BidSum_AK BLM GFO 2019(1).pdf
PDF 95 KB Posted
- Attached to
- AK BLM GFO 2019 (1) Sourdough Campground Bridge
- Solicitation number
- 69056722B000023
About this file
This bid opening summary outlines the bids received in response to solicitation number 69056722B000023 issued by the Bureau of Land Management Alaska State Office. Five contractors submitted bids for the AK BLM GFO 2019(1) Sourdough Campground Bridge project, with prices ranging from $3,251,212 to $5,587,647.10. D&L Construction Inc. provided the lowest bid at $3,251,212, while the engineer's estimate was $2,468,448.25. The solicitation sought full and open competition for construction of a bridge as part of the Sourdough Campground located on federal land managed by the Department of Transportation Federal Highway Administration. Bids were due between January 9-13, 2023 and were publicly opened on the latter date with representatives from five contractors attending.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID OPENING SUMMARY
Solicitation No. 69056722B000023 Bid Opening Date 01/13/2023 Time 2:00 p.m.
Project Name/Number: AK BLM GFO 2019(1), Sourdough Campground Bridge
OFFER RECEIVED
REC'D
BY
CONTRACTOR
DATE
TIME
Schedule A
1.
1/9/23 Mod
1/13/2023
7:42am Mod
1:23pm
AA
Mod
RW
Brice Civil Constructors
$5,587,647.10
2.
1/10/23 Mod
1/13/2023
12:15pm Mod
8:55am
AA
Mod
RW
D&L Construction Inc.
$3,251,212.00
3.
1/11/23 2:45 pm AA
Drennon Construction & Consulting, Inc.
$3,545,784.25
4.
11/12/23 9:59am AA HC Contractors, LLC $3,348,653.00
5.
6.
7.
8.
9.
Engineer’s Estimate
$2,468,448.25
LOW BIDDER'S
PHONE NUMBER: 907-262-6160
Attendance: 0
Bid Opening Officer: Andres Arredondo Assistant: Rebekah Webb