QA_12-20-2022.pdf
PDF 99 KB Posted
- Attached to
- AK BLM GFO 2019 (1) Sourdough Campground Bridge
- Solicitation number
- 69056722B000023
About this file
This document contains answers to technical questions regarding federal solicitation number 69056722B000023 for the AK BLM GFO 2019 (1) Sourdough Campground Bridge project. The solicitation by the Department of Transportation Federal Highway Administration is for full and open bidding to replace an existing bridge over Sourdough Creek. The questions and answers provide details on the lack of as-built plans for the existing bridge, utilities attached to the bridge, differences from a previous solicitation, the purpose of a temporary diversion channel, whether the creek supports anadromous fish, and permit requirements. No state habitat permit is needed for the prescribed work. Bids are to be submitted according to the solicitation documents.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK BLM GFO 2019(1)
Sourdough Campground Bridge
# General Technical Question Answer Date
1 X Do you have any as builts for the existing bridge?
As‐Builts are not available. See Physical
Data file named
FY20_SourdoughCGBridge_InspRpt
7_22_2020 final.pdf for existing conditions.
12/20/2022
2 X
What is the cable attached to the existing bridge? Electrical? Communications? And who is the owner?
Plan Sheet D.2 shows the existing utility lines in the vicinity of the bridge. See Sheet
A.3 for Plan Symbols and Abbreviations;
and see Subsection 107.02 for specifications regarding the utility relocation requirements for this project.
12/20/2022
3 X
How do the specifications for this project differ from those of the project previously bid on May
4, 2022?
Please submit bids according to the solicitation documents under this project re‐solicitation.
12/20/2022
4 X What is the purpose of the Temporary
Diversion Channel?
See callouts on Sheet E.1. 12/20/2022
5 X Is Sourdough Creek an Anadromous fish creek?
See last sentence under Regional Condition
G on Page H‐31.
12/20/2022
6 X
Will a State of Alaska, ADF&G Habitat Permit be required for this project? And, if so, have you acquired the permit?
The prescribed work does not require an
Alaska Fish Habitat Permit. Comply with the requirements of Subsection 107.01, and please submit bid according to the solicitation documents.
12/20/2022