This document package includes plans and specifications for a federal construction project. The project involves replacing the existing bridge at the Sourdough Campground in Alaska with a new bridge along with related roadway work. The project scope includes clearing and grubbing, excavation, placing riprap, roadway aggregate, reconditioning, installing steel piles, structural concrete, precast girders, reinforcing steel, bridge railings, signage, erosion control measures, revegetation, and traffic control. The solicitation is identified as number 69056722B000023 and is a full and open competition being conducted by the Department of Transportation Federal Highway Administration to replace the bridge at the Sourdough Campground located in Alaska.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L
COE
Digitally signed by
BRENT L COE
Date: 2022.03.17 07:16:07 -07'00'
3/17/22
11".JDEX TO SHEETS
A. GEr\lESAL INFORMATION
A.1 TTTLF SHEET
A.2 INDEX TO SHEETS
A.3 PLAN SYMBOLS AND ABBREVIATIONS
VICHiiITY M/\P
B. SUMMARIES
B.1-2 SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
\_, HPICAL SECTIONS
D. PLAN & PROFILE
D.l
D.2
D.3
MAINLINE Af\lD ROADWAY DIVERSIOf\i QUANTITIES
Mt\lNUNE PLAl'J Al'JD PROFILE
ROADWAY DIVERSION PLAN AND PROFILE
0.4 STAGTNG ARF.:A
D.5 SURVEY CONTROL
D.6 SURVEY CONTROL MAP
D. SELECTIVE CLEf\RING LIMITS
E. EROSION CONTROL
E.1 MAINLINE AND DIVERSION EROSION CONTROL PLANS
E.2 STAGING AREA EROSION CONTROL PLAf\iS s:: ".? ROLEED EROSION CONTROE PRODUCT LOC/\TIONS
E.4 TEMEORP·.RY DIVERSION CHANNELS
F.:.5 STLT FEl'JCE
E.6 FIBER ROLL
E.7 ROLLED EROSION CONTROL PRODUCT ON SLOPES
E.8 SWPPP SIGN DETAIL
F. STRUCTURES
F.1 PLAN AND ELEVATION
F.2 GENERAL NOTES
s:: ".? FOUNDATION UWOUT
F.4 ABUTMENT LWOUT
F.5 .ARUTME'!'JT FNDWA! L
F.6 ABUTMENT WINGWALL
F.7 TYPICAL SECTION & FRAMING
F.8 EXTERIOR GIRDER
F.9 INTERIOR GIRDER
F.JO GTRDF.R SECTION
F.11 EXTERIOR GIRDER TOP FLANGE
F.12 lf\iTERIOR GIRDER TOP FLANGE
F.13 GIRDER DETi\ILS
F.14 BRIDGE RAILING
F.J 5 PAIL TRANSITION
F.16 REINFORCING
INDEX TO SHEETS
C. RIIVEGETATI0rP
G 1 PLANTINGS
G.2 WILLOW AND COTTONWOOD INSTALLATION DETAILS
H. HYDH-AULICS
H.1 SOURDOUGH BRIDGE RIPR/1.P ELEVATIONS
H2 SOURDOUGH RRT!1GF RTPRAP P! Al'J
I. TEMPORARY TRAFFIC CONTROL
I. l
TEMPORARY TRAPFIC CONTROL QUANTITIES
TEMPORARY TRAFFIC CONTROL
J. PERMANENT TRAFFIC CONTROL
J.l
J.2
J.3
PERMAf\lENT TRAFFIC COf\lTROL QUANTITIES
PERMNJENT TRAPFIC CONTROL
AL\fSKA DELINEATORS
STATE PRO.1FCT
AK BLM GFO 2019(1)
INDEX TO SHEETS
SHEET
\fUMDER
A.2
AK BLM GFO 2019(1) A.3
Sheet and Description
Section D Section E Section F Section G Section H Section I Section J
Plan & Profile Erosion Control Structures Revegetation Hydraulics Temporary Traffic Control
Permanent Traffic Control Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM All ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,012 88 1,100
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,028 52 1,080
A0180 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0200 20101-0000 CLEARING AND GRUBBING ACRE 1.4 0.1 1.5
A0220 20201-0000 SELECTIVE CLEARING ACRE 0.3 0.3
A0240 20301-2400 REMOVAL OF SIGN EACH 8 8
A0260 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0280 20403-0000 UNCLASSIFIED BORROW CUYD 3,104 316 3,420
A0300 20801-0000 STRUCTURE EXCAVATION CUYD 190 190
A0320 20803-0000 STRUCTURAL BACKFILL CUYD 200 200
A0340 20820-0000 DEWATERING LPSM All ALL
A0360 25101-2500 PLACED RIPRAP, METHOD B, CLASS 5 CUYD 860 90 950
A0380 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 512 88 600
A0400 30303-3000 ROADWAY RECONDITIONING SQYD 432 28 460
A0420 55101-2100 STEEL H-PILE, 14X 117, IN PLACE LNFT 630 630
A0440 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2
A0460 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 75 75 Contract quantity
A0480 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) CUYD 30 30 Contract quantity
A0500 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE
GIRDER (42-INCH) LNFT 364 364
A0520 55401-1000 REINFORCING STEEL LB 4,673 4,673 Contract quantity
A0540 55401-2000 REINFORCING STEEL, EPOXY COATED LB 2,048 2,048 Contract quantity
A0560 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (TUBE) LNFT 240 240 Contract quantity
A0580 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 8 8
A0600 57502-0000 TEMPORARY BRIDGE LPSM All ALL
A0620 61901-0000 FENCE (TEMPORARY) LNFT 197 23 220
A0640 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0660 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40 40
A0680 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40 40
A0700 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0720 62301-0000 GENERAL LABOR HOUR 40 40
A0740 62501-0000 TURF ESTABLISHMENT ACRE 2.6 2.6
A0760 62631-0000 PLANTINGS (RIPARIAN) ACRE 0.1 0.1
A0780 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D SQYD 2,124 116 2,240
MileStone: 100% Date Completed: In Progress Report Date: 03/11/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-M ar
-2
9:
A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
M yF ile s\
D es ig n\
So ur do ug h C am pg ro un d
B ri dg e\
0% t o
A cq ui si ti on s W or ki ng
0%
S um m ar y of
Q ua nt it ie s.
xl sm ]S he et
STATE PROJECT
B.1BLM GFO 2019(1)AK
SHEET
NUMBER
Sheet and Description
Section D Section E Section F Section G Section H Section I Section J
Plan & Profile Erosion Control Structures Revegetation Hydraulics Temporary Traffic Control
Permanent Traffic Control Allowance Bid
Schedule
A0800 63301-0000 SIGN SYSTEM EACH 2 2
A0820 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0840 63309-0000 DELINEATOR EACH 12 12
A0860 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0880 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
A0900 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 430 50 480
-M ar -2
9:
A M
MileStone: 100% Date Completed: In Progress Report Date: 03/11/22
C
M yF ile s\
D es ig n\
So ur do ug h C am pg ro un d
B ri dg e\
0% t o
A cq ui si ti on s W or ki ng
0%
S um m ar y of
Q ua nt it ie s.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2BLM GFO 2019(1)AK
NUMBER
N
Line to be constructed
Edge of roadway
Slope stake limits
See F Sheets
12+26.49 to 13+18.49
Sourdough Campground Bridge
See H Sheets
Placed riprap, method B, class 5
[1] Temporary power line
(to remain)
Underground power line
(to be relocated)
[1]
Underground power line
Existing ground
Profile grade
END PROJECTBEGIN PROJECT
S74°3 8'05"W
S78°42'01"W e = 3.0%
'106.44L =
'53.24T =
'1,500.00R =
(RT)04°03'56"Δ =
11+49.31PI
e = 3.0% '322.30L = '161.87T = '1,400.00R =
(RT)13°11'26"Δ =
14+83.93PI 1
.0
P C
.5
T
.0
C
1 1
2 1 3 1
10+00 11+00 12+00 13+00 14+00 15+00 16+00
1,880 1,880
1,890 1,890
1,900 1,900
-1.422%
-0.996%
-2.811%
+2.053
.8
.6
.4
' VC91
50.00K =
'226.68SSD =
' VC128
300K =
'INFHLSD =
' VC122
25K =
'159.20HLSD =
,8
.7
El= 1887.71 E= 1721730.36 N= 3116079.25
15+94.00
AK BLM GRO 2019(1)
El= 1894.78 E= 1722301.37 N= 3116176.35
10+13.04
AK BLM GRO 2019(1)
MAINLINE PLAN AND PROFILE
Exact location may vary slightly, within Selective Clearing area.
after Selective Clearing is performed (see Sheet D.7) and prior to removal of existing bridge.
Underground power line to be rerouted to temporary power line by Copper Valley Electric Association,[1]
FOOTNOTES:8
:2
A
M o v e m b e r
M a in li n e
P la n
S h e e t] c p w
-w o rk
\d \a k -b
-g fo
P
L N
.d g n
STATE PROJECT
NUMBER
AK BLM GFO 2019(1) D.2
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
19101 3117130.099 1722095.848 1896.176 62°31'48.698350"N 145°30'59.027795"W 1943.1034 0.999814927 5/8" IR w/FHWA Alum Cap 1.
19102 3116146.194 1722340.289 1894.888 62°31'38.992992"N 145°30'53.975309"W 1941.7966 0.999815035 5/8" IR w/FHWA Alum Cap
19103 3116089.880 1721706.878 1887.572 62°31'38.485195"N 145°31'07.483466"W 1934.489 0.999815266 5/8" IR w/FHWA Alum Cap
PROJECT :Sourdough Campground Bridge DATE OF FIELD WORK : September 2019
EPOCH DATE : 2010.0000
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Alaska zone 3 SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
D es ig n\
S ou rd ou gh C am pg ro un d B ri dg e\ w or ki ng
S ou rd ou gh _B ri dg e_ co nt ro ls he et .x ls x]
Sh ee t 9-
N ov
-2
7:
A
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
BLM GFO 2019(1)AK
SURVEY CONTROL
50 10002550
Scale in feet
N
Selective clearing
E=1722269.64
N=3116131.85
E=1722275.06
N=3116102.35
E=1722259.11
N=3116128.13 E=1722076.77
N=3116072.20 E=1722020.99
N=3116061.96 E=1721897.21
N=3116057.45
E=1721882.09
N=3116057.28
E=1721887.51
N=3116027.78
E=1721902.63
N=3116027.94
E=1722026.41
N=3116032.45
E=1722082.19
N=3116042.70
E=1722264.53
N=3116098.62
:3
A
M o v e m b e r
P la n
S h e e t] c p w w o r k
\d
\D
S e le c ti v e C le a r in g L im it s .d g n
SELECTIVE CLEARING LIMITS
STATE PROJECT
NUMBER
AK BLM GFO 2019(1) D.7
AK BLM GFO 2019(1) E.4
AK BLM GFO 2019(1) E.5
AK BLM GFO 2019(1) E.6
AK BLM GFO 2019(1) E.7
SWPPP
Permit: 123456789 Contact: First Last Phone: 123-456-7890
SWPPP NOTICE SIGN [1]
[1] B ack border and text on white background. Fabricate sign panel from aluminum. Adjust text as needed for specific project information.
FOOTNOTE:
42"
3"
4"C
3.5"
2.5"B
3"
2"C
14"
2" 2"C
BORDER R = 11
8" TH = 5 8" IN = 38"
AK BLM GFO 2019(1) J.3