ALL REQUIRED BY ALL REQUIRED BY ALL BY ALL BY ALL ALL ALL AUTHORITIES HAVING JURISDICTION, CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED HAVING JURISDICTION, CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED HAVING JURISDICTION, CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED JURISDICTION, CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED JURISDICTION, CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED CONDUCT REQUIRED TESTS AND OBTAIN REQUIRED REQUIRED TESTS AND OBTAIN REQUIRED REQUIRED TESTS AND OBTAIN REQUIRED TESTS AND OBTAIN REQUIRED TESTS AND OBTAIN REQUIRED AND OBTAIN REQUIRED AND OBTAIN REQUIRED OBTAIN REQUIRED OBTAIN REQUIRED REQUIRED REQUIRED PERMITS.

AutoCAD SHX Text TEMPORARY SHUTDOWN OF EXISTING SERVICES. A. AT NO ADDITIONAL CHARGES. B. AT TIMES NOT TO INTERFERE WITH NORMAL OPERATION OF EXISTING FACILITIES. C. ONLY WITH WRITTEN CONSENT OF THE AUTHORITY.

AutoCAD SHX Text 2.

AutoCAD SHX Text

ALARM AND EMERGENCY SYSTEMS: NOT TO BE INTERRUPTED.

AutoCAD SHX Text 3.

AutoCAD SHX Text MAINTAIN CONTINUOUS OPERATION OF EXISTING FACILITIES AS REQUIRED WITH CONTINUOUS OPERATION OF EXISTING FACILITIES AS REQUIRED WITH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .