Appendix A - Mechanical Drawing Set (FOUO).pdf

PDF 22 MB Posted

Attached to
Condenser Water Filtration System Upgrade Federal contract opportunity
Solicitation number
HC102821R0018
Issued by
Defense Information Systems Agency

About this file

This request for proposal concerns upgrading the condenser water filtration, controls and piping system at a Defense Information Systems Agency facility in San Antonio, Texas. The contractor will enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing and adjust the water filtration controls. This capital equipment project focuses on the IT mechanical system separately from the building mechanical system. A site visit is scheduled for March 31, 2021 with two sessions for contractors to better understand the work location and conditions. Questions are due by April 9, 2021. The goal is to improve reliability, energy use and redundancy to meet Department of Defense standards for the condenser water system.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R00180009.pdf PDF
QandA.xlsx XLSX spreadsheet
HC102821R00180007.pdf PDF
HC102821R0018-New CLIN Pricing Worksheet.xlsx XLSX spreadsheet
HC102821R00180005.pdf PDF
HC102821R00180003.pdf PDF
HC102821R00180002.pdf PDF
Q and A on Water Filtration Upgrade.xlsx XLSX spreadsheet
eHTX-0090-ICWT-Independent-Testing.pdf_safe.pdf PDF
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
IMG_1605.JPG JPG image
IMG_1608.JPG JPG image
IMG_1597.JPG JPG image
IMG_1591.JPG JPG image
IMG_1592.JPG JPG image
IMG_1588.JPG JPG image
IMG_1584.JPG JPG image
IMG_1582.JPG JPG image
IMG_1579.JPG JPG image
IMG_1576.JPG JPG image
IMG_1623.JPG JPG image
IMG_1621.JPG JPG image
IMG_1622.JPG JPG image
IMG_1619.JPG JPG image
IMG_1610.JPG JPG image
IMG_1604.JPG JPG image
IMG_1603.JPG JPG image
IMG_1600.JPG JPG image
IMG_1595.JPG JPG image
IMG_1598.JPG JPG image
IMG_1587.JPG JPG image
IMG_1580.JPG JPG image
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Appendix B - DISA Electrical Master Drawing (FOUO).pdf PDF
Appendix N - SEC Inventory and EPL Format.xls XLS spreadsheet
Appendix D - Pump Specification.docx DOCX document
Appendix K - San Antonio Building Layout (FOUO).pdf PDF
Appendix O - SEC Process.xlsx XLSX spreadsheet
HC102821R0018.pdf PDF
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

44 35

El Paso

Amarillo

Lubbock

Abilene

Dallas

Waco

Austin

San Antonio

Houston

LOCATION MAP

PROJECT

LOCATION

Laredo

N.T.S.

PROJECT LOCATION

CLARENCE TINKER DRIVE

GENERAL HUDNELL DRIVE

DEFENSE INFORMATION SYSTEMS AGENCY

CONDENSER WATER FILTRATION AND UPGRADES

DATA CENTER SAN ANTONIO (BLDG 200)

COVER SHEET

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A D

ES

IG

N

R M

F

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

G -0

N /A

N /A

N /A

1/

/2

G-001

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

C O

VE

R

S H

EE

T

G

EN

ER

AL

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

234567 14 13 12 11 10 9 8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

LG-001

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

LE

G

EN

D

M

EC

H

AN

IC

AL

D

ES

IG

N

N /A

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

LG

-0

.D

W G

N /A

N /A

N /A

1/

/2

LEGEND

SYMBOLS ABBREVIATIONS

A

AFF

AH

AHU

AS

BFP

BTU

CFM

CH

CHEM

CHWR

CHWS

COMS

CRAH

CRU

CT

CW

CWP

CWR

CWS

D

DCWR

DCWS

DISA

EAT

EF

ELEC

ESP

EWT

FC

FO

FOR

FOS

FOV

FPV

FR

FS

FT

FW

GAL

GPH

GPM

HB

HC

HD

HP

HR

HUM

HW

HWR

HWS

HX

HZ

IN

KW

LAT

LB

LPC

LPS

LWT

MBH

MFR

NA

NG

NO.

P

PD

PH

PL

PSIG

QTY

RECIRC

RF

RHC

RPM

TEL

TYP

UH

UPS

V

VAV

VC

VF

AMPERES

ABOVE FINISHED FLOOR

AIR HANDLER

AIR HANDLER UNIT

AIR SEPARATOR

BACK FLOW PREVENTER

BRITISH THERMAL UNIT

CUBIC FEET PER MINUTE

CHILLER

CHEMICAL

CHILLED WATER RETURN

CHILLED WATER SUPPLY

COMMUNICATIONS

COMPUTER ROOM AIR HANDLER

COMPUTER ROOM UNIT

COOLING TOWER

COLD WATER (DOMESTIC)

CONDENSER WATER PUMP

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DRAIN

DIESEL COOLING WATER RETURN

DIESEL COOLING WATER SUPPLY

DEFENSE INFORMATION SYSTEMS AGENCY

ENTERING AIR TEMPERATURE

EXHAUST FAN

ELECTRICAL

EXTERNAL STATIC PRESSURE

ENTERING WATER TEMPERATURE

FAN COIL

FUEL OIL

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL VENT

FAN POWERED VAV

FLOOR RADIATOR (BASEBOARD)

FLOW SWITCH

FEET

FEED WATER

GALLONS

GALLONS PER HOUR

GALLONS PER MINUTE

HOSE BIB

HEATING COIL

HEAD

HORSE POWER

HOUR

HUMIDIFIER

HOT WATER

HOT WATER RETURN

HOT WATER SUPPLY

HEAT EXCHANGER

HERTZ

INCHES

KILOWATT

LEAVING AIR TEMPERATURE

POUNDS

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

LEAVING WATER TEMPERATURE

MEGA BTU

MANUFACTURER

NOT AVAILABLE

NATURAL GAS

NUMBER

PUMP

PRESSURE DROP

PHASE

PLACES

POUNDS PER SQUARE INCH GAUGE

QUANTITY

RECIRCULATING

RETURN FAN

REHEAT COIL

REVOLUTIONS PER MINUTE

TELEPHONE

TYPICAL

UNIT HEATER

UNINTERRUPTIBLE POWER SUPPLY

VOLTS

VARIABLE AIR VOLUME

VACUUM

VENTILATING FAN

T

S

FS

TS

B4

A B

A X B

X

LS

DPS

AP

PS

F

AV

TS

AS

VAV

FS

P

FD

PIPE TEE SIDE OUTLET FACING

TOWARD

PIPE TEE STRAIGHT SIZE

M

M

UNIT HEATER

UH

TEMPERATURE CONTROL VALVE

GATE MOTORIZED VALVE

GLOBE MOTORIZED VALVE

IN-LINE PUMP

PUMP

FILTER (CHANGEABLE ELEMENT)

LEVEL SWITCH

PRESSURE SWITCH

TRIPLE DUTY (SERVICE) VALVE

AIR PURGER

SUPPLY AIR

RETURN AND EXHAUST AIR

SUPPLY AIR DIFFUSER

(WITH END OF LINE CAP)

RETURN AIR DIFFUSER

(WITH END OF LINE CAP)

A X B DUCTWORK

A X B DUCTWORK

VARIABLE AIR VOLUME BOX

MANUAL DAMPER

FLEXIBLE DUCT

FLOW SENSOR

TEMPERATURE SENSOR

FLEXIBLE HOSE

DIFFERENTIAL PRESSURE SWITCH

TEMPERATURE SWITCH

PIPE CHASE OR LOCATOR WITH

COLUMN GRID INDICATOR

COLUMN DESIGNATOR

SOLENOID VALVE

ELBOW FACING AWAY

ELBOW FACING TOWARD

PIPE TEE SINGLE SWEEP

BOILER

DOUBLE BRANCH ELBOW

90° ELBOW

45° ELBOW

HAND WHEEL STEM VALVE

STRAINER

FLOOR DRAIN

REDUCER

TEST CONNECTION

BUTTERFLY VALVE

RELIEF VALVE

ANGLE DRAIN VALVE WITH

HOSE CONNECTION

PRESSURE REDUCING VALVE

BALL VALVE

DRAIN VALVE WITH HOSE

CONNECTION

PIPE CAP

FLANGE CAP

FLOW SWITCH

UNIDENTIFIED VALVE

CIRCUIT SETTER

AIR SEPARATOR

TEMPERATURE GAUGE

PRESSURE GAUGE

AUTOMATIC VENT VALVE

GLOBE VALVE

GATE VALVE

FLANGE

BACKFLOW PREVENTER

CHECK VALVE

UNION

3-WAY TEMPERATURE REGULATING

VALVE

M

M

AUTOMATIC MOTORIZED 12"

BUTTERFLY VALVE

12" TEE, ELEVATION DROP

AUTOMATIC MOTORIZED

BALANCING VALVE

SHEET LIST TABLE

SHEET NUMBER SHEET TITLE

GENERAL

G-001 COVER SHEET

LG-001 LEGEND

MECHANICAL

MD-100 REMOVAL SUCTION PIPING

MD-101 REMOVAL DISCHARGE PIPING

MD-103 DEMO 3D COOLING TOWER PIPING - INSIDE

MD-104 DEMO 3D COOLING TOWER PIPING - OUTSIDE

MD-105 DEMO 3D COOLING TOWER 2 PIPING - OUTSIDE

M-100 NEW SUCTION PIPING

M-101 NEW DISCHARGE PIPING

M-103 NEW 3D COOLING TOWER PIPING - OUTSIDE

M-104 NEW 3D COOLING TOWER 1 ISO VIEW

M-105 NEW 3D COOLING TOWER 2 ISO VIEW

M-106 NEW PUMP - PIPING - INSIDE

M-107 NEW PUMP - INSIDE

ELEVATIONS

EL-200 TOP VIEW - INSIDE AND OUTSIDE

EL-201 BACK & SIDE - OUTSIDE

EL-202 BACK & INSIDE - NEW PUMP

EL-203 TOP VIEW - DISCHARGE

EL-204 TOP VIEW - SUCTION

DETAILS

M-500 DETAIL SHEET - APPENDIX A

CONNECT TO EXISTING

EQUALIZER LINE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

234567 14 13 12 11 10 9 8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

MD-100

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

R

EM

O

VA

L

SU

C

TI

O N

P

IP

IN

G

M

EC

H

AN

IC

AL

D

ES

IG

N

R M

F

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

M D

-1

.D W

G

N /A

N /A

N /A

1/

/2

REMOVAL SUCTION PIPING - APPENDIX A

SCALE : 1/4" = 1'-0"

N

PLAN

REFERENCE

NORTH

A B

C D

KEY PLAN

SCALE: NONE

0 2' 4' 8'

1. ALL DASHED SECTIONS SHALL BE REMOVED .

2. EXISTING VALVE (BETWEEN BUILDING EXTERIOR AND BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

3. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR

REPLACED.

4. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING

TOWERS 1 AND 2.

KEYNOTES

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS

FOR ALL NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL

BE REVIEWED AND APPROVED BY THE GOVERNMENT PRIOR TO

ORDERING PARTS AND EQUIPMENT, IF THE CONTRACTOR WOULD LIKE

TO DEVIATE FROM THIS DRAWING SET, COR APPROVAL MUST BE

REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE THAT THE

NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS,

PUMPS, PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED

CHILLED WATER TO THE MAIN MECHANICAL PLANT FOR THE ENTIRE

PROJECT. CONTRACTOR SHALL PROVIDE A PLAN FOR ACCOMPLISHING

THIS FOR REVIEW AND APPROVAL BY THE COR 14 DAYS PRIOR TO

ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE

MEETING ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH

WELDED SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF

ALL INSTALLED JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL

INSTALLED PIPE AND COMPONENTS. SUPPORTS SHALL MEET THE

MANUFACTURERS' AND INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS

WHENEVER POSSIBLE. AT MINIMUM 95% OF ALL INSTALLED ELBOWS

SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND

EXISTING CONDENSER WATER PIPING INSIDE AND OUTSIDE THE

BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM

FILTERS, PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE

DELTA AND ICONICS BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE

AND CAPABLE OF INTERFACING WITH DELTA CONTROLS AND THE

EXISTING ICONICS PER APPENDIX F.

CT-1 CT-2

CH-1 CWP-1 CWP-2

12"

12"

ST

AI

R S

D O

W N

REMOVE PIPE

REMOVE PIPE

REMOVE PIPE

REMOVE PIPE

EQUALIZER LINE

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

234567 14 13 12 11 10 9 8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

MD-101

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

R

EM

O

VA

L D

IS

C

H

AR

G E

PI

PI

N G

M

EC

H

AN

IC

AL

D

ES

IG

N

R M

F

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

M D

-1

.D W

G

N /A

N /A

N /A

1/

/2

REMOVAL DISCHARGE PIPING- APPENDIX A

SCALE : 1/4" = 1'-0"

N

PLAN

REFERENCE

NORTH

A B

C D

KEY PLAN

SCALE: NONE

0 2' 4' 8'

1. ALL DASHED SECTIONS SHALL BE REMOVED .

2. EXISTING TRIPLE DUTY VALVE SHALL BE EITHER REUSED OR

REPLACED.

3. EXISTING VALVE SHALL BE EITHER REUSED OR REPLACED.

4. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING

TOWERS 1 AND 2.

KEYNOTES

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS

FOR ALL NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL

BE REVIEWED AND APPROVED BY THE GOVERNMENT PRIOR TO

ORDERING PARTS AND EQUIPMENT, IF THE CONTRACTOR WOULD LIKE

TO DEVIATE FROM THIS DRAWING SET, COR APPROVAL MUST BE

REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE THAT THE

NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS,

PUMPS, PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED

CHILLED WATER TO THE MAIN MECHANICAL PLANT FOR THE ENTIRE

PROJECT. CONTRACTOR SHALL PROVIDE A PLAN FOR ACCOMPLISHING

THIS FOR REVIEW AND APPROVAL BY THE COR 14 DAYS PRIOR TO

ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE

MEETING ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH

WELDED SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF

ALL INSTALLED JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL

INSTALLED PIPE AND COMPONENTS. SUPPORTS SHALL MEET THE

MANUFACTURERS' AND INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS

WHENEVER POSSIBLE. AT MINIMUM 95% OF ALL INSTALLED ELBOWS

SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND

EXISTING CONDENSER WATER PIPING INSIDE AND OUTSIDE THE

BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM

FILTERS, PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE

DELTA AND ICONICS BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE

AND CAPABLE OF INTERFACING WITH DELTA CONTROLS AND THE

EXISTING ICONICS PER APPENDIX F.

2 3

DEMO 3D COOLING TOWER PIPING - INSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

C O

O

LI

N G

T O

W

ER

P

IP

IN

G

EX

IS

TI

N G

1/

/2

MD-103

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

D

EM

O

D C

O O

LI

N

G T

O W

ER

P

IP

IN

G

IN

SI

D E

M

EC

H

AN

IC

AL

3D D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

KEY NOTES

1. EXISTING TRIPLE DUTY VALVES SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING VALVE SHALL BE EITHER REUSED OR REPLACED.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

CWP-2

CWP-2

DEMO 3D COOLING TOWER PIPING - OUTSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

N

KL

K

AS

S

H O

W N

JE

S

1/

/2

C O

O

LI

N G

T O

W

ER

P

IP

IN

G

EX

IS

TI

N G

1/

/2

MD-104

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

D

EM

O

D C

O O

LI

N

G T

O W

ER

P

IP

IN

G

O U

TS

ID

E M

EC

H

AN

IC

AL

3D

D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

CT-1

CT-2

DEMO 3D COOLING TOWER 2 PIPING - OUTSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

C O

O

LI

N G

T O

W

ER

EX

IS

TI

N

G

1/

/2

MD-105

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

D

EM

O

D C

O O

LI

N

G T

O W

ER

P

IP

IN

G

O

U

TS

ID

E

M

EC

H

AN

IC

AL

3D D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

CT2

CT2

M M

MM

M

EQUALIZER LINE

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

234567 14 13 12 11 10 9 8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

M-100

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

S U

C

TI

O N

P

IP

IN

G

M

EC

H

AN

IC

AL

D

ES

IG

N

R M

F

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

M -1

.D

W G

N /A

N /A

N /A

1/

/2

0 2' 4' 8'

NEW SUCTION PIPING - APPENDIX A

SCALE : 1/4" = 1'-0"

N

PLAN

REFERENCE

NORTH

A B

C D

KEY PLAN

SCALE: NONE

1. EXISTING VALVE (BETWEEN BUILDING EXTERIOR AND BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR

REPLACED.

3. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE

ASSEMBLIES SHALL BE MOTORIZED BUTTERFLY VALVES.

PROVIDE VALVES WITH TWO POSITION ACTUATORS WITH END

SWITCH INDICATION, WITH BACK-UP MANUAL OVERRIDE

HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT

CAN BE FED FROM EITHER 24 VOLTS OR 120 VOLTS.

4. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER

PIPING ON THE SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH

DIAMETER PIPE SHALL BE PERMITTED PER COOLING TOWER

UNLESS APPROVED BY THE COR.

5. PIPING FOR COOLING TOWER 1 SHALL BE A MIRROR IMAGE OF

THE PIPING FOR COOLING TOWER 2.

6. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM

JACKETING ON ALL EXTERIOR CONDENSER WATER PIPE THAT IS

BOTH NEW AND EXISTING TO INCLUDE THE CONDENSER WATER

BASIN EQUALIZER PIPE.

7. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING

TOWERS 1 AND 2.

KEYNOTES

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS

FOR ALL NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL

BE REVIEWED AND APPROVED BY THE GOVERNMENT PRIOR TO

ORDERING PARTS AND EQUIPMENT, IF THE CONTRACTOR WOULD LIKE

TO DEVIATE FROM THIS DRAWING SET, COR APPROVAL MUST BE

REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE THAT THE

NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS,

PUMPS, PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED

CHILLED WATER TO THE MAIN MECHANICAL PLANT FOR THE ENTIRE

PROJECT. CONTRACTOR SHALL PROVIDE A PLAN FOR ACCOMPLISHING

THIS FOR REVIEW AND APPROVAL BY THE COR 14 DAYS PRIOR TO

ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE

MEETING ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH

WELDED SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF

ALL INSTALLED JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL

INSTALLED PIPE AND COMPONENTS. SUPPORTS SHALL MEET THE

MANUFACTURERS' AND INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS

WHENEVER POSSIBLE. AT MINIMUM 95% OF ALL INSTALLED ELBOWS

SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND

EXISTING CONDENSER WATER PIPING INSIDE AND OUTSIDE THE

BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM

FILTERS, PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE

DELTA AND ICONICS BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE

AND CAPABLE OF INTERFACING WITH DELTA CONTROLS AND THE

EXISTING ICONICS PER APPENDIX F.

COOLING TOWER

FOUNDATION

ABOVE GROUND

ST

AI

R S

D O

W N

M M

MM

M MM

NEW PIPE

BEGINS

NEW PIPE

BEGINS

NEW PIPE

BEGINS

NEW PIPE

BEGINS

EQUALIZER LINE

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

234567 14 13 12 11 10 9 8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

M-101

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

D

IS

C H

AR

G

E

PI

PI

N

G M

EC

H

AN

IC

AL

D

ES

IG

N

R M

F

AK

S

N /A

AS

S

H O

W N

JE

S

1/

/2

M -1

.D

W G

N /A

N /A

N /A

1/

/2

0 2' 4' 8'

NEW DISCHARGE PIPING - APPENDIX A

SCALE : 1/4" = 1'-0"

N

PLAN

REFERENCE

NORTH

A B

C D

KEY PLAN

SCALE: NONE

1. EXISTING TRIPLE DUTY VALVE SHALL BE EITHER REUSED OR

REPLACED.

2. EXISTING VALVE SHALL BE EITHER REUSED OR REPLACED.

3. PROVIDE A MINIMUM OF ONE FOOT SPOOL PIECE BETWEEN THE

TRIPLE DUTY VALVE AND THE ISOLATION VALVE TO PROVIDE

ISOLATION AND REMOVAL OF THE TRIPLE DUTY VALVE IN THE

FUTURE BY MAINTENANCE.

4. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE

ASSEMBLIES SHALL BE MOTORIZED BUTTERFLY VALVES.

PROVIDE VALVES WITH TWO POSITION ACTUATORS WITH END

SWITCH INDICATION, WITH BACK-UP MANUAL OVERRIDE

HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT

CAN BE FED FROM EITHER 24 VOLTS OR 120 VOLTS.

5. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE

ASSEMBLIES SHALL BE MOTORIZED GLOBE VALVES. PROVIDE

VALVES WITH MULTIPLE POSITION ACTUATORS WITH POSITION

SWITCH INDICATION, WITH BACK-UP MANUAL OVERRIDE

HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT

CAN BE FED FROM EITHER 24 VOLTS OR 120 VOLTS.

6. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER

PIPING ON THE DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8

INCH DIAMETER PIPE SHALL BE PERMITTED PER COOLING

TOWER UNLESS APPROVED BY THE COR.

7. PIPING FOR COOLING TOWER 1 SHALL BE A MIRROR IMAGE OF

THE PIPING FOR COOLING TOWER 2.

8. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM

JACKETING ON ALL EXTERIOR CONDENSER WATER PIPE THAT IS

BOTH NEW AND EXISTING TO INCLUDE THE CONDENSER WATER

BASIN EQUALIZER PIPE.

9. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED

TO PROVIDE A WATER LEG OR WATER TRAP DURING LOSS OF

FLOW. ELEVATION CHANGE SHALL BE A MINIMUM OF 5 FEET

UNLESS THE CONTRACTOR REQUESTS AND THE COR APPROVES

DEVIATION.

10.EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING

TOWERS 1 AND 2.

KEYNOTES

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS

FOR ALL NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL

BE REVIEWED AND APPROVED BY THE GOVERNMENT PRIOR TO

ORDERING PARTS AND EQUIPMENT, IF THE CONTRACTOR WOULD LIKE

TO DEVIATE FROM THIS DRAWING SET, COR APPROVAL MUST BE

REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE THAT THE

NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS,

PUMPS, PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED

CHILLED WATER TO THE MAIN MECHANICAL PLANT FOR THE ENTIRE

PROJECT. CONTRACTOR SHALL PROVIDE A PLAN FOR ACCOMPLISHING

THIS FOR REVIEW AND APPROVAL BY THE COR 14 DAYS PRIOR TO

ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE

MEETING ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH

WELDED SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF

ALL INSTALLED JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL

INSTALLED PIPE AND COMPONENTS. SUPPORTS SHALL MEET THE

MANUFACTURERS' AND INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS

WHENEVER POSSIBLE. AT MINIMUM 95% OF ALL INSTALLED ELBOWS

SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND

EXISTING CONDENSER WATER PIPING INSIDE AND OUTSIDE THE

BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM

FILTERS, PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE

DELTA AND ICONICS BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE

AND CAPABLE OF INTERFACING WITH DELTA CONTROLS AND THE

EXISTING ICONICS PER APPENDIX F.

NEW 3D COOLING TOWER PIPING - OUTSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -3

D

C

T

PI

PI

N

G

N

EW

1/

/2

M-103

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

D

C O

O

LI

N G

T O

W

ER

P

IP

IN

G

O

U

TS

ID

E

M

EC

H

AN

IC

AL

3D D

ES

IG

N

0 1' 2' 4'SCALE :1/2" = 1'-0"

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

4. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

5. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED TO PROVIDE A

WATER LEG OR WATER TRAP DURING LOSS OF FLOW.

6. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED BUTTERFLY VALVES. PROVIDE VALVES WITH TWO

POSITION ACTUATORS WITH END SWITCH INDICATION, WITH BACK-UP MANUAL

OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT CAN BE

FED FROM EITHER 24 VOLT OR 120 VOLTS.

7. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED GLOBE VALVES. PROVIDE VALVES WITH MULTIPLE

POSITION ACTUATORS WITH POSITION SWITCH INDICATION, WITH BACK-UP

MANUAL OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER

THAT CAN BE FED FROM EITHER 24 VOLT OR 120 VOLTS.

8. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM JACKETING ON ALL

EXTERIOR CONDENSER WATER PIPE THAT IS BOTH NEW AND EXISTING TO

INCLUDE THE CONDENSER WATER BASIN EQUALIZER PIPE.

9. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

NEW 3D COOLING TOWER 1 ISO VIEW

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -3

D

C

T1

PI

PI

N G

-N

EW

1/

/2

M-104

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

D

C O

O

LI

N G

T O

W

ER

IS

O V

IE

W

M

EC

H

AN

IC

AL

3D D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

4. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

5. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED TO PROVIDE A

WATER LEG OR WATER TRAP DURING LOSS OF FLOW.

6. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED BUTTERFLY VALVES. PROVIDE VALVES WITH TWO

POSITION ACTUATORS WITH END SWITCH INDICATION, WITH BACK-UP MANUAL

OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT CAN BE

FED FROM EITHER 24 VOLT OR 120 VOLTS.

7. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED GLOBE VALVES. PROVIDE VALVES WITH MULTIPLE

POSITION ACTUATORS WITH POSITION SWITCH INDICATION, WITH BACK-UP

MANUAL OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER

THAT CAN BE FED FROM EITHER 24 VOLT OR 120 VOLTS.

8. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM JACKETING ON ALL

EXTERIOR CONDENSER WATER PIPE THAT IS BOTH NEW AND EXISTING TO

INCLUDE THE CONDENSER WATER BASIN EQUALIZER PIPE.

9. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

NEW 3D COOLING TOWER 2 ISO VIEW

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -3

D

C

T2

PI

PI

N G

-N

EW

1/

/2

M-105

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

D

C O

O

LI

N G

T O

W

ER

IS

O V

IE

W

M

EC

H

AN

IC

AL

3D D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

4. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

5. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED TO PROVIDE A

WATER LEG OR WATER TRAP DURING LOSS OF FLOW.

6. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED BUTTERFLY VALVES. PROVIDE VALVES WITH TWO

POSITION ACTUATORS WITH END SWITCH INDICATION, WITH BACK-UP MANUAL

OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT CAN BE

FED FROM EITHER 24 VOLT OR 120 VOLTS.

7. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED GLOBE VALVES. PROVIDE VALVES WITH MULTIPLE

POSITION ACTUATORS WITH POSITION SWITCH INDICATION, WITH BACK-UP

MANUAL OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER

THAT CAN BE FED FROM EITHER 24 VOLT OR 120 VOLTS.

8. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM JACKETING ON ALL

EXTERIOR CONDENSER WATER PIPE THAT IS BOTH NEW AND EXISTING TO

INCLUDE THE CONDENSER WATER BASIN EQUALIZER PIPE.

9. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

NEW PUMP - PIPING - INSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -3

D

N

EW

P

U M

P

1/

/2

M-106

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

P U

M P

- P

IP

IN

G

IN

SI

D

E M

EC

H

AN

IC

AL

3D

D

ES

IG

N

0 1' 2' 3'SCALE : 3/4" = 1'-0"

KEY NOTES

1. EXISTING TRIPLE DUTY VALVES SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING VALVE SHALL BE EITHER REUSED OR REPLACED.

3. PROVIDE A MINIMUM OF A 1 FOOT SPOOL PIECE BETWEEN THE TRIPLE DUTY

VALVE AND THE ISOLATION AND REMOVAL OF THE TRIPLE DUTY VALVE IN THE

FUTURE BY MAINTENANCE.

4. PROVIDE AND INSTALL BOTH A DIFFERENTIAL PRESSURE SENSOR TO BE USED

BY THE PUMP/BAS AND A DIFFERENTIAL PRESSURE GAUGE PER DETAIL SHEET

M-500.

5. REDUCER SHALL BE INSTALLED WITH THE SMALL DIAMETER AXIS HIGHER THAN

THE LARGE DIAMETER AXIS.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

CWP-2 CWP-1

CWP-1

NEW PUMP - INSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -3

D

N

EW

P

U M

P

1/

/2

M-107

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

N

EW

P U

M P

- I N

SI

D

E M

EC

H

AN

IC

AL

3D

D

ES

IG

N

0 1' 2' 4'SCALE : 1/2" = 1'-0"

KEY NOTES

1. EXISTING TRIPLE DUTY VALVES SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING VALVE SHALL BE EITHER REUSED OR REPLACED.

3. PROVIDE A MINIMUM OF A 1 FOOT SPOOL PIECE BETWEEN THE TRIPLE DUTY

VALVE AND THE ISOLATION AND REMOVAL OF THE TRIPLE DUTY VALVE IN THE

FUTURE BY MAINTENANCE.

4. PROVIDE AND INSTALL BOTH A DIFFERENTIAL PRESSURE SENSOR TO BE USED

BY THE PUMP/BAS AND A DIFFERENTIAL PRESSURE GAUGE PER DETAIL SHEET

M-500.

5. REDUCER SHALL BE INSTALLED WITH THE SMALL DIAMETER AXIS HIGHER THAN

THE LARGE DIAMETER AXIS.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

CWP-1

TOP VIEW - INSIDE AND OUTSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -E

L2

T O

P

1/

/2

EL-200

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

TO

P

VI

EW

IN

SI

D

E

AN

D O

U

TS

ID

E

EL

EV

AT

IO

N S

D

ES

IG

N

0 2' 4' 6'SCALE 3/8" = 1'-0"

TOP VIEW

CT-1

CT-2

8'-05 8"

12'-03 4"

15'-43 4"

2'-4"

1'-117 8"

8"

5'-01 2"

24'-01 2"

8'-8"

2'-7 1 16"

CWP-1

5'-113 4"

CWP-2

6"

12"

8"

8" 8"

12"

12"

GENERAL NOTES

6 5

6 6

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET, COR

APPROVAL MUST BE REQUESTED AND APPROVED. ANY DEVIATION MAY REQUIRE

THAT THE NEW DEVIATION DRAWING BE STAMPED BY A PROFESSIONAL ENGINEER

IN ORDER TO OBTAIN COR APPROVAL.

2. CONTRACTOR SHALL PROVIDE REDUNDANT TEMPORARY CHILLERS, PUMPS,

PIPING, AND CONDUCTORS TO SUPPLY UNINTERRUPTED CHILLED WATER TO THE

MAIN MECHANICAL PLANT FOR THE ENTIRE PROJECT. CONTRACTOR SHALL

PROVIDE A PLAN FOR ACCOMPLISHING THIS FOR REVIEW AND APPROVAL BY THE

COR 14 DAYS PRIOR TO ORDERING RENTAL EQUIPMENT OR CUTTING ANY PIPE.

3. ALL CONDENSER WATER PIPE INSTALLED SHALL BE BLACK STEEL PIPE MEETING

ASTM A53, GRADE B, TYPE E. FITTINGS SHALL MEET ANSI B16.9.

4. CONTRACTOR SHALL INSTALL THE CONDENSER WATER PIPING WITH WELDED

SEAMLESS JOINTS WHENEVER POSSIBLE. AT MINIMUM 90% OF ALL INSTALLED

JOINTS SHALL BE WELDED SEAMLESS.

5. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORTS FOR ALL INSTALLED PIPE

AND COMPONENTS. SUPPORTS SHALL MEET THE MANUFACTURERS' AND

INDUSTRY STANDARD FOR PIPE SUPPORTING.

6. CONTRACTOR SHALL PROVIDE AND INSTALL LONG ELBOWS WHENEVER POSSIBLE.

AT MINIMUM 95% OF ALL INSTALLED ELBOWS SHALL BE LONG ELBOWS.

7. CONTRACTOR SHALL INSTALL NEW LABELS ON BOTH NEW AND EXISTING

CONDENSER WATER PIPING INSIDE AND OUTSIDE THE BUILDING PER APPENDIX J.

8. PROVIDE, INSTALL, AND INTEGRATE THE NEW VALVES, SIDE STREAM FILTERS,

PUMPS / MOTORS / VFDS. FAN VFDS, AND SENSORS INTO THE DELTA AND ICONICS

BAS. ALL NEW EQUIPMENT SHALL BE COMPATIBLE AND CAPABLE OF INTERFACING

WITH DELTA CONTROLS AND THE EXISTING ICONICS PER APPENDIX F.

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. EXISTING TRIPLE DUTY VALVES SHALL BE EITHER REUSED OR REPLACED.

4. EXISTING VALVES SHALL BE EITHER REUSED OR REPLACED.

5. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

6. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

7. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED TO PROVIDE A

WATER LEG OR WATER TRAP DURING LOSS OF FLOW.

8. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED BUTTERFLY VALVES. PROVIDE VALVES WITH TWO

POSITION ACTUATORS WITH END SWITCH INDICATION, WITH BACK-UP MANUAL

OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT CAN BE

FED FROM EITHER 24 VOLT OR 120 VOLTS.

9. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED GLOBE VALVES. PROVIDE VALVES WITH MULTIPLE

POSITION ACTUATORS WITH POSITION SWITCH INDICATION, WITH BACK-UP

MANUAL OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER

THAT CAN BE FED FROM EITHER 24 VOLT OR 120 VOLTS.

10. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM JACKETING ON ALL

EXTERIOR CONDENSER WATER PIPE THAT IS BOTH NEW AND EXISTING TO

INCLUDE THE CONDENSER WATER BASIN EQUALIZER PIPE.

11. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

BACK & SIDE - OUTSIDE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R M

F

KL

K

AS

S

H O

W N

JE

S

1/

/2

M -E

L2

O U

TS

ID

E

- B

AC

K

SI

D E

1/

/2

EL-201

C O

N D

EN

SE

R W

AT

ER

F

IL

TR

AT

IO

N

A N

D U

PG

R

AD

ES

D

AT

A C

EN

TE

R S

AN

A

N

TO

N

IO

BA

C

K

SI

D

E

- O

U

TS

ID

E

EL

EV

AT

IO

N S

D

ES

IG

N

0 2' 4' 6'SCALE : 3/8" = 1'-0"

19'-111 2"

11'-51 2"

2'-91 2"

6'-8 3 16"

12'-03 4"

3'-81 8"

8'-6"

15'-43 4"

2'-4"

9'-71 4"

6'-8 3 16"

5'-01 2"

9'-2 1 16"

12'-01 2"

8"

12"

12"

SIDE VIEW BACK VIEW

12"

CT-1CT-2

12"

8"

6'-0 3 16"

KEY NOTES

1. EXISTING VALVE (BETWEEN THE BUILDING EXTERIOR AND THE BASKET

STRAINER) SHALL BE EITHER REUSED OR REPLACED.

2. EXISTING BASKET STRAINERS SHALL BE EITHER REUSED OR REPLACED.

3. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

SUCTION-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

4. CONTRACTOR SHALL MINIMIZE THE USE OF 8 INCH DIAMETER PIPING ON THE

DISCHARGE-SIDE. A MAXIMUM OF 8 FEET OF 8 INCH DIAMETER PIPE SHALL BE

PERMITTED PER COOLING TOWER UNLESS APPROVED BY THE COR.

5. PIPING SHALL HAVE AN ELEVATION CHANGE AS REPRESENTED TO PROVIDE A

WATER LEG OR WATER TRAP DURING LOSS OF FLOW.

6. PROVIDE NEW CONDENSER WATER ISOLATION VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED BUTTERFLY VALVES. PROVIDE VALVES WITH TWO

POSITION ACTUATORS WITH END SWITCH INDICATION, WITH BACK-UP MANUAL

OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER THAT CAN BE

FED FROM EITHER 24 VOLT OR 120 VOLTS.

7. PROVIDE NEW CONDENSER WATER BALANCING VALVES. THESE ASSEMBLIES

SHALL BE MOTORIZED GLOBE VALVES. PROVIDE VALVES WITH MULTIPLE

POSITION ACTUATORS WITH POSITION SWITCH INDICATION, WITH BACK-UP

MANUAL OVERRIDE HANDLES OR GEAR DRIVEN WHEELS, AND WITH POWER

THAT CAN BE FED FROM EITHER 24 VOLT OR 120 VOLTS.

8. CONTRACTOR SHALL INSTALL PROTECTIVE ALUMINUM JACKETING ON ALL

EXTERIOR CONDENSER WATER PIPE THAT IS BOTH NEW AND EXISTING TO

INCLUDE THE CONDENSER WATER BASIN EQUALIZER PIPE.

9. EXISTING EQUALIZER PIPE TO REMAIN BETWEEN COOLING TOWERS 1 AND 2.

GENERAL NOTES

1. CONTRACTOR SHALL PROVIDE DETAILED INSTALLATION SHOP DRAWINGS FOR ALL

NEW INSTALLED PIPE AND EQUIPMENT. SHOP DRAWING SHALL BE REVIEWED AND

APPROVED BY THE GOVERNMENT PRIOR TO ORDERING PARTS AND EQUIPMENT, IF

THE CONTRACTOR WOULD LIKE TO DEVIATE FROM THIS DRAWING SET,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .