AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 5 April 18, 2013
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service R5 Acquisition Management 1600 Tollhouse Road Clovis, CA 93611
USDA Forest Service R5 Acquisition Management 1600 Tollhouse Road Clovis, CA 93611
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-9A40-S-13-0007
9B. DATED (SEE ITEM 11)
February 26, 2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Kitchen Creek Helibase, Cleveland National Forest
This solicitation is amended as follows:
1. Schedule of Items, Item # 31 20 00G Geoweb, pen and ink change unit of measure to Square Yard (SY)
2. All prior communication regarding fire sprinklers shall be superseded by the following:
The Hangar Building shall be used for overnight storage and security of the helicopter. No additional fuel will be stored inside the building. No repair work will be completed inside the building. All sprinkler systems are to be designed in accordance with IBC 2009 Section 903. The water storage tanks shown on plans may or may not be needed for this purpose.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PATRICK J. GALLEGOS, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
RFP AG-9A40-S-13-0007
Amendment No. 5
3. Delete detail H on sheet C20. Bid item covers only detail L.
Class II Aggregate Base:
4. Specification 31 20 00, Section 3.5 D.4.a. – Change from 4” to 6” minimum.
5. Change on drawing, sheet C21, detail L (show base as 6”).
6. The only place we use 4” of class II base rock is under the asphalt.
Curb:
7. On sheet C20, detail H – delete. There is no curb for the taxiway.
8. Change bid item 03 30 00C, Cast in Place Concrete Curb, Type IIA, Portland
Cement Concrete from 15 cy to 19 cy.
Well:
9. Change bid item 33 21 13 D & E from 8” steel to 4 ½” PVC.
10. Specification 33 21 13 1.06 A 3 & 4: delete “6 inch inside diameter” and replace with
“4 ½ inch diameter”.
11. Specification 33 21 13 2.01 A.2. Delete in entirety and replace with the following:
“PRODUCTION CASING: Production casing shall be new, single wall, PVC – SDR 17 water well casing meeting ASTM D1785, ASTM F480, and NSF Standard 14.”
Geotechnical Site Evaluation Report:
12. Replace the entire old report with the amended report (March, 2013). There are no changes, just clarification of pavement thicknesses, doweling, and joints.
Amendments are to make it easier to determine the above. Also adds links to the report to make it easier to navigate around it.
Statement of Work, Section 4.4.2 (SUBMITTAL MATRIX)
13. Drawings – CD AutoCAD 2008: under 100%, add 6
14. Specifications – CD MS Word 2010: under 100%, add 6
15. Cost Estimate – CD MS Excel 2010: under 100%, add 6
16. Submittal Schedule – CD MS Excel 2010: under 100%, add 6
Hangar Insulation
17. Specification 08 34 16, Section 2.1 G. Delete in its entirety.
18. Specification 08 34 16, Section 2.2 A. 6. Delete
19. Additional information from SDGE:
As builts will be required on SDGE Form D299. Handwritten measurements will be acceptable. Survey – not required by licensed land surveyor
20. AT&T Additional Information/Clarification.
• -Boxes can be set at same distance as SDGE.
• -Handholds can’t say “AT&T”. Use “Communications”.
• -Ground rods – see spec 88 (attached). Put in when trench is open. # ground rods spaced 8 feet apart.
• -Will take ~30 days for AT&T to respond once they receive payment.
• -As builts for AT&T – copy of SDGE’s as builts with any notes specific to
AT&T will be acceptable.
RFP AG-9A40-S-13-0007
Amendment No. 5
Pump Control
21. Drawing CE6, detail 1
• Delete Franklin Pump-Tec-Plus and replace with Symcom Motor Saver 777.
• Delete Thermal Units.
• Change NEMA 1 enclosure to NEMA 3R enclosure.
22. Drawing CE6, detail 2
• Delete pump control box.
23.
List of Attachments: PAGES: